HomeMy WebLinkAboutContract 50622 Developer and Project Information Cover Sheet:
Developer Company Name: RCM ArchCo Dylan Phase I, LLC I
Address, State,Zip Code: Seven Piedmont Center, Suite 300,Atlanta,GA, 30305
Phone& Email: 469-533-4107, dcain@realtycapital.com
Authorized Signatory, Title: Neil T. Brown , Authorized Signatory
Project Name: The Dylan
Brief Description: Water, Sewer, Storm Drain
Project Location: Portion of property address is 7500 Summer Creek Dr.
Plat Case Number: FP-16-097 Plat Name: Summer Creek Crossing the Dylan
Mapsco: GRID 102M Council District: 6
CFA Number: 2017-106 City Project Number: 100989
To be connpleted by srajj
AVReceived by: Date: 2
Eti 4�
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-The Dylan CI`T`Y#EC�E'�"�RY
CFA Official Release Date: 02.20.2017 lid, OR,rN
Page 1 of 13 o
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § ContractNo.
WHEREAS, RCM ArchCo Dylan Phase I, LLC ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as The Dylan ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan OFFICIAL RECORD
CFA Official Release Date: 02.20.2017
Page 2 of 13 CITY SECRETARY
FT.WORM TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer(A-1) ®, Paving (B) p, Storm Drain (B-1) ®, Street Lights & Signs
(C) O.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 3 of 13
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 4 of 13
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees; provided, however, said Developer's indemnification
obligations under this provision shall not extend to the proportionate amount of any suits,
actions or claims caused by the negligence or willful misconduct ofthe City of Fort Worth,
its officers, agents and employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure contemplated
herein; provided, however, said Developer's indemnification obligations under this
provision shall not extend to the proportionate amount of any suits, actions or claims caused
by the negligence or willful misconduct of the City of Fort Worth, its officers, agents and
employees. Further, Developer will require its contractors to indemnify, and hold
harmless the City for any losses, damages, costs or expenses suffered by the City or
caused as a result of said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects in materials and
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 5 of 13
workmanship, in conformance with the Policy, and in accordance with all plans and
specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third-party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two-year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 6 of 13
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
V. Notwithstanding the foregoing, the Developer shall have such additional time to
complete the Improvements as may be required in the event of force majeure,
defined herein, if the Developer is diligently and faithfully pursuing completion of
such Improvements. For this purpose, "force majeure" shall mean any contingency
or cause beyond the reasonable control of the Developer including, without
limitation, acts of God and/or nature or the public enemy, war, riot, civil
commotion, insurrection, state, federal or municipal government or de facto
governmental action (unless caused by acts or omissions of the Developer), fires,
casualty, explosions, floods, severe inclement weather, shortages in labor or
materials, and strikes. In an event of force majeure,the Developer shall be excused
from doing or performing the same during such period of delay, so that the
completion date applicable to such performance,or to the construction requirement,
shall be extended for a period of time equal to the period the Developer was
delayed. Upon the occurrence of an event of force majeure the Developer shall
promptly give written notice (setting forth full particulars of the event and the
efforts being made to resolve the event) to the City and shall resume the keeping
and performance of the respective obligation after the cause of force majeure event
has come to an end. During the existence of a force majeure event the Developer
and the City shall bear its own costs resulting therefrom.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 7 of 13
event and the efforts being made to resolve the event) to the City and shall resume
the keeping and performance of the respective obligation after the cause of force
majeure event has come to an end. During the existence of a force majeure event
the Developer and the City shall bear its own costs resulting therefrom.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
R. IMMIGRATION AND NATIONALITY ACT
Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification Form
(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and
supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate
procedures and controls so that no services will be performed by any Developer employee who is
not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND
HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO
VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,
SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer,
shall have the right to immediately terminate this Agreement for violations of this provision by
Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 8 of 1S
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20,2017
Page 9 of 13
Cost Summary Sheet
Project Name: The Dylan
CFA No.: 2017-106 City Project No.: 100989
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction $ 154,782.21
2.Sewer Construction $ 109,247.54
Water and Sewer Construction Total $ 264,029.75
B. TPW Construction
1.Street $ -
2.Storm Drain $ 205,371.03
3.Street Lights Installed by Developer $ -
4. Signals $ -
TPW Construction Cost Total $ 205,371.03
Total Construction Cost(excluding the fees): $ 469,400.78
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 5,280.59
D. Water/Sewer Material Testing Fee(2%) $ 5,280.59
Sub-Total for Water Construction Fees $ 10,561,18
E. TPW Inspection Fee(4%) $ 8,214.84
F. TPW Material Testing(2%) $ 4,107.42
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 12,322.26
Total Construction Fees: $ 22,883.44
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 469,400.78
Completion Agreement=100%/Holds Plat $ 469,400.78
Cash Escrow Water/Sanitary Sewer=125% $ 330,037.19 x
Cash Escrow Paving/Storm Drain=125% $ 256,713.79 x
Letter of Credit=125%w/2yr expiration period $ 586,750.98
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 10 of 13
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
RCM ArchCo Dylan Phase 1,LLC
J us J. Chapa �
Assistant Cit Manager
Date: _ " 0
a e: it T. B n
Recommended by: Title: Authorized Signatory
Date: 3/22I2Dii4
Wendy Ch' abulal, EMBA, P.E. ATTEST: (Only if required by Developer)
Development Engineering Manager
Water Department
L� 't 1,i, Signature
Douglas . Wiersig, P.E. V Name:
Director
Transportation &Public Works Department Contract Compliance Manager:
Approved as to Form &Legality: By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
Richard A. McCracken requirements.
Assistant City Attorn y
M&C No. ��/�
Date:
Ie: Janie Morales
Form 1295: N g" NTitle: Development Manager
FORT r,O
ATTEST: 'A
F—: _
ry J. Ka-,/4r .Q`5
City Secretar ,
City of Fort Worth,Texas OFFICIAL RECIU"
Standard Community Facilities Agreement-The Dylan CITY$ECR9TARY
CFA Official Release Date: 02.20.2017
Page 11 of 13 FT`WORTNj TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
z Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
Exhibit B: Paving Improvements
CI Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 12 of 13
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100989
None
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Dylan
CFA Official Release Date: 02.20.2017
Page 13 of 13
m Y
v fV
pp S a 04.E
QRP d 3�
L< � FRANCISCO OOtl3W NOl yj
o
Ory W
apHNSSOH
Iz
a B9/yOS II
3 U 4 O
6 2 Z y
Q
p p ..
073 0323
300ib Q
o U
b3q>1 N
W� aDowl� a°
r
os o
bd/Ybd
01115 CpUROE rc
VIN bNl y
CEC < `ri7,y �[P�'� 39 N33a9
to/�
m w m
w \�pH p 3Ntl MOOtl3ry oa
x
NOSSOIB 3ui
w i �N�fR SAF, N oW
� � S DNtlISStllq
W V U
W
d 1
IONtlO
U
S
OLD GRANBURY ROAD
/ � O
II W Q �_-
�� O
DC J
�0 I
0
� aX
m
t
l t^^
a LLNa
Z m�
5mY
m
7
C
m
Q
m
N
&vP'lI9IHX3 AlINDIA\S)!9!R3 tl.O\57!Q!WCAS&nmeKN!AD\100\6ZOZ\000Z00\OOSUD( npOJd\:9:H1tld3lIA Wd EO:b:ltl LTOZ'ES-nC'AeP-^l:NO EW—uaH 4-r:A9 ClaUC 1d
1, in
\ \ C)
\ Ln
Ln
O II
'x' CUT u
ON INLET y
3 o �/ '� ELEV-801.07'
a •,
LU
bo , w W
u
i a 0° wLL,
g I LU
uj
LU
H W /
muvWQ,
� Q >
Ja w w
1 3 00
o
/ Z o
Z o
�o
\ W d o
J t
\ / 3
0 F4-
I5mP'SJS9IFD(3 tl:b—SSBM\SY4!W9 tlM\W4!W9X — I!j\S00\6ZOZ1000Z001005�!A�PULd�"IMKA aly��A+�U11 H1Vd31IA Wd SZZS ltl BSOZ'OZ LWeW'A�nl NOW H II"eO A9 Q3LL0ld
} )
E
ƒ
)
\�
a
s $ ggagkqm § �
eFC /
LOcoll Sq cot 17 o ƒ1)\ \
/ }
2 a §
/ ) 22 \�
®kLO co N 2
, -
o
. , J
A k § / ; Kz »
ul Lu
/
� ± aa55 � � ) 5B % ) \
& 1 ■ m
LuSL *
o
2 0 )
. e §\ , = B \
&
z 2 ƒ 7
■ 2
kk R
IL k
■ § ■ )
k ( \
k � E
c
x ƒ 2
%
$ $ } ] /
! ! ! , _ a « £ ±
/ kk ( 2 )
kkkJ { § ! § R
o \ \ \ oM - m NcD
;
! 5qq / 9555 /
i
§) � � � , � _ � � ,
` Ln
7F
\` o i
® 4 :1
Q w
1 � J
U a CUT U
'! ON INLET !n
In 00 `� / ELEV-802.07'
\ t
\
`\ ® W W
I H � >
W o
W
\ LL J
2
— o
wcC �
w
I I W
��Lu/�
J W W V/
U Vf
CL /
I as
� w
vyi
/ 7
Z
4 y <
a
CL
l LJJ w 0 K
LJ�J
J
to
? / 3
1 ' ¢ 2 N v
cLL
n mmc
N
6mP'S1I9IHX}V=[:)7S54M\w!4!W9 V.D\w!4!4x3\S�!+ +0\I!tiJ\T00\6ZOZ\000Z00\OOswi.p�Pdd\ aNJ\ul lA\ H1Vd3II�WV LS TT 1V BTOZ'OZ LWeNI'�P-^l NO W�OH II�eO A8 O311O1d
\ \
/
\
)
¥
mqq
;
2 �\ m VD,M.}\\ ci
)
o o 0C4q IQ q
a k -d §bow 2 ),
coclil 01 )
� §
§ ƒ
§ {
$ z ■
\ \ ul� � � \
J
0 J
Qj § § \
. 2y # y ; # aRR ; a
zmmm = ; = a00 a
E ; mmm@RRmm %
; ul
2 / %
!
§ � 0 § /
k \ k '
§ $ E
�
E
� \
ca
� co
� }
] \ CD
kc
22222 /%ƒ §
/ 2
� kk | | 3: o
a ( aaaf ) ;
04
0
m
W a
Z U O
In
VN N ® `.-l-�i
;<., � J
t / FiT WT u
g N"% ON INLET N
ELEV-801.07'
I
CL
L)
to I4 a o a ~ Ln
,tea, a I < � g" F
p
a. g 1 CN Z
g' g
�I � gig" w
NI p Ali p� N i ®' W
p N N I N N
pp
N N N ,1 W CC
p
1
/ U
w
Q m z
CID 0-
X — o
�cai a0- r- 0-- a a � W C =
N oC �
g�
N " N "per 1n O
,F—
I v f
� a � a m /
� cai g �111 I g � Wa z z
I p r 1n C41 N N =R / f
N N I N / O O
CL
y
r \ w K
Na
Q W
p f0 t J t
•_ N M / 3
N LL^;F
owc
Fo
r)MP'SLI9UG-V�ff-SSBM\TA!tA(3 tl=o\S !NrAs6u-e0 l--D\100\6ZOZ\000Z00\OOSuoApnGnid\ww,sAs aN1\W,—i3\\:HiVdTU WV£S:11:ltl 810Z'OZ LWeW'AeP-1:NO W—H WeCl:AS=Old
a
0
�R
GD
rr�
Ga
U
L
CI
O O m m m O O N N O O aD V m R O AI
N a ft O m 1n O N f� Of 1� A F
Of a0 m O m W O th crcy�- 1q fl P! �
m m 6-1M m M S 6N9 64 M Om1 » O p,l
y e9 d3 M H fR M Vol C
d Q
Q
oo m o o in a o o iO a
ti O O N m O O I� N O O H
� m fV Oi C7 m Ol N f� 1� O ifi N
p m a m rn r m o m as
m m 00 f9 IR M df N m Of O N
N fn
M
I
a
N
m Io O m N �n m O
Lo a)m a m m m F y[ ~
W in N
W W U
W = W CD
Q QQ Q Q Q Q W Q J J J J J Q W W W J C7 K
CL CL 9
~ SO
— Z — C
lz O W W
W 0 Q ^
W =03
U_
a � A
Od
ca
m O 0 0 0 0 0 o v o o OF
N N Ol C
co a s7 a V a a a V a 0 6
(7 m m to m m m N m N m m 3
W O
CL
0 k_
d V,4 w C]
Q - y
o v
ca
ca 9
CL = c
p E
E
JRY
� U
W m
= a
a
c
m
E o 0
m m
c c
m m W
c c U U U U v A > > U
w
U U U U U o E E m t
F-
e- t7 � m N 01 01 tD N � N Ol
O O N N Oo] 0 0 0 0
m m O O O O O M O O O O
.Oyl �O{iomm af Ci N �ti
m p1 C7 O] O] O] O] O f� O] m f7