Loading...
HomeMy WebLinkAboutContract 48020-CO1 C7Y SECRETARY FORT WORTHCity of Fort Worth GCI}i RACT NJ' qh2L -CO Y � Change Order Request Breakdown Project Name F'M;r Grano Creek Erosion Convol Improvements City Sec# 1 48020 Client Prayed#(s1 C01605 -— Contracfor Austin f=ilter Systems,Inc. PM Steven Eubanks Inspector Ariel Duarte Change Order Submittal# Date 111212018 Dept. TPW(CD= Contract Time Totals (CD) Odginal Contract Amount $611,638.04 5611,635.40 1701 Extras to Date $0.00 Credits to Date $0.00 _ Pending Change Orders(in M&C Process) $0.00 _ Contract Cost to Date $611,638.00 $611,638.04 170 Amount of Proposed Change Order $65,193.04 _ $89,193.00 175 Revised Contract Amount $700,831.00 $700,831.00 345 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO Additional Funding(it necessary) $$9,193.00 $89,193-04 CHANGE ORDERS to DATE(INCLUDING THIS ONE)RS%OF ORIGINAL CONTRACT 14,59% MAX ALL0WASLE CONTRACTAMOUNT(ORIGINAL CONTRA C'TCOST+25%} $764,547.50 JUSTIFICATION(REASONS)FOR CHANGE ORDER Since project was designed;significant additional degradation occurred along the stream banks adjacent to Che Site @ restoration area. The change order extends the project to provide stream bank restoration in these adjacent degraded areas. Also,due to unexpected high stream flows in creek en numerous occasions,and due to delays for wall re-design,an additional 115 days is recommended for the original contract work. In addition,an additional 60 calendar days are required to perform the change order work. �5ro 7 �8 7 n. i T 0\% k. Ea���� OFFICITAL RECORD CITY��CREraRr 7Y WORTH, TX City of Fort Worth Change Order Additions Project Name I LOWer Cam6 C e0 Eroeion Control Improyements City Sac# Client Protect# 1 C01605 Conlract Au4n Filter Systems,Inc. PM Steven Eubanks InpCLtof.F Niel Duane Change Order Submittal# F1 pale 1i1&2(118 AOOITEONS ITEM DESCRIPTION DEPTnrt nit ast atal 3110-0102 Mobilization w{ ] 1. L 2 0241.0500 Remove Fenca TPW(CD) LF $7.00 $C27 3 0241.0800Remove Mprap TPW(CD) F 4 3110-0102 Ue CloarrigTrwL 15,000-00 15, 5 3110.01020'-1T Tree Removal TPW(CD) 1-00000000 EA $1.300.00 1, 3123.0101 Vndassified Fxcavation by Plan TPW(CD) 65.00000000 CY $24.p0 7 3124.0 101 Embaoment by Plan Tpw(CD) 65.00000000 CY 18.00 8 3231.04126Fence,Wood TPW(CD} 66.00000000 LF $42.00 9 291.010OTopsoil TPW(CD) 25.00000000 CY 536.00 10 3292.0400 Hydroseeding Dy 590.OD 0000 Y 11 3292.0100 Block Sod Placement(As Directed in Field) TPW CD} 12 9999.0003 Slope§Mization Mat T (My 590.00000000 Sr $104.00 13 9999.0004 Bend Way Weir TPW(CD} 20.00000000 EA $912. 14 9999.0005 Planting Vegetation{Select} TPW(CD) 5,300.00DDDDDO SF $300 $15.90000 15 Modify Existing Headwa I and Pipe TPW(Col 1.00D00000 LS $1408100 TPW(CD) Change Order Additions Page 2 of 6 Sub oia iuons Change Order Additions Page 3 of 6 }r JRI%%(kR III City of Fort Worth -T--r Change Order Deletions ProjectName Lower Cantu Creek Eiosion Contral Improverrants 771 City Sec# 48010 Client Projectli C01E05 Can Auslin Filter ,terns Inc PM Steven Eu4anks Inspecto kriel Guade Change OrderSArnrtlal# Gate 22018 DELETIONS ITEM PT oty Unit Unit Qtj Total YearPost- n lustmeMsYPWTM7—­73FUM FA 31-m 2War 9999.0007 lff a on AdyRepair Allowance(pre-b d) TPW(CD) TPW( 0) --W-00000 . Change Order Deletions Page 4 of 6 Sub otal Deletions Change Order Deletions Page 5 of 6 M15BE Breakdown for this Change Order M1SBE Sub Type of Service Amount for this CO NA Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval COAppr-02 Page 2 of 3 FORT WORTH:,, CitY of Fort Worth Change order Request Approval (Change order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order COAppr-02 Date Started: 2018-01-30 No.. City Sec. No.: 48020 Date Due: 2018-03-21 Project Name: 01605 - Lower Como Creek Erosion Control Improvements Project 01605 DOE Numbers: Numbers: Project Stream bank erosion protection along Lower Como Creek Description: Project/Contract Compliance Steven E. Eubanks City Inspector: Ariel Duarte Manager: Contractor: Austin Filter Systems, Inc. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPw Stormwater $ 89,193.00 59551 0200431 5740010 001605 C[ 175 Total Cost: $ 89,193.00 Total Requested Days: 175 Approval Status: https://projectpoint.huzzsaw.com/_bz_web/Forms/For-mPrint.aspx?SiteId=S... 2/21/2018 CFW Change Order Approval COAppr-02 Page 3 of 3 Approved: Yes Comments: User: Rich Klassen Date: 2018-02-01 5:13 AM Approved: Yes Comments: No M&C required. User: Steven E. Eubanks Date: 2018-02-01 4:19 PM Approved: Yes Comments: User: Linda S. Young Date: 2018-02-05 1:35 PM Approved: Yes Comments: User: Kim Arnold Date: 2018-02-05 2:21 PM Approved: Yes Comments: User: Doug Wiersig Date: 2018-02-07 3:13 PM Approved: Yes . Comments: User: Doug Black Date: 2018-02-13 5,10 PM by Approved: Yes Comments: A� User: ]ay Chapa R natd P GOWWCS, Date: 2018-02-14 11:32 AM Action Required: Please approve. M&C: 1295: NA OFFICIAL WORD CITY■ICR"Mr WOMw,rx htt p s:11 pro j eetp o f nt.b uzzs aw.c o m/_b z_we b/Forms/FormP r i nt.aspx?S i tel d=5... 2/21/2018 CFW Change Order Approval COAppr-02 Pagel of 3 Routine Assigned To: due bate: Assigned By: Due Time: Links 1 tortworthoov/Infrastructure Proiect5101605-Lower Como Creek Erosion Control Imoroyemgntj gntr��jgrQange IZdars/Lower Como Chance Order 1 Brea kd own.x Ism Attachments f0] No Attachments have been added to this form. https://pro j ectpoint.buzzsaw.com/_bz_web/Forms/FormP rint.aspx?S ite I d=S... 2/21/2018 4 %oma Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. J� Name of Employee/Signature Ar1Ct. Title LJ This form is N/A as No City Funds are associated with this Contract 1 Printed Name Signature