HomeMy WebLinkAboutContract 50393 CITY SECRETARY
CONTRACT NO.
Received Date: 3/13/2018
Received Time: 9:00 am
Developer and Project Information Cover Sheet:
Developer Company Name: Fort Capital,LP
Address, State,Zip Code: 105 Nursery Ln., Ste 200 Fort Worth,Texas 76114
Phone&Email: 817-887-9370//shana@fort-companies.com
Authorized Signatory, Title: Chris Powers Jr. ,CEO
Project Name: Nursery Phase 2
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: 240 Nursery Lane
Plat Case Number: FS-17-130 Plat Name: Deavers Addition
Mapsco: 61X Council District: 7
CFA Number: 2017-123 City Project Number: 101144
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Fort Capital, LP, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Nursery Phase 2 ("Project") within the City or the extraterritorial
jurisdiction of Fort Worth, Texas("City"); and
WHEREAS,the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 2 of ll
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A),®, Sewer(A-1) P,Paving(B)4, Storm Drain(B-1)18,, Street Lights & Signs
(C)P.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section Il,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s),Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
1. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or damages are
caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify,and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date: 02.20.2017
Page 5of11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent(4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth, Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 6of11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2)will not boycott Israel during the term of the contract.
R. IMMIGRATION AND NATIONALITY ACT
Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (1-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 7 of 11
■
Cost Summary Sheet
Project Name:Nursery Phase 2
CFA No.: 2017-123 City Project No.: 101 144
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 33,410.00
2.Sewer Construction $ 13,850.00
Water and Sewer Construction Total $ 47,260.00
B. TPW Construction
1.Street $ 106,419.50
2.Storm Drain $ 138,115.00
3.Street Lights Installed by Developer $ 10,476.40
4. Signals $ -
TPW Construction Cost Total $ 255,010.90
Total Construction Cost(excluding the fees): $ 302,270.90
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 945.20
D. Water/Sewer Material Testing Fee(2%) $ 945.20
Sub-Total for Water Construction Fees $ 1,890.40
E. TPW Inspection Fee(4%) $ 9,781.38
F. TPW Material Testing(2%) $ 4,890.69
G. Street Light Inspsection Cost $ 419.06
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 15,091.13
Total Construction Fees: $ 16,981.53
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 302,270.90
Completion Agreement=100%/Holds Plat $ 302,270.90
Cash Escrow Water/Sanitary Sewer=125% $ 59,075.00
Cash Escrow Paving/Storm Drain=125% $ 318,763.63
Letter of Credit=125%w/2yr expiration period $ 377,838.63 X
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Fort Capital,LP
Jesus J. Chapa Chris Powers
Chris Powers(Mar 6,2018)
Assistant City Manager
Date: Name: Chris Powers Jr.
Title: CEO
Recommended by.
Date: Mar 6,2018
r
Evelyn Roberts/Jennifer Ezernack
Project Assistant Contract Compliance Manager:
Planning and Development
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
Approved as to Form &Legality: ensuring all performance and reporting
requirements.
%GIM- d'i / (LI-J-91/Are
Richard A.McCracken(Mar 7,2018)
Richard A. McCracken a Scarlett Morales(Mar 7,2018)
Assistant City Attorney Name: Janie Morales
M&C No. N/A Title: Development Manager
Date:
Form 1295: N/A
ATTEST:
MA Ti yam. gYser
MAry J Kayser(Mar 12,2018)
Mary J. Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
®' Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101 144
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Nursery Phase 2
CFA Official Release Date:02.20.2017
Page 11 of 11
00 42 43
DAP-BIDPROPOSAL
Page 1 of 4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 3311.0141 6"Water Pipe 3311 10, LF 40 $28.00 $1,120.00
_ 33 11 12 _
2 3311.0151 6"DIP Water 3311 10 LF 25 $41.00 – $1,025.00
3 0241.1511 Salvage 3/4"Water Meter _ 0241 14 EA 5 $950.00 $4,750.00
4 3201.0112 5'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 65 $60.00 $3,900.00
5 3201.0151 Asphalt Pvmt Repair,Water Service 3201 17 LF 80 $60.00 $4,800.00
6 3312.0001 Fire Hydrant 33 12 40 EA 1 $5,500.00 $5,500.00
7 3305.0002 6"Waterline Lowering_ 33 05 12 EA _ 1 $3,500.00 $3,500.00
8 3305.0109 Trench Safety 33 05 10— LF_ 65 – $1.00 $65.00
9 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TO 1 $1,250.0_0 $1,250.0_0
10 3312.2003 1"Water Service 33 12 10 EA _1 $750.00 _$750.00
11 3312.2203 2"Water Service 33 12 10 EA 1 _ $4,250.00 $4,250.00
12 3312.3002 6"Gate Valve 33 12 20 EA 1 _ $2,500.00 $2,500.00
13
15
16
17
18
19 –
-- _
20
22
23 -�—
24
25
26
27 _
28
29
30
31 ---
32
33
34
35
36
37
38
39
40
41
42
43
44
TOTAL UNIT I:WATER IMPROVEMENTS $33,410.00
MY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43_Bid Pmposa1_DAP.x1n
00 42 43
DAP-BID PROPOSAL
Page 2 of 4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of I Bid
No. Description Section No. Measure I Quantity Unit Price Bid Value
UNIT II:SANITARY SEW R IMPROVEMENTS
1 0241.2011 Remove 4"Sewer Line 0241 14 LF 140 $10.00 $1,400.00
2 3201,0150 Asphalt Pvmt Repair,Sewer Service 3201 17 LF 100 $60.00 $6,000.00
3 3301.0101 Manhole Vacuum Testing 33 01 30 EA 1 $100.00 $100.00
4 3305.0109 Trench Safety 33 05 10 LF 150 $1.00 $150.00
5 3305.0112 Concrete Collar 33 05 17 EA 1 $200.00 $200.00
6 3331.3201 6"Sewer Service 33 31 50 EA 1 $2,500.00 $2,500.00
7 3339.1001 4'Manhole 33 39 10, EA 1 $3,500.00 $3,500.00
8
9
10
11 `^
_12
13 _---
14
15
16
17
18
19
20
21
22
23
24
25 v
26
27
28 _
29
30
_31
32 �--
_ 33
_34
35
36
37
_38
39
U
_
TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $13,850.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43—Bid Pmposal_DAP.xlsx
DO 42 43
DAP-BID PROPOSAL
Page 3 of 4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS
1 0241.3014 Remove 21"Storm Line 0241 14 LF 6 _$10.00 $60.00
2 0241.3019 Remove 36"Storm Line 0241 14 LF_ 44 $15.00 $660.00
3 0241.3023 Remove 48"Storm Line02 41 14 — LF 410 $21.00 $8,610.00
4 0241.3402 Remove 5'Storm Junction Box — 02 41 14 EA_ 1 $450.00 $450.00
5 0241.4202 Remove 5'Drop Inlet 0241 14 EA_ 1 _ $_450.00 $450.00
6 3305.0109 Trench Safety 33 05 10 LF_ 1050 $0.10 $105.00
7 3341.0201 21"RCP,Class III 33 41 10 LF 86_ $65.00 $5,590.00
8 3341.0302 30"RCP,Class 111 3341 10 LF 58 $105.00 $6,090.00
9 3341.0409 48"RCP,Class 111 3341 10LF 440 $235.00 $103,400.00
10 3349.0002 5'Storm Junction Box 33 4910 _ EA 1 $6,850.00 $6,850.00
11 3349.5001 10'Curb Inlet 33 49 20 EA 1 $5,850.00 $5,850.00
12
13
14
15
17 —
18
19
20
21
22
23
24 ��-
25
26
27 - _ —
_
28
30
31
�32
33
34
35
36
37
38
39
40
41
42 V
43
44 _
45
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $138,115.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal DAP.xlsx
00 42 43
DAP-BID PROPOSAL
Page 1 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Biddees Proposal
Bidlist Item Description Specification I Unit of Bid Unit Price Bid Value
N I Section No. I Measure Quantity
UNIT IV: PAVING IMPROVEMENTS
1 3213.0101 6"Conc Pvmt 32 13 13 SY 1145 $46.00 $52,670.00
2 3213.0301 4"Conc Sidewalk 32 13 20 SF 3210 $4.50 $14,445.00
3 3213.0401 6"Concrete Ddvew_�y 32 13 20 SF 1530 $5.00 $7,650.00
4 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 430 $24.00 $10,320.00
5 _
6
_7
8
9
10
11 _
12
13
14 _
15
16
17
18
19
20
21
22
23
24
25 __..
26
27
28
29
30
31
32 _
33
34
35 _
36
37
38
39
40
41
42
43
44
45
OTAL UNIT IV:PAVING IMPROVEMENTS1 $85,085.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43—Bid Proposal DAP.xlsx
00 42 43
DAP-BID PROPOSAL
Page I of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
NIT IV:PAVING IMPROVEMENTS
1 3211.0111 4"Flexible Base,Type A,GR-1 32 11 23 SY 165 $77.40 $12,771.00
2 3212.0303 Y'AsphaN Pvmt Type D 32 12 16 Sy 165 $51.90 $8,563.50
3
4
5 _
6
7
8
9
10
11
12
13
14 ._
15
16
17 ~� -
18 -
19
20
21
22
23
24
25
26
27
28
29
30
31
32 _
33
34
35
36
37
38 --
39
40
_ 41
_42
43
44 _
45
TOTAL UNIT IV:PAVING IMPROVEMENTS1 $21,334.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Pmposal_DAP..Isz
00 42 43
DAP-BIDPROPOSAL
Page 1 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure I Quantity Unit Price Bid Value
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3015 2"Condt PVC Sch 80 M 26 05 33 LF 120 $18.81 $2,257.20
2 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 240 $1.47 $352.80
3 3441.1415 NO 10 Bare Elec Condr 3441 10 LF 120 _$1.47 $176.40
4 3441.1646 Furnish/Install Type 33B Arm 3441 20 EA T 1 $317.00 $317.00
5 3441.3050 Furnish/Install LED Lighting Fixture(70 watt 34 41 20 EA 2 $427.00 $854.00
_ATBO Cobra Head
6 3441.3301 Rdwy lllum Foundation TY 1 2 and 4 34 41 20 EA 1 $2,792.0 _$2,792.00
7 3441.3351 Furnish/Install Rdway Illum TY 11 Pole 344120 _EA 1 $3,313.00 $3,313.00
8 9999.9999 Remove Street Light,Arm,and Conductors 34 41 20 EA 1 $207.00 $207.00
on Oncor Pole
9 9999.9999 Salvage Street Light on Oncor Pole 34 41 20 EA 1 $207.00 $207.00
10
11
12
13
14
15
16
17
18
19
20
21
22
23 _
24
25 _
26
27
_28
29 _
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $10,476.40
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal DAPAm
I� Hill loll_ ITS
kj
OMAN
lit -u
BMW I
\ r � � � �♦Ifiliilii!!!.�
��r��,.gin�Q// ''•�111���1�.
FT
FIFIX 192 ME==
/
dr,"
,— Fr
^.,
LAI
rNW
: .
RLG
RAYMOND L ..,
>
0 30 60
M
(FEET) LOT 20R
1 inch = 60 ft. LOT 19R
W
PRIVATE ALLEY
I
DD
2
2•W/R SSC LOT 18R-1 Q
U
j
(iRRIa4 MV)Eli
_
Lu
j
811w 14R
"w a
ALLEY
LOT 1R LOT 2R LOT 3R LLOT SR LOT 6R LOT 7R LOT 8R
�o
LEMNQ
i2v EXISMG WATER LINE
El PROPOSED WA TER LINE
■ PROPOSED WA TER METER
N PROPOSED GA TE VALVE
PROPOSED f7RE HYDRANT
KA GA LOT 9R ELOTlOR LOT 11R LOT 12R LOT 13R EXIS7NG WATER METER
EXIS77NG GA TE VALVE
EXIS77NG FIRE HYDRANT
EXHIBIT A
WA MR
RAWaVD L GOWSYW A.,/NC. NURSERY PHASE 2
CMSUL ANG ENGINEERS
W01 BR10GE STREET, 5UTE 420 C/TY OF FORT wRTH, TEXAS
FWT WRTH, TEXAS 76112 817-687-0080
E-AG6: rIvOigibe can FIRM REG.`F-49J RL G#1723.008 DA 1F' 12/18117
0 30 60
LOT 20R (FEET)
LOT 19R 1 inch = 60 ft.
PRIVATE ALLEY
S
v N
O
Z
SS AIH
6'Ss SW I
LOT 18R-1
N W
2
0
PRIVATE ALLEY
S 8"ss "ss S
LOT 1R LOT 2R LOT 3R LOT 4R LOT 5R LOT 6R LOT 7R LOT 8R
S
g ❑ LEGMD
QS EXISANG MANHOLE
PROPOSED MANHOLE
LOT 9R LOT fOR LOT 11R LOT 12R LOT 13R ss EXISANG SS LINE
— — PROPOSED SS LINE
S 8"ss
E-mal r A 1
SANITARY SEWR
RAYJI/QVD L GOWSOV JZ,/NC. NURSERY PHASE 2
CaIIII ANG ENaMEMS
6601 SME s7REET. SWE 470 CITY OF FORT IVRTH, TEXAS
Fwr ftw7H. 7EXAS ma 877-687-00W
E-MAX: ilg4/yma can FM REa F-49J RL G#1723.008 DA TE.- 12/18/17
0 30 60
(FEET)
1 inch = 60 ft.
LOT 20R
LOT 79R
PR/VA TE ALLEY
I,
Z rl J I(
I W LOT 78R-1
JIJ u
%. J
I=F IF--- D
r'
PR/VA TE ALLEY
LOT 1R LOT 2R LOT 3R LOT 4R LOT 5R LOT 6R LOT 7R LOT 8R M
I
PROPOSED CONCRETE PA VEMENT
--,4' Jl�_� ' %/ PROPOSED ASPHAL T PA VEMENT
I
I PROPOSED CONCRETE SIDEWALK
z
EXH/B/T B
PA WNG
RAYMaVD L. G"SM ,R.,INr- NURSERY PHASE 2
CWSUL ANC ENGINEERS
M01 AW06£SMEEr. SWE 420 _ C/TY OF FORT WORTH, TEXAS
flY
Fwr WN 1EYAS 761% 617-667—OG140 {.
E—MAK: r.?(Y.pi9r.:.cry FIRM R£G` F—f9J '�F ��',�','723.008 DAM- 1777
0 30 60
(FEET)
1 inch = 60 ft.
N
EX. CURB INLET LOT 19R � ? PROP. CURB INLET
SD LAT—A4
SD ✓UNC. BOX SD LINE A SD LAT—A1
PR/VA TE ALLEY
SD
LA T—A3 r
U
SD LAT—A2 U Ll �
EX. CURB INLET
LOT 18R-1
2 2
2
PRIVATE ALLEY
LOT 1R LOT 2R LOT JR LOT 4R LO? /E
GEND
88 so EXISANG STORM DRAIN
PROPOSED STORM DRAIN
o EXISANG CURB INLET
D PROPOSED CURB INLET
. PROPOSED STORM
✓UNC77ON BOX
EXHIBIT B1
S7VRV DRAIN
RAWaVD L. GOWSW NURSERY PHASE 2
MWSUL ANG ENGINEERS
3601 SWGE SMEEr SWE 420 CITY OF FORT WORTH, TEXAS
Fwr omm,, )ERAS ma 817-687-OGt40
E-MAK: AgRlglnc.com FIRM REG F-491 RLG,¢11723.008 DA 7E.- 12/18/17
N TS.
\ DEAVERS LANE a fE0.1"' f
1 f
I --- --- ---- -
— ------- — — — — — — — — PRIVATE DRIVE
i
54viGE xG LIM�NN�N�E ,� f
LJ N��Nu�-RE f
e wv
� N,
1 TT ---------T------T------ ------Ti -- T T -----TT ,
fW .
----- -----+----------- -----+ + +---------- -- - - ----- -- --
-- -W -----�+----- --
�I
1
(u)
JII
--- _ �--- --
.-..._.. - - -- - - -- - - --- -- - - ---
- - - -- - - - -- ------- ------ ----
_ I �
EXISTING i
' PRIVATE DRIVE � –
l - W
fN� g
�{ 25'STEEL POLE,SINGLE ARM LED FIXTURE
EXISTING LIGHT POLE
ONCOR 120/240V UTILITY TRANSFORMER
ONCOR HAND HOLE
EXISTING CITY OF FORT WORTH GROUND BOX-11X17'
BRANCH CIRCUIT CONDUIT AND CONDUCTORS
Emm7/T C
SWEr UGH75
RA MOND L GOC19S a'V A..ING NURSERY PHASE 2
LYWSVL ANG ENGINEERS
560/WIOCE s7REET, Sul7E 420 ary OF FORT {Nmm, TEXAS
FDRT WNW 7EXAS 76112 817-667—GgBO
E—MAX: Mgp/glnac FIRM REG` F—f9J RLG,01723.008 DATE.- 12118/17