HomeMy WebLinkAboutContract 47386-CO1 Fc oTH
n-r WORCit GtTYSECRETARY
City of Fort Worth coNaw, 41�- C� 1
Change Order Request
Projectame: 2014 CIP Year 2,Contract 1 City Sec No.: 47386
REGEl . Ll 59601-0600430-CO2369&59607-0700430-002369-C01783,
P(gl�¢(11�0'(5)' 34014-0200431-CO2369-CO1783 DOE No. City Proj.No.: 02369
APS- L Lul
Ctt R?tion: Water and Sewer replacement on Embrey Place,Park Street,Grover Avenue and N Hampton Street
rt i'
Contractor: JLB Contracting,LLC Change Order# 0 Date: 1 3/14/2018
~�l n��p11ect Mgr. Roberto C.SaUCeda,P.E. City Inspector: I GaryDeyon
a Ft%rfd'N�um er: 817-392-2387 Phone Number: 817-392-8306
pc`t Coll P�N De t. Water Sewer TPW Totals Contract Time
5�C .r P
(Calendar days)
Original Coact Amount $926,990.70 $926,990.70 $1,560,315.50 $3,414,296.90 300
Extras to bate
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $926,990.70 $926,990.70 $1,560,315.50 $3,414,296.90 300
Amount of Proposed Change Order -$2.54 $0.00 $0.00 -$2.54 325
Revised Contract Amount $926,988.16 $926,990.70 $1,560,315.50 $3,414,294.36 625
Original Funds Available for Change Orders $0.00 $0.00 $0.00
Remaining Funds Available for this CO $0.00 $0.00 1 $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,267,871.13
The change order will provide a pay item for a 4-inch water line to be installed to complete the project.
Additional time is required for the fire line, as well as coordination and scheduling around the development.
Furthermore,time is required due to constraints surrounding construction on Park Street due to parks
department requirements for the medians. That all long side water services were to be bored rather than
installing by open cut to minimize the damage to the mature trees on the medians.
Staff concurs with the contractor's reque J2E)q al calendar days on the change order.
Ates by. `o. �o
OFFICIAL RECORD
Mary J. ,Citi * CITY SECRETARY
FT.WORTH,TX
in full(both time and money)for all costs arising out of,ori ;b>j4e Change Or
JLB Contracting,LLC Sam Davis
)
3 Z�
amsislontuirecto, �! t
o> n.t N lei
M&C Number N/A M&C Date Approved NIA
FORT WOO rH City of Fort Worth
I'"W Change Order Additions
Project Name 2014 CIP Year 2,Contract 1 City Sec No.: 47386
Project No.(s): 59601-0600430-CO2369&59607-0700430-CO2369-C01783, DOE No. City Proj.No.: 02369
Project Water and Sewer replacement on Embrey Place,Park Street,Grover Avenue and N Hampton Street
Description
Contractor JLB Contracting,LLC Change Order:=1 Date:F 3/14/2018
City Project Mgr. Roberto C.Sauceda,P.E. City Inspector GaryDeyon
ADDITIONS
DEPT Qty Unit Unit Cost Total
50 4-inch PVC water Line Water 184.00 Cy $35.00 $6,440.00
Water $6,440.00
Sewer
TPW
Page 2 of 4 Additions Sub Total 1$6,440.00
FLIRT WORTH City of Fort Worth
Change Order Deletions
Project Name 2014 CIP Year 2,Contract 1 City Sec No.: 1 47386
Project No.(s): DOE No. City Proj.No.: 02369
Project Description Water and Sewer replacement on Embrey Place,Park Street,Grover Avenue and N Hampton Street
Contractor JLB Contracting,LLC Change Order: F-1 I Date 3/14/2018
City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Gary Deyon
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
33 5-inch Concrete Driveway Water 425.25 LF $15.15 $6,442.54
Water $6,442.54
Sewer
TPW
Page 3 of 4 IDeletions Sub Total $6,442.54
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
FoRTWORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all 5,C
rmance and reporting requirements.
Signature
Roberto C.Sauceda,P.E.
Name of Employee
Water Department-Eng
Department
Senior Professional En ' eer
Title
817-392-23 L7
Phone
obi o�i�
Date
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
3