HomeMy WebLinkAboutContract 26733 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No._, jr
WHEREAS, Fort Worth Independent School (FWISD), hereinafter called
"Developer", desires to make certain improvements for storm drain installation to
serve Trimble Tech high School, located on College Avenue between Terrell
Avenue and Pennsylvania Avenue, an addition to the City of Fort Worth, Texas;
and
WHEREAS, the said Developer has requested the City of Fort Worth, a
municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called
"City", to do certain work in connection with said improvements;
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Elton Ray, its duly
authorized Deputy Superintendent and the City, acting herein by and through
Mike Groomer, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree
as follows:
c � Q�NA,� PECOR®
COMMUNITY FACILITIES AGREEMENT
to install
STORM DRAIN IMPROVEMENTS
TRIMBLE TECH HIGH SCHOOL — COLLEGE AVENUE
BETWEEN TERRELL AVENUE AND PENNSYLVANIA
A. The Developer agrees to install or to cause to have installed, the street, storm
drainage, street lighting, street name sign and other community facilities
improvements shown as "current improvements" on the attached Exhibits B1.
B. The Developer agrees to comply with all city accepted practices, ordinances,
regulations, as well as provisions of the City Charter, the City Subdivision
Ordinance, City Design Standards and the current Policy for Installation of
Community Facilities in the design, contracting and installation of required "current
improvements".
C. The Developer agrees to comply with the General Requirements contained herein
(Attachment A).
D. As shown on the attached "Summary of Cost", the Developer agrees to fund his
share of "current improvements" and to pay the City for his share of the cost of
street, storm drainage, street lighting, street name sign and other community
facilities shown as "future improvements" on the attached Exhibits B-1. Payment is
due at the time this agreement is executed by the City and the Developer.
E. The estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection is
estimated to be $106,492.
In accordance with the City's current Policy for Installation of Community Facilities
as shown in the Cost Summary on page 3,
The Developers shall contribute Dollars $54.999.00 of the total amount.
The City shall contribute Dollars $51,493.00of the total amount.
F. Developer agrees to provide, at his expense, all necessary rights of way and
easements required to construct current and future improvements provided for in this
agreement.
1
W
G. Developer agrees to relieve the City of any responsibilities for any inadequacies in
the preliminary plans, specifications and cost estimates supplied for the purpose of
this contract.
H. Developer also agrees to install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. Developer agrees that no street construction or storm drainage will begin prior to
City Council approval of this Community Facilities agreement. (Article 104.100,
Ordinance 7234).
J. Developer agrees that no lot shall be occupied until improvements required herein
have been constructed (Article 104.100, Ordinance 7234).
K. Developer agrees to complete the improvements covered by this agreement within
90 calendar days after having been instructed to do so, in writing, by the Director of
Transportation and Public works. It is understood that the developer will initiate the
construction of all improvements to conform with his own schedule, except for those
improvements which the Transportation and Public Works Director deems necessary
for the proper and orderly development of the area. In the event Developer fails to
carry out any such instructions within the 90-day period, the Developer gives the City
the right to design and award a contract, and inspect the improvements in question,
and agrees to pay to the City prior to the award of the contract, the amount of the
low bid.
L. City participation in "current improvements" shall not exceed 125% of cost shown in
Summary of Cost.
2
OFFICIAL PEORD
SUMMARY OF COST
STORM DRAIN IMPROVEMENTS- TRIMBLE TECH HIGH SCHOOL
(COLLEGE AVENUE BETWEEN TERRELL AVENUE TO PENNSYLVANIA AVENUE)
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ - $ -
2. Storm Drainage $ 54,017.00 $ 44,587.00 $ 98,604.00
3. Street Lights $ -
4. Street Name Signs $ - $ -
B. Engineering Design $ - $
C. Construction Engineering
and Management b DOE (8%). $ 982.00 (") $ 7,888.00
TOTALS $ 54,999.00 (*) $ 106,492.00
NOTES:
1. All Preliminary Plats filed after July 11, 2000 will require sidewalks on all streets.
Forty-two (42) feet and wider street include sidewalk cost.
2. Construction items (1-2) cost includes 10% contingencies for Developer and City.
3. Developer's column for Item C represents two percent(2%)costs for construction
inspection and materials testing. Average City participation (') for inspection services
paid through bond funds is approximately $6,906 (6%) of cost.
4. City not preparing plans and specifications.
CITY PARTICIPATION - The City will participate for the cost of re-aligning the strom drain
from Cannon Street to Pennsylvania Avenue. Funds for this project will be provided
from 1998 CIP Minor Drainage Projects.
CFA CODE: 20066
CORD
r19, VEX
10117/2000 15:24 AO%l 8173359955 A N A CONSULTANTS PAGE 03
ANA CONSULTANTS,L.L.C.
ENGINEERING-SURVEYING-PLANNING
1701 RIVER RUN,SUITE 610,FORT WORTH,TX 76107
(817)3354M FAX(817)33549955
PROBABLE ESTIMATED COST FOR COMMUNITY FACILITY AGREEMENT
PROJECT NO.: 00-0101
LOCATION: TRIMBLE TECH HIGH SCHOOL
DESCRIPTION: STORM DRAIN IMPROVIDENT IN COLLEGE AVE.
ESTIMATED BY: OSAMA F.NASHED,E.I.T.
SUMMARY
Item No. Description Quant1 nit Unit Price Amount
1 STORM DRAIN SYSTEM(BY CITY FUNDS) Total i
2 STORM DRAIN SYSTEM(BY SCHOOL FUNDS _ Total Cost $49,106.00
Sub-Total $89649.00
10%CONTINGENCY
2 CITY INSPECTION FEE 2%(CITY) $810.86
2 1 CITY INSPECTION FEE 2%(SCHOOL) $982.12
Grand Total $100,406.581
STORM DRAIN SYSTEM ( BY CITY FUNDS )
Item No. Descri Quantity nit Unit Price Amount
1 24"CLASS III RCP STORM PIPE 417 L.F. $33.00 $13,761.00
2 LOWER 8 WATER 20 L.F. $30.00 $600.00
3 WATER FITTINGS 0.3 TONS $2,500.00 $750.00
4 TRENCH EXCAVATION 500 C.Y. 50 $1,250.00
5 TRENCH SAFETY 417 L.F. $1.00 $417.00
6 4'S . .D.MANHOLE 1 EA. $4,500.00 $4,500.00
7 PERMANENT PAVEMENT REPAIR 417 L.F. $45.00 $18,765.00
8 STORM WATER MANAGEMENT 1 L.S. 5500.00 $500.00
TOTAL STORNI=N SYS—TIM00
STORM DRAIN SYSTEM ( BY SCHOOL FUNDS )
Item No. Description uanti Unit Unit Price Amount
1 24"CLASS III RCP STORM PIPE 522 L.F. $33.00 $17,226.00
2 21"CLASS III RCP STORM PIPE 18 L.F. $30.00 _ 540.00
3 TKNCH EXCAVATION 600 C.Y. $2.50 $1,500.00
4 TRENCH SAFETY 540 L.F. $1.00 $540.00
5 4'SQ.S.D.MANHOLE 1 EA. $4,500.00 $4,500.00
6 PERMANENT PAVEMENT_REPAIR 540 L.F. $45.00 $_24.300.00
7 STORM WATER MANAGEMENT 1 L.S. $500.00 $500.00
TOTAL STORM BW JN SY TEM 1 .00
CFA 101.123 TRIMBLE TECH HIGH SCHOOL 03:14:02 PM 10/17/2000
VENOM
ATTACHMENT A
GENERAL REQUIREMENTS
A. It is agreed and understood by the parties hereto that the developer shall
employ a civil engineer, licensed to practice in the State of Texas, for the
design and preparation of plans and specifications for the construction of all
current improvements covered by this contract, subject to Paragraph B.
B. For any project estimated to cost less than $10,000 or for any project
designed to serve a single lot or tract, the developer may at his option request
the City to provide the design engineering, and if such request is granted, the
developer shall pay to the City an amount equal to 10 percent of the final
construction cost of such project for such engineering services.
C. In the event the developer employs his own engineer to prepare plans and
specifications for any or all current improvements, the plans and specifications
so prepared shall be subject to approval by the department having jurisdiction.
One (1 ) reproducible set of plans with 15 prints and 35 specifications for each
facility shall be furnished the department having jurisdiction. It is agreed and
understood that in the event of any disagreement on the plans and
specifications, the decision of the Transportation/Public Works Department
Director, and/or Water Department Director will be final.
D. It is further agreed and understood by the parties hereto that upon acceptance
by the City, title to all facilities and improvements mentioned hereinabove shall
be vested at all times in the City of Fort Worth, and developer hereby
relinquishes any right, title, or interest in and to said facilities or any part
hereof.
E. It is further agreed that the decision of the City to not collect funds for "future
improvements" required in previous CFA agreements does not constitute an
obligation on the part of the City to construct such "future improvements" at
its expense.
A-1 R11-Al [DICGQD
TV V Mc- MY
.a.
.•.
F. Work hereunder shall be completed within two (2) years from date hereof, and
it is understood that any obligation on the part of the City to make any refunds
with respect to water and/or sanitary sewer facilities or street, storm drain,
street light and street name sign shall cease upon the expiration of two (2)
years from date hereof, except for refunds due from "front foot charges" on
water and sanitary sewer mains, which refunds may continue to be made for a
period of ten (10) years commencing on the date that approach mains are
accepted by the Director. If less than 70% of the eligible collections due to
the developer has been collected, the Developer may request in writing an
extension of up to an additional 10 years for collection of front charges. If the
construction under the Community Facilities Contract shall have started within
the two-year period, the life of the Community Facilities Contract shall be
extended for an additional one-year period. Community Facility Contracts not
completed within the time periods stated above will require renewal of the
contract with all updated agreements being in compliance with the policies in
effect at the time of such renewal. Developers must recognize that City funds
may not be available to pay all or a portion of the normal City share for
renewal contracts. It must be understood by all parties to the Community
Facilities Contract that any of the facilities or requirements included in the
contract that are to be performed by the developer, but not performed by the
developer within the time periods stated above, may be completed by the City
at the developer's expense. The City of Fort Worth shall not be obligated to
make any refunds due to the developer on any facilities constructed under this
agreement until all provisions of the agreement are fulfilled.
G. PERFORMANCE AND PAYMENT GUARANTEES
1 . For Street, Storm Drain, Street Light and Street Name Sign
Improvements to be Constructed by the Developer or City on Behalf of
the Developer:
Performance and Payment bonds or cash deposits acceptable to the City
are required to be furnished by the developer for the installation of
streets, storm drains, street lights, and street name signs, on a non-
assessment basis, and must be furnished to the City prior to execution
A-2 �����CA PECO 'D
of this contract. The performance and payment bonds shall be in the
amount of one hundred percent (100%) of the developer's estimated
share of the cost of the streets, storm drains, street lights, and street
name signs. If the deposit is in the form of cash, the deposit shall be in
the amount of one hundred twenty five percent (125%) of the
developer's estimated cost of the streets, storm drains, street lights,
street name signs, and change orders (during the course of the project).
2. For Future Improvement:
Performance and payment bonds or cash deposits, acceptable to the
City are required to be furnished by the developer for one hundred
percent (100%) of the developer's estimated cost resulting from the
paving, drainage, lighting and name signage of border streets on an
assessment paving basis. (Reference Section VI, Item 3, Development
Procedures Manual.) Said performance and payment bonds or cash
deposits must be furnished to the City prior to execution of this
contract.
Where the City lets the contract, performance and payment bonds shall
be deposited, in the amount of one hundred percent (100%) of the
estimated cost of construction as stated in the construction contract, is
required prior to issuance of a work order by the City.
3. For Water and Sanitary Sewer Facilities:
Performance and payment bonds, or cash deposits, acceptable to the
City are required to be furnished by the developer for the installation of
water and sanitary sewer facilities.
a. Where the developer lets the construction contract for water and
sanitary sewer facilities, performance and payment bonds shall be
deposited, in the amount of one hundred percent 0 00%) of the
estimated cost of construction, cash deposited shall be in the
amount of one hundred twenty-five percent (125%), as stated in
the construction contract, is required to be furnished simultaneous
with execution of the construction co
A-3 '� W PIC=
b. Where the City lets the contract, performance and payment bonds
shall be deposited, in the amount of one hundred percent (100%)
of the estimated cost of construction as stated in the construction
contract, is required prior to issuance of a work order by the City.
4. Types of Guarantees:
a. Performance and Payment Bonds: Are required for the
construction of streets, storm drains, street lights, and street
name signs, the following terms and conditions shall apply:
(1 ) The bonds will be standard performance and payment bonds
provided by a licensed surety company on forms furnished
by that surety company.
(2) The bonds will be subject to the review and approval by the
City Attorney.
(3) The performance bond shall be payable to the City and shall
guarantee performance of the street, storm drain, street
light, and street name sign construction contemplated under
this contract.
(4) The Payment Bond shall guarantee payment for all labor,
materials and equipment furnished in connection with the
street, storm drain, street light, and street name sign
construction contemplated under this contract.
(5) In order for a surety company to be acceptable, the name of
the surety shall be included on the current U.S. Treasury list
of acceptable sureties, and the amount of bond written by
any one acceptable company shall not exceed the amount
shown on the Treasury list for that company.
b. Cash Deposits: A cash deposit shall be acceptable with
verification that an attempt to secure a bond has been denied,
A-4 J�KNA EICOND
�0T �ECC,E�EaG')IV
R WO rflw M.—
such deposit shall be made in the Treasury of the City of Fort
Worth. The City of Fort Worth will not pay interest on any such
cash deposit.
(1) At such time that the contract is bid for projects other than
assessment projects, the cash deposit shall be adjusted to
one hundred twenty five percent (125%) of the actual bid
price. No contract shall be awarded and no work order shall
be issued until such adjustment is made.
(2) When a cash deposit is made, the additional twenty-five
percent (25%) beyond the one hundred percent (100%) of
the estimated developer's share represents additional funds
for change orders during the course of the project. This
twenty five percent (25%) shall be considered the
developer's change order fund.
(3) If the developer makes a cash deposit with the City, the
developer may make timely withdrawals from the cash
funds in order to pay the contractor and/or subcontractor
based on amount of construction work completed as
approved and verified by the City Engineer or authorized
representative. For projects whose actual total contract
cost is $400,000 or greater, such release of security shall
equal the percentage of work completed for that period
multiplied by ninety-five percent (95%). This percentage
shall be applied to the actual current total contract cost to
determine the amount that may be reduced upon request of
developer. For projects whose actual total contract cost is
less than $400,000, such release of security shall equal the
percentage of work completed for that period multiplied by
ninety percent (90%). This percentage shall then be applied
to the actual current total contract cost to determine the
amount of security that may be reduced upon request of
developer. The remaining security, five percent (5%) for
projects of $400,000 or greater and ten percent (10%) for
A-5
� � 8���� ���GQ�
projects less than $400,000 together with the remaining
funds from the Developer's Change Order Fund, if any, will
be released to the developer after the project has been
accepted by the City. Partial release of funds shall be limited
to once per month. There shall be no partial release of funds
for projects of less than $25,000. Proof that the developer
has paid the contractor shall be required for partial releases.
5. Purpose, Term and Renewal of Guarantees:
a. Performance and payment bonds, and cash deposits furnished
hereunder shall be for the purposes of guaranteeing satisfactory
compliance by the developer with all requirements, terms and
conditions of this agreement, including, but not limited to, the
satisfactory completion of the improvements prescribed herein,
and the making of payments to any person, firm, corporation or
other entity with whom the developer has a direct contractual
relationship for the performance of work hereunder.
b. Developer shall keep said performance and payment bonds, and/or
cash deposits in full force and effect until such time as developer
has fully complied with the terms and conditions of this
agreement, and failure to keep same in force and effect shall
constitute a default and breach of this agreement.
H. The City shall assume its share of the cost of the improvements covered by
this agreement along with the engineering fee only if funds are available for
such participation. In the event that no funds are available for City
participation, the developer shall award the contract and deposit with the City
a performance and payment bonds or cash for 100 percent of the estimated
total construction cost of the improvements [plus ten percent (10%) for
engineering and miscellaneous costs if the City prepares the plans).
I. On all facilities included in this agreement for which the developer awards its
own construction contract, the developer agrees to follow the following
procedures:
TY MrMly
F1IJ VEX,
1 . If the City participates in the cost of the facilities, the construction
contract must be advertised, bid and awarded in accordance with State
statutes prescribing the requirements for the letting of contracts for the
construction of public work. This includes advertising in a local
newspaper at least twice in one or more newspapers of general
circulation in the county or counties in which the work is to be
performed. The second publication must be on or before the tenth
(10th) day before the first date bids may be submitted. The bids must
be opened by an officer or employee of the City at or in an office of the
City.
2. To employ a construction contractor, who is approved by the Director of
the Department having jurisdiction over the facility to be so constructed,
said contractor to meet City's requirements for being insured, licensed
and bonded to do work in public right of way.
3. To require the contractor to furnish to the City payment, performance
and maintenance bonds in the names of the City and the developer for
one hundred percent (100%) of the contract price of the facility, said
bonds to be furnished before work is commence. Developer further
shall require the contractor to provide public liability insurance in the
amounts required by the City's specifications covering that particular
work.
4. To give 48 hours notice to the department having jurisdiction of intent
to commence construction of the facility so that City inspection
personnel will be available; and to require the contractor to allow the
construction to be subject to inspection at any and all times by City
inspection forces, and not to install any paving, sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and
gives his consent to proceed, and to make such laboratory tests of
materials being used as may be required by the City.
5. To secure approval by the Director of the Department having jurisdiction
A-7
LP, C0QPD
'����,g�yf��h m("�)(L�D�G;�/(Y
U . lrU V t+U Il 118 U9Y
of any and all partial and final payments to the contractor. Said
approval shall be subject to and in accordance with requirements of this
agreement, and is not to constitute approval of the quantities of which
payment is based.
6. To delay connections of buildings to service lines of sewer and water
mains constructed under this contract until said sewer and water mains
and service lines have been completed to the satisfaction of the Water
Department.
7. It is expressly understood by and between the developer and the City of
Fort Worth, that in the event the developer elects to award one single
construction contract for storm drainage and pavement, said contract
shall be separated in the bidding and City participation, if any, shall be
limited to the lowest possible combination of bids as if each of the
above were awarded as separate contracts.
J. Anything to the contrary herein notwithstanding, for and in consideration of
the promises and the covenants herein made by the City, the developer
covenants and agrees as follows:
1 . The developer shall make separate elections with regard to water and/or
sanitary sewer facilities, storm drainage, street improvements and street
lights as to whether the work prescribed herein shall be performed
by the City, or by its contractor, or by the developer, through its
contractor. Each separate election shall be made in writing and
delivered to City no later than six (6) months prior to the expiration of
this agreement. In the event any of such separate elections has not
been made and delivered to City by such date, it shall be conclusively
presumed that the developer has elected that such work be performed
by the City in accordance with all of the terms of this agreement, and in
particular Paragraph V-F hereof.
2. Irrespective of any such election and whether the work is to be
performed by the City, or by its contractor or by the developer through
its contractor, the developer covenants and agrees to deliver to the City
A-8
RPEC. D
ANN*. ik
a performance and payment guarantee in accordance with the provisions
of Paragraph V-F of this agreement.
3. In addition to the guarantee required in the preceding paragraph, in the
event developer elects that the work be performed by the City, or by the
City's contractor, or such election is presumed as provided above, the
developer covenants and agrees to pay to the City the developer's share
of the estimated construction costs. The amount of such estimated
payment shall be computed as set out on the Summary of Cost hereof,
based upon the lowest responsive bid for such work, as determined by
City, or upon a cost estimated to be performed by City forces prepared
by the City, as appropriate, and shall be subject to adjustment to actual
costs upon final completion of the subject work. Such estimated
payment shall be made promptly upon demand by City, it being
understood that such payment will be made after the receipt of bids for
work, but in every case prior to the award of any construction contract,
unless otherwise specifically set out herein.
4. Developer further covenants and agrees to, and by these presents does
hereby fully indemnify, hold harmless and defend the City, its officers,
agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to
persons or property, including death, resulting from, or in any way
connected with, this agreement, or the construction of the
improvements or facilities described herein, whether or not caused, in
whole or in part, by the negligence of officers, agents, or employees, of
the City. In addition, the developer covenants to indemnify, hold
harmless and defend the City, its officers, agents and employees from
and against all claims, suits, or causes or action of any nature
whatsoever brought for, or on account of any injuries or damages to
persons or property, including death, resulting from any failure to
properly safeguard the work or an account of any act, intentional or
otherwise, neglect, or misconduct of the developer, its contractors,
subcontractors, agents or employees, whether or not
A-9
figU��WrUUanu
�s: o
,,.k
caused, in whole or in part, by the negligence of officers, agents, or
employees of the City.
5. Developer covenants and agrees that it discriminates against no
individual involving employment as prohibited by the terms of Ordinance
No. 7278 (as amended by Ordinance No. 7400), an ordinance prohibiting
discrimination in employment practice because of race, creed, color,
religion, national origin (except for illegal aliens), sex or age, unless sex or
age is a bonafide occupational qualification, subcontractor or
employment agency, either furnishing or referring applicants to such
developer, nor any agent of developer is discriminating against any
individual involving employment as prohibited by the terms of such
Ordinance No. 7278 (as amended by Ordinance No. 7400).
K. Venue of any action brought hereunder shall be in Fort Worth, Tarrant County,
Texas.
L. The City's Policy for the Installation of Community Facilities, as adopted by the
City Council on September 1992, is hereby incorporated herein by reference,
and Developer covenants and agrees to comply with said Policy as a condition
of this contract and as a condition to the platting of the subject property.
M. The following descriptions of work apply, as appropriate, to the areas included
in the Community Facilities Agreement:
1. STREETS
Streets as shown in Exhibit B will be in accordance with plans and
specifications prepared by the Owner's engineer and approved by the
Director of Engineering.
2. STORM DRAINAGE
Storm drain as shown in Exhibit B — 1 will be in accordance with plans and
specifications prepared by the Owner's engineer and approved by the
Director of Engineering.
A-10
G,EC0E,D
'11:01 NIC2MY
n WOU-NIH, 0.
3. STREET LIGHTING
a. The Developer shall provide for the installation of streetlights by the City
forces at the approximate locations shown in Exhibit C, immediately
after final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation and
Public Works Department.
b. Streetlights on residential and / or collector streets can be installed using
overhead or underground conductors with the approval of the streetlight
Engineer.
c. Streetlights on arterial streets shall be installed with underground conduit
and conductors.
d. The Developer shall provide for the installation of a 1'/4 inch schedule 40
PVC conduit at the depth not less than 30 inches and at least 18 inch
behind the curb, "clear from all other utilities".
e. The Developer shall provide for the installation of a 1'/4 inch schedule 40
PVC conduit between streetlights proposed for installation and the power
source to become operational.
f. A 3 inch schedule 80 PVC conduit is required when crossing streets at
depth not less than 30 inches, unless indicated otherwise on the plans.
Concrete pull boxes shall be provided at the crossing points.
g. Luminaire ballast shall be rated for multitap operation and each luminaire
shall have it's own photocell.
4. TRAFFIC CONTROL DEVICES
a. The Developer agrees to pay for the street name sign installations required
by this development to the extent of $80.00 per inspection. This unit cost
will be revised annually by the Department of Transportation and Public
Works to reflect prevailing costs of materials and labor.
b. This development creates the following number intersections at a total cost
as shown to the Developer.
c. The Developer may either deposit cash funds with the City equal to the
following amount at the time of Community Facilities Agreement approval
or wait until the street name signs are to be installed. If the Developer
elects to wait, the cost of street name signs will be at the rate
prevailing when the Developer deposits funds with the City.
A-11
ORKNAL D'EcoDD
C(Jrf R D KA Ell
Cho K)FIffbiP M.
d. The City will install the street name signs upon final approval of the street
construction. The street name signs will remain the property of, and will be
maintained by, the City.
5. OTHER WORKS
In the event that other works is required it will be included as specific
requirements to Community Facilities Agreement.
N. Developer and City agree that this Agreement represents the complete and
exclusive statement of the mutual understandings of the parties and that this
Agreement supersedes and cancels and previous written and oral agreements
and communications related to the subject matter of this Agreement.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said
Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this
the day of
APPROVED AS TO FORM AND RECOMMENDED:
LEGALITY:
Gary J. Steinberger �Malanga, ector
Assistant City Attorney �Transportion and Public
4 Works Department
ATTEST: CITY OF FORT 0 H, ;TEXAS
Lf-4 0"'-e-z By.
G oria Pearso Mike Groomer
City Secretar Assistant City Manager
-• /1?1!9 A-12
Contract Authorization
Date �IY F(":'m ay
I.
i'
i
I
DEVELOPER:
I
Fort Worth Independent School District (FWISD)
By:
Eldon Ray, Deputy Superi e ent
'I
I
i
'i
i
i
I
i
A-13
uf�V Cc: iL kECUkD
CNN*"Cl °Qy
10/17/2000 15:24 ^8173359955 A N A CONSULTANTS .r PAGE 02
o PENNSYLVANIA ST.
L E SD
i
r --- — - ----- ----------
o i
o
A j
i
,
----------
------------ -
---------------------- - ._ �_--- - --
a � 1••150'
- -- -
a
f I f 1 I I
v N
v I 1 I I I 1
------------------
o ,
0
1 1 1 I I I
0
W.CANNON AVE EX, 18" RCP
a ------------------------ JQ-JK-A&NIDONED
a
V)V L----------
I
TRIMBLE TECH HIGH SCHOOL C
v� L----------
> I
CL
i
.,.,.. 7w
,.,.
z f- --
,
FUN , i LEGEND
T) I I
_q_ _——______ EXISTING PROPOSED
STORM DRAIN LINE (CITY FUNDS) �•�
i
STORM DRAIN LINE (SCHOOL FUNDS)i —�
! STORM GRAIN INLET
STORM DRAIN MANHOLE _ �.•-�..�-
w= suwewwr+c
EXHIBIT ""13-l" TRIMBLE TECH.
STORM DRAIN HIGH SCHOOL
SQL EEO ED
rN
U�a U'U rll.�l�ll Up �LSCNa
City of Fort Worth, Texas
"anor and Council Communication
DATE REFERENCE NUMBER I LOG NAME
PAGE
4/10/01 C-18541 20TRIMBLE 1 of 1
SUBJECT APPROVAL OF COMMUNITY FACILITIES AGREEMENT WITH THE FORT WORTH
INDEPENDENT SCHOOL DISTRICT FOR STORM DRAIN IMPROVEMENTS FOR
TRIMBLE TECH HIGH SCHOOL
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a Community Facilities
Agreement with the Fort Worth Independent School District (FWISD) for storm drain improvements for
Trimble Tech High School.
DISCUSSION:
The FWISD has executed a proposed contract for community facilities to serve Trimble Tech High
School located south of Vickery Boulevard on College Avenue, between Terrell Avenue and
Pennsylvania Avenue (see attached map).
The proposed facilities are for storm drain improvements to serve the school site. The cost to the
school for a 24-inch storm drain is $54,017, plus construction inspection fees. City participation is
$44,587 and will be provided from 1998 Capital Improvement Program small drainage funds.
The proposed Community Facilities Agreement is in compliance with standard City policy.
Trimble Tech High School is located in COUNCIL DISTRICT 8.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Street Improvements Fund.
MG:k
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
APPROVED
Mike Groomer . 6140 CITY COUNCIL
Originating Department Head:
Hugo Malanga 7801 (from) APR 10 2001
C115 541200 020115028921 $44,587.00 A ��)
Additional Information Contact: .1Wv�-Ij
city secretary of the
Hugo Malanga 7801 city of roe Worth,Texas