HomeMy WebLinkAboutContract 43103-CO1 FORT WORTH , city of Fort worth CITY SECRETARY NO Y Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: COAppr-02 Date Started: 2018-03-19 City Sec. No.: 43103 Date Due: 2018-05-12 Project Name: 00856 - South-Central High-Speed Corridor Quiet Zone Project Numbers: C00856 DOE Numbers: Project Change Order #1 to CSN 43103 for Grade Crossing Construction Description: and Maintenance Agreement With BNSF for the crossing at Biddison Street for a reduction in additional amount of - $24,795. Project/Contract Compliance Clint Hoover City Inspector: Darryl Ruffin Manager: Contractor: COUNCIL ACTION (If Required): M&C Log Name: 20SCHSC RAILROAD SAFETY IMPROVEMENTS M&C Number: **C-28004 M&C Date: 2016-12-06 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ -24,795.00 Total Cost: $ -24,795.00 Total Requested Days: 0 Action Required: Allow Existing Purchase Order to decrease by this amount. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX CITY SECRETARY FORT WORTH.. City of Fort Worth CONTRACT NO. 13 Change Order Request Breakdown Project Namel Grade Crossing Construction and Maintenance Agreement-Biddison Street City Sec# 43103 Client Project#(s)J 00856 Contractor BNSF Railway PM Lissette Acevedo Inspectorl Darryl Ruffin Change Omer Submittal# 0 Date 3/19/2018 Contract Time Dept. TPW Totals (CD) Original Contract Amount $83,831.00 $83,831.00 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $83,831.00 $83,831.00 Amount of Proposed Change Order -$24,795.00 -$24,795.00 Revised Contract Amount $59,036.00 $59,036.00 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.0) Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -29.58% MAXALLOWABLECONTRACTAMOUNT(ORIGINALCONTRACT COST+25%) $104,788.75 N5)FOR GIMME he City e N ed rrto an agreement with BNSF Railway to share costs For comtruction of railraad ifrastructure on BNSF Railway faet;ies on Dot"25,2011 (CSN 43103k The project was put on hold until 2016,and the costs for the construction increased in those 5 years. BNSF Railway sent the City updated construction costs in 2016. City Council approved these additional costs on December 6,2016(M&C C-28004). The decrease in cost for the Biddison Street crossing improvements was-$24,795. This change order will allow the existing Purchase Order to be decreased by this amount. �c9��gq�9T OFFICIAL RECdTX CITY'SECRET IFT, WORTH City of Fort worth Change Order Additions Project Name Grade Crossing Construction and Maintenance Agreement-Biddison Street City Sec# 43103 Client Project# 00856 Contractor] BNSF Railway PM Lissette Acevedo Inspectof Darryl Ruffin Change Order Submittal# 0 Date 3/19/2018 ADDITIONS ITEM DESCRIPTION DEPT ry Unit Unit Cost Total TPW $0.00 Sub otal Addruons Change Order Additions Page 1 of 1 FORTWORTH City of Fort worth -- Change Order Deletions ProjectName Grade Crossing Construction and Maintenance Agreement-Biddison Street City Sec# 43103 Client Project# 00856 Contractor! BNSF Railway PM Lissette Acevedo Inspector Darryl Ruffin Change Order Submittal# 0 Date 3/19/2018 UtLt I IUNS Unit Unit os o a 1 BN SF Rai ay construct on cost sharing increase TPW 24,795.D Sub otal Ueletions Change Order Deletions Page 1 of 1 MISBE Breakdown for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORT�WOR,TII COUNCIL ACTION: Approved on 12/6/2016 REFERENCE 20SCHSC RAILROAD DATE: 12/6/2016 NO.: **C-28004 LOG NAME: SAFETY IMPROVEMENTS CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendments to Three Agreements in the Combined Amount of$201,298.00 with the Burlington Northern Santa Fe Railway Company for Upgrades of Railroad Signal Equipment at W. Seminary Drive, W. Butler Street and W. Biddison Street for a Collectively Revised Amount of$440,181.00 and Authorize Execution of an Agreement with CTC, Inc., in the Amount of$150,730.00 for the Installation of Wayside Horns at W. Butler Street and W. Biddison Street (COUNCIL DISTRICTS 6 and 7) RECOMMENDATION: It is recommended that the City Council: 1. Authorize Amendment No. 1 to a Grade Crossing Construction and Maintenance Agreement, City Secretary Contract No. 43102, with the Burlington Northern Santa Fe Railway Company in the amount of$98,041.00 for upgrades to railroad signal equipment at W. Seminary Drive for a revised City cost amount of$210,241.00; 2. Authorize Amendment No. 1 to a Wayside Horn Agreement, City Secretary Contract No. 43104, with the Burlington Northern Santa Fe Railway Company in the amount of$128,052.00 for upgrades to railroad signal equipment at W. Butler Street for a revised City cost amount of$170,904.00; 3. Authorize Amendment No. 1 to a Wayside Horn Agreement, City Secretary Contract No. 43103, with the Burlington Northern Santa Fe Railway Company in the reduced amount of$24,795.00 for upgrades to railroad signal equipment at W. Biddison Street for a revised City cost amount of $59,036.00; and 4. Authorize the execution of a contract in the amount of$150,730.00 with CTC, Inc., for the installation of Wayside Horns at W. Butler Street and W. Biddison Street. DISCUSSION: The City of Fort Worth received a federal earmark to be used to deploy railroad crossing safety improvements at crossings on the South Central High Speed Rail Corridor for the establishment of quiet zones. These improvements are necessary to improve safety at these crossings and to establish quiet zones. The City will reimburse Burlington Northern Santa Fe Railway Company (BNSF) for improvements required to their tracks and equipment and a construction contract with CTC, Inc., will be executed to install Wayside Horn Systems at W. Butler Street and W. Biddison Street. Once the quiet zones are established, trains will no longer sound their horns at each of these crossings, which will significantly reduce the noise impact to the surrounding homes. Previous City Council approvals related to this project include: acceptance of a federal grant in the amount of$379,985.00 (Mayor and Council Communication (M&C) C-22731), approval of the execution of an Agreement with BNSF, (M&C C-25440) in the amount of$238,883.00 for upgrades to railroad signal and crossing equipment. Due to the unexpected increase in railroad construction costs that exceeds the current project budget originally authorized by the City Council, additional funds in the combined amount of$201,298.00 are needed to complete the railroad improvements. The City advertised for bids for the installation of Wayside Horn Systems at W. Butler Street and W. Biddison Street. The sole bid received for the project was from CTC, Inc., of Fort Worth, Texas in the amount of$150,730.00. The unit prices for these work elements is responsible and comparable to other bid costs. Additionally, the City received TxDOT approval to award this contract to CTC, Inc., in a memorandum dated March 13, 2013. A portion of this project will include 2014 Bond Program funds. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund, in accordance with the statement expressing official Intent to Reimburse which was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014) and the subsequent ordinance authorizing debt in 2016 (Ordinance No. 22216-05-2016). The total project costs are summarized in the following table: Total Project Description of Project Costs City Costs Federal Grant Railroad Costs Project Management/ Construction Services $ 22,000.00 $ 0.00 $ 0.00 $ 22,000.00 Construction-CTC $150,730.00 $ 0.00 $ 0.00 $150,730.00 Construction–RR reimbursement $ 60,196.00 $379,985.00 $ 0.00 $440,181.00 Construction–RR costs $ 0.00 $ 0.00 $110,149.00 $110,149.00 Right-of-way $ 0.00 $ 0.00 (—$ 0.00 $ 0.00 State Direct Costs $ 10,228.00 $ 0.00 $ 0.00 $ 10,228.00 Quiet Zone Establishment $ 25,000.00 $ 0.00 0.00 $ 25,000.00 Total Project Costs $268,154.00 $379,985.00 l— $110,149.00 $758,288.00 This project is located in COUNCIL DISTRICTS 6 and 7. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated of the 2014 Bond Program, the Grants Capital projects Federal Fund and the 2007 Critical Capital Projects Fund. Description Existing Additional Appropriations Proposed Appropriations Per M&C Appropriations 2014 Bond-34014 $241,380.00 $0.00 $241,380.00 Grant/Cap.-31001 $396,210.00 $0.00 $396,210.00 2007 Critical Cap-39001 $146,281.93 $0.00 $146,281.93 TOTAL $793,871,93 $0.00 $783,871.93 TO Fund Department Account Project Program Activity Budget Reference# ID ID Year (Chartfield 2) Amount FROM Fund Department Account Project Program Activity Budget Reference# Amount ID I I Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Todd Estes (5448) ATTACHMENTS BNSF-signed FORM 1295 for City of Fort Worth.pdf CTC WSH Form 1295 Certificate-signed.pdf SCHSC MC map.pdf C 0) 'O pr _ mL V x 2 U � H H O Y LLI 3 U) o O O ~ U) 3 U) L� ¢ Z m a m �, p dp X N LLJU W O Z m l[7 W m -q- M Om m m CZ o � mNm0 (nUIQa °D 0 O 11 O � U) a O O Q O Q J L1 fry J U) J f O O U) Y Z O LL •7 �2 of a a 3 LU � 3 q m o in O - � o - L cro -j O O O Cb co roc c CD Z W O N � r 3 3 O O C N C •— M M N C C C92 z O v m F NC: m Qf <rI , U OLL. N M Q +.� m u L— O ~ m H J W tom^ uj to accc) OD .. U Z H ,w m J lob N N ® C O m • U + C N h O O to U m O 'O O SZ N • W O } O O O O L4 0 ct cl U m "3 F 7 ¢ m d m 0 0 U L4Z ( O m N 1f�1 U U W 2 Q •_ C a0 O (y 3 L4 Z3 co Z >- Z Ln 0:: (n Q m Q 3 J E— E— Z o Ct 0 S Z o C Z Q N C7 W J f U O uU W U ce W z Z 0 Z 0. ¢f O O Z - O o (n U to N ¢ di J ? 3 ot$ LUW) p CC U f N U p F U J W w ct W = Z J ¢ � L> O ZH UO Z O m J O J 0 Z O Z w 0 L) m � X: z u Lu w J J i W D cc U) W m W O w J O ' �7 J W N m p a m mo Q Q U) w w 0 z o Z J K m f c.) m m c.) 0 Z0 U m (n MAINTAIN PROPRIETARY CONFIDENTIALITY '•*•• EXHIBIT B- Signal Cost Estimate BNSF RAILWAY COMPANY Biddison Street-DOT No.020480T FHPM ESTIMATE FOR Revised on 3/08/2016 CITY OF FORT WORTH LOCATION FT WORTH DETAILS OF ESTIMATE PLAN ITEM: PS1020480T VERSION: 5 PURPOSE,JUSTIFICATION AND DESCRIPTION INSTALL PREEMPT FOR WAYSIDE HORN AT BIDDISON ST,FT WORTH,TX;TEXAS DIV;FT WORTH SUBDIV;LS 7500;MP 342.14;DOT# 01-0480T:SEQ4 38505 MONTHLY POWER UTILITY COST CENTER:61698 THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTIVE PACKAGES USED FOR ESTIMATING PURPOSE ONLY. THIS ESTIMATE IS GOOD FOR 90 DAYS,THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR,MATERIAL,AND OVERHEAD. CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. iRiR rt■RRARr tttr qRr rttRV Nl RfR SIGNAL WORK ONLY fl1Rlti R#t RRtitr tt Rr q!!NR■RR■ THE CITY OF FORT WORTH IS FUNDING 80%,BNSF IS FUNDING 20%OF THIS PROJECT. ****ADVISE THAT AFE IS ON HOLD PENDING NOTICE THAT NEW COST HAS BEEN ACCEPTED BY CITY**** MAINTAIN PROPRIETARY CONFIDENTIALITY. PRIMARY FUNDING SOURCE IS FHWA ••BUY AMERICAN)APPLIES•' DESCRIPTION QUANTITY U/M COST TOTAL$ ifltttRift LABOR ■ttfiRRtRR SIGNAL FIELD LABOR-CAP 280.0 MH 8,633 PAYROLL ASSOCIATED COSTS 5,670 DA OVERHEADS 8,383 EQUIPMENT EXPENSES 2,325 INSURANCE EXPENSES 1,449 TOTAL LABOR COST 26,460 26,460 prt Rti wri!■ MATERIAL ifrf!#RlRRffR ARM,EZ-GATE 2.0 EA N 1,152 BELL 1.0 EA N 196 CABLE,5C/10 35.0 FT N 65 FIELD MATERIAL 1.0 LS N 7,386 GATE KEEPER 2.0 EA N 3,726 HAWK 48 DIM L0 EA N 1,425 JUNCTION BOX,PREEMPTION 1.0 LS N 320 LED LIGHT 12.0 EA N 2,412 LED LIGHT GATE KIT 2.0 EA N 372 LIGHT OUT DETECTOR 1.0 EA N 1,023 RELAY W/PLUGBOARD 5.0 EA N 5,000 SIDELIGHT,I-WAY 1.0 EA N 799 SIGN,DOUBLE SIDED XBUCK 2.0 EA N 328 WIRE MATERIAL 1.0 LS N 2,600 USE TAX 2,329 OFFLINE TRANSPORTATION 331 TOTAL MATERIAL COST 29,464 29,464 RiRRRiRRRR OTHER RlRRttRRRf CONTRACT ENGINEERING 1.0 LS N 8,000 CONTRACT SIGNS/CONES 1.0 LS N 2,500 TOTAL OTHER ITEMS COST 10,500 10,500 PROJECT SUBTOTAL 66,424 Page 1 of 2 r CONTINGENCIES 6,642 BILL PREPARATION FEE 731 GROSS PROJECT COST 73,797 LESS COST PAID BY BNSF 14,761 TOTAL BILLABLE COST 59,036 Page 2 of 2 Lissette Acevedo, TPW d2 �a Date Ricardo Matute, TPW Date 3 Kim Arnold TPW Va k4t+ff Date —0Doug Wiersig, TPW t )• 0 Date 3r3o�� g Doug Black, LEGAL Date ('054 U16-(Z077 Susan Alanis, CMO -4- wig t �F�RT•lj,0 Mary Kayser, CSO �- v * ate TEXP`' OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX ..7777777777777777.�.7��,�7777:'I 77 77 77 . Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all perform ce and reporting req�re t . Clint Hoover, P.E.,YABA Sr. Professional Engineer OFFICIAL RECORD CITY SECRETARY FT.WORTHP TX