Loading...
HomeMy WebLinkAboutContract 48666-FP1 FORTWORTH. `�....� ...-- CITY SECRETARY J _ CONTRACT NO. p TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION (Developer Projects) ea � I,Il��3/7 City Project Ng: 100484 �l� 6!.S 4 qk' G� Regarding contract 100484 for BERKSHIRE LAKE BLVD as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $841,978.62 Amount of Approved Change Orders: ($15,057.25) NO 1 Revised Contract Amount: $826,921.37 Total Cost Work Completed: $826,921.37 EIAL RECORDSECRETARYORTH,TQC Recommen or Acceptance Date Asst. Direct PW - Development Services Accepted Date 40 Director, TRANSPORTATION & PUBLIC WORKS �r 3 Asst. City Manager Date Department f T &W Const. Services Q 11 CPN# D to Project Manager I� Risk Management Canad �• Comments: D.O.E. Brotherton L1-191 CFA Morales/Scanned Gutzler/Scanned R��1G � The Proceeding people have been contacted r, G�yoF nGRE�P�' concerning the request for final payment& have �' G1 released this project for such payment. Rev.9/22/6 Clearance Conducted By 0� FQRTWQRTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BERKSHIRE LAKE BLVD Contract Limits Project Type PAVING City Project Numbers 100484 DOE Number 0484 Estimate Number 1 Payment Number I For Period Ending 1/26/2018 CD City Secretary Contract Number Contract Time WD Contract Date Days Charged to Date 229 Project Manager NA Contract is 100.00 Complete Contractor L.H.LACY COMPANY P.O.BOX 541297 DALLAS, TX 75354 Inspectors LAYER / SAMANIEGO Friday,January 26,2018 Page 1 of 5 City Project Numbers 100484 DOE Number 0484 Contract Name BERKSHIRE LAKE BLVD Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 1!26/2018 Project Funding PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6"CONC PVMT 2544 SY $29.41 $74,819.04 2544 $74,819.04 2 6"CONC NON-REINFORCED PVMT 287 SY $28.40 $8,150.80 287 $8,150.80 3 7.5"CONC PVMT 11038 SY $35.16 $388,096.08 11038 $388,096.08 4 6"LIME TREATMENT 2974 SY $2.10 $6,245.40 2974 $6,245.40 5 8"LIME TREATMENT 11778 SY $2.56 $30,151.68 11778 $30,151.68 6 HYDRATED LIME 342 TN $136.80 $46,785.60 342 $46,785.60 7 REMOVE EOR BARRICADE 1 EA $142.40 $142.40 1 $142.40 8 REMOVE TEMPORARY TURN-AROUND 287 SY $11.94 $3,426.78 287 $3,426.78 9 BARRIER FREE RAMP 2 EA $1,344.97 $2,689.94 2 $2,689.94 10 BARRIER FREE RAMP 2 EA $1,307.40 $2,614.80 2 $2,614.80 11 BARRIER FREE RAMP 2 EA $1,426.72 $2,853.44 2 $2,853.44 12 4"CONC SIDEWALK CO#1 29815 SF $5.33 $158,913.95 29815 $158,913.95 13 2"ASPHALT PAVEMENT TYPE A 841 SY $14.82 $12,463.62 841 $12,463.62 14 8"ASPHALT BASE TYPE B 841 SY $49.32 $41,478.12 841 $41,478.12 15 TACK COAT 841 SY $3.43 $2,884.63 841 $2,884.63 16 PRIME COAT 841 SY $3.22 $2,708.02 841 $2,708.02 17 REMOVE 4"PVMT MARKING 785 LF $1.00 $785.00 785 $785.00 18 REFL RAISED MARKER 3 EA $4.74 $14.22 3 $14.22 19 4"SLD PVMT MARKING HAS 60 LF $1.25 $75.00 60 $75.00 20 4"SLD PVMT MARKING HAS 495 LF $1.25 $618.75 495 $618.75 21 8"SLD PVMT MARKING HAS 200 LF $2.51 $502.00 200 $502.00 22 8"DOT PVMT MARKING HAS 310 LF $2.51 $778.10 310 $778.10 23 LANE LEGEND ARROW 2 EA $234.35 $468.70 2 $468.70 24 LANE LEGEND ONLY 2 EA $272.50 $545.00 2 $545.00 25 5-3/4"CONC CURB&GUTTER 633 LF $18.90 $11,963.70 633 $11,963.70 26 7"CONC CURB 100 LF $23.75 $2,375.00 100 $2,375.00 27 18"SAWCUT 785 LF $8.71 $6,837.35 785 $6,837.35 28 FURNISH/INSTALL ALUM SIGN GROUND 2 EA $354.25 $708.50 2 $708.50 MOUNT CITY STD 29 FURNISHIINSTALL ALUM SIGN GROUND 2 EA $430.55 $861.10 2 $861.10 MOUNT TXDOT Friday,January 26,2018 Page 2 of 5 City Project Numbers 100484 DOE Number 0484 Contract Name BERKSHIRE LAKE BLVD Estimate Number I Contract Limits Payment Number 1 Project Type PAVING For Period Ending 1!26(2018 Project Funding 30 FURNISHANSTALL ALUM SIGN GROUND 1 EA $354.25 $354.25 1 $354.25 MOUNT CITY STD 31 CITY BONDS FOR ALL PAVING 1 LS $15,000.00 $15,000.00 1 $15,000.00 IMPROVEMENTS 32 STREET 4 EA $152.60 $610.40 4 $610.40 Sub-Total of Previous Unit $826,921.37 $826,921.37 Friday,January 26,2018 Page 3 of 5 City Project Numbers 100484 DOE Number 0484 Contract Name BERKSHIRE LAKE BLVD Estimate Number 1 Contract Limits Payment Number 1 Project Type PAVING For Period Ending 1/26/2018 Project Funding Contract Information Summary Original Contract Amount $841,978.62 Change Orders Change Order Number 1 ($15,057.25) n Total Contract Price $826,921.37 1 l Date 7i Total Cost of Work Completed $826,921.37 contractor Less %Retained $0.00 X�^ Date Net Earned $826,921.37 Inspection Supe 'sor Earned This Period $826,921.37 Retainage This Period $0.00 Date Z� Y Less Liquidated Damages Project al ger A^ � Days @ /Day $0.00 Date Y 1►d+ LessPavement Deficiency $0.00 As irecW-Infrastructure Design and/Construction Less Penalty $0.00 Date / Less Previous Payment $0.00 Direct /Contracting Deplament Plus Material on Hand Less 15% $0.00 Balance Due This Payment $826,921.37 Friday,January 26,2018 Page 4 of 5 City Project Numbers 100484 DOE Number 0484 Contract Name BERKSHIRE LAKE BLVD Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 1/26/2018 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / SAMANIEGO Contract Date Contractor L.H.LACY COMPANY Contract Time 60 CD P.O.BOX 541297 Days Charged to Date 229 CD DALLAS, TX 75354 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded ----------------------------------------- Total Cost of Work Completed $826,921.37 Less %Retained $0.00 Net Earned $826,921.37 Earned This Period $826,921.37 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $826,921.37 Friday,January 26,2018 Page 5 of 5 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: Berkshire Lake Boulevard CHANGE CONTRACT: B Paving ORDER No: CFA# 2016-121 CITY PARTICIPATION: No CITY PROJECT# 100484 DOE# None B1 WATER PROJECT# 59601-0600430-100484-001580 SEWER PROJECT# FILE# INSPECTOR: Unknown Phone No: PROJECT MANAGER: Fred Ehia Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT Developer Developer Developer Developer Developer DAYS Cost Cost Cost Cost Cost ORIGINAL CONTRACT 11"1970.62 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $0.00 $0.00 $541,9T8.62 $0.00 $0.00 0 AMOUNT OF PROP.CHANGE ORDERmim ($15,057.25) REVISED CONTRACT AMOUNT $0.90 _ $0.00 ffINIMM$826,921.37 OAO $0.00 0 TOTAL REVISED CONTRACT AMOUNT PERUNIT $0.00 $O.OD $826,921.37 0.00 $0.00 REVISED COST SNARE Dev.Cost: $826,921.37 TOTAL REVISED CONTRACT $826,921.37 Revised:10-12-2011 Page 1 You are directed to make the followingthan es in the contract documents: CRY BID ITEM PAY ITEM IF N QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 1 3213.0301 .2825 SF 4'Con Sidewalk $5.33 -515 057.25 TOTAL -$1505725 Peptiem-WI-wa$action efaldewalk changed/ram 6,width 10 6,WWIh,antlanelhardranped[mm,51 to Wwkkhs.Refaronce$heels 39 A 39 NO OITY FU110S INVOLVED IN THIS CONTRACT.DEVELOPER IS RESPONSIBLE FOR 1001/,OFTHE CHANGE ORDER COSTAND NO REIMBURSEMENT FROM THE CITY WALL DE SOUGHT By THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: taco s Engineering Group,Inc. Knox Ebro n,L u Name: Blake Bradley Nama: Don Luedtka NamO: I- Tile: Prolect E.ndneer Tiles Executive Vice President TiOe: T Revised:10.12-2011 Page 2 FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.: 1 NAME OF PROJECT: Berkshire Lake Boulevard PROJECT NO.: 100484 CONTRACTOR: Lacy DOE NO.: PERIOD FROM:06/26/17 TO: 12/15/17 FINAL INSPECTION DATE: 14-Dec-17 WORK ORDER EFFECTIVE:6/26/2017 CONTRACT TIME: 60 0 WD 0 CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 229 PERIOD PREVIOUS PERIOD TOTALS 229 TO DATE *REMARKS: NTRACT R JbAIE INSPECTOR DATE _ ENGINEERING DEPAR'1 I NT �`tL The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name L.H.Lacy Berkshire Lake Blvd Inspector City Project Number Albert Samaniego 100484 Construction Components Project Manager ii Water ❑ Waste Water ii Storm Drainage o Pavement Fred Ehia Initial Contract Amount Project Difficulty $841,978.62 D Simple o Routine O Complex Final Contract Amount Date $826,921.37 2/1/2018 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 428 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 428 HD CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS]*100%) 428 / 448 = 96% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Contractor Signature Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TX 76116• (817) 392-8306 FORTWORTHREV:02'2210' TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 2/1/2018 Name of Contractor Project Name L.H.Lacy Berkshire Lake Blvd DOE Inspector Project Manager Albert Samaniego Fred Ehia DOE Number Project Difficulty Type of Contract p$841,978.62 /A Simple ® Routine O Complex Water 11 Waste Water El Storm Drainage o Pavement tial ContractAmount Final Contract Amount $826,921.37 In PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION f PLANS&SPECIFICATIONS 1 Availability of Inspector Lf 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability ofProject Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe II1)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor 7jAj 119 INSPECTOR'S COMMENTS I i TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Ronald SJ Murawski, President Of L.H. Lacy Company, Ltd,known to me to be a credible person,who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Berkshire Lake Blvd-Paving Improy-pients BY. ' Ronald . Murawski, President Subscribed and sworn before me on this date 21 of December, 2017. 1AIM Votary Public Dallas, Texas DARLENE CONEY Notary iD# 10317301 My Commission Expires i. March 9,2020 C CONSENT OF SURETY OWNRR ❑ TO FINAL PAYMENT ARCHITKT 0 AIA Document G707 CONTRACTOR ❑ SUR);'1'Y � Bond No. 1750856 OTH1R 1� TO ONVNER: ARCHITECT'S PROJECT NO.: (Rarneemdaddrm) City of Fort Worth & Knox Street Partners 7, Ltd. 3CONTRACT'FOR: Construction 001 Knox Street, Suite 207 Dallas,TX 75205 PROJECT: CONTRACT DATED:February 8, 2017 (Mone mrd adrh V Berkshire Lake Blvd., FCP $717,807.20 In accordance with the provisions of the Contract between the Owner and the Contractor as Indicated above,the (/inert name and addmiv of S)a-M Great American Insurance Company of New York 301 E. Fourth Street Cincinatti, OH 45202 SURMY, on bond of (lmwn natne and addrrss of Conn-aaor) L.H. Lacy Company, Ltd. 1880 Crown Road Dallas,TX 75234 , CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of Its obligations io (hart nameand addnmv a(ouwar) City of Fort Worth & Knox Street Partners 7, Ltd. 3001 Knox Street, Suite 207 Dallas, TX 75205 OVNHR, as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: February 12, 2018 (IsmminudtGrktlk ntontlafoilouvx(kis dvwwrericdate andpar.) Great American Insurance Company of New York (Stn+c(17 B • lbX�nattttroJ tl4orizedrept n tnrl Attest: Ashley Britt Attorney-in-Fact Pik5lb Jeanne , ness llrtfnterl uatua and titlr) 0707--1894 GREAT AMERICAN INSURANCE COMPANY® Administrative Office: 301 E 4TH STREET • CINCINNATI,OHIO 45202 • 513-369-5000 • FAX 513-723-2740 The number of persons authorized by this power of attorney is not more than TEN No.0 15072 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the GREATAMERICAN INSURANCE COMPANY,a corporation organized and existing under and by virtue of the laws of the State of Ohio,does hereby nominate,constitute and appoint the person or persons named below,each individually if more than one is named,its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of the said Company,as surety,any and all bonds, undertakings and contracts of suretyship,or other written obligations in the nature thereof;provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power DAVID G.MICLETTE KRISTI LOVETT ALL OF ALL EDWARD G. BRITT,JR. JENNIE GOONIE HOUSTON, $100,000,000.00 BARRY K.McCORD TABITHA STARKEY TEXAS DAVID T.MICLETTE ASHLEY BRITT JONI BOWEN MANESS NIKOLE JEANNETTE This Power ofAttomey revokes all previous powers issued on behalf of the attorneys)-in-fact named above. IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 21ST day of SEPTEMBER 1 2017 Attest GREAT AMERICAN INSURANCE COMPANY �usro� F Assistant Secretary Divisional Senior Vice President STATE OF OHIO,COUNTY OF HAMILTON-ss: DAVID C.KiTCHiN(877-377-2405) On this 21ST day of SEPTEMBER 2017 ,before me personally appeared DAVID C. KITCHIN,to me known,being duly swom,deposes and says that he resides in Cincinnati,Ohio,that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company,the Company described in and which executed the above instrument;that he knows the seal of the said Company;that the seal affixed to the said instrument is such corporate seal;that it was so affixed by authority of his office under the By-Laws of said Company,and that he signed his name thereto by like authority. $1f8811ik WOW NftN- Iwsd10(d110 /U9'(SC� myc011�1 �sam This Power ofAttomey is granted by authority of the following resolutions adopted by the Board of Directors of GreatAmerican Insurance Company by unanimous written consent dated June 9,2008. RESOLVED: That the Divisional President,the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisonal Assistant Vice Presidents,or any one of them,be and hereby is authorized,from time to time,to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety,any and all bonds,undertakings and contracts ofsuretyship,or other ivritten obligations in the nature thereof to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretory or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of arty bond,undertaking,contract of suretyship, or other lvritten obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION I,STEPHEN C.BERAHA,Assistant Secretary of Great American Insurance Company,do hereby certify that the foregoing Power ofAttomey and the Resolutions of the Board of Directors of June 9,2008 have not been revoked and are now in full force and effect. Signed and sealed this I day of�' , �`2 . p�l`lf�p+ryC� � w Assistant Secretary S1029AF(06/15)