HomeMy WebLinkAboutContract 47994-CO1 ""Fcpiwr Wbia'rH City of Fort Worth
CITY SECRETARY? 9
Mcp\'j ' W Change Order Request COURACT NO.
MAO 2F;oject Name:1 2014 CIP Year 2,Contract 3 City Sec No.: 9
CM ctNo.(s}: M1a004WM4n&6s601-07004=024=01763 City Pro
j.M 1
DOE No. Ci .No.: 02433
7493
Project Description: Water and Sewer replacement on Wonder Drive,Glenmont Drive,Wilde Way and Winifred Drive.
Contractor: Conaster Construction TX,LP Change Order# Date: 1 3/14/2018
City Project Mgr.1 Roberto C.Sauceda,P.E. City Inspector: I Edward Davila
Phone Number: 817-392-2387 Phone Number. 817-223-2259
Dept, Water Sewer TPW Totals Contract Time
(Calendar days)
Original Contract Amount $619,645.00 $390,645.00 $925,926.00 $1,936,216.00 260
Extras to Date
Credits to Date
Pending Change Orders On MAC Process)
Contract Cost to Date $619,645.00 $390,645.00 $925,926.00 $1,936,216.00 260
Amount of Proposed Change Order $0.00 -$15.00 -$378.00 .$393.00 090
Revised Contract Amount $619,645.00 $390,630.00 $925,548.00 $1,935,823.00 350
Original Funds Available for Change Orders $0.00 $0.00 $0.00
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 -0.02%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2596) $2,420,270.00
The change order will provide for the grouting of an abandoned 24-inch water main and the installation
of a 6-inch Blow off valve and vault.
Staff concurs with the contractor's request for 90 additional calendar days on the change order.
FO&>,
Aftes
C { f
ary J. ;.:. Oki .ecreta,�
In full(both time and money)for all costs arising out of,or incidental to,the above Change Or r.
Contraotor's"Com an Name i . . Codt(Wor:Name.
Conaster Construction TX,LP Jesse Martinez1'64Z.4 Z
Ins eoto i Date Pto eet;M ef _ -
3
3T/9
` s�st."trDjregtb :WateT be"# Date, 'BonstructlowSuftbordob
e
311CoundlAction`(Required)
M&C Number NIA M&C Date Approved NIA
r
FORT' WORTH City of Fort Worth
Change Order Additions
Project Name 2014 CIP Year 2,Contract 3 City Sec No.: +4M
Project No.(s): 59601-0600430-CO2433&59607-0700430-CO2433-C01783, DOE No.= City Proj.No.: 02433
ProjectWater and Sewer replacement on Wonder Drive,Glenmont Drive,Wilkie Way and Winifred Drive.
Description
Contractor Conaster Construction TX,LP Change Order:�.J Date: 3/14!2018
City Project Mgr. Roberto C.Sauceda,P.E. City Inspector F Edward Davila
ADDITIONS
TRIM
13 Water line Grouting of 24-inch Water Main Water 235.00 CY $200.00 $47,000.00
35 Installation of a 6-inch Blow Off Water 1.000 LS $19,900.00 $19,900.00
19 Grouting of Water line Sewer 179,00 CY $200.00 $35,800.00
43 Grouting of Water line TPW 412.75 CY $200.00 $82,550,00
g
i
Water $66,900.00
Sewer $35,800.00
TPW $82,550.00
Page 2 of 4 Additions Sub Total 1$185,250.00
FORT WORTH City of Fort Worth
Change Order Deletions 4/ Ct y
Project Name 2014 CiP Year 2,Contract 3 City Sec No.: rl
Project No.(s): DOE No. 7493 City Proj.No.: 02433
Project Description Water and Sewer replacement on Wonder Drive,Glenmont Drive,Willde Way and Winifred Drive.
Contractor Conaster Construction TX,LP Change Order: F1 I Date 3/14/2018
Cily Project Mgr. Roberto C.Sauceda,P.E. City inspector: F Edward Davia
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
2 8'DIP Sewer Pipe Sewer 551.00 LF $65.00$35,815.00
17 4'Wide Asphalt Pavment Repair Water 1,185.00 LF $40.00$47,400.00
19 6'Concrete Driveway Water 600.00 SF $10.00$6,000.00
22 1'Water Service Water 9.00 Ea $1,100.00$9,900.00
23 1'Water Service,Meter Relocation Water 9.00 Ea $400.00$3,600.00
4 6'Concrete Cub and 18'Gutter TPW 2,183.00 LF $23.00$50,209.00
33 Unclassified Street Excavation TPW 189.00 CY $18.00$3,402.00
42 Paving Construction Allowance TPW 1.00 LS $29,317.00$29,317.00
Water $66,900.00
Sewer $35,815.00
TPW $82,928.00
Page 3 of 4 Deletions Sub Total 1$185,643.00
MIWBE Breakdown for this Change Order
Map
,-
Total
Previous Change Orders
i
i
Total
Page 4 of 4
FORTWORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract,including ensuring all performance and reporting requirements.
4nature
Roberto C.Sauceda,P.E
Name of Employee
Water Department-Engineering
Department
Senior Professional Engineer
Title
817-392-2387
Phone
� , /�j is
Date
WAM DEPARTMENT
EN(31mmNG AND Asm SERvKzs
THe Carr oa Form Warm * 1000 THRommovom Srnw Fm Wo m+,THw 76102
817-392-8240 * FAx 817-392,8195
Q printed on recycled paper