HomeMy WebLinkAboutContract 26763 CITY SECRETARY
CONTRACT NO. (25
STATE
STATE OF TEXAS §
COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO. 26491
WHEREAS, the City of Fort Worth ("City") and Huitt-Zollars, Inc. ("Consultant") made
and entered into City of Fort Worth City Secretary Contract No. 26491 , ("Contract"); and
WHEREAS, the Contract involves professional services for the following project:
West Community Park Development Phase One
and
WHEREAS, it has become necessary to amend the Contract to include an increased scope
of work and/or revised maximum fee.
NOW, THEREFORE, City and Consultant, acting herein by and through their
duly authorized representatives, enter into the following agreement which amends the contract:
1.
Article I , Section A of the Contract is amended to include the additional engineering
services specified in a letter dated May 9, 2001, a copy of which is attached hereto and
incorporated herein.
2.
Article II of the Contract is amended to provide for an increase in the maximum fee in
the amount of$ 9,517.20, which is to be paid to Consultant for all work and services under the
Contract, as amended, so that the total fee to be paid by City for all work and services shall not
exceed the sum of$ $127,017.20.
3.
All other provisions of the Contract that are not expressly amended herein shall remain in
full force and effect.
Executed on this the day of , 200 .
ATTEST: CITY O FORT WORTH
-r B .
Gloria Pearson L Watso
City Secretary, Assistant City Manager
I-Q�
Ri hard Zavala, Director
Pis and Community Services Department
APPROVED AS TO FORM CONSULTANT:
Huitt-Zol rs I
Assistant Uy Attorney n
Na e: J1 L/.,off e
Title: V►��.. Psis;��,,,}- 1
Contract Authorization (Company Address)
' D I 15oo w. -1}1' S� • 'Z-4t 30D
Date
F4 �Jori�. ?1� 7(olo'Z
f\10'
HUITT-ZOLLARS
Huitt-Zollars,Inc./500W.7th Street/Suite 300/Fort Worth,Texas 76102-4728/Phone(817)335-3000/Metro(817)429-1291/Fax(817)335-1025
May 8, 2001
Mr. David Creek
Fort Worth City Parks &
Community Services Department
4200 South Freeway, Suite 2200
Fort Worth, TX 76115-1499
RE: Survey, Geo-tech, & Centerline Staking
West Community Park Phase I
HZI Project#03-0753-01
Dear Mr. Creek:
As per your request, we have prepared this letter which outlines the additional services
requested for the project. As you requested, this letter outlines the additional fees
required to complete the project in two stages. The first stage is to develop the drawings
in the park area proper, and second for the area within the R.O.W. associated with the
proposed entry drive.
1. Wendy Lopez& Associates, our Survey consultant for the topography portion of
the work, has indicated that they will need an additional $800.00 of labor to re-
establish control points and schedule two separate surveying efforts to provide
surveying of the site in two stages.
Terra-Mar, Inc.,the Geotechnical consultant, has indicated that it will require an
additional $795.00 of labor to drill on two separate occasions and to produce two
separate reports to complete their scope of work.
2. Huitt-Zollars, Inc., will provide field staking of the approximate location of the
centerline of the proposed entry drive utilizing a GPS system. We require an
additional $360.00 to perform this service.
3. Huitt-Zollars, Inc., will prepare a R.O.W. dedication Plat for the dedication of the
R.O.W. for the proposed entry road from Loop 820 service road to the proposed
parking area adjacent to the proposed soccer fields. We require an additional
$7062.20 to perforin this service.
��►f� ��B � EPECOND
Dallas/Fort Worth/Houston/EI Paso/Phoenix/Tustin/Ontario/Albuquerque/Seattle/Tacoma
Compensation Summary
Task 1. $1,595.00
Task 2. $360.00
Task 3. $7062.20
Total Labor for Additional Services $9017.20
Reimbursable expenses will be in addition to the Labor for Additional Services fees.
Expenses include such items as all known and customary review and permit fees,
reproduction costs, mileage, fax, Xerox copies, photographic costs, deliveries,
plotting, etc. Reimbursable expenses will be paid for at cost.
Reimbursable Expenses (Not to Exceed) $500.00
Total fee for Additional Services including Reimbursable Expenses $9,517.20
If the services and associated fees outlined in this letter are acceptable, please
incorporate into a standard City of Fort Worth Contract, and forward for our
signature.
Thanks,
Huitt-Zollars. Inc.
Bill Nicholson, ASLA
Associate, Project Manager
U Uo UG"U�Ij��j� � p1No
City of Fort Worth, Texas .
qvriyor and council communication
DATE REFERENCE NUMBER LOG NAME PAGE
1/2/01 **C-18409 1 80H-Z 1 of 2
SUBJECT EXECUTION OF A PROFESSIONAL SERVICES AGREEMENT WITH HUITT-
ZOLLARS, INC. FOR IMPROVEMENTS AT WEST COMMUNITY PARK
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a professional services
agreement with Huitt-Zollars, Inc. in the amount of $117,500 for the design and preparation of
construction documents for 4 soccer fields, an entry road, utilities, and a 120-car parking lot at West
Community Park.
DISCUSSION:
On July 6, 1999 (M&C G-12601), the City Council authorized the reprogramming of $500,000 from the
1986 Capital Improvement Program (CIP) designated for acquisition of a large community park in the
western area of Fort Worth for use as development funds for the West Community Park. Additionally,
the 1998 CIP appropriated $200,000 toward the development of the West Community Park. It was
determined that the old Rifle and Pistol Club site on Silver Creek Road was suitable for recreational
development as the West Community Park.
In order to determine the actual configuration and recreational opportunities, on December 21, 1999
(M&C C-17799), the City Council authorized the execution of a professional services agreement with
Huitt-Zollars, Inc. in the amount of $45,000 for the West Community Park master plan development.
Public meetings were held on January 24, May 15, and May 25, 2000 to receive public input and review
the master plan development. On September 19, 2000, the final master plan concept was endorsed by
the Parks and Community Services Park Board.
Huitt-Zollars, Inc. has proposed to perform the design work for a lump sum of $117,500. Huitt-Zollars,
Inc. will prepare construction documents based on the master plan they have previously prepared.
Staff considers this fee to be fair and reasonable for the scope of services proposed.
Huitt-Zollars, Inc. is in compliance with the City's M/WBE Ordinance by committing to 20% M/WBE
participation. The City's goal on this project is 18%.
This project is located in COUNCIL DISTRICT 7.
City of Fort Worth, Texas
qV111jor and1:01"I"uniention
Council
DATE REFERENCE NUMBER LOG NAME PAGE
1/2/01 **C-18409 80H-ZJ 2 of 2
SUBJECT EXECUTION OF A PROFESSIONAL SERVICES AGREEMENT WITH HUITT-
ZOLLARS, INC. FOR IMPROVEMENTS AT WEST COMMUNITY PARK
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of
the Specially Funded Capital Projects/Parks and Community Services Fund and the General Fund.
LW:k
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
APPROVED
Libby Watson 6183 CITY COUNCIL
Originating Department Head:
Richard Zavala 5704 (from) JAN 2 2001
GG01 541200 0808080 $70,000.00
Additional Information Contact: GC05 541200 080050410010 $47,500.00 �i
City
of Fe rtey of the
Cit
Richard Zavala 5704 Worth,Texag