NOTICE OF PROJECT COMPLETION
(Developer Projects)
e IrA e&, fd City Project Ns: 100484
Regarding contract 100484 for BERKSHIRE LAKE BLVD as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $201,547.00
Amount of Approved Change Orders: $474.00 Ns 1
Revised Contract Amount: $202,021.00
Total Cost Work Completed: $202,021.00
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Recomme rW -
ptance Date
Asst. Direct evelopment Services
Accepted t Date
Directors TRANSPORTATION & PUBLIC ORKS
Asst, City Manager Date
loll I- Department f TP&W Const. Services
q, CPN# 100 Da e
Project Manager
Risk Management Canadv
Comments:. D.O.E. Brotherton
' •�+1� CFA Morales/Scanned
Gutzler/Scanned N( t1k
IxFQR�GAR� The Proceeding people—h ave been Contacted
concerning the request for final payment& have
released this project for such payment.
Rev.9/22/16 Clearance Conducted By 4 C!?u&
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name BERKSHIRE LAKE BLVD
Contract Limits
Project Type STORM DRAIN
City Project Numbers 100484
DOE Number 0484
Estimate Number 1 Payment Number 1 For Period Ending 1/26/2018
CD
City Secretary Contract Number Contract Time 6aD
Contract Date Days Charged to Date 229
Project Manager NA Contract is 100.00 Complete
Contractor JACKSON CONSTRUCTION LTD
5112 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors LAYER / SAMANIEGO
Friday,January 26,2018 Page 1 of 4
City Project Numbers 100484 DOE Number 0484
Contract Name BERKSHIRE LAKE BLVD Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 1/26/2018
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
I CONCRETE RIPRAP 100 SY $75.00 $7,500.00 100 $7,500.00
2 4'STORM JUNCTION BOX 1 EA $3,800.00 $3,800.00 1 $3,800.00
3 5'STORM JUNCTION BOX I EA $7,000.00 $7,000.00 1 $7,000.00
4 4'DROP INLET I EA $3,700.00 $3,700.00 1 $3,700.00
5 10'CURB INLET 3 EA $4,280.00 $12,840.00 3 $12,840.00
6 54"FLARED HEADWALL 1 EA $6,175.00 $6,175.00 1 $6,175.00
7 21"RCP CLASS III CO#1 50 LF $79.00 $3,950.00 50 $3,950.00
8 30"RCP CLASS III 106 LF $119.00 $12,614.00 106 $12,614.00
9 36"RCP CLASS III 592 LF $134.00 $79,328.00 592 $79,328.00
10 54"RCP CLASS III 242 LF $265.00 $64,130.00 242 $64,130.00
11 TRENCH SAFETY 984 LF $1.00 $984.00 984 $984.00
Sub-Total of Previous Unit $202,021.00 $202,021.00
------------------------------------- ---
Friday,January 26,2018 Page 2 of 4
City Project Numbers 100484 DOE Number 0484
Contract Name BERKSIIIRE LAKE BLVD Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 1/26/2018
Project Funding
Contract Information Summary
Original Contract Amount $201,547.00
ChanEe Orders
Change Order Number 1 $474.00
Total Contract Price $202,021.00
44ate G Total Cost of Work Completed $202,021.00
Contractor Less %Retained $0.00
Date Net Earned $202,021.00
Inspection Supervisor Earned This Period $202,021.00
Retainage This Period $0.00
%� Date L' Less Liquidated Damages
Proje anager
M Days @ /Day $0.00
z
Date Y4` LessPavement Deficiency $0.00
As t r
PW-Infrastructure Design and Constructi 0.00
g Less Penalty $
QDate 3 Less Previous Payment $0.00
Direct /Contracting Depalgnet Plus Material on Hand Less 15% $0.00
Balance Due This Payment $202,021.00
Friday,January 26,2018 Page 3 of 4
City Project Numbers 100484 DOE Number 0484
Contract Name BERKSHIRE LAKE BLVD Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 1/26/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / SAMANIEGO Contract Date
Contractor JACKSON CONSTRUCTION LTD Contract Time 60 CD
5112 SUN VALLEY DRIVE Days Charged to Date 229 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $202,021.00
Less %Retained $0.00
Net Earned $202,021.00
Earned This Period $202,021.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $202,021.00
Friday,January 26,2018 Page 4 of 4
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Berkshire Lake Boulevard CHANGE
CONTRACT: A Water,Sewer,Storm Drain ORDER No:
CFA# 2016.121 CITY PARTICIPATION: No
CITY PROJECT# 100484
DOE# None Al
WATER PROJECT# 59601.0600430.100484-001580
SEWER PROJECT#
FILE#
INSPECTOR: Unknown Phone No:
PROJECT MANAGER: Fred Ehia Phone No: 817-392.8424
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT
eve oyer eve per eve aper eva oper eve open DAYS
Cost Coat Cost Cost Cost
ORIGMALCONTRACT $266,64510 $0.00 Sol= $201,547.00
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE 5266,64510 50.00 $0.00 $201,547.00 50.00 0
AMOUNT OF PROP.CHANGE ORDER 637,321.60 $474.00
REVISED CONTRACT AMOUNT $303,9663 50.00 60.00 5202,021.00 60.00 0
TOTAL REVISED CONTRACT AMOUNT
PER UNIT 6303,986.70 60.00 $0.00 6202,021.00 $0.00
REVISED COST SHARE Dov.Cost: $5D5,987.70
TOTAL REVISED CONTRACT $505,987.70
Revised:10-12-2011 Page 1
You are directed to make the lollowin than es in the contract documents:
CITY BID REM
PAY FFEM1 $ NOUANTrrY UNITITEM DESCRIPTION UNIT PRICE TOTAL1 3311.0010TON Ductile Iron Water FtOn s w/Restraint $6,000.00 $6 600.00
2 3311.0441 LF 12'Water Line549.50 5346.50
3 9999 0023 EA Private Water Service 52,000.00 52 000.00
4 9999.0020 EATMeter Box516.400.00
5 gggg.00E1 EA 2'Irri efion Boz S1,700.00 51,700.006 3341.0201 LF 21'RCP,CL In
$79.00 $474.00
7 3311.0241 25 LF 8'Water Line 535.00 $875.00
8 3311.0141 4 EA 6'Water Line 5' 32,350.00I $9,400.00
TOTAL 537,795.50
REASONS FOR CHANGE ORDER
Payternftf,Z3.6,Q7 Forad0orWeduciiwrofwa(erplpeand appudenancesreferencesheaf 7and10
Pay Item*2 7I.Fad/usmentfor alignment startstallonfng
Pay Item N6 Intel move created change In Ilaearfeat.Reference ahsats29 and32
Pay Item#7 Solitary sawerstab added forfefure devaWnwrit.Reference Meet 13B
ND CITY FUNDS INVOLVED IN THIS CONTRACT DEVELOPER IS RESPONSIBLE FOR 1006 OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY MILL BESOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: _ APPROVED:
Jacobs Engineering GtoUp,Ina. Knox S(reel P 7,L Jackson Ciolmclion,Lfd'�+G
By: rt,Tv By:- By: !J
Name: Blake Bradley Name: Ben Lued(ke Name: Steve Haberatmh
Tido' Project Englnaer Title: Executive Vice Pr"Went Tule: Opplalloas Manaaar
Revised:10.12-2011 Page 2
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.: 1
NAME OF PROJECT: Berkshire Lake Boulevard
PROJECT NO.: 100484 CONTRACTOR: Jackson
DOE NO.:
PERIOD FROM:06/26/17 TO: 12/15/17 FINAL INSPECTION DATE: 14-Dec-17
WORK ORDER EFFECTIVE:6/26/2017 CONTRACT TIME: 60 0 WD 0 CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WE, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
229
PERIOD
PREVIOUS
PERIOD
TOTALS
TO DATE 229
*REMARKS:
^� 11
CONTRACTOR DATE INS TOS' DATE
ENGINEERING DEP_1RTi\1ENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817)392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Jackson Construction Berkshire Lake Blvd
Inspector City Project Number
Albert Samaniego 100484
Construction Components Project Manager
o Water o Waste Water o Storm Drainage ❑ Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$201,547.00 D Simple a Routine O Complex
Final Contract Amount Date
$202,021.00 2/1/2018
I1)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 1 20 1 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 428
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 428
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] x 100%) 428 / 448 = 96%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
r
7
Inspector Signature Contractor Signatur
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116• (817) 392-8306
FORTWORTH REV:0212210'
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 2/1/2018
Name of Contractor Project Name
Jackson Construction Berkshire Lake Blvd
DOE Inspector Project Manager
Albert Samaniego Fred Ehia
DOE Number Project Difficulty Type of Contract
N/A P Simple ® Routine O Complex o Water o Waste Water o Storm Drainage Pavement
Initial Contract Amount Final Contract Amount
$201,547.00 1$202,021.00
Il)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor "e" �J
XL-
Signature DOE Inspector
Signature DOE Inspector's Supervisor y
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
eCONSTRUCTION LTD.
5112 SUN VALLEY DRIVE
FORT WORTH,TX 76119
TEL 817-572-3303
FAX:817-478-0443
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Troy L. Jackson,
President Of Jackson Construction, Ltd, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Berkshire Lake Blvd
BY
Troy L7J`ackson, President
Subscribed and sworn before me on this date 6th of February, 2018.
Nota 64c CARMEN L. ESTEP
`Y P�A��' Public. 06-2020
State of Texas
Tarrant, Texas �z:: 4�:Notary
a- [�1;+� Comm.Expires 04
Notary ID 2910611
CONSENT OF SURETY OWNU ❑
TO FINAL PAYMENT ARCMTRCT �J
CGINTRACTOR ❑
-IIA Document G707 SURE'l'Y �
Bond No. BCD1054920 OTHER
TO O%VNER ARCMTEcrs PROJECT -NO.:
Maine curd addmz)
City of Fort Worth
1000 Throckmorton Street CONTRAC`TFOR Water/Storm Draiange
Fort Worth, TX 76102
PROJECT: CONTRACT DATED:
(tVanteand ad k&o
Berkshire Lake Blvd
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
finw#narneand addmstG-f,Surcry)
The Hanover Insurance Company
440 Lincoln Street
Worcester, MA 01653
SURETY,
on bond of
flaxen name and addrrsa(j'Contractar)
Jackson Construction, Ltd.
5112 Sun Valley Drive
Fort Worth, TX 76119
CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of
any of its obligations to
(11 Mt r nWn a tWd a1*1Mce ofQmner)
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
OWNER,
as set fnreb in said Surety's bond.
W W TINESS WHEREOF,the Surety has hereon€o set its hand on this date: December 21, 2017
(hwW in mrlthW the tnontb folloxwed t?t the nraaeric d1?1eand)¢wr,1
The Hanov surance Company
(sttrzrtr) /
By:
(S7q»attt atttbo trpr�rntatit�)
Attest` Jack M Crowley Attorney-in-Fact
(Seal�c "
(himad rraure and t:rlr)
Surety Phone No. 508-853-7200 x-4476
G707-1994
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWERS OF ATTORNEY
CERTIFIED COPY
KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY,both being
corporations organized and existing under the laws of the State of New Hampshire,and CITIZENS INSURANCE COMPANY OF AMERICA,a corporation
organized and existing under the laws of the State of Michigan,do hereby constitute and appoint
Steven R.Foster,Jack M.Crowley,Patricia A.Smith and/or Marie Perryman
of Dallas,TX and each is a true and lawful Attorney(s)-in-fact to sign,execute,seal,acknowledge and deliver for,and on its behalf,and as its act and deed
any place within the United States,or,if the following line be filled in,only within the area therein designated any and all bonds,recognizances,undertakings,
contracts of indemnity or other writings obligatory in the nature thereof,as follows:
Any such obligations in the United States,not to exceed Thirty Five Million and No/100($35,000,000)in any single instance
and said companies hereby ratify and confirm all and whatsoever said Attorney(s)-in-fact may lawfully do in the premises by virtue of these presents.
These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions
are still in effect:
"RESOLVED,That the President orany Vice President,in conjunction with any Vice President,be and they are hereby authorized and empowered to appoint
Attomeys-in-fact of the Company,in its name and as its acts,to execute and acknowledge for and on its behalf as Surety any and all bonds,recognizances,
contracts of indemnity,waivers of citation and all other writings obligatory in the nature thereof,with power to attach thereto the seal of the Company.Any such
writings so executed by such Attomeys-in-fact shall be as binding upon the Company as if they had been duly executed and acknowledged by the regularly
elected officers of the Company in their own proper persons."(Adopted October 7, 1981 -The Hanover Insurance Company;Adopted April 14, 1982-
Massachusetts Bay Insurance Company;Adopted September 7,2001-Citizens Insurance Company of America)
IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals,duly attested by two Vice Presidents,
this 5th day of December 2011.
THE HANOVER INSURANCE COMPANY
IILL4L, XuuN,
MASSACHUSETTS BAY INSURANCE.COMPANY
CITIZENS tNSURAtVCE OMPANY OF AMERICA
MI 41074
Robert Thomas.Vice President
THE COMMONWEALTH OF MASSACHUSETTS
COUNTY OF WORCESTER )ss. Joe Rrenstrom,Viet.President
On this 5th day of December 2011 before me came the above named Vice Presidents of The Hanover Insurance Company,Massachusetts Bay Insurance
Company and Citizens Insurance Company of America,to me personally known to be the individuals and officers described herein,and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens
Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said
instrument by the authority and direction of said Corporations.
BARBARAA.GARIICK
No[ary Public
r
CemrLwLmeafthotMzssachesetts
y� f
lAY,^,Mrahssla Ex�r�Sep;.21.ZCflt 'S
Barbara A.Garlick, Notary Public
My Commission Expires September 21,2018
1,the undersigned Vice President of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certify that the above and foregoing is a full,true and correct copy of the Original Power of Attorney issued by said Companies,and do hereby further
certify that the said Powers of Attorney are still in force and effect.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover Insurance Company,
Massachusetts Bay insurance Company and Citizens Insurance Company of America.
"RESOLVED,That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto,granted and executed
by the President or any Vice President in conjunction with any Vice President of the Company,shall be binding on the Company to the same extent as if all
signatures therein were manually affixed,even though one or more of any such signatures thereon may be facsimile." (Adopted October 7,1981,-The
Hanover Insurance Company;Adopted April 14,1982-Massachusetts Bay Insurance Company;Adopted September 7,2001-Citizens insurance Company of
America)
GIVEN under my hand and the seals of said Companies,at Worcester,Massachusetts,this 21st day of December 2017.
THE HANOVER INSURANCE COMPANY-, _
MASSACHUSETTS BAY INSURANCE COMPANY-
CITIZENS INSURANCE COMPANY OF AMERICA
-
(ienn Margosian,Vice President