Loading...
HomeMy WebLinkAboutContract 48821-FP2 FORT WORTH® CITY SECRETARY TRANSPORTATION AND PUBLIC WORKS CONTRACT NO. NOTICE OF PROJECT COMPLETION (Developer Projects) City Project Ns: 100015 Regarding contract 100015 for DEER MEADOW PHASE 3A as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. m Original Contract Price: V t 1 $122,878.00 Amount of Approved Change Orders: G i co, v Revised Contract Amount: Z c o. E m S 1 � r00. 1 fJ Total Cost Work Completed: i m _— $122,878.00 {' = o > o v r ° ` >, V . cwt y N G m w O d CL 0 Vic o � c, ++ mM dam nt a m •0 G Cf E = C C CL C M M v t GI fn M M � W da V L- 44 ' ) CL. � NYLal 3 = CO N 0 DUG. ROVt� F- 0V ...... Recommefor Acceptance Date Asst. Dire t , TPW - Development Services 4114/ Accepted 0 Date IM Director, TRANSPORTATI N & PUBLIC WORKS Asst. anager Date Comments: �� OFFICIAL RECORD G �pp1B CITY SECRETARY apR Mr. WORTH,TX c j Rev.9/22/16 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name DEER MEADOW PH 3A Contract Limits Project Type STORM DRAIN City Project Numbers 100015 DOE Number 0015 Estimate Number I Payment Number 1 For Period Ending 3/15/2018 CD City Secretary Contract Number Contract Time 18VD Contract Date Days Charged to Date 323 Project Manager NA Contract is 100.00 Complete Contractor D T UTILITY CONTRACTORS,INC. 2614 CAUSBIE RD WEATHERFORD, TX 76087 Inspectors LAYER / SMITH Thursday,March 15,2018 Page 1 of 4 City Project Numbers 100015 DOE Number 0015 Contract Name DEER MEADOW PH 3A Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 3/15/2018 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 42"RCP 656 LF $136.00 $89,216.00 656 $89,216.00 2 42"SLOPING HEADWALL 1 E3 $5,000.00 $5,000.00 1 $5,000.00 3 12"ROCK RIP RAP 125 SY $130.00 $16,250.00 125 $16,250.00 4 5'STORM DRAIN MANHOLE 2 EA $5,500.00 $11,000.00 2 $11,000.00 5 REMOVE CONCRETE HEADWALL 1 EA $50.00 $50.00 1 $50.00 6 CONNECT TO EXIST 42"RCP I EA $50.00 $50.00 1 $50.00 7 TRENCH SAFETY 656 LF $2.00 $1,312.00 656 $1,312.00 Sub-Total of Previous Unit $122,878.00 $122,878.00 -------------------------------------- Thursday,March 15,2018 Page 2 of 4 City Project Numbers 100015 DOE Number 0015 Contract Name DEER MEADOW PH 3A Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 3/15/2018 Project Funding Contract Information Summary Original Contract Amount $122,878.00 Change Orders Total Contract Price $122,878.00 �y Date Total Cost of Work Completed $122,878.00 Contractor Less %Retained $0.00 A2 L�X�hDate Net Earned $122,878.00 y-y�✓� Earned This Period $122,878.00 Inspection upervisor Retainage This Period $0.00 -- LC-- - - Date (i� 1v% Less Liquidated Damages Pr oje t anager Days @ /Day $0.00 �3 Ir Date VLessPavement Deficiency $0.00 r ori )W Less Penalty $0.00 �`'� Date b Y Less Previous Payment $0.00 Directog Contracting Departme Plus Material on Hand Less 15% $0.00 Balance Due This Payment $122,878.00 Thursday,March 15,2018 Page 3 of 4 City Project Numbers 100015 DOE Number 0015 Contract Name DEER MEADOW PH 3A Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 3/15/2018 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / SMITH Contract Date Contractor D T UTILITY CONTRACTORS,INC. Contract Time 180 CD 2614 CAUSBIE RD Days Charged to Date 323 CD WEATHERFORD, TX 76087 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded -- --------------------------------------- Total Cost of Work Completed $122,878.00 Less %Retained $0.00 Net Earned $122,878.00 Earned This Period $122,878.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $122,878.00 Thursday,March 15,2018 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Deer Meadow 3A PROJECT NO.: 100015 CONTRACTOR: D.T. Construction DOE NO. N/A PERIOD FROM 04/10/17 TO: 02/19/18 FINAL INSPECTION DATE: 15-Mar-18 WORK ORDER EFFECTIVE 4/10/2017 CONTRACT TIME 180 a WD o CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS * DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 0 0 0 0 323 323 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 323 323 TO DATE *REMARKS CONTRACTOR DATE INS ECT R DATE ENGINEERING DEPARni ENT 0 The City of Fort North• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 (817) 392-7941 •Fax: (817) 392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Deer Meadows Phase 3A PROJECT NUMBER: 100015 DOE NUMBER: N/A WATER PIPE LAID SIZE TYPE OF PIPE LF Water 8"inch SDR-14 PVC 1134 LF FIRE HYDRANTS: 1 VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: NEW SERVICES: 1" inch copper 540 LF SEWER PIPE LAID SIZE TYPE OF PIPE LF Sewer 8" inch SDR-26 PVC 5816 LF PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: NEW SERVICES: 8" inch SDR-26 PVC 3975 LF TRANSPORTATION AND PUBLIC WORKS nA-� The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 3/14/2018 Name of Contractor Project Name D.T.Utility Contractors Deer Meadow Phase 3A DOE Inspector Project Manager Kedric Smith Gopal Sahu DOE Number Project Difficulty T)pe of Contract 100015 Simple ® Routine a Complex 11 Water 11 Waste Water o Storm Drainage 11 Pavement btitial Contract.4mount Final ContractAmount $122,878.00 $122,878.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 7 Availability of Inspector �l 1 Accuracy of Plans to Existing Conditions y 2 Knowledge of Inspector 4f 2 Clarity&Sufficiency of Details 14 3 Accuracy of Measured Quantities Lf 3 Applicability of Specifications 14 T Display Of Professionalism L 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution tom( PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs I Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication A:d 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor �Z / INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS , sa The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:. (817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name D.T.Utility Contractors Deer Meadow Phase 3A Inspector City Project Number Kedric Smith 100015 Construction Components Project Manager ❑ Water ❑ Waste Water o Storm Drainage ❑ Pavement Gopal Sahu Initial Contractdn aunt Project Dijjicwlty $122,878.00 3 Simple o Routine o Complex Final Contract Amount Date $122,878.00 3/14/2018 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums W 448 Rating([TS/MS] y 100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature t Contractor Signature Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 8851 Camp Bowie\West Blvd. •Fort Worth,TX 76116 • (817) 392-8306 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Lori Tollett,Vice President Of D.T. Utility Contractors, Inc.,known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Deer Meadow Addition Phase 3A (City Project No. 100015), City of Fort Worth, Tarrant County,Texas. BY �� L 1 Lori Tollett,Vice President of D.T. Utility Contractors, Inc. Subscribed and sworn before me on this date 4th of April, 2018. Notary Public �.p�, TANYA DAVIS State of Texas, - Notary Public County of Parker 'v�, :y STATE OF TEXAS �,,EOF��}� ID#56914.4 M Comm.Ex .Sep.28,2021 OWNER CONSENT OF SURETY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Conforms with the American Institute of Architects G707 form OTHER ❑ Bond No: PB11509800946 TO OWNER: ARCHITECT'S PROJECT NO.: 100015 (Name and address) City Of Fort Worth 1000 Throckmorton Street CONTRACT FOR: Water, Sanitary Sewer, & Drainage Fort Worth, TX 76102 PROJECT: CONTRACT DATED: (Nome and address) Water, Sanitary Sewer, and Drainage Improvements for Deer Meadow Phase 3A Project No. 100015 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Surety) Philadelphia Indemnity Insurance Company One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 SURETY on bond of (Insert name and address of Contractor) D. T. UTILITY CONTRACTORS, INC. 2614 Causbie Road Weatherford, TX 76087 ,CONTRACTOR hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) City Of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 OWNER as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: April 2, 2018 (Insert in writing the month followed by the numeric date and year.) Philadelphia Indemnity Insurance Company (Surety) (Signa of authorized representative) Attest: �J/ Fred A Thetford Jr Attorney-in-fact (Seal):�/��77 (Printed name and title) 5059 PHILADELPHIA INDENINTTY INSURANCE COMPANY Bond No: PB11509800946 One Bala Plaza,Suite 100 Bala Cynvyd,PA 19004-090 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS:That PHILADELPHIA INDENINITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint Jared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young and/or Fred A."Thetford, III of Contract Bond Agency,LLC.,its true and lawful Attorney-in-fact with full authority to execute on its behalf bonds,undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed$25,000,000. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 140i of November,2016. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company: (1) Appoint Attomey(s) in Fact and authorize the Attomey(s) in Fact to execute on behalf of the Company bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the fixture with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 27""DAY OF OCTOBER,2017. (Seal) Robert D.O'Leary Jr.,President&CEO Philadelphia Indemnity Insurance Company On this 27`h day of October,2017,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed. r,OV,xprlw'cALl or vEnYSY"A111A eoruutsen� � Notary Public: l0xti L'c,mn hp.Mnmga 25,ryCCu Ary euTmiss:>+E,paes SeDi tG2 21 i ,Cwt +tvn,t�riT uAt;�Cut�0.v�1 N� residing at: Bala C'�vd.PA (Notary Seal) My commission expires: September 25 2021 I,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do hereby certify that the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto on this 270i day of October,2017 are true and correct and are still in full force and effect. I do further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 2nd day of April 120 18 Edward Sayago,Corporate Secretary PHILADELPHIA INDEI INITY INSURANCE COMPANY