Loading...
HomeMy WebLinkAboutContract 42347-FP1 FORT WCITYSECREARYf CONTRACT'NO. � TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION D.O.E.Ne: 66.11 Cl1V ` Regarding contract 11661 for HARMONY SCHOOL ADDITION,LT 1,BLOCK 1-PAVING as required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council.on N/A through M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $105,499.25 Amount of Approved Change Orders: $12,248.50 Ns 1 Revised Contract Amount: $117,747.75 Total Cost Work Completed: $117,747.75 Less Deductions: Liquidated Damages: Days Q$210.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 OFFICIAL.RECORD Total Cost Work Completed: $117,747.75 CITY SECRETARY FT.WORTH,TX Less Previous Payments: Final Payment a $117,747.75 Recommende ptance Date Asst. Director - Infrastructure Design and Construction Accepted Date Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT City Manager — - - - Departme t of TP,&W Const.Services CPN# Date '�_� Project Mana er Commet'its: C�Ora- 41200-20676016858 1 g �1 Risk Management anadv X,1\1 D.O.E. Brotherton Z � CFA Morales/Scanned G�\ �� Gutzler/Scanned 2 f:24—f' �. ,1 tL The Proceeding people have been Contacted ` ��4t Ch concerning the request for final payment& have G �\ 0> released this project for such payment. CY }, pry t 4 q�° Clearance Conducted By 0&.A.gr..4 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name HARMONY SCHOOL ADDITION,LOT 1,BLOCK 1 Contract Limits Project Type PAVING City Project Numbers 01685 DOE Number 6611 Estimate Number I Payment Number I For Period Ending 9/17/2013 CD City Secretary Contract Number 216611 Contract Time 4ED Contract Date Days Charged to Date 360 Project Manager Ehia Contract is .000000 Complete Contractor SOLIDARITY CONTRACTING 10100 SAM HOUSTON PKWY S,STE 340 HOUSTON, TX 77099 Inspectors LAYER / ODEN Wednesday,September 18,2013 Page 1 of 4 City Project Numbers 01685 DOE Number 6611 Contract Name HARMONY SCHOOL ADDITION,LOT 1,BLOCK I Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 9/17/2013 Project Funding UNIT I:PAVING C205 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- I ----- --------------------- 1 EXCAVATION REMOVE 850 CY $10.00 $8,500.00 850 $8,500.00 2 SUBGRADE LIME FOR STABILIZATION 33 TN $145.00 $4,785.00 33 $4,785.00 INSTALL 3 SUBGRADE LIME STABILIZED 1810 SY $9.00 $16,290.00 1810 $16,290.00 4 6"HIGH VOLUME DRIVEWAY INSTALL 266 SY $24.75 $6,583.50 266 $6,583.50 5 7"PAVEMENT CONCRETE INSTALL 1380 SY $26.55 $36,639.00 1380 $36,639.00 6 CURB 6"INSTALL 1011 LF $4.25 $4,296.75 1011 $4,296.75 7 6"TOPSOIL INSTALL 1350 CY $10.00 $13,500.00 1350 $13,500.00 8 GRASS HYDROMULCH SEEDING 4600 SY $0.25 $1,150.00 4600 $1,150.00 9 TRAFFIC CONTROL INSTALL 1 LS $5,500.00 $5,500.00 1 $5,500.00 10 EROSION CONTROL INSTALL 1 LS $5,000.00 $5,000.00 1 $5,000.00 11 IRRIGATION SLEEVE-INSTALL 165 LF $15.00 $2,475.00 165 $2,475.00 12 PAVEMENT MARKING LANE MARKERS TYPE 18 EA $10.00 $180.00 18 $180.00 H CR 4 INSTALL 13 PAVEMENT MARKING LANE MARKERS TYPE 60 EA $10.00 $600.00 60 $600.00 W-4 INSTALL 14 Y LOWERING OF LIGHTING CONDUIT 1 LS $12,248.50 $12,248.50 1 $12,248.50 BETWEEN POLE LIGHTS CO#I --------------------------------------- Sub-Total of Previous Unit $117,747.75 $117,747.75 -------------------------------------- Wednesday,September 18,2013 Page 2 of 4 City Project Numbers 01685 DOE Number 6611 Contract Name HARMONY SCHOOL ADDITION,LOT 1,BLOCK I Estimate Number I Contract Limits Payment Number 1 Project Type PAVING For Period Ending 9/17/2013 Project Funding Project Manager Ehia City Secretary Contract Number 216611 Inspectors LAYER / ODEN Contract Date Contractor SOLIDARITY CONTRACTING Contract Time 40 CD 10100 SAM HOUSTON PKWY S,STE 340 Days Charged to Date 360 CD HOUSTON, TX 77099 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded ---------------------------------------- Total Cost of Work Completed $117,747.75 Less %Retained $0.00 Net Earned $117,747.75 Earned This Period $117,747.75 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $117,747.75 Wednesday,September 18,2013 Page 4 of 4 City Project Numbers 01685 DOE Number Will Contract Name HARMONY SCHOOL ADDH ION,LOT I,BLOCK I Estimate Number Contract Limits Payment Number I Project Type PAVING For Period Ending 9/17/2013 Project Funding Contract Informs►tion tiununsu•N. Original Contract Antonin S105,499.25 Chanu Orders Change Order Numher 1 512,248,50 Total Contract Price $117.747.7, Zlt-i4 c Total Cost ofWork Completed SI17,747.7; Contractor y� Less %Retained $0.00 Date Net Earned $117.747.75 Inspection Supervisor Earned This Period 5117,747.75 l 2 Retainage This Period $0.00 Date Less Liquidated Damages Proj Manager Days n /nay so.ull Date LessPavement Deficiency $0.00 As a Less Penalty 50.00 Date 3 �/v Less Previous Payment V).00 Directs l ontracting thpartnt t Plus Material on Hand Less 15%, S0.00 Balance Due This Payment S 117.747.75 Wednesday,September 18.2013 Page 3 ol'4 FORTWORTH rev 03/05/07 TRANSPORTATION &PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:l NAME OF PROJECT: Hannony School Addition,Lot 1, Block I PROJECT NO.: 01685 CONTRACTOR: Solidarity Construction DOE NO.: 6611 PERIOD FROM:12/19/11 TO: 09/11/13 FINAL INSPECTION DATE: 11-Sep-13 WORK ORDER EFFECTIVE:12/19/2011 CONTRACT TIME: 40 Q Wcst ' CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. n. 20. 6. 21. 7. 22. 8. 23. 9. 24. 111. 25, 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILI'T'IES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS PERIOD 360 PREVIOUS PERIOD TO'T'ALS -- - --_---. -�. �. TO DATE --- _- >i>(.) *REMARKS: CONTRACTOR DATE (f PECTOR DATE DEPAR"i'h1LNT '111c City of Fort Worth• 100011irockinorton Sircct• bort Vlortli,'IX 76012-6311 (817)392 7941 •Fax:(81 7)392 7845 ro o Q m Q 17 F -u Cnc' 0 C7 C7 C? 0 Q -� rtm z o v 2� mm �m 3m -C �' QC7 -� q^ mm g oAO ^SN p O a n0 no" � D—i m z z n 0 -i0m z+ n n C o X �Ay Z m -� 0 y p m � � t -i cr j � w cr (��• 0 3 13 [Z @ w a o 0 o c p a (D o a o ' o m o v o o '0 'U C7 °V' A70 0 040 t7 O Q Q 0 o� co co m 46 °«` -fit 1 N tl� tOir O W W � 0 °w m o m .`3 ry{a 0 z rn o c � O 6 O n m d 2 � K a a C ap o o a a �y 0 o O $ $ P o D A On 0 m a $ $ o 0 0,$ Z low O qOq O pQp O q � d d O $ O O $ m ^f g r n s Ct o a Q b a � o o N A H m N 0 7 cL 0 ,n o -U o o > | � \ m 0 z w 3 co T 0 CD � \ k \ M o a \ 2 CD rn a jo � \\ » \ \ i3 - \\ � � � 03 co u 51 or lo m 01 Fo rn a 46 to k j (c) m Rn FORTWORTH Its Ali 02/20107 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Nance ofContractor Project Name Solidarity Construction Harmony School Addition, Lot I, Block I DOEInspector DOE.Nunther Weyman Oden 6611 DOF.Itspertor Project Manager ❑ Water❑ Waste Water[] Storm Drainage0 Pavement Fred Ehia htitial Contract Amount Pri feet Dfeirul(p $105,499.25 0 Simple (.�_ Routine v Complex Final Contract Amount Date $117,747.75 9/16/2013 11) PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(K) APPLICABLE(1'/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 N 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 'traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 1.5 10 Citiren's Complaint Resolution 5 N I I Property Restoration 5 Y 1 3 20 15 12 After Hours Response 5 N 13 Project Completion 5 Y 3 20 15 TOTAI:I-11- IENT SCORE(A) 298 BONUS POINTS(25 Maximum)(Il) TOTAL SCORE(es) 298 111)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which_ 388 Rating(ITS/MSI* 100%) 298 ! 388 = 77% Performance Category Good <20% -Inadequate 20%to<40%=Dejicieni 40%to<60016-Standard 60%to '80% = Good >80% ,Ercellettl Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) f Signature DOE Inspector ,��,a �� Signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS I'Rr1NSI10IffXI-I0N AND PUBLIC WORKS `s 171c City of Fort Alorth- I(XV17hrockmnrton Street-bort Worth,T\76012-6311 (81 7)392- 7941 - Vax:(817)392- 7845 FORTWORTHREM 02J22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I PROJECT INFORMATION Date: ;9/16/2013 -—r- - Nanre oJConlructor ----- __.- Prglecl Name - Solidarit� Construction Harmony School Addition,Lot 1, Block I DOE Itupector /'r(jecl itannger - - - Weyman Oden 11'red Ehia _.—_ —. --- - .... -- ------ 7i/� DOE Manlier !'r ojerl DiJ�rulh r qf t oanrrrt 6611 _ O Simple Q Routine Q Complex I❑ water Waste Water[] Storm Drainage] Pavement Initin!C'ururucJ Amount — -�- Final(•onlracl Amount $105,499.25 -__ - $117,747.75 II) PERFORMANCE EVALUATION 0- Inadequate— I -Deficient 2-Standard 3-Good_ 4-Excellent ELEMENT -- - - -- 1 ItA'1'IN(i C.LEMIiN'f -� RATING S -- ! (0-4) 1 1 (0-4)_. . INSPECTION EVALUATION _ PLANS&SPECIFICATIONS I Availability of Inspects I Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clari &Sufficiency of Details _ q 3 Accuracy of Measured Quantities }3 Applicability of Specifications 4 Display C f Professionalism _ —� 14 Accuracy of Plan Quantities _ 5 Citizen Complaint Resolution `PROJECT MANAGER EVALUATION 6 Performance-Settingu Valve Crews,Labs _ I Knowledge And/Or Problem Resolution ADMINISTRATION 2Availability of Project Manger 1 Chan c Order Processing Time 3 Communication 2 Timliness of Contractor Payments t 4 Resolution of Utility Conflicts 3 Bid O cn�to Pre-Con Meeting Timeframc III)COMMENTS&SIGNATURES COMMENTS i Signature Contractor Signature DOE Inspector O Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TR ANSPOR'I'ATION .\ND K'BLIC:WORKS The City of Fort Worth• 100011irockmorton Strect•bort Worth,-1-X 76012-6311 (817) 39-2--7941 •Rax:(817)392- 7945 ' ' • Public Schools Where Excellence Is Our Standard November 20, 201 Mr. Wade Johnson Cite of Fort Worth TPW Infrastructure & Design Group 1000 Throckmorton Street Fort Worth,Texas 76102 RE: Harmony School of Innovation Dort Worth Project Wade, Please allow this letter to serve as confirmation that no liquidated damages are being charged to Tri- bal and Solidarity Construction in connection with the construction of the Harmony School of Innovation Fort Worth project. If you have any questions,please feel free to call me at 713-343-3333 ext:2031. Sincerely, Ero*! .Dirnd Planning Department eko 9321 W Sam Houston Pkwy S. Houston, TX 77099 0 Phone: 713-343-3333 0 Fax: 713-777-8555 0 www.harmonytx.org