Loading...
HomeMy WebLinkAboutContract 26772 STATF OF TEXAS § COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO.4�2"k WHEREAS, the City of Fort Worth ("City") and Graham Associates, Inc. ("Consultant") made and entered into City of Fort Worth City Secretary Contract No. 26321, ("Contract"); and WHEREAS, the Contract involves professional services for the following project: South Z. Boaz Parking Lot Improvements; and WHEREAS, it has become necessary to amend the Contract to include an increased scope of work and/or revised maximum fee. NOW, THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the contract: 1. Article _ISection _A of the Contract is amended to include the additional engineering services specified in a letter dated May 9, 2001, a copy of which is attached hereto and incorporated herein. 2. Article_II_of the Contract is amended to provide for an increase in the maximum fee in the amount of$14,915.00, which is to be paid to Consultant for all work and services under the Contract, as amended, so that the total fee to be paid by City for all work and services shall not exceed the sum of$36,415.00. 3. All other provisions of the Contract that are not expressly amended herein shall remain in full force and effect. Executed on this the,--�54�day of-,nam 2001 1 r�c 1�`,�tJ1lC ATTEST: CITY OF FORT WORTH S By: G oria Pear on �5j 5-1 Libby atson City Secretary Assistant City Manager chard Zavala,Director Parks and Community Services Department APPROVED AS TO FORM CONSULTANT: By: Assistant Attorney Name: • ,Teff Williams Title: vice-President rn (Company Address) 616 Six Flags Drive, buire 400 Contract Authorization Arlington, TX 76011 Date C1 Tf�E("PFRGy 18 01 07: 5Ga Graham Associates, Inc. 817-633-5240 p. 2 Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS May 9,2001 z°d VISION Mr.Scott Penn City of Tort Worth Parks&Community Services Dept. 4200 South Freeway,Suite 2200 Fort Worth,Texas 76115-1499 Re: Log Cabin Village Comprchensive Master Plan Development Parking&Roadway Improvements Dear Mr.Penn: We are pleased to provide this proposal for professional services to develop a comprehensive master plan for future Log Cabin Village facility/traffic circulation expansion and parking lot renovation design. The following would be major elements of the project: COM REHENSIVE MASTER PLAN a. Meeting with PACSD staff to discuss future facility/roadway expansion of Log Cabin Village into the Bobo Woods arca. b. Development of a schematic Master Plan concept which identifies in graphic form the proposed Log Cabin Village facility expansion while incorporating appropriate roadway/parking solutions,which will include relocation of existing parking areas, park road re-alignment,bus parking and security lighting. Such solutions may require a traffic feasibility study, which if required would be provided as an additional service. We anticipate the cost of a traffic feasibility study to be in the$3,000 to$5,000 range. e. Presentation of the schematic Master Plan to PACSD staff and community support groups for initial review and comment. d. Schematic Master flan based upon initial review comments and presentation at a public meeting for final review and public input. t. Preparation of Final Master Plan and public presentation of Master Plan, including I'hase I roadway renovation design for approval and endorsement. f. Topographical survey and/or tree survey of the Bobo Woods arca, if required, will be provided as an additional service. PHASE I PARKING IMPROVEMENTS a. Survey and geotechnical investigation of existing parking lot and proposed bus parking areas. Survey will be conducted and data provided/presented in accordance with the City of Fort Worth Department of Engineering Survey Guidelines. b. Preparation of constriction plans and specifications for the renovation of existing parking area and proposed bus parking and south shoulder enhancements along the Log Cabin Village Road. plans will include dimension&control plan,grading plan,erosion control plan and details. Specifications will be provided in accordance with PACS standards. It is our understanding that the PACSD has a construction budget not to exceed$50,900 for this project. C. Inclusion in Contract Documents of requirements for the mplaccment/tn. �b1® existing roadway lighting, rA Summit Office Park Contorpoint Two gp� u,t5 Wnlltt U 1300 Summit Ave.,Suite 419 616 Six Flags Drivo,Suite 400 1 1 I S G�+Iq{j l�V ', 2 Ft.Worth.Texas 76102 Arlington,Toxo;76011 GcarfaLid _ (817)332-5756 (817)649-8530 • Motro(a 17)640-8535 (972J 272-4655 R FAX(817)336-6909 FAX(817)633.5240 FAX(972)272-4655 J1 07: 5Ga Graham Associates, Inc. 817-633-5240 p. 3 d. Submittal of Plans to the Texas Department of Licensing and Regulation, if required. Note: City will provide any required TDLR submittal fee. We will provide the above-described services on a cost-plus basis, not to exceed $14,915, based on the following cost breakdown: Section 1—Master Plan Development....................................................................................................$6,240 Section2 Survey/Geotechnical Services.............................................................................................$2,925 Section 3—Construction Plans for Parking Improvements....................................................................$3,400 Section 4—Plans for Lighting Renovation/Improvements.....................................................................$1,850 ReimbursableExpenses—(Not to exceed)................................................................................................$500 Total... .. .. ............................................................................................................ ..............................$14,915 It is our understanding that if accepted,the City will add this amount to our existing contract with the City, as referenced in your RFP dated March 21,2001. SCHEDULE MASTER PLAN Kickoff meeting with PACSD.......................................................................................week of lune 25,2001 Schematic Master Plan Conceptual Development&Presentation.......................................................6 wccks Preliminary Schematic Master Plan&Presentation.............................................................................3 weeks FinalMaster Plan&Presentation.........................................................................................................4 weeks PHASE I PARKING IMPROVEMENTS Sarveying/Geotechnical Jnvestigation...........................................................3 weeks from Notice to Proceed Schematic Layout Submittal to PACSD&Staff Review.....................................................................3 weeks Construction I?]ans and Specifications..................................................................................................3 weeks OwncrRcvicw of Construction Plans....................................................................................................1 week Incorporation of Owner Review comments and Advertisement............................................................ 1 week BiddingAssistance.................................................................... ....................................... .................30 clays Please call if I may answer any questions. Thank you for your consideration. Sincerely, Graham Associates,Inc. avid M. Smith,P.E. Project Manager CC, Jeff Williams-GAI ca FP'FER ply ':.aL IllSG�a i 1 City of Fort Worth, Texas d&yc4,,aY>,� Womm4Y W DATE REFERENCE NUMBER LOG NAME T AGE 10/3/00 **C-18265 80BOAZ 1 of 1 SUBJECT AUTHORIZATION FOR PROFESSIONAL SERVICES AGREEMENT WITH GRAHAM ASSOCIATES, INC. FOR PARKING LOT AND ROADWAY IMPROVEMENTS AT SOUTH Z. BOAZ PARK RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a professional services agreement with Graham Associates, Inc. in the amount of $21,500 for the design and preparation of construction documents for parking lot and roadway improvements at South Z. Boaz Park. DISCUSSION: The 1993 Capital Improvement Program allocated $150,000 for roadway, parking and drainage improvements for South Z. Boaz Park. Graham Associates, Inc. has proposed to perform the design work for a lump sum of$21,500. Graham Associates, Inc. and the Parks and Community Services Department will assess the existing roads and parking conditions, determine recommended repair, replacement, and necessary additions to the existing infrastructure as warranted by additional recreational uses. Staff considers this fee to be fair and reasonable for the scope of services proposed. This project is located in COUNCIL DISTRICT 3. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. LW:j Ste} Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Libby Watson 6183 Originating Department Head: Richard Zavala 5704 (from) APPROVED 10/03/00 C111 541200 080111037147 $21,500.00 Additional Information Contact: Mike Ficke 5746