Loading...
HomeMy WebLinkAboutContract 46976-CO9 CITY SECRETARY q CONTRACT NO, L I rI :Qq RECEIVES FORT WORTH, 2018 CI C�SECREfARY� City Of Fort Worth Change Order Request Fa ft and p North Senior Cenler,Phase 16 2 City Sec No. 46976 Descriptim- Funding(FID)304014-0200431-5740010-CO2105-000780-2015.14060199 City Proj.No.02105 No.(s) Contractor.Ridgemont Commercial Construction Change Order i 0 Date: 3/1612018 City project Mgr.Ronnla Clements City Inspector Mike WIM Phone Number:(817)392-8014 Phone Number. (817)392-2297 ContraclTime (CO) Original Contract Amount $25,462,398.00 660 Extras to Date $1,096,216.00 30 Credits to Date $0.00 0 Pending Change Orders(in MAC Process) $0.00 0 Contract Cost to Dat $26,558,614.00 690 Amount of Proposed Change Order $12,024.00 0 Revised Contrail Amount $26,570,638.00 690 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $0.00 CHANGE ORDERS to DATE pNCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.3% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $31,827,99750 ,IUSTffICAi10N r�CFIANGE oRDet_ . The purpose of Change Order No.91s loprovide 1 new OPW COPT FIT at the fuel island,install associated wiring,and reprogram fuel site controllers.This is needed due to riot enough room on epsiting controllers at the fuel island.This was not included it the original contract. Charge Order No.9,addst�ito the contract.Change Order Nos.I.8 increased the contract amount by$1,096,216.00. Including Change Ord. o.9,the combined increase to the contract is$1,108,240.00 or 4.35 percent Change order No.7 was approved through MAC C-28508 The total of Change Orders 8 and 9 equal$99,082.00. N t It Is understood and agreed that the acceptance of this Change Order by the contractor consitutesan accord and satisfaction and repr 1�'•. payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order. Cbnbaela's Norma ContradcrName ' Coir�S(gnahas Data Ridgemonl Commercial Construction )Ce_V 1�1 AA,-Z/<,< PllfahupeuAor'. Rate Nedmatager 3•zi•�g C.,,,,__. 3.27.1 PMD t Data Ardrbeural Servloes Manager _. _ Deb Architect Date peiiy Depa*w11 • 12�- o3•�.t8 ,� 2 6� Jc AssialantclhrAmome Date Assistant aly Fnff t Dario ►-; 0. 51A>14 137574 -x:30� MAC Number � NA I MAC Date Approved Contract Compliance Manager: By signing I acknowledge that I am the person responsible pAL RECORD for the monitoring and administration of this contract,including •�Brian R.Glass,ARS.Glass, VUH ensuring all performance and reporting requirements, Architectural Services Man a�. Y WO u� �ECRETARAR FT. 1n , aA Proposed Change Order Request Ridgemont Commercial Construction 1520 W Walnut Hill Lane Irvinq, TX 75038 R I D G E M O N T Phone: 214-492-8900 commercial construction Owner: City of Fort Worth Project: 1603509- / Fort Worth North Service Center-Pha! 200 Texas Street 301 Hilshire Drive Fort Worth, TX 76102-6314 Fort Worth, TX 76052 Change Order Request#: 46 Additional COPT 1 Date Submitted: 3/26/2018 Response Due By: Includes the cost of the added COPT at Fuel Station Item Phase Description Estimated Cost COPT Material 26-00- Electrical and Fire Alarm 11,788.00 Bond 1.00% 118.00 Insurance 1.00% 118.00 Requested Total For Item 12,024.00 Total For Change Order $92.024.00 The execution of this PCO officially authorizes Ridgemont and it's subcontractors to proceed with the work as described and approves the cost and schedule changes stated herein to be added to the contract The Contract time will be unchanged,the Contract Completion date as of this Change Order will remain 4/3/2018 Submitted By: Ridgemont Commercial Construction Approved By: y rt o Signed: Kevin Bran num v 4, Signed:_ Date: 3/26/18 Date: 3'Z7•18 Reviewed By: Quorum Architects, Inc Signed: Date: Proposed Change Order Request Ridgemont Commercial Construction 1520 W Walnut Hill Lane AA _ Irving,TX 75038 R 1 D G C M G N f Phone:214-492-8900 commercial construction Owner: City of Fort Worth Project: 1603509- / Fort Worth North Service Center-Pha: 200 Texas Street 301 Hilshire Drive Fort Worth, TX 76102-6314 Fort Worth,TX 76052 Change Order Request#: 46 Additional COPT 1 Date Submitted: 3/2 612 0 1 8 Response Due By: Includes the cost of the added COPT at Fuel Station Item Phase Description Estimated Cost COPT Material 26-00- Electrical and Fire Alarm 11,788.00 Bond 1.00% 118.00 Insurance 1.00% 118.00 Requested Total For Item 12,024.00 Total For Chancre Order $12,024.00 The execution of this PCO officially authorizes Ridgemont and it's subcontractors to proceed with the work as described and approves the cost and schedule changes stated herein to be added to the contract The Contract time will be unchanged,the Contract Completion date as of this Change order will remain 4/3/2018 Submitted By: Ridgemont Commercial Construction Approved By: y rt o Signed: Kevin Brannulm Signed: Date: 3/26118 Date: 3.27•#8 Reviewed By: Quorum Architects, Inc Signed: — Date: 0 3.2�.2018