Loading...
HomeMy WebLinkAboutOrdinance 23186-04-2018 Ordinance No. 23186-04-2018 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE TRANSPORTATION IMPACT FEE CAPITAL LEGACY FUND, FROM AVAILABLE FUNDS IN THE AMOUNT OF $1,493,499.68, FOR TRANSFER TO THE TRANSPORTATION IMPACT FEE CAPITAL FUND FOR THE CDC OAK GROVE EXPANSION PROJECT; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2017-2018 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Transportation Impact Fee Capital Legacy Fund in the amount of$1,493,499.68, from available funds, fo transfer to the Transportation Impact Fee Capital Fund for the CDC Oak Grove Expansion Project. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impai the remaining portions, sections, or parts of sections of this ordinance,which said remaining provisions sha I be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance 22928-09-2017 and all other ordinances appropriations amending the same except in those instances where the provisions of this ordinance ar: direct conflict with such other ordinances and appropriations, in which instance said conflicting provisiow said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: CITY SECRETARY, j 6in, vtRichard McCracken,Assistant City Attorney WaryJ. Kay e ADOPTED AND EFFECTIVE: April 17. 2018 i lhln uM WK PROJECT LOCATION TRA N VA N PN�MN ALTA M HI ND �F h ? A V 5 IR g ,pEL EAST �n HALLMA NATCHQ SHERTE > we g Sp A" REVEN B C 7 SHY ALLBR y p AN t Q � BE11 or a 35E O g dlF ANG N Pu r OOL JqM IIRGUE a TARRANT COUN MAPSCO F905— VICINITY MAP (NOT TO SCALE) I Pacheco Koch 7557 RAMBLER ROAD, SUITE 1400 VICINITY MAP Pacheco DALLAS, TX 75231 972.235.3031 2.400 LF OF OAK GROVE TX REG. ENGINEERING FIRM F-469 ROAD IMPROVEMENTS TX REG. SURVEYING FIRM LS-10008000 LIMITS INCLUDE JOEL EAST DRAWN BY I CHECKED BY SCALEDA 7E ✓OB NUMBER ROAD TO ALTA MESA AJC CJS N.T.S. 01/31/2018 2685-16.131 BOULEVARD J4 Pacheco Koch Pno/ect Maitre: OakGrere RwA(2480 UF) M,Mo.: 210E-14.12T Prepared BY PACFKO SOCK LLC(ALEX CAYf04E2) Date: 272NWIS Tx R.g&Onwap Fym F469 Asaw pOons -Awnn.d Unw app0ed ala rob ol6 ber pInch of subgade per Kp"e yard -Unck3s We R«dnw Eua.Wlaa needed r oomm ROW vAda rrAw p Yom tw dRch meftn to wb and guiwr -TF&lc to remciln open baro dkec%on Item Est. I UMt Developer Developer City City No. Ouont. Unit Description Price ReWor W Cost RespmsbRty Cost Told Oak Grove Road % % I I I LS Mobization $10.000.00 0% $0,00 100% 310,000,00 00,00 310,0 2 1 LS SW PPP 2 1 ocre $30,000.00 0% $0,00 100% 3.'50,000.00 330400.00 3 I LS Site Clearing $5,000.00 0% $0,00 100% $5,000.00 35,000.00 4 2.000 LF Relocate overhead Power line $125.00 0% $0.00 100% $250,000.00 3250,000,00 5 2,400 U Demolition of 4"Asphc*Base $20.00 0% $0.00 100% 340.000.00 $48.000.00 6 9,600 SY 8'kbgrade lRood) $4.00 0% $0.00 IOD% $38,400.00 338.400.00 7 600 Sy 6"subgrode)D/newoys) 34.00 0% WOO 100% $2,400.00 32,400.OD 8 245 ION Line la 5ubgrade)480»per SY) 3200.OD 0% 30.00 100% 348,960,00 348,94040 9 9,067 SY 10"Concn to Pavement $72.00 0% $040 100% $652.800.00 36.52,00000 t0 600 SY 7"Concrete Driveway 33040 0% Woo 100% $30,00040 $30,00040 11 6 EA Barrier Nee Romp $1,200.00 D% $040 1017% $7,200.00 37,21M.OD 12 26,000 sF '"Concrete sld-a& $5.00 0% $0.00 100% ;130,000.00 sixodo.00 13 I LS Pavemenh markings and skipig 3301000.00 0% $040 100% 3.30,000,00 $30,000.00 14 I LS Ironic sigrusge - $20.00040 0% $040 100% $20,000.00 320.WO.OD 15 10 MO ironic Control $6,000.00 0% $0.00 100% $60,000.00 360.00040 16 1 LS Erosion Control $20,000.00 0% 3040 100% $20.00040 320.000.00 17 2,900 CY Unclassified Roadway Excavation $340 0% $0.00 100% $8.700.00 $0,700.00 18 12 EA Light Pole,Fixture 3 Concha% 35,000.00 0% $0.00 100% $60,000.00 $60,00040 19 2 EA Rc*ood Crossings $100,000.00 3% 36,000.00 97% 3194'000.0O $200,000.00 20 600 LF 24"RCP.Class A $ 50.00 IBX $5,400.00 82% $24,600.00 $30.000.00 21 250 LF 36"RCP,Class 0 $85.00 16% $3,400.00 847. $17,850.00 321,2.50.00 22 50 LF 66"RCP,Closs 0 3400.00 16% $3,200.00 84% $16,000.00 $20,000.00 23 1 EA 66"Type"B"He dwal 315,000.00 16% $2,400.00 84% $12.60D.00 $15,000.00 24 I EA 5'x5'Wye Wet fto,000.00 16% $1,600.00 84% $8.400.(70 $10,666.00 25 7 EA 10'Recessed Wet $4,000.00 16% $4,480.00 84% $23,52040 $26, .00 26 908 LF Irench Solely $140 16% $145.20 M $762.72 Jrb-Tod $26,625.28 $1,749,992.72 31.776,618.00 Enghee*Q Surveykrg aM MatKkg TesY'7g 207�.a pubk kr7Pr.v.maMa 3355,323.60 33554323.60 CvnYpen V 128%1 $5,325.06 3349,998.54 $355,323.60 Orar. ek*gWmdby C&FW $266.25 - 317,499.93 $17,766.18 L.Mw M C.c. 3130,000,00 $130,000.00 TOM W7,54D.IY $2,099,991.26 $2,635. 1.38 Me qu a-WArs and prices shown haare a9#K ica8on W Are Ergheer's apkrbn of pcbabte comili ckn cart anoclofed w0b Y7t referenced praiiecf and are NOT a gw ante•of kxtviduat or told consirmnon cost, Legk AJC 7557 Rambler Road ■ Suite 1400 ■ Dallas,TX 75231 ■ T:972.235.3031 ■ pkce.com City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 4/17/2018 -Ordinance Nos. 23155-04-2018 & 23186-04. 2018, DATE: Tuesday, April 17, 2018 REFERENCE NO.: "'C-26660 LOG NAME: 061000 OAK GROVE RD CFA WITH CITY PARTICIPATION SUBJECT: Authorize Execution of a Community Facilities Agreement with Rob Riner Companies GP, LLC, in the Estimated Project Amount of$2,487,274.00 Including City Participation in an Amount Not to Exceed $2,100,000.00 to Construct Oak Grove Road from Alta Mesa Boulevard to Joel East Road and Adopt Appropriation Ordinances (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached ordinance increasing appropriations in the Transportation Impact Fee Capital Legacy Fund (39008), in the amount of$1,493,499.68, from available funds, for the purpose of making a transfer to the Transportation Impact Fee Capital Fund (30108), to pay a portion of the City participation in the CDC Oak Grove Expansion Project; 2. Adopt the attached ordinance increasing estimated receipts and appropriations in the Transportation Impact Fee Capital Fund, in the amount of$2,100,000.00, from available funds including transferred revenues, for the purpose of funding the CDC Oak Grove Expansion Project and reduce the fund balance in the Service Area X Project (UN9926); and 3. Authorize the execution of a Community Facilities Agreement with Rob Riner Companies GP, LLC, in the estimated project amount of$2,487,274.00, which includes City participation in an amount not to exceed $2,100,000.00 to construct Oak Grove Road from Alta Mesa Boulevard to Joel East Road. DISCUSSION: The purpose of this M&C is to authorize execution of a Community Facilities Agreement (CFA) wit Rob Riner Companies GP, LLC (Developer), the developer of the proposed Carter Distribution Center I cated generally east of Oak Grove Road and north of Joel East Road, for the construction of the outstan ing two lanes of Oak Grove Road between Alta Mesa Boulevard and Joel East Road and to take financial actions associated with funding the City participation in the project. The City will participate in the cost of tie road construction in order to have Oak Grove Road built out to its ultimate configuration through this arqa. The table below reflects the delineation of construction costs and related fees between the developer %d the City. Estimated Project Expenditures: Project Component Developer's Cost I City's Cost Total Cost Construction T $ 31,950 $ 2,100,000 $ 2,131,950 Logname: 061000 OAK GROVE RD CFA WITH CITY PARTICIPATION Page I of 2 Design ( $ 355,324 ( $ 0 ( $ 355,324 TOTAL r $ 387,274 $ 2,100,000 ' $ 2,4875274 These costs are based upon the engineer's estimate and are consistent with the City Council adopted 2017 Transportation Impact Fee Study (identified as projects X-16 and X-17). The project will be publicly bid. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon the approval of the above recommendations and the adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Transportation Impact Fee Capital Fund. Prior to an expenditure being incurred, the participating department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project Program ctivity Budget Reference # �mountl ID ID Year Chartfield 2 FROM Fund Department ccoun Project JProgram ctivity Budget Reference # moun ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Jesus Chapa (5804) Originating Department Head: Randle Harwood (6101) Julie Westerman (2677) Additional Information Contact: Janie Morales (7810) Logname: 061000 OAK GROVE RD CFA WITH CITY PARTICIPATION Psg 2 of 2