Change Order Request CONTRACT NO.
S
I Project Name Northside II 48-inch Phase I,Part 2 City Sec No. 46606
VMIP N0. S 56001-0600430-002082-001483,59607-0700430 002082-001483 CI Pro No. 2082
( ) 7068 City 1
MpR20
;CCN.
C rya b '&tion: Northside 1148-Inch Water Main,Phase I,Part 2 from Old Denton Road to Heritage Trace Parkway.
CCCI SECR
Contractor: Oscar Renda Contracting, Inc. 0 Date: 2/9/2018
City Project Mgr.1 Roberto C. Sauceda Raymond Brice
Phone Number: 817-392-2387 817-223-2269
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $10, 109,900.00 $336,310.00 $10,446,210.00 260
Extras to Date $611,092.63 $611,092.63 120
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $10,720,992.63 $336,310.00 $11,057,302.63 380
Amount of Proposed Change Order -$36.94 -$36.94 030
Revised Contract Amount $10,720,955.69 $336,310.00 $11,057,265.69 410
Original Funds Available for Change Orders $303,300.00 $16,820.00 $320,120.00"
Remaining Funds Available for this CO $16,820.00 $16,820.00 1
Additional Funding(if necessary) 1CfaL RECORD
ANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.85% �SECRETARY
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $13,057,762.:301" ' WORriH,TX
In order to maintain two way traffic during the water main installation on Golden Triangle Boulevard
it is necessary to construct a temporary roadway within the parkway on the west side of the road. The
trench for the water main installation will take up one of the two existing driving lanes. The change
order will also allow for the deletio s that are no longer needed on the project.
MbOF•FO�T
: y o � M&Q-
Aary k.
Y r, eity b 1295:
Staff concurs with the contract t for 30 additional calendar days on the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor`sCpogW Name Contracto
Oscar Renda Contracting, Inc. Rudy V. Renda ✓-q24(D
3/14 e& < { _
;Stant atr ... . . ,. P
Date
Date
Do lfitt ,, .
M&C Number N/A M&C Date Approv
FO RT WO P,-F H City of Fort Worth
Change Order Additions
Project Name Northside II 48-inch Phase I, Part 2 City Sec No. 46606
Project No.(s) 56001-0600430-CO2082-C01483,59607-0700430-CO2082-C01483 DOE No.F-70-6-8--1 City Proj. No. 2082
Project Northside II 48-Inch Water Main,Phase I,Part 2 from Old Denton Road to Heritage Trace Parkway.
Description
Contractor Oscar Renda Contracting, Inc. Change Order: 0 Date: 2/9/2018
City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice
ADDITIONS
-]DEPT - - Unit_ Unit Cost _ Tow,
58 Temporary HMAC Road Water 1.00 LS $72,898.06 $72,898.06
61 Remove and Replace of Electric Light Pole Water 1.00 LS $1,800.00 $1,800.00
Water $74,698.06
Sewer
Page 2 of 4 Additions Sub Total $74,698.06
FO RT WO RT H City of Fort Worth
'- � Change Order Deletions
Project Name Northside II 48-inch Phase I,Part 2 City Sec No. 46606
Project No.(s) DOE No. 7068 City Proj.No. 2082
Project Description Northside II 48-Inch Water Main,Phase I,Part 2 from Old Denton Road to Heritage Trace Parkway.
Contractor Oscar Renda Contracting, Inc. Change Order: 0 Date 219/2018
City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice
DELETIONS
ITEM t l G i>? 14N DEPT Unit unit Cost otat
4B 36"Steel AWWA C200 Water 9.00 LF $500.00 $4,500.00
12 10'Wide Asphalt Pavement Repair, Residential Water 150.00 LF $45.00 $6,750.00
13 110'Wide Asphalt Pavement Repair,Arterial Water 27.00 LF $55.00 $1,485.00
15 ITemporary Asphalt Paving Repair Water 1170.00 LF $25.00 $29,250.00
17 Concrete pavement repair Water 125.00 SY $50.00 $6,250.00
20 5"Concrete Driveway Water 3780.00 ISF $5.00 $18,900.00
26 Topsoil Water 500.00 ICY $10.00 $5,000.00
30 Exploratory Excavation Water 13.00 EA $200.00 $2,600.00
Water $74,735.00
Sever
Deletions Sub Total
Page 3 of 4
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Page 4 of 4
FORT WORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
4–natur—e
Roberto C. Sauceda, RE
Name of Employee
Water Department-En ineering
Department
Senior Professional En ig neer
Title
817-392-2387
Phone
3 / ICK/
Date
EOFFICIALRECORD
RETARY
H,TX
WATFR DEPARTMENT
ENGINEERING AND FISCAL SERVICES