Loading...
HomeMy WebLinkAboutContract 43102-CO1 FORT WORTH�, City of Fort Worth CITY SECRETARY Change Order Request Approval CONTRACT NO. ID (Upload Change Order Breakdown in Links) For Change Order Submittal No.: 1 Change Order No.: COAppr-01 Date Started: 3/23/2018 City Sec. No.: 43102 Date Due: 5/12/2018 Project Name: 00856 - South-Central High-Speed Corridor Quiet Zone Project Numbers: C00856 DOE Numbers: N/A Project Chane Order #1 to CSN 43102 for Grade Crossing Construction and Description: Maintenance Agreement with BNSF for the crossing at W. Seminary for an additional amount of $98,041. Project/Contract Compliance Clint Hoover City Inspector: Darryl Ruffin Manager: Contractor: COUNCIL ACTION (If Required): M&C Log Name: 20SCHSC RAILROAD SAFETY IMPROVEMENTS M&C Number: **C-28004 M&C Date: 12/6/2016 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TRW $ 98,041.00 Total: $ 98,041.00 Total Requested Days: 0 Action Required: Allow existing Purchase Order to increase by this amount. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Lissette Acevedo, TPW Date Ricardo Matute, TPW Date 3 /Zq l/ts Kim Arnold, TPW C k" � Date 312-0ij i 1 Doug Wiersig, TPW 4 C.�. Date Doug Black, LEGAL Vk*C- C,- C& Date Lys 2016- [2�4 } Susan Alanis, CMO 4 4 1 S T Mary Kayser, CS s f-: '. Efate � ................. TE OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 77 77 7= 77777 7- .. Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all perform ce and reporting require t . .11 Clint Hoover, P.E.,ftA Sr. Professional Engineer OFFICIAL RECORD CITY 810FWAW I�:WORTNI roc FORT WORTH City of Fort Worth `— Change Order Request Breakdown Project Namel Grade Crossing Construction and Maintenance Agreement-W.Seminary City Sec# 43102 Client Project#(s)l00856 Contractor] BNSF Railway PM Lissette Acevedo Inspector Darryl Ruffin Change Order Submittal# Date 3/19/2018 Contract Time Dept. TPW Totals (CD) Original Contract Amount $112,000.00 $112,000.00 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $112,000.00 $112,000.00 Amount of Proposed Change Order $98,041.00 $98,041.00 Revised Contract Amount $210,041.00 $210,041.00 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $98,041.00 $98,041.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 87.549/6 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $140,000.00 ,IU5TIFICATJON OMASOHS)FOE.CHANGE ORDER he City entered r„8 an agreement wil I; USF zailway to sh�r2 costs for cm$.rL-_L•cfl d-ailrcav inha.=.-..::'.:,e on ir,SF Rairvay iaulities on November 17,X011 ;CSN 43102). The project was put on hold until 2016,and the costs for the construction increased in those 5 years. BNSF Railway sent the City updated construction costs in 2016. City Council approved these additional costs on December 6,2016(M&C C-28004). The increase in cost for the W.Seminary crossing improvements was$98,041. This change order will allow the existing Purchase Order to be increased by this amount. E ]RECORD City of Fort Worth Change Order Additions Project Name Grade Crossing Construction and Maintenance Agreement-W.Seminary City Sec# 43102 ClientProject# 00856 Contractorl BNSF Railway PMJ Lissette Acevedo InspectorF Darryl Ruffin Change Order Submittal# O1 Date 3/19/2018 ADDITIONS ITEM DESCRIPTION DEPT uty Unit Unit CostTotal BNSF Railway construction cost sharing increase TPW $98,041.00 Sub Total Additons Change Order Additions Page 1 of 1 FORTWogrx City of Fort Worth ,I- Change Order Deletions Project Name I Grade Crossing Construction and Maintenance Agreement-W.Seminary City Sec# 43102 Client Project# 1 00856 Contracto BNSF Railway PM Lissette Acevedo Inspector Darryl Ruffin Change Order Submittal# 0 Date 3/19/2018 MLI=I TUNS HEM L)LbURIP- DEPT uty Unit Unit os otal TPW $0.00 Sub ota Deletion Change Order Deletions Page 1 of 1 MISBE Breakdown for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRT WO RT 1 COUNCIL ACTION: Approved on 12/6/2016 REFERENCE ** 20SCHSC RAILROAD DATE: 12/6/2016 NO.: C-28004 LOG NAME: SAFETY IMPROVEMENTS CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendments to Three Agreements in the Combined Amount of$201,298.00 with the Burlington Northern Santa Fe Railway Company for Upgrades of Railroad Signal Equipment at W. Seminary Drive, W. Butler Street and W. Biddison Street for a Collectively Revised Amount of$440,181.00 and Authorize Execution of an Agreement with CTC, Inc., in the Amount of$150,730.00 for the Installation of Wayside Horns at W. Butler Street and W. Biddison Street(COUNCIL DISTRICTS 6 and 7) RECOMMENDATION: It is recommended that the City Council: 1. Authorize Amendment No. 1 to a Grade Crossing Construction and Maintenance Agreement, City Secreta;•Contract No. 43102, with the Burlington Northern Santa Fe Railway Company in the amount of$98,041.00 for upgrades to railroad signal equipment at W. Seminary Drive for a revised City cost amount of$210.241.00; 2. Authorize Amendment No. 1 to a Wayside Horn Agreement, City Secretary Contract No. 43104, with the Burlington Northern Santa Fe Railway Company in the amount of$128,052.00 for upgrades to railroad signal equipment at W. Butler Street for a revised City cost amount of$170,904.00; 3. Authorize Amendment No. 1 to a Wayside Horn Agreement, City Secretary Contract No. 43103, with the Burlington Northern Santa Fe Railway Company in the reduced amount of$24,795.00 for upgrades to railroad signal equipment at W. Biddison Street for a revised City cost amount of $59,036.00; and 4. Authorize the execution of a contract in the amount of$150,730.00 with CTC, Inc., for the installation of Wayside Horns at W. Butler Street and W. Biddison Street. DISCUSSION: The City of Fort Worth received a federal earmark to be used to deploy railroad crossing safety improvements at crossings on the South Central High Speed Rail Corridor for the establishment of quiet zones. These improvements are necessary to improve safety at these crossings and to establish quiet zones. The City will reimburse Burlington Northern Santa Fe Railway Company (BNSF)for improvements required to their tracks and equipment and a construction contract with CTC, Inc., will be executed to install Wayside Horn Systems at W. Butler Street and W. Biddison Street. Once the quiet zones are established, trains will no longer sound their horns at each of these crossings, which will significantly reduce the noise impact to the surrounding homes. Previous City Council approvals related to this project include: acceptance of a federal grant in the amount of$379,985.00 (Mayor and Council Communication (M&C) C-22731), approval of the execution of an Agreement with BNSF, (M&C C-25440) in the amount of$238,883.00 for upgrades to railroad signal and crossing equipment. Due to the unexpected increase in railroad construction costs that exceeds the current project budget originally authorized by the City Council, additional funds in the combined amount of$201,298.00 are needed to complete the railroad improvements. The City advertised for bids for the installation of Wayside Horn Systems at W. Butler Street and W. Biddison Street. The sole bid received for the project was from CTC, Inc., of Fort Worth, Texas in the amount of$150,730.00. The unit prices for these work elements is responsible and comparable to other bid costs. Additionally, the City received TxDOT approval to award this contract to CTC, Inc., in a memorandum dated March 13, 2013. A portion of this project will include 2014 Bond Program funds. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund, in accordance with the statement expressing official Intent to Reimburse which was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014) and the subsequent ordinance authorizing debt in 2016 (Ordinance No. 22216-05-2016). The total project costs are summarized in the following table: Total Project Description of Project Costs City Costs Federal Grant I Railroadil Costs Project Management/ Construction Services $ 22,000.00 $ 0,0071 .00 $ 0.00 $ 22,000.00 Construction-CTC $150,730.00 $ 0.00 $ 0.00 J $150,730.00 Construction—RR reimbursement $ 60,196.00 $379,985.00 $ 0.00 $440,181.00 Construction—RR costs $ 0.00 $ 0.00 $110,149.00 $110,149.00 Right-of-way $ 0.00 $ 0.00 $ 0.00 $ 0.00 State Direct Costs $ 10,228.00 $ 0.00 $ 0.00 11 $ 10,228.00 Quiet Zone Establishment $ 25,000.00 $ 1 $ 0.00 $ 25,000.00 Total Project Costs $268,154.00 1 $379,985.00 $110,149.00 $758,288.00 This project is located in COUNCIL DISTRICTS 6 and 7. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated of the 2014 Bond Program, the Grants Capital projects Federal Fund and the 2007 Critical Capital Projects Fund. Description Existing Additional Appropriations Proposed Appropriations Per M&C Appropriations 2014 Bond-34014 $241,380.00 $0.00 $241,380.00 Grant/Cap.-31001 $396,210.00 $0.00 $396,210.00 2007 Critical Cap-39001 $146,281.93 $0.00 $146,281.93 TOTAL $793,871,93 $0.00 $783,871.93 TO Fund Department Account Project Program Activity Budget Reference# ID ID Year (Chartfield 2) Amoun9 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Todd Estes (5448) ATTACHMENTS B_N_SF-signed FORM 1295 for City of Fort Worth.pdf CTC WSH Form 1295 Certificate-signed.pd SCHSC MC map.pdf i c I 01 O V = U 2 ~ � W � Y N O W cO F ao y m m a m a Y \, X O 1l X LL N N vLUZ � mco a 2 a m N O U WNX Im rr(L cr m OF (L V 1 3 w rl U) LO W W m aQ � Nciiao > jaoa � f LL 3 J f 0 O to ]C Z O LL a a 3 f- LLJ N D jo O L — m O 7 w V L U m 0 7t �1 U O 0 P m Z_ F } } z W O •• 3 3 O O ~ C N C O M M cV C C LD r� •� D c aD - 7: 7: J rl CU UO WO 7 N M ` Q U V CD Ci (n ko 1 J CD Qz .. U f C O m 92 U U a w Nm w V O �p O O O O I-bq O O a U m .q Q) c 4 U 4Q 4) v o U L m 0 m � '0 O U W m P C U Z L b0 g O 3 X 1 X 1 LD z a 3 J c H Z O M LL] Z o z z U1 U OU Q (n W U J z O o z ?o N =LLU U N N Q (LX (n W O J O c< LLJ z d m U f N pm w U p cr U J W W Z O Z O W O O z U o o J s a C7 O O Z w o F- U a LLIf z U W W W L, J O 1 0 ¢ J w (N!) ¢ o a m Q c = Q U) J 1"' O C) O a Z O Q J ? m f u m Z) oU m 0 Z OU 0 ( 1 (nF- •"" MAINTAIN PROPRIETARY CONFIDENTIALITY •'•'• EXHIBIT D-Signal Cost Estimate BNSF RAILWAY COMPANY W.Seminary Drive-DOT No.020478S FHPM ESTIMATE FOR Revised on 3/08/2016 CITY OF FT WORTH LOCATION FT WORTH DETAILS OF ESTIMATE PLAN ITEM: 000216701 VERSION: 2 PURPOSE,JUSTIFICATION AND DESCRIPTION W.SEMINARY DRIVE-FORT WORTH,TX;INSTALL GATES/FLASHERS;TEXAS DIV;FT WORTH SUBDIV;LS 7500;MP 341.10;DOT# 0204785;SEQ#38506. MONTHLY POWER UTILITY COST CENTER:61698 THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTATIVE PACKAGES USED FOR ESTIMATING PURPOSES ONLY. THIS ESTIMATE IS GOOD FOR 90 DAYS.THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR,MATERIAL,AND OVERHEAD. CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. rrrsrssrsssasssss►aarrrrr rrrrss SIGNAL WORK ONLY ssssssrrrsrssrrsssrssssssasrrsr THE CITY OF FT.WORTH,TX IS FUNDING THIS PROJECT 80'/a, BNSF IS FUNDING 20%. •• *ADVISE THAT AFE IS ON HOLD PENDING NOTICE THAT NEW COST HAS BEEN ACCEPTED BY CITY.*'*• MAINTAIN PROPRIETARY CONFIDENTIALITY DESCRIPTION QUANTITY U/M COST TOTAL$ srsrsssssr LABOR rsrrarrrrs SIGNAL FIELD LABOR-CAP 1006.0 MH 31,015 SIGNAL SHOP LABOR-CAP 80.0 MH 2,489 PAYROLL ASSOCIATED COSTS 22,004 DA OVERHEADS 32,535 EQUIPMENT EXPENSES 9,025 INSURANCE EXPENSES 5,624 TOTAL LABOR COST 102,692 102,692 rrrrrrssrssss MATERIAL f rrrNrrripr BATTERY,10 VGL-255,18 VGL-350 1.0 LS N 7,954 BELLS 1.0 EA N 196 BUNGALOW 6X6 1.0 EA N 6,456 BUNGALOW MATERIAL 1.0 LS N 7,130 CABLE,2016 TW 500.0 FT N 580 CABLE,3C/2 500.0 FT N 2,760 CABLE,5010 70.0 FT N 129 CABLE,506 1000.0 FT N 3,950 CABLE,7014 1000.0 FT N 1,690 CHARGERS,12/20,12/40 1.0 LS N 848 CONDUIT,PVC 4,SCH 80 500.0 FT N 1,685 ELECTRICAL MATERIAL 1.0 EA 1,500 EVENT RECORDER I.0 EA N 3,560 FIELD MATERIAL 1.0 IS N 7,386 FOUNDATION,STEEL 2.0 EA N 1,458 GATE KEEPER 2.0 EA N 3,726 GATE MECHANISM,S-60 2.0 EA N 12,032 HAWK 48 DIM 1.0 EA N 1,425 LED LIGHT 16.0 EA N 3,216 LED LIGHT GATE KIT 4.0 EA N 744 LIGHT OUT DETECTOR 2.0 EA N 2,046 SHUNT,NBS WITH ENCLOSURE 2.0 EA N 2,162 SIGN,DOUBLE-SIDED X-BUCK 2.0 EA N 328 SURFACE ROCK 22.0 CY N 1,100 TELLULAR DEVICE(RTU) LO EA N 3,052 MATERIAL HANDLING 75 USE TAX 6,708 OFFLINE TRANSPORTATION 958 Page 1 of 2 TOTAL MATERIAL COST 84,854 84,854 OTHER as«aria+aa AC POWER SERVICE 1.0 EA 10,000 CONTRACT ENGINEERING 1.0 LS N 8,000 CONTRACT FLAGGING/SIGNS/CONES 1.0 LS N 5,500 DIRECTIONAL BORE 510.0 FT N 25,500 TOTAL OTHER ITEMS COST 49,000 49,000 PROJECT SUBTOTAL 236,546 CONTINGENCIES 23,654 BILL PREPARATION FEE 2,602 GROSS PROJECT COST 262,802 LESS COST PAID BY BNSF 52,561 TOTAL BILLABLE COST 210,241