HomeMy WebLinkAboutContract 48821-FP4 i
FORTWORTH®
CITY SECRETAR
KS COIU'fRACT N0Y
TRANSPORTATION AND PUBLIC WOR
NOTICE OF PROJECT COMPLETION
(Developer Projects)
City Project Ns: 100015
Regarding contract 100015 for DEER MEADOW PHASE 3A as required by the
I
��wv /
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete
m
Original Contract Price: 'a c $14,148.95
w
Amount of Approved Change Orders: w; N9
dam' i ° fid
Revised Contract Amount: Z I , a E,CL
.l 1
Total Cost Work Completed: u�
c ° $14,148.95
o > 0 °
• 0 Gl d d
CL.oC d
wo v 0
o. Aro ad �
rnE � ctm
cca c
-tum a c -0 — Lh °
= 0M0mm V
E' o -.7. 2Ly c
1� 111 *2 OM U L
G> d 0 N O LL = C d d
� t9dR dVC9E- 0
13 a
Recommel defor Acceptance Date
Asst. Dire r, PW - Development Services
ago
Accepted 6 Date
4M Director, TRANSPORTATIO & PUBLIC WORKS
Asst. CityManager Date
Comments:
�ITIf �
Rev.9/22/16 �.
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name DEER MEADOW PH 3A
Contract Limits
Project Type ST LIGHT
City Project Numbers 100015
DOE Number 0015
Estimate Number i Payment Number 1 For Period Ending 3/15/2018
CD
City Secretary Contract Number Contract Time 18(YD
Contract Date Days Charged to Date 323
Project Manager NA Contract is 100.00 Complete
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors LAYER / SMITH
Thursday,March 15,2018 Page 1 of 4
City Project Numbers 100015 DOE Number 0015
Contract Name DEER MEADOW PH 3A Estimate Number 1
Contract Limits Payment Number I
Project Type ST LIGHT For Period Ending 3/15/2018
Project Funding
ST LIGHT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 TYPE 1 FOUNDATION 2 EA $1,374.00 $2,748.00 2 $2,748.00
2 TYPE 11 LIGHT POLE 2 EA $1,659.00 $3,318.00 2 $3,318.00
3 70W LED LIGHT FIXTURE 2 LF $350.00 $700.00 2 $700.00
4 2"SCH 80 PVC CONDUIT,TRENCH 745 LF $7.76 $5,781.20 745 $5,781.20
5 #6 ALTRIPEX WIRE 745 LF $2.15 $1,601.75 745 $1,601.75
---------------------------------- -------
Sub-Total of Previous Unit $14,148.95 $14,148.95
----------------------------------------
Thursday,March 15,2018 Page 2 of 4
City Project Numbers 100015 DOE Number 0015
Contract Name DEER MEADOW PH 3A Estimate Number 1
Contract Limits Payment Number 1
Project Type ST LIGHT For Period Ending 3/15/2018
Project Funding
Contract Information Summary
Original Contract Amount $14,148.95
Chante Orders
Total Contract Price $14,148.95
Date Total Cost of Work Completed $14,148.95
400ntractor Less %Retained $0.00
Net Earned $14,148.95
.Date
JInspeupervisor Earned This Period $14,148.95
Retainage This Period $0.00
Date > Less Liquidated Damages
ager 12 Days @ /Day $0.00
Date LessPavement Deficiency $0.00
As Less Penalty $0.00
Date Less Previous Payment $0.00
Director/ ontracting Depa nt Plus Material on Hand Less 15% $0.00
Balance Due This Payment $14,148.95
Thursday,March 15,2018 Page 3 of 4
City Project Numbers 100015 DOE Number 0015
Contract Name DEER MEADOW PH 3A Estimate Number I
Contract Limits Payment Number I
Project Type ST LIGHT For Period Ending 3/15/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / SMITH Contract Date
Contractor INDEPENDENT UTILITY CONSTRUCTION Contract Time 180 CD
5109 SUN VALLEY DRIVE Days Charged to Date 323 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------- --------------------------------
Total Cost of Work Completed $14,148.95
Less %Retained $0.00
Net Earned $14,148.95
Earned This Period $14,148.95
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $14,148.95
Thursday,March 15,2018 Page 4 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO. 1
NAME OF PROJECT: Deer Meadow Phase 3A
PROJECT NO.: 100015 CONTRACTOR: Independent Utility Construc
DOE NO. N/A
PERIOD FROM 04/10/17 TO: 02/19/18 FINAL INSPECTION DATE: 15-Mar-18
WORK ORDER EFFECTIVE 4/10/2017 CONTRACT TIME 180 o WD o CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS * CHARGED DAYS
THIS 0 0 0 0 323 323
PERIOD
PREVIOUS 0 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 323 323
TO DATE
*REMARKS
CO T C OR bATE SPECTOR ATE
ENGINEERING DEP�RT-T\)ENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311
a1
(817)392-7941 •Fax: (817) 392-7845
tORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Deer Meadows Phase 3A
PROJECT NUMBER: 100015
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 8" inch SDR-14 PVC 1134 LF
FIRE HYDRANTS: 1 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES:
NEW SERVICES:
1" inch copper 540 LF
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Sewer 8" inch SDR-26 PVC 5816 LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES:
NEW SERVICES: 8" inch SDR-26 PVC 3975 LF
TRANSPORTATION AND PUBLIC WORKS
nAu
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
FORT WORTH
REV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 3/14/2018
Nante of Contractor Project Name
Independent Utility Construction,Inc. Deer Meadows 3A
DOE Inspector Project Manager
Kedric Smith Gopal Sahu
DOENtunber Project Difficulty Type of Contract 0 Signal Lights
100015 Simple o Routine O Complex ❑ Water ❑ Waste Water ❑ Storm Drainage ❑ Pavement
Initial ContractAmottttt Final Contract Amount
$14,148.95 $14,148.95
U)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
T Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
—Ei
"COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor /!B
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
3 The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TK 76012-6311
°° (817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Nanre
Independent Utility Construction,Inc. Deer Meadows Phase 3A
Inspector City Project Number
Kedric Smith 100015
Construction Components Q Signal Lights Project Manager
❑ Water ❑ Waste Water ❑ Storm Drainage ❑ Pavement Gopal Sahu
Initial Contract Amount Project Difflculo
$14,148.95 Simple a Routine O Complex
Final Contract Amount Date
$14,148.95 3/14/2018
II)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] s 100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%_Facellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
1
Inspector Signature i y Contractor Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116•(817)392-8306
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, on this day personally appeared RICHARD
WOLFE, President of INDEPENDENT UTILITY CONSTRUCTION, INC., known
to me to be a credible person, and after being duly sworn by me, upon his oath deposed
and said;
"That all persons, firms, associations, corporations, or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as: Deer Meadow Addition Phase 3A—CitProject No. 100015
BY: rzt4�& X
Rtchar o resident
SJJBSCRIBED AND SWORN TO BEFORE ME on this 3Laday of
2018.
��aaYpai,,� CHRISTINA GARCIA
0 °�Notary Public,
_ �; State of Texas
e Comm.Expires 12-20-2020 �
U
Notary ID 130940785
Notary Public, State of Texas
5109 Sun Valley Drive
I I Fort Worth,Texas 76119
817-478-4444
www.iuctx.com
April 3`d,2018
City of Fort Worth
CFA Administration
200 Texas St.
Fort Worth,TX 76102
Project Name: Deer Meadow Addition Phase 3A
City Project No.: 100015
The purpose of this letter is to acknowledge that Independent Utility Construction, Inc. (the
"Contractor")has been paid in full by Deer Meadow Development,Inc.(the"Developer")for the public
improvements constructed to serve Deer Meadow Addition Phase 3A in Fort Worth,Texas. As a result,
we hereby waive, release and relinquish all rights to assert any claim or demand for lien in connection
with this project.
Please feel free to contact me with any questions you may have.
Sincerely,
Richard Wolfe
President
5109 Sun Valley Drive
I f Fort Worth,Texas 76119
817-478-4444
www.iuctx.com
April 3 d,2018
City of Fort Worth
CFA Administration
200 Texas St.
Fort Worth,TX 76102
Project Name: Deer Meadow Addition Phase 3A
City Project No.: 100015
Please accept this letter as our formal acknowledgment to the City of Fort Worth that Independent
Utility Construction, Inc.,the Street Light Contractor for Deer Meadow Addition Phase 3A, has not
been assessed any liquidated damages under its contract with Deer Meadow Development,Inc.
If you need any further information in regards to this matter,feel free to contact me.
Sincerely,
Richard Wolfe
President
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT El
CONTRACTOR ❑
TO FINAL PAYMENT STY ❑
OTHER
(SIMILAR TO AIA DOCUMENT G707)
Bond No. 5063169
PROJECT: Deer Meadow Phase 3A, City Project No. 100015
(name,address)Fort Worth, Texas
TO (Owner)
ARCHITECTS PROJECT NO:
F—City of Fort Worth, Texas CONTRACT FOR: Above Project
200 Texas Street
Fort Worth, Texas 76102
CONTRACT DATE:
CONTRACTOR: Independent Utility Construction, Inc.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the(here insert name and
address of Surety Company) Westfield Insurance Company
555 Republic Drive, Suite 450
Plano, Texas 75074 ,SURETY COMPANY,
on bond of(here insert name and address of Contractor)
Independent Utility Construction, Inc.
5109 Sun Valley Drive ,CONTRACTOR,
Fort Worth, Texas 76119
hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the
Surety Company of any of its obligations to(here insert name and address of Owner)
City of Fort Worth, Texas
200 Texas Street
Fort Worth, Texas 76102 'OWNER'
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
The Surety Company has hereunto set its hand this 3rd day of April 2018
WESTFIELD INSURANCE COMPANY
Surety Compan
i i
By
Signatures 6 ative
Attest:
(Seal): Kyle W. Sweeney Attorney-in-Fact
Title
Note:This form is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims,Current Edition
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARINU I nls SAMt
POWER#AND ISSUED PRIOR TO 04120111, FOR ANY PERSON OR PERSONS NAMED BELOW.
POWER NO. 4220052 06
General Westfield Insurance Co.
Power
of Attorney Westfield National Insurance Co.
Ohio Farmers Insurance Co.
CERTIFIED COPY Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W.SWEENEY, ELIZABETH GRAY, JOINTLY OR SEVERALLY
of FORT WORTH and State of TX its true and lawful Alto rney(s)-in-Fact,with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - -
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)An-Fact may do in
the_premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
"Be It Resolved,that the President, any Senior Executive, any Secretary or any Fidelity& Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary."
"Be it Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting
held on February 8,2000).
-In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of
APRIL A.D.,2011 .
yfalff•NlN,I, „fff if f,,,,„ A•1„/II,
Corporate a�• '+uR•l�j"' , �,ONA('r'• �liSU WESTFIELD INSURANCE COMPANY
Seals �rQ�,,.•«••.;C� ;`aP,.. NSG,,; :. ,..•. c.a WESTFIELD NATIONAL INSURANCE COMPANY
Affixed.? -y.- .n. :ta O, Z~_ & � jFRf:e^ - OHIO FARMERS INSURANCE COMPANY
4"• � 'rod �_, SEAL °•.a -
3, ''•.�• 17 ,•, :o; : 18 4 8:•� `
By
State of Ohio "`"'"'" ^^ """""" Richard L. Kinnaird, Jr., National Surety Leader and
County of Medina ss.: Senior Executive
On this 20th day of APRIL A.D., 2011 before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say,that he resides-in Medina, Ohio; that he is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed
by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order.
Notarial
Seal Ft1 A L
Affixed
William J. Kahelin,A rney at Law, Notary Public
State of Ohio N I o My Commission Does Not Expire(Sec. 147.03 Ohio Revised Code)
County of Medina ss.:
_ •.,y f O F
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby.certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies,which is still in full force and effect; and furthermore,the resolutions of the Boards of Directors,set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 3rd day of
April A.D. , 2018
�oNAt Z/V r \4l$UR, ;4
Fv.'• .C3• qia
tJ; 0- A v �m- f�
4"j S1SEAL
_N eUI =o' ;�- �ti-o-�i�'l � Secretary.
,•_y,� ��� i .-a '�184H :�s Frank A. Carrinc, Secretary
BPOAC2 (combined) (06-02)