Loading...
HomeMy WebLinkAboutContract 48436-FP1 Department of T W Const. Services CPN#0� Date/ 7 Project Manager /J' `' CITY SECRETARY Risk Management S. Cate ood �f RT WART ® CONTRACT NO. b D.O.E. Brotherton Water V. Gutzier C a ieales/Scanned ii :T �_ ATION AND PUBLIC WORKS // � f T e Proceeding eqle have been Contacted concerning the request OF PROJECT COMPLETION �pQ J -- 3& for final payment&have released this project for such payment. (Developer Projects) CIenrnneeL-Cnn.dnetP&Rv—P- % R-go-, City Project N2: 100361 Regarding contract for QUIKTRIP STORE#0959 as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon die recommendation of the Assistant Director c Works Department has accepted the project as complete. MAR 06 2018 Original Contract Price:' $20,256.61 Amount of Approved Change Orders: Ns 1 Revised Contract Amount: $20,256.61 Total Cost Work Completed: $20,256.61 Recommenwr, -ccinfrastructure eptance Date Asst. Direct Design and Construction Accepted Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date ./ 1b +." mme e�• ��' . ` OFFICIAL.ICOR® CITY SECRETARY 4' FT. wORTjj TX ,.� Rev.9/22/16 City Project Numbers 100361 DOE Number 0361 Contract Name QUIKTRIP STORE#0959 Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 1/9/2018 Project Funding Project Manager NA City Secretary Contract Number Inspectors RODGERS / ROY Contract Date 11/3/2016 Contractor TRANSCEND CONSTRUCTION INC. Contract Time 120 CD 2105 BANCROFT CT. Days Charged to Date 361 CD ARLINGTON, TX 76017 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $20,256.61 Less %Retained $0.00 Net Earned $20,256.61 Earned This Period $20,256.61 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $20,256.61 Tuesday,January 9,2018 Page 4 of 4 FORTOAR iTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name QUIKTRIP STORE#0959 Contract Limits Project Type WATER&SEWER City Project Numbers 100361 DOE Number 0361 Estimate Number 1 Payment Number 1 For Period Ending 1/9/2018 CD City Secretary Contract Number Contract Time 120;D Contract Date 11/3/2016 Days Charged to Date 361 Project Manager NA Contract is 100.00 Complete Contractor TRANSCEND CONSTRUCTION INC. 2105 BANCROFT CT. ARLINGTON, TX 76017 Inspectors RODGERS / ROY Tuesday,January 9,2018 Page 1 of 4 • F� City Project Numbers 100361 DOE Number 0361 Contract Name QUIKTRIP STORE#0959 Estimate Number 1 Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 1/9/2018 Project Funding UNIT I:WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ------------ --- ----- ------ ——---— ——-- --- - 1 8"PVC WATER PIPE 412 LF $26.36 $10,860.32 412 $10,860.32 2 DUCTILE IRON WATER FITTINGS 0.25 TN $5,000.00 $1,250.00 0.25 $1,250.00 W/RESTRIANT 3 2"WATER SERVICE 1 EA $1,000.00 $1,000.00 1 $1,000.00 4 1 1/2"WATER SERVICE 1 EA $925.09 $925.09 1 $925.09 5 TRENCH SAFETY 412 LF $0.10 $41.20 412 $41.20 6 CONNECTION TO EXISTING 4"-12"WATER 2 EA $1,000.00 $2,000.00 2 $2,000.00 MAIN 7 FIRE HYDRANT 1 EA $1,500.00 $1,500.00 1 $1,500.00 Sub-Total of Previous Unit $17,576.61 $17,576.61 UNIT H:SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I MANHOLE ADJUSTMENT,MINOR 1 EA $500.00 $500.00 1 $500.00 2 8"SEWER ABANDONMENT PLUG 1 EA $500.00 $500.00 1 $500.00 3 ABANDON MANHOLE 1 EA $500.00 $500.00 1 $500.00 4 6"SEWER SERVICE 1 EA $1,000.00 $1,000.00 1 $1,000.00 5 MANHOLE VACUUM TESTING 1 EA $150.00 $150.00 1 $150.00 6 TRENCH SAFETY 15 LF $1.00 $15.00 15 $15.00 7 POST CCTV INSPECTION 15 LF $1.00 $15.00 15 $15.00 Sub-Total of Previous Unit $2,680.00 $2,680.00 Tuesday,January 9,2018 Page 2 of 4 City Project Numbers 100361 DOE Number 0361 Contract Name QUIKTRIP STORE#0959 Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 1/9/2018 Project Funding Contract Information Summary Original Contract Amount $20,256.61 Chante Orders Total Contract Price $20,256.61 Date �' v Total Cost of Work Completed $20,256.61 VCont, tor Less %Retained $0.00 Net Earned $20,256.61 14� Dte Earned This Period $20,256.61 � Retainage This Period $0.00 Date (JLess Liquidated Damages (/ Days @ /Day $0.00 Date �1j� LessPavement Deficiency $0.00 Asst.Di /-/ infrastructure Design and Construction v Less Penalty $0.00 ``�'� Date Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $20,256.61 Tuesday,January 9,2018 Page 3 of 4 OKLAHOMA SURETY COMPANY Affidavit With respect to Bond No. ,we hereby request the following: ❑ Release of Retainage O �, XFinal Payment in the sum of S 3(0 � ( � � O � We hereby make the following declarations and agreements: 1. The amount owed by us to the subcontractors,suppliers,etc.,for this project is S 3b!5i !i . !91 (Please attach a separate list of names and amounts.) p Ia ' n017 2. If complete,the date of completion wasT(�1 L 3.If not complete,the anticipated completion date is 4A 4. The final contract price, including change orders,etc. is $ The money received by us,in accordance with your consent,will be used exclusively to pay outstanding bills on this contract and for no other purpose until all bills Tare aid on this contract. A4 -7. 2017 C���i�tror� lr��. {Dates {Contr or} {Con actor's Sig1 afore} Witnessed this day of u L personally appeared and made oath that the—� statements are true. n {Commission} { T Publi } 19� {Commission No. {Typed N6mel C.SY�NY FLOURNOY W Notary ID#130533840 of ; Expires Fobngq 10,2020 P.O.BOX 1409 TULSA,OKLAHOMA 74101-1409 918-587-7221 1-800-722-4994 FAX:918-588-1296 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me,the undersigned authority,a notary public in the state and county aforesaid,on this day personally appeared Mandy Loyd, President Of Transcend Construction Inc.,known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said; That all persons,firms,associations,corporations,or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Retail Construction located at 5300 McCart Ave Fort Wo ,TX 76133 B41a Mandy toyd,President Subscribed and sworn before me on this date of , Jubql c. Notary P c TY C.MNYFLOURNOY 1Pc�� "�� My�r ID#13="01,11 6 `(— � " ',o Feer„ ry1o,2020 F. J' ! RT WORTHo TRANSPORTATION AND PUBLIC WORKS INSPECTION PUNCH LIST 1. Brick MH needed to be replaced by the water dept. per TCEQ regulations. 2. Trench failure on Stormdrain line redone due to trench failure on Southgate. 3. Speed bump reflector needed to be corrected to the reflective paint. 4. Cur utte needed to be redone at Southgate & Lubbock. Contr or 1 Gam, Inspector FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Transcend Construction, Inc. Quiktrip#959 Inspector City Project Number Daniel Roy 100361 Construction Components Project Manager Q Water Q Waste Water ❑ Storm Drainage ❑ Pavement Patrick Buckle Initial Contract Amount Project Difficulty $20,256.61 O Simple Routine O Complex Final Contract Amount Date $20,256.61 1/18/2018 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 421 BONUS POINTS(25 Maximum)(B) III)CONTRACTOR'S RATING TOTAL SCORE(TS) 421 Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] * 100%) 421 / 448 = 94% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signaturezz Contractor Signature Inspector's Supervisor Signature —� CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of FortWorth• 8851 Camp Bowie West Blvd.•Fort Worth,Thi 76116 • (817)392-8306 FORTWORTHREV:02'22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY PROJECT INFORMATION Date: 1/18/2018 Name of Contractor Project Name Transcend Construction,Inc Quiktrip#959 DOE Inspector Project Manager Daniel Roy Patrick Buckle DOE Number Project Difficulty Type of Contract 100361 O Simple QQ Routine Q Complex 21 water 0 waste water ❑Storm Drainage ❑ Pavement 1Initial Contract Amount Final Contract Amount $20,256.61 $20,256.61 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING INSPECTION EVALUATION (0-4) PLANS&SPECIFICATIONS (0-4) 1 Availability of Inspector y 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector y 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 44 1 5 Citizen Complaint Resolution Lf PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time Z-/ 3 Communication 2 Timliness of Contractor Payments 4 Resolution of UtilityConflicts 3 Bid Opening to Pre-Con Meeting Timeframe II1)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS wg The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Quiktrip#959 PROJECT NUMBER: 100361 DOE NUMBER: N/A WATER PIPE LAID SIZE TYPE OF PIPE LF Water C900 Diamond Plastics 8" PVC 412 FIRE HYDRANTS: 1 VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 2" Copper 1 EA. 1 1/2" Copper 1 EA. SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 6" PVC 1 EA. TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817)392-7845 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: QuikTrip#959 PROJECT NO.: 100361 CONTRACTOR: Transcend Const. DOE NO.: N/A PERIOD FROM:12/27/16 TO: 12/22/17 FINAL INSPECTION DATE: 30-Aug-17 WORK ORDER EFFECTIVE:12/27/2018 CONTRACT TIME: 120 0 WD CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTHCHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS PERIOD 361 PREVIOUS PERIOD TOTALS TO DATE 361 *REMARKS: CONTRAC,T6R DATE INSPECTOR DATE ENGINEERING DEPARTMENT The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817) 392-7845