HomeMy WebLinkAboutContract 48338-FP1 Department of TPW Const. Services
CFN# 00-31YDate
Project ManagerA L Jl a RT WO RT Ho CITY SECRETARY
Risk Management S. Gate ood Z Z t CONTRACT NO. 4
i J
D.O.E. Brotherton
Water V. Gutzier -2-
CFA Janie Morales/Scanned ❑ CATION AND PUBLIC WORKS
2-1,(f—t q 3F PROJECT COMPLETION
The Proceeding people have been Contacted concerning the request 59601 , d U 3,3 9
for final payment&have released this project for such payment. (Developer Projects)
City Project Ns: 100339
Clearance Conducted By-li ta-� cs*Ile 338
Regarding contract 100339 for WELLINGTON,AREA 1 SOUTH PHASE 1 as required by the
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project as complete.
Original Contract Price: $1,125,906.15
Amount of Approved Change Orders: Ns
Revised Contract Amount:
Total Cost Work Completed: $1,125,906.15
-zt t 6 AL. I
Recommea for Acceptance Date
Asst. Dire r, TPW - Development Services
4`1
Accepted
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City <anager Date
q"Cnts: O ---
�6;'\ � OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,I
Rev.9/22/16 ''
� R (0 (.)o 339
City Project Numbers 100339 DOE Number 0339
Contract Name WELLINGTON,AREA 1 SOUTH,PHASE 1 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 2/26/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / SLATEN Contract Date
Contractor KODIAK TRENCHING 7 BORING,LLC Contract Time 114 CD
P 0 BOX 93929 Days Charged to Date 457 CD
SOUTHLAKE, TX 76092 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,125,906.15
Less %Retained $0.00
Net Earned $1,125,906.15
Earned This Period $1,125,906.15
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,125,906.15
Monday,February 26,2018 Page 5 of 5
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WELLINGTON,AREA 1 SOUTH,PHASE 1
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100339
DOE Number 0339
Estimate Number 1 Payment Number 1 For Period Ending 2/26/2018
CD
City Secretary Contract Number Contract Time 114�D
Contract Date Days Charged to Date 457
Project Manager NA Contract is 100.00 Complete
Contractor KODIAK TRENCHING 7 BORING,LLC
P 0 BOX 93929
SOUTHLAKE, TX 76092
Inspectors LAYER / SLATEN
Monday,February 26,2018 Page 1 of 5
City Project Numbers 100339 DOE Number 0339
Contract Name WELLINGTON,AREA 1 SOUTH,PHASE 1 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 2/26/2018
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
----------- -------------------------------
1
-- ----- — — --------
1 12"WATER PIPE 251 LF $37.00 $9,287.00 251 $9,287.00
2 12"WATER CARRIER PIPE 257 LF $52.00 $13,364.00 257 $13,364.00
3 24"CASING BY OTHER THAN OPEN CUT 254 LF $105.00 $26,670.00 254 $26,670.00
4 8"WATER PIPE 9695 LF $22.00 $213,290.00 9695 $213,290.00
5 12"GATE VALVE 2 EA $2,400.00 $4,800.00 2 $4,800.00
6 8"GATE VALVE 25 EA $1,250.00 $31,250.00 25 $31,250.00
7 FIRE HYDRANT 9 EA $2,450.00 $22,050.00 9 $22,050.00
8 DUCTILE IRON WATER FITTINGS 4.07 TN $5,000.00 $20,350.00 4.07 $20,350.00
W/RESTRAINT
9 2"WATER SERVICE 1 EA $2,000.00 $2,000.00 1 $2,000.00
10 1 1/2"WATER SERVICE 1 EA $1,500.00 $1,500.00 1 $1,500.00
11 1"WATER SERVICE 216 EA $600.00 $129,600.00 216 $129,600.00
12 1"WATER SERVICE WITH 100'ROLL OF 1 EA $600.00 $600.00 1 $600.00
COPPER
13 12"X12"TAPPING SLEEVE&VALVE 1 EA $4,000.00 $4,000.00 1 $4,000.00
14 TRENCH SAFETY 9946 LF $0.25 $2,486.50 9946 $2,486.50
15 SWPPP>1 ACRES 1 LS $250.00 $250.00 1 $250.00
———————————————————— ——————————————————
Sub-Total of Previous Unit $481,497.50 $481,497.50
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------- ---------------------------
1
--------- ------- ----------------- -
1 16"SEWER PIPE 936 LF $55.00 $51,480.00 936 $51,480.00
2 15"SEWER PIPE 327 LF $48.00 $15,696.00 327 $15,696.00
3 12"SEWER PIPE 1293 LF $40.00 $51,720.00 1293 $51,720.00
4 12"SEWER PIPE 1236 LF $40.00 $49,440.00 1236 $49,440.00
5 8"SEWER PIPE 1266 LF $29.00 $36,714.00 1266 $36,714.00
6 8"SEWER PIPE 4631 LF $29.00 $134,299.00 4631 $134,299.00
7 4"SEWER PIPE 251 EA $525.00 $131,775.00 251 $131,775.00
8 CONCRETE ENCASEMENT FOR UTILITY PIPES 58.6 CY $145.00 $8,497.00 58.6 $8,497.00
9 4'MANHOLE 33 EA $2,450.00 $80,850.00 33 $80,850.00
10 4'DROP MANHOLE 6 EA $4,200.00 $25,200.00 6 $25,200.00
Monday,February 26,2018 Page 2 of 5
City Project Numbers 100339
DOE Number 0339
Contract Name WELLINGTON,AREA 1 SOUTH,PHASE 1 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 2/26/2018
Project Funding
11 4'MANHOLE WITH BOLT DOWN LID 1 EA $2,890.00 $2,890.00 1 $2,890.00
12 4'EXTRA DEPTH MANHOLE 188 VF $125.00 $23,500.00 188 $23,500.00
13 EPDXY MANHOLE LINER 74.5 VF $175.00 $13,037.50 74.5 $13,037.50
14 TRENCH SAFETY 9689 LF $0.25 $2,422.25 9689 $2,422.25
15 POST CCTV INSPECTION 9689 LF $1.10 $10,657.90 9689 $10,657.90
16 MANHOLE VACUUM TESTING 40 EA $150.00 $6,000.00 40 $6,000.00
17 SWPPP>1 ACRES 1 LS $230.00 $230.00 1 $230.00
Sub-Total of Previous Unit $644,408.65 $644,408.65
--------------------------------------
Monday,February 26,2018 Page 3 of 5
City Project Numbers 100339
DOE Number 0339
Contract Name WELLINGTON,AREA 1 SOUTH,PHASE 1 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 2/26/2018
Project Funding
Contract Information Summary
Original Contract Amount $1,125,906.15
Change Orders
Total Contract Price $1,125,906.15
Date lr 1 b Total Cost of Work Completed $1,125,906.15
Contractor Less %Retained $0.00
Date
Net Earned $1,125,906.15
3"��;�
Inspection Supervisor Earned This Period $1,125,906.15
/ q Retainage This Period $0.00
Date /z Less Liquidated Damages
PrkJ ' Days @ /Day $0.00
Date (.0 �/ LessPavement Deficiency $0.00
ALess Penalty $0.00
Date Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,125,906.15
Monday,February 26,2018 Page 4 of 5
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.: 1
NAME OF PROJECT: Wellington Area 1 South Phase 1
PROJECT NO.: 100339 CONTRACTOR: Kodiak
DOE NO.:
PERIOD FROM:11/07/16 TO: 02/06/18 FINAL INSPECTION DATE: 6-Feb-18
WORK ORDER EFFECTIVE: 11/7/2016 CONTRACT TIME: 114 o WD o CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD
TOTALS
TO DATE 457 457
*REMARKS:
CONTRACT R DATE INSPECTOR DATE
ENGINEERING DEPARTMENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
s
(817) 392-7941 •Fax: (817) 392-7845
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Wellington Area 1 South Phase 1
PROJECT NUMBER: 100339
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
12" PVC
251
8" PVC 9695
FIRE HYDRANTS: 9 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: All Passed
NEW SERVICES: 2 Copper 15
11/2 Copper 15
1" Copper 2700
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
16" PVC 936
15" PVC 327
12" PVC 1293
8" PVC 5897
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: All Passed
NEW SERVICES: 4" PVC 251
TRANSPORTATION AND PUBLIC WORKS
nall The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
FORTWORTH REV:02/22
'07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 2/21/2018
Name of Contractor Project Name
Tiseo Paving Company Wellington Area 1 South Phase 1
DOE Inspector Project Manager
Albert Samaniego Aaron Long
DOE Number Project Diffrculry Type of Contract
100339 Simple o Routine o Complex D Water o Waste Water ❑ Storm Drainage ❑ Pavement
Initial Contract Amount Final Contract Amount
$1,125,906.15 1$1,125,906.15
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
INSPECTION EVALUATION (0-4) PLANS& SPECIFICATIONS (0-4)
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions y
2 Knowledge of Inspector y 2 Clarity&Sufficiency of Details 4
3 Accuracy of Measured Quantities 4 13 Applicability of Specifications y
4 Display Of Professionalism t{ 14 Accuracy of Plan Quantities
5 Citizen Complaint Resolution Qi PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs y 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time �{ 3 Communication
2 Timliness of Contractor Payments It 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS& SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311
(817)392-7941 •Fat: (817) 392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Kodiak Wellington Area 1 South Phase 1
Inspector City Project Number
Albert Samaniego 100339
Construction Components Project Manager
o Water o Waste Water ❑ Storm Drainage ❑ Pavement Aaron Long
Initial Contract Amount Project Difficulty
$1,125,906.15 D Simple o Routine o Complex
Final Contract Amount Date
$1,125,906.15 2/21/2018
M PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 396
BONUS POINTS(25 Maximum)(B)
CONTRACTOR'S RATING TOTAL SCORE(TS) 396
IIT)
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] x 100%) 396 / 448 = 88%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TK 76116• (817)392-8306
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Matthew Mahone,
Managing Director Of Kodiak Trenching and Boring,LLC, known to me
to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Wellington Area South Phase 1
BY
Matthew Mahone
Subscribed and sworn before me on this date 15th of February, 2018.
a.,=� /V -
No y Public
Tarrant, Texas
""""• JENNIFER NAVARRO
�Sty�Y PSA�S
Notary Public,State of Texas
Comm. Expires 04-28-2020
�'•o;FCF .` Notary ID 130640644
nnn�
BCD1045809
OWNER
CONSENT OF SURETY ARCHITECT
TO FINAL PAYMENT CONTRACTOR F-1
Conforms with the American Institute of SURETY F
Architects,AIA Document G707 OTHER El
TO OWNER: HPC Wellington South Development Coll ARCHITECT'S PROJECT NO.:
(Nameandaddress) 3001 Knox St, Suite 207 Dallas, TX
AND The City of Fort Worth Texas
200 Texas Street CONTRACT FOR:
Fort Worth, TX 76102 o Wellington,Area 1 South, Phase 1
PROJECT: Wellington, Area 1 South, Phase1 CONTRACT DATED:
(Maine and address) Fort Worth, Texas October 13,2016
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Insert name and address of Surety)
The Hanover Insurance Company
440 Lincoln Street
Worcester, MA 01653
,SURETY,
on bond of
(Insert name and address of Contractor)
Kodiak Trenching and Boring
214 East College Street
Grapevine,TX 76051
,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any
of its obligations to
(Insert name and address of 0m,ner)
HPC Wellington South Development Corp
3001 Knox St, Suite 207 Dallas, TX AND The City of Fort Worth Texas
200 Texas Street
Fort Worth,TX 76102
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: February 13, 2018
(Insert in writing the month,followed by the numeric date and year.)
The Hanover Insurance Company
Subscribed and sworn'to before me,a Notary (Sorely)
Public, in and for Coun of Fairfield and _
f n this .: day f. ga izire u�atJ noriea representative)
Expiration Date...... ...j.�,1'3l 12Q� Robert D. Riggs/Dir. of Construction Operations-Surety
(Printed name and title)
S-2134/AS 10/01
XDP