HomeMy WebLinkAboutContract 49565-CO1 CITY SECRETARY, /n zz FORT WORTH City of Fort Worth CONTRACT NO. -"1� Change Order Request (D P . . IA)At Name: Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 1 49565 woR� c\��c FOr {No.(s): 59607-0700430-CO2223-C01783 DOE No. 7214 City Proj.No.: 02223 Project Description: Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road Contractor: William J.Schultz,Inc.Circle C Construction,Co. Change Order# Date: 1 3/19/2018 City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Virginia Garcia Phone Number: 817-392-2387 Phone Number: 817-223-2259 Dept. Sewer Totals Contract Time (Calendar days) Original Contract Amount $1,634,700.00 $1,634,700.00 320 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,634,700.00 $1,634,700.00 320 Amount of Proposed Change Order $56,400.00 $56,400.00 030 Revised Contract Amount $1,691,100.00 $1,691,100.00 350 Original Funds Available for Change Orders $81,800.00 $81,800.00 Remaining Funds Available for this CO $81,800.00 $81,800.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.45% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,043,375.00 JUSTIFICATION FOR CHANGE ORDER The change order will provide for the replacement of a 188 foot segment of a project sewer main by other than open cut(BOTC) instead of rehabilitating the segment via pipe enlargement. During construction it was determined that the identified line segment was not contained within the dedicated easement. BOTC will allow for the main to be installed within the easement.The existing line segment will be grouted and abandoned once the replacement main is in service.Open cut installation is not feasible due to the location of the pipe segment on Huffines Boulevard. Staff concurs with the contractor` equest for 30 additio Iendar days on the change order. F A b • off....�!4T ary J. ay er, ity S It is understood and agreed that the acceptance of this Change 0 Ctor con es an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or in o e hares Order. Contractor's Name Contractor.Name _,Contractor Signa l William J.Schultz,Inc.Circle C Construction,Co. Teri Skelly Date Project Ma ger --- cvt c� 3.do t., Date on 'tr ion Supervisor Mater CiA Date Assistantft (2-3Tf3 Council Acboriffitat to M&C Number N/A M&C Date Approved IF MOCRETARY FC�►RT WORTH City of Fort Worth Change Order Additions Project Name Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 49565 Project No.(s): 59607-0700430-CO2223-CO1783 DOE No. 7214 City Proj.No.: 1 02223 Project Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek Description Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road Contractor William J.Schultz,Inc.Circle C Construction,Co. Change Order:= Date: 3/19/2018 City Project Mgr. Roberto C.Sauceda,P.E. City Inspector Virginia Garcia ADDITIONS Tobi, 36 24-inch PVC Sewer Line Installed BOTOC Sewer 188.00 LF $700.00 $131,600.00 Sewer $131,600.00 Page 2 of 4 Additions Sub Total 1$131,600.00 FC►RT WORTH City of Fort Worth 4V WOW— Change Order Deletions Project Name Marine Creek Interceptor Improvements Phase I, Part 1 City Sec No.: 49565 Project No.(s): 59607-0700430-CO2223-CO1783 DOE No. 7214 City Proj.No.: 02223 Project Description Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road Contractor William J. Schultz, Inc.Circle C Construction,Co. Change Order: 0 Date 3/19/2018 City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Virginia Garcia DELETIONS ITEM DESCRIPTION DEPT Unit Unit Cost Total 20 18"to 24"Pipe Enlargement Sewer 188.00 LF $400.00 $75,200.00 Sewer $75,200.00 Page 3 of 4 IDeletions Sub Total $75,200.00 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4 FORT WORTH Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all ormance and reporting requirements. S'gnature Roberto C. Sauceda,P.E. Name of Employee Water Department-Engineering Department Senior Professional Engineer Title 817-392-2387 Phone Date OFFICIAL RECORD CITY SECRETARY FT.WORTNI TX