r C��a TRAC;T NO. ��
'b CROSSING SURFACE INSTALLATION AGREEMENT
BNSF FORM 0108
�%
�G ti Q
CL �� �O y n
BNSF RIGHT-OF-WAY
�Q GORDON AVENUE
Fort Worth, Texas
�� DOT NO. 020835S
O1 6 8 L 9 LS 7262, MP 0.38
This Crossing Surface Installation Agreement (hereinafter called, this "Agreement") is
entered into effective as of August 10. 2017, by and between the City of Fort Worth, Texas
(hereinafter called, "Agency") and The BNSF Railway Company (hereinafter called, the
"Company").
WHEREAS, Company operates a freight transportation system by rail with operations
throughout the United States and Canada; and
WHEREAS, Agency and Company desire to install a new concrete and rubber crossing
surface and perform drainage work at Gordon Avenue;
NOW, THEREFORE, in consideration of the mutual covenants and agreements of
the parties contained herein, the receipt and sufficiency of which is hereby acknowledged, the
parties agree as follows:
1. Company Work. The Company will install one new concrete and rubber crossing surface for
a width of 48 feet on the one track by replacing the track panels through the roadway.The crossing surface will
cover all vehicular driving lanes and the proposed sidewalk at Gordon Avenue. The Company will
perform all necessary track upgrades to accommodate the new crossing surface. The
Company contact person to coordinate and schedule the work will be Roadmaster Rodney
Adams at Mobile #402-416-9927.
2. Payments Invoicing. Upon execution of this Agreement by both parties hereto, Company
will order materials and upon completion of installing the new concrete crossing surface will send
Agency an invoice detailing the total amount owed by Agency for the new crossing surface.
Agency agrees to pay Company a lump sum total cost of thirty thousand and no/100 dollars
($30,000.00) for the new crossing surface (based on $400/FT x 48 FT long crossing + cost of
asphalt work and temporary traffic control). The railroad cost estimate is attached to this
Agreement.
3. Maintenance of the Crossing Surface. After installation of the new concrete crossing
surface is completed, the Company will maintain, at its own cost and expense, the crossing
surfaces in a satisfactory manner. Notwithstanding the preceding sentence, the Company shall
be entitled to receive any contribution toward the cost of such maintenance made available by
reason of any existing or future laws, ordinances, regulations, orders, grants, or other means
or sources.
112 AMular Traffmc duriing Installation. The Company agrees to hire a contractor, at the
�o , A en cost and expense, all necessary barricades, lights or traffic control devices for
CO etoun ehicular traffic at the Gordon Avenue crossing during installation of the new crossing
��oQQye rn
QQ�' i�cOQO�P FORM 0108, 8/10/2017 OFFICIAL RECORD
O 410 1
�, Q CITY SECRETARY
WORTH,TX
5. Drainage. The Agency agrees to allow the Company to drain water from the Gordon
Avenue crossing area into existing Agency storm sewers, if such storm sewers are available.
Drain pipes and filter fabric necessary for such drainage will be furnished and installed by the
Company.
6. Roadway Surfacing Work and Maintenance. The Company agrees to hire a contractor,
at the Agency's cost and expense, to furnish asphalt-stabilized base, as needed, under the
track and place asphalt on both roadway approaches to the new crossing surface at Gordon
Avenue. The Agency will own and be fully responsible for repairs, maintenance, future
construction or reconstruction of the Gordon Avenue roadway. The Agency will maintain the
elevation of the Gordon Avenue roadway approaches to match the elevation of the crossing
surface.
7. Sidewalk Surfacing Work and Maintenance. The Agency must mark the centerline
location of the proposed sidewalk crossing PRIOR TO the Company installing the concrete
crossing panels. The Agency will own and be fully responsible for construction, repairs,
maintenance, future construction or reconstruction of the sidewalk(s) in accordance with the
construction plans that have been approved by the Company. Agency must require its
contractor to execute a BNSF Right of Entry Agreement prior to start of construction work on
Company's right of way. Sidewalks must terminate no closer than 6'-0" from centerline of each
track. Agency will install a 1'-0" minimum width asphalt expansion joint between the end of
sidewalk pavement and the edge of railroad concrete crossing panel. Sidewalks must intersect
the track as close to perpendicular as practical. Sidewalk approaches must be constructed level
with top-of-rail for a minimum distance of 14'-0", as measured from the outside rail in the track.
Detectable Warnings must be installed on each sidewalk approach to the crossing, must extend
across the full width of the sidewalk, provide a 2'-0" minimum depth, and be located 12'-0"
minimum from the outside rail in the track.
[INTENTIONALLY LEFT BLANK, SIGNATURE PAGE TO FOLLOW]
FORM 0108, 8/10/2017
2
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed and attested by its duly qualified and authorized officials as of the day and year first
written above.
COMPANY:
The BNSF Railway Company:
By:
imothy J. Huya,I Manager Publi-0011ciects
AGENCY:
City of Fort Worth, Texas
By: APPRO L RECOMMENDED:
By: ti. Li
Printed Name: Jesus J. Chapa
Printed Name: Douglas W. Wiersig, P.E.
Title: Assistant City Manager
Title: Director of Transportation and Public Works
APPROVED AS TO FORM AND LEGALITY:
079�0� At �i c �
By.
ATTEST:
Printed Name: Douglas W. Black
n 4Ltre
Title: Assistant City Attorney Mary J. Kayser, City Secretarjr '
xAS
All invoices for the project will be sent to: Contract Compliance Manager:
CITY OF FORT WORTH
Engineering Services By signing, I acknowledge that I am the
Attn: Tai Nguyen person responsible for the monitoring and
Railroad Project Manager administration of this contract, including
5001 James Avenue ensuring a!! performance and report!ng
Fort Worth, Texas 76115 requirements. r"�
Phone: 817-392-2359 �
Email: Tai.Nguyen@fortworthtexas.gov
Lissette Acevedo, P.E.,
Engineering Manager
FORM 0108, 8/10/2017 OFFICIAL RECORr
3 CITY SECRE"rgli-
N-r WORTH,TY
_-__A
""••' MAINTAIN PROPRIETARY CONFIDENTIALITY •""""
• Concrete Crossing Cost Estimate BNSF RAILWAY COMPANY
GORDON STREET-DOT NO.020835S FHPM ESTIMATE FOR
CITY OF FT WORTH
LOCATION BIRDS DETAILS OF ESTIMATE PLAN ITEM: 407923000 VERSION: 2
PURPOSE,JUSTIFICATION AND DESCRIPTION
PIP TX DIV BIRDS TO BELT JCT SUB LS 7262 MP 0.38-DOT#0208355-$30,000 BILLABLE TO CITY OF FORT WORTH
BNSF TO INSTALL ONE 48-FT CONCRETE CROSSING ON THE MAIN TRACK AT GORDON STREET-DOT NO.020835S ON THE TEXAS
DIVISION,OLD DUBLIN SUBDIVISION,LS 7262,MP 0.38 IN FORT WORTH.
BNSF TO ALSO HIRE ASPHALT CONTRACTOR TO FURNISH AND PLACE ASPHALT UNDER TRACK AND ON ROADWAY APPROACHES.CITY
OF FORT WORTH IS LUMP SUM BILLABLE FOR$30,000.BNSF WILL HIRE CONTRACTOR TO PROVIDE TEMPORARY TRAFFIC CONTROL
AND ASPHALT WORK ON ROADWAY APPROACHES,AT THE CITY'S EXPENSE.TOTAL BILLABLE COST IS$30,000.
DESCRIPTION QUANTITY U/M COST TOTAL$
rurrrrrrr
LABOR
rrrrrrrrrr
PLACE FIELD WELDS-CAP 120.0 MH 3,519
REMOVE PUBLIC CROSSING 216.15 MH 6,000
REMOVE TRACK 5.4 MH 170
REPLACE PUBLIC CROSSING-TOTAL REHAB 48.0 MH 1,333
SURFACE TRACK-REPLACEMENT-CAP 72.0 MH 2,083
UNLOAD BALLAST-REPLACEMENT-CAP 6.0 MH 167
UNLOAD CROSSING MATERIAL-PUBLIC-CAP 24.0 MH 667
PAYROLL ASSOCIATED COSTS 9,194
DA OVERHEADS 6,719
EQUIPMENT EXPENSES 7,567
INSURANCE EXPENSES 2,336
TOTAL LABOR COST 39,755 39,755
rprprrr•rrr
MATERIAL
rrr•rrwrrpr
ASPHALT,PAVING MATERIAL,PER NT 20.0 NT NX 659
ASPHALT IN PLACE PER TON 10.0 NT NX 1,417
BALLAST,FOR GENERIC USE ONLY 100.0 NT •• 876
TRACK PANEL,136 STANDARD RAIL,40 FT-10 FT TIES- 2.0 EA •• 10,998
RAIL,TRANSN,BE,40 FT,136-1/4 WORN 132 4.0 EA X 5,124
SPIKE,TBR SCREW 3/4"X13",F/ROAD XING 108.0 EA •• 243
TIE,TRK,IOFT PRE-PLATED,6IN,STD AREA 20.0 EA 1,915
WELDKIT,GENERIC FOR ALL RAIL WEIGHTS 15.0 KT •• 1,018
CONC 136 08-SEC WITH FILLER FOR 10'WOOD TIES•• 48.0 FT •• 7,656
CONCRETE XING RAMP AND PANEL RESTRAINT, 1.0 ST "" 310
MATERIAL HANDLING 1,402
ONLINE TRANSPORTATION 1,591
USE TAX 2,366
OFFLINE TRANSPORTATION 277
TOTAL MATERIAL COST 35,852 35,852
prrrrrrrr
OTHER
rrrrrr»rr
ASPHALT BY CONTRACTOR 1.0 LS 6,000
TRAFFIC CONTROL BY CONTRACTOR 1.0 LS 8,000
TOTAL OTHER ITEMS COST 14,000 14,000
PROJECT SUBTOTAL 89,607
CONTINGENCIES 7,255
BILL PREPARATION FEE 969
GROSS PROJECT COST 97,831
LESS COST PAID BY BNSF 67,831
TOTAL BILLABLE COST 30,000