HomeMy WebLinkAboutContract 49182-FP1 FORTWORTH. CITY SECRETARY
CONTRACT NO. — FP I
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
(Developer Projects)
1f�
City Project Ns: 100572
erA S LGiime01 �
Regarding contract 100872 for PRIMROSE CROSSING PHASE 3C as required by the
TRANSPORTATION& PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION& PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $60,101.16 ,
Amount of Approved Change Orders: NA
Revised Contract Amount:
n a.
Total Cost 1Vorlc Completed: $60,101.16
s
by � •�
€
t
IS
` t�
. k .,
Mw
Recommen Acceptance Date
Asst. Direc , TPW - Development Services
L�- � L'i. 0 lel-� I Z/?-r/iY
Accepte Date
Director, TRANSPORTAT4q & PUBLIC WORKS
Asst. City Manager Date
1I „ Department,00f T &W Const. Services
CPN# Date
Project Manager
Coinmel Risk Management CaYiady lel t
D.O.E. Brotherton
CFA Morales /Scanned
Baa `��' til boy Gutzler/scanned 1—�'1—I OFFICIAL RECORD
cl 45 �'Y h The Proceeding people have been Contacted
of concerning the request for final payment& have01 CITY SECRETARY
released this project for such payment. FTS WORTHo TX
Rev.9/22/16 Clearance Conducted By 0&zW"Xmmt*
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PRIMROSE CROSSING PHASE 3C
Contract Limits
Project Type STREET LUGHTING
City Project Numbers 100872
DOE Number 3110
Estimate Number 1 Payment Number 1 For Period Ending 2/9/2018
WD
City Secretary Contract Number 3110872 Contract Time I IWD
Contract Date 5/16/2017 Days Charged to Date 198
Project Manager NA Contract is 100.00 Complete
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors DICKINSON / DIVER
Friday,February 9,2018 Page 1 of 4
City Project Numbers 100872 DOE Number 3110
Contract Name PRIMROSE CROSSING PHASE 3C Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIIGHTING For Period Ending 2/9/2018
Project Funding
UNIT IV:STREEET LIGHTING IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 2"CONDT PVC SCH 90(T) 1356 LF $9.41 $12,759.96 1356 $12,759.96
2 GROUND BOX TYPE B W/APRON 7 EA $362.00 $2,534.00 7 $2,534.00
3 TYPE 33B ARM 14 EA $153.00 $2,142.00 14 $2,142.00
4 LED LIGHTING FIXTURE(ATBO-20BLEDGE 70- 14 EA $513.00 $7,182.00 14 $7,182.00
MVOLT T-R23K-P7 500W-NW)
5 RDWY ILLUM FOUNDATION TY 1 14 EA $1,112.00 $15,568.00 14 $15,568.00
6 RDWY ILLUM TY 11 POLE 14 EA $1,161.00 $16,254.00 14 $16,254.00
7 6-6-6 TRIPLEX ALUM ELEC CONDUCTOR 1356 LF $2.70 $3,661.20 1356 $3,661.20
W/#10 COPPER GROUND IN POLE
Sub-Total of Previous Unit $60,101.16 $60,101.16
-----------------------------------------
Friday,February 9,2018 Page 2 of 4
City Project Numbers 100872 DOE Number 3110
Contract Name PRIMROSE CROSSING PHASE 3C Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIIGHTING For Period Ending 2/9/2018
Project Funding
Conti-act Information Summary
Original Contract Amount $60,101.16
Chance Orders
Total Contract Price $60,101.16
�\7 aDate I a + Total Cost of Work Completed $60,101.16
Contractor Less %Retained $0.00
/ �� Net Earned $60,101.16
Date
Inspection Supervisor Earned This Period $60,101.16
Retainage This Period $0.00
Date /j
� Less Liquidated Damages
Proje ana r
Days @ /Day $0.00
Date N� LessPavement Deficiency $0.00
s. Less Penalty $0.00
a ` 3 Date D Less Previous Payment $0.00
Direct /Contracting Departitnt Plus Material on Hand Less 15% $0.00
Balance Due This Payment $60,101.16
Friday,February 9,2018 Page 3 of 4
City Project Numbers 100872 DOE Number 3110
Contract Name PRIMROSE CROSSING PHASE 3C Estimate Number I
Contract Limits Payment Number 1
Project Type STREET LIIGHTING For Period Ending 2/9/2018
Project Funding
Project Manager NA City Secretary Contract Number 3110872
Inspectors DICKINSON / DIVER Contract Date 5/16/2017
Contractor INDEPENDENT UTILITY CONSTRUCTION Contract Time 115 WD
5109 SUN VALLEY DRIVE Days Charged to Date 198 WD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
----------------------------------------
Total Cost of Work Completed $60,101.16
Less %Retained $0.00
Net Earned $60,101.16
Earned This Period $60,101.16
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $60,101.16
Friday,February 9,2018 Page 4 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Primrose Crossing Phase 3 C
PROJECT NO.: 100872 CONTRACTOR: Independent Utility Const.
DOE NO.:
PERIOD FROM:07/05/17 TO: 01/19/18 FINAL INSPECTION DATE: 19-Jan-18
WORK ORDER EFFECTIVE:7/5/2017 CONTRACT TIME: 115 @) W13 CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS
198
PERIOD
PREVIOUS
PERIOD
TOTALS 198
TO DATE
*REMARKS:
CON CT DATE PECTOR DATE
ENGINEERING D TlltENT
�' The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,Thi 76012-6311
(817)392-7941 •Fax: (817) 392-7845
FORTWORTH REV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Projecl Name
Independent Utility Construction Primrose Crossing Phase 3C
Inspector City Project Number
James Diver 100872
Construction Componen/s Project Manager
❑ Water❑ Waste Water[] Storm Drainage❑ Pavement Khal Jaafari
Initial Contract Amount Prqeet-Difficulty
$60,101.16 O Simple Routine O Complex
Final Contract Annowri Date
$60,101.16 2/13/2018
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS) * 100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signa n
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX 76116 • (817)392-8306
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 2/13/2018
Name of Contractor Project Name
Independent Utility Construction Primrose Crossing Phase 3C
DOE Inspector Project Manager
James Diver Khal Jaafari
DOE Number ProjectDetculty Type of Contract
100872 O Simple Q Routine Q Complex ❑ Water Waste Water❑ Storm DrainageE] Pavement
Initial Contract Amount Final Contract Amomil
$60,101.16 1$60,101.16
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager zt
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts CT
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS Street Lighting
Signature Contractor
n
Signature DOE Inspector -
n
Signature DOE Inspector's Supervisor L
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT
CONTRACTOR ❑
TO FINAL PAYMENT STY ❑
OTHER
(SIMILAR TO AIA DOCUMENT G707)
Bond No. 5063194
PROJECT: Street Lighting Improvements for Primrose Crossing Phase 3C, Fort Worth, Texas
(name,address)
TO (Owner)
ARCHITECT'S PROJECT NO:
City of Fort Worth CONTRACT FOR: Above Project
200 Texas Street
Fort Worth, Texas 76102
CONTRACT DATE:
CONTRACTOR: Independent Utility Construction, Inc.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the(here insert name and
address of Surety Company) Westfield Insurance Company
555 Republic Drive, Suite 450
Plano, Texas 75074 SURETY COMPANY,
on bond of(here insert name and address of Contractor)
Independent Utility Construction, Inc.
5109 Sun Valley Drive CONTRACTOR,
Fort Worth, Texas 76119
hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the
Surety Company of any of its obligations to(here insert name and address of owner)
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
The Surety Company has hereunto set its hand this 18th day of December 2017
WESTFIELD INSURANCE COMPANY
Surety Compan
/7
By
Signature o e epresentative
Attest:
(Seal): Kyle W. Sweeney Attorney-in-Fact
Title
Note:This form is intended to be used as a companion document to the Contractors Affidavit of Payment of Debts and Claims,Current Edition
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING I till SAMt
POWER#AND ISSUED PRIOR TO 04/20/11, FOR ANY PERSON OR PERSONS NAMED BELOW.
POWER NO. 4220052 06
General Westfield Insurance Co.
Power
of Attorney Westfield National Insurance Co.
Ohio Farmers Insurance Co.
CERTIFIED COPY Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a -Company' and collectively as -Companies,- duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio, do by these
presents make,constitute and appoint
CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W. SWEENEY, ELIZABETH GRAY, JOINTLY OR SEVERALLY
of FORT WORTH and State of TX its true and lawful Attorneys)-in-Fact,with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - --
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
'Be It Resolved,that the President, any Senior Executive,any Secretary or any Fidelity& Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary.'
'Be it Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.' (Each adopted at a meeting
held on February 8,2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of
APRIL A.D.,2011
Corporate �h$U WESTFIELD INSURANCE COMPANY
ASeals N ffixed .`• .ra.~'0F', P �'6"", . y WESTFIELD NATIONAL INSURANCE COMPANY
moo'- '.A OHIO FARMERS INSURANCE COMPANY
r
. :, SEAL .�.CNARTE$��:3C !!11
rw% ���` ="': ;`o; :• 11348 ;•tea, Fj�/
y
B . �)7
State of Ohio ""*^ """"" ,,`, Richard L. Kinnaird, Jr., National Surety Leader and
County of Medina ss.: Senior Executive
On this 20th day of APRIL A.D.,2011 , before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say,that he resides"in_Medina, Ohio;that he is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed
by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order.
Notarial - `"•M""�"44, r '
Seal Ft\A L S '
Affixed O �,�t��%9•"
William J. Kahelin,A rney at Law, Notary Public
State of Ohio s Nd. W040 My Commission Does Not Expire(Sec. 147.03 Ohio Revised Code)
County of Medina ss.: ,.. �';� 1, -
.�C OF„o
I, Frank A..Carrino,Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby.certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies,which is still in full force and effect;and furthermore,the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 18th day of
Decembg,„A;; 2017 ,„A11111111,.,
P\\O A(
?0 :my SEAL :m_ -off tas Secretary
o, ?�;,1848 ;•��= Frank A. Carrino, Secretary
' . �♦ o .+ `
•'� ........... •••• ..••
4MMMM`” •1111\I, "•'1/11111111...•`,'
BPOAC2 (combined) (06-02)
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, on this day personally appeared RICHARD
WOLFE, President of INDEPENDENT UTILITY CONSTRUCTION, INC., known
to me to be a credible person, and after being duly sworn by me, upon his oath deposed
and said;
"That all persons, firms, associations, corporations, or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as: Primrose Crossing Phase 3C—City Project No. 100872
BY:
C
Richard Wolfe,President
USUNS �IBE AND SWORN TO BEFORE ME on this r9kdayof
eC017.
CHRISTINA GARCIA.
J�PN..Ua p� .
_=o ��_Notary Public,State of Texas
=I.. Comm.Expires 12-20-2020
Notary ID 130940786
NotaryTexas
5109 Sun Valley Drive
I I Fort Worth,Texas 76119
817-478-4444
www.iuctx.com
December 18th, 2017
City of Fort Worth
CFA Administration
200 Texas St.
Fort Worth,TX 76102
Project Name: Primrose Crossing Phase 3C
City Project No.: 100872
Please accept this letter as our formal acknowledgment to the City of Fort Worth that Independent
Utility Construction, Inc.,the Street Light Contractor for Primrose Crossing Phase 3C,has not been
assessed any liquidated damages under its contract with First Texas Homes,Inc.
If you need any further information in regards to this matter,feel free to contact me.
Sincerely,
i
Richard Wolfe
President
5109 Sun Valley Drive
Fort Worth,Texas 76119
817-478-4444
www.iuctx.com
December 18th,2017
City of Fort Worth
CFA Administration
200 Texas St.
Fort Worth,TX 76102
Project Name: Primrose Crossing Phase 3C
City Project No.: 100872
The purpose of this letter is to acknowledge that Independent Utility Construction, Inc. (the
"Contractor") has been paid in full by First Texas Homes, Inc. (the "Developer") for the public
improvements constructed to serve Primrose Crossing Phase 3C in Fort Worth,Texas. As a result,we
hereby waive,release and relinquish all rights to assert any claim or demand for lien in connection with
this project.
Please feel free to contact me with any questions you may have.
Sincerely,
&_r r
Richard Wolfe
President