HomeMy WebLinkAboutContract 46673 CITY SECRETA( .r CONTRACT NO. �U , Fft ..........CCM wT" CowrRACTM-3 soon CO. �. �CAYAIlY O RT WO RT H C"K""E"OFFS. -TW•RECM PROJECT MANUAL ----- FOR 2014 CIP SIDEWALK CONTRACT 1 .. At Various Locations City Project No. 02406 DOE No. 7372 Betsy Price David Cooke Mayor City Manager Douglas W. Wiersig, P.E. Director, Transportation and Public Works Department .. Prepared by The City of Fort Worth TRANSPORTATION AND PUBLIC WORKS OF or 2015 CC- to Otto% OFFICIAL RECORD ' * • /...........s.....i.i.� CITY SECRETARY 1,, 1 NUS....l..i.. •• r �; 88823 FT.WORTH,TX �+ o . 60 .p a•.o r RECEIVED MAY 14`Z0B `��! M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRTWoRTH COUNCIL ACTION: Approved on 4/21/2015 DATE: 4/21/2015 REFERENCE NO.: **C-27269 LOG NAME: 202014 CIP SIDEWALKCONTRACT 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Contract with P.C. Contractors, LLC, in the Amount of $653,667.87 for the Construction of Approximately 50,375 Square Feet of Concrete Sidewalk and 65 Americans with Disabilities Act Barrier Free Ramps Throughout the City of Fort Worth and Provide for Additional Construction Costs and Contingencies for a Total Project Amount of$884,484.84 (2014 BOND PROGRAM) (COUNCIL DISTRICTS 3, 6, 7 and 9) RECOMMENDATION: It is recommended that the City Council authorize execution of a contract with P.C. Contractors, LLC, in the amount of$653,667.87 for construction of approximately 50,375 square feet of concrete sidewalk and 65 Americans with Disabilities Act barrier free ramps at multiple locations. DISCUSSION: The 2014 Capital Improvement Program (2014 CIP) includes Sidewalk funds in the amount of $10,000,000.00 for citywide installation of sidewalks over a five year period. The City's capital project implementation plan allocated$1,000,000.00 in FY2014-15 for sidewalk projects under the 2014 Capital Improvement Program. An additional$42,531.98 from Council District 7 undesignated funds will be applied towards Council District 7 Sidewalks included in this project. The project goal of the sidewalk program is to focus on streets with high pedestrian activity where sidewalks or Americans with Disabilities Act(ADA) barrier free ramps do not exist, gaps in the existing sidewalk network exist or there are opportunities to extend the current sidewalk network. The sidewalk program seeks to improve the use, safety and comfort for pedestrians. The 2014 CIP Sidewalk Contract No. 1 provides for the construction of approximately 50,400 square feet of sidewalk and 65 ADA barrier free ramps to fill gaps in areas of high pedestrian activity that are included in City Project No. 02406 of the 2014 CIP. Construction is scheduled to begin May 2015 with project completion by September 30, 2015. ITEM COSTS Construction Bid $653,667.87 Construction Contingencies 25percent) $163,416.97 .. Subtotal Construction: $817,084.84 Construction M mt, Surveying, Material Testing and Inspection 1 $67,400.00 Subtotal Services: $67,400.00 TOTAL PROJECT COSTS: 1 $884,484.841 The project was advertised for bid in the Fort Worth Star-Telegram on January 15, 2015 and January 22, http://apps.cfwnet.org/council_packet/mc review.asp?ID=20993&councildate=4/21/2015 4/27/2015 MR M&C Review Page 2 of 3 2015. On February 12, 2015, the following bids were received: Bidders Amounts _ P.C. Contractors, LLC $653,667.87 FNH Construction, LLC $744,842.65 Northstar Construction, LLC $783,803.00 Arreguin Group, Inc. $845,664.75 I Bradley Douglas Construction Services, LLC $857,254.75 This project is included in the 2014 CIP. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official intent to reimburse that was adopted as part of the ordinance canvassing the bond election-Ordinance No. 21241-05-2014. M/WBE Office—P.C. Contractors, LLC, is in compliance with the City's BDE Ordinance by committing to 21 percent MBE participation on this project. The City's MBE goal on this project is 16 percent. FUND Existing FY15 Additional Total to Date Projected Total Appropriation Appropriation Program Encumbered/ Revised Budget Expenditures Proram grogram •. 2014 Bond $1,000,000.00 $0 $10,000,000.00 $841,952.86 $9,158,047.14 Program - Sidewalks 1998 CIP $38,411.25 $0 $38,411.25 $38,411.25 $0 CD7 Undesignated 1993 CIP $4,120.73 $0 $4,120.73 $4,120.73 $0 Mo CD7 Undesignated TOTAL 1 $1,042,531.981 $0 1 $10,042,531.981 $884,484.841 $9158 047.14 MR These sidewalk projects are located in COUNCIL DISTRICTS 3, 6, 7 and 9, Mapsco 73T, 74K, 75L, 75T, 75Y, 76L, 88Q, 88T, 89C, 89W, 90D, 90K, 90Q, 102D, 103J, 103K, 103N and 103W. r FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are included in the Fiscal Year 2015 Adopted Budget of the 2014 Bond Program per Ordinance No. 21457-09-2014 and funds are available in .. the General Fund to pay expenses which will be incurred on this contract until reimbursement can occur from the issuance of public securities, and that funds are available, as appropriated, of the current capital budgets in the 1998 Street Improvements Fund and the 1993 Street Improvements Fund. ® TO Fund/Account/Centers FROM Fund/Account/Centers C111 541200 020111038132 $4,120.73 .� C210 541200 201380240683 $611.135.89 C115 541200 020115038132 $38,411.25 Submitted for City Manager's Office by: Fernando Costa(6122) Originating Department Head: Douglas W. Wiersig (7801) http://apps.cfwnet.org/council_packet/mc review.asp?ID=20993&councildate=4/21/2015 4/27;'2 15 no M&C Review Page 3 of 3 no Additional Information Contact: Tariqul Islam (2486) David Jodray (2891) .. .. ATTACHMENTS Map 2014 CIP Sidewalk Contract 1.pdf ,., Sidewalk Locations.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=20993&councildate=4/21/2015 4/27/2015 000000-1 _ TABLE OF CONTENTS Page 1 of 2 1 SECTION 00 00 00 2 TABLE OF CONTENTS 3 a. 4 Division 00-General Conditions 5 0005 10 Mayor and Council Communication 6 0005 15 Addenda 7 00 11 13 Invitation to Bidders 8 0021 13 Instructions to Bidders 9 0035 13 Conflict of Interest Affidavit 10 00 41 00 Bid Form 11 00 42 43 Proposal Form Unit Price 12 0043 13 Bid Bond 13 00 43 37 Vendor Compliance to State Law Nonresident Bidder 14 00 45 26 Contractor Compliance with Workers'Compensation Law 15 00 45 40 Minority Business Enterprise Goal 16 00 52 43 Agreement 17 0061 13 Performance Bond 18 0061 14 Payment Bond 19 0061 19 Maintenance Bond 20 00 61 25 Certificate of Insurance 21 00 72 00 General Conditions 22 007300 Supplementary Conditions 23 24 Division 01-General Requirements 25 01 11 00 Summary of Work 26 0131 19 Preconstruction Meeting 27 013120 Project Meetings 28 0132 16 Construction Progress Schedule ri 29 01 32 33 Preconstruction Video 30 0135 13 Special Project Procedures 31 01 45 23 Testing and Inspection Services 32 01 5000 Temporary Facilities and Controls 33 01 55 26 Street Use Permit and Modifications to Traffic Control 34 01 58 13 Temporary Project Signage 35 01 70 00 Mobilization and Remobilization 36 01 71 23 Construction Staking 37 01 74 23 Cleaning 38 0177 19 Closeout Requirements 39 01 78 39 Project Record Documents 40 41 Division 02-Existing Conditions 42 0241 13 Selective Site Demolition 43 0241 15 Paving Removal 44 45 Division 31-Earthwork 46 31 1000 Site Clearing 47 3123 16 Unclassified Excavation 48 49 Division 32-Exterior Improvements CITY OF FORT WORTH 2014 CEP SIDEWALK CONTRACT1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 024 D6 Revised November 9,2011 000000-2 TABLE OF CONTENTS Page 2 of 2 1 32 13 13 Concrete Paving 2 32 1320 Concrete Sidewalks,Driveways and Barrier Free Ramps 3 32 13 73 Concrete Paving Joint Sealants 4 32 16 13 Concrete Curb and Gutters and Valley Gutters 5 32 1723 Pavement Markings 6 32 17 25 Curb Address Painting 7 32 32 13 Cast-In-Place Concrete Retaining Walls 8 3291 19 Topsoil Placement and Finishing of Parkways 9 3292 13 Hydro-Mulching, Seeding,and Sodding 10 11 Division 33—Utilities 12 33 05 13 Frame,Cover,and Grade Rings 13 3305 14 Adjusting Manholes,Inlets,Valve Boxes,and Other Structures to Grade 14 15 Division 34-Transportation 16 3471 13 Traffic Control 17 18 Technical Specifications listed below are included for this Project by reference and can be 19 viewed/downloaded from the City's Buzzsaw site at: 20 21 hips:Hprojectpoint.buzzsaw.com/client/fortworthizov/Resources/02%20- 22 %20Construction%2ODocuments/Specifications 23 24 Division 99—Special Technical Specifications 25 9999.0096 Paving Construction Allowance 26 27 Appendix 28 GC-6.06.D Minority and Women Owned Business Enterprise Compliance 29 GC-6.07 Wage Rates 30 A Locations 31 B Standards and Details 32 33 END OF SECTION CITY OF FORT WORTH 2014 CEP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 9,2011 000510-1 MAYOR AND COUNCIL COMMUNICATION(M&C) Page 1 of 1 1 SECTION 00 0510 2 MAYOR AND COUNCIL COMMUNICATION(M&C) 3 4 5 6 [Assembler. For Contract Document execution, remove this page and replace with the approved 7 M&C for the award of the project. M&C insert shall be on blue paper.] 8 9 10 11 12 13 14 15 16 17 18 14 20 END OF SECTION CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 000515-1 ADDENDA Page 1 of 1 1 SECTION 00 0515 2 ADDENDA 3 4 5 6 [Assembler. For Contract Document execution, remove this page and replace with any addenda 7 issued during bidding.] 8 9 10 11 12 13 14 15 — 16 17 18 19 20 21 22 23 24 END OF SECTION CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 001113-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of 2014 CIP CONCRETE SIDEWALK CONTRACT 1,AT 6 VARIOUS LOCATIONS,City project#02406,will be received by the City of Fort Worth 7 Purchasing Office: 8 9 City of Fort Worth 10 Purchasing Division 11 1000 Throckmorton Street 12 Fort Worth,Texas 76102 13 until 1:30 P.M.CST,Thursday,February 12, 2015, and bids will be opened publicly and read 14 aloud at 2:00 PM CST in the Council Chambers. 15 16 GENERAL DESCRIPTION OF WORK 17 The major work will consist of the(approximate)following: 18 68,900 S.F. 4"Concrete sidewalk 651 L.F. 7 inch Concrete Curb&Gutter 3,725 S.F. Concrete Retaining wall 70 EA Install ADA Ramp 6,720 S.Y. Block Sod Placement 19 DOCUMENT EXANIINATION AND PROCUREMENTS 20 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 21 of Fort Worth's Purchasing Division website at hqR://www.fortworthgov.org/purchasinp-,/and 22 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The 23 Contract Documents may be downloaded,viewed,and printed by interested contractors and/or 24 suppliers. 25 _ 26 Copies of the Bidding and Contract Documents may be purchased from Nikki McLeroy, 817- 27 392-8459,City of Fort Worth,Transportation and Public Works, 1000 Throckmorton St.,Fort 28 Worth,TX 76102 29 30 The cost of Bidding and Contract Documents is: $30.00 31 32 PREBID CONFERENCE 33 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 34 BIDDERS at the following location, date,and time: 35 DATE: Wednesday,January 28,2015 36 TIME: 9:00 A.M. 37 PLACE: Transportation and Public Works, 1000 Throckmorton St.,RM#: 270,Fort 38 Worth,Texas 76102 y 39 LOCATION: Municipal Building,2°d Floor CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ;2406 Revised November 27,2012 001113-2 INVITATION TO BIDDERS Page 2 of 2 1 2 3 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 4 City reserves the right to waive irregularities and to accept or reject bids. 5 6 INQUIRIES 7 All inquiries relative to this procurement should be addressed to the following: 8 Attn: Tariqul Islam, City of Fort Worth 9 Email: tariqul.islam@fortworthtexas.gov 10 Phone: 817-392-2486 11 12 ADVERTISEMENT DATES 13 January 15,2015.. 14 January 22,2015 15 16 END OF SECTION CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,20I2 _ 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 1. Defined Terms 4 5 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 6 00-GENERAL CONDITIONS. Y 7 8 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural thereof. 10 11 1.2.1. Bidder: Any person,firm,partnership,company,association,or corporation acting 12 directly through a duly authorized representative,submitting a bid for performing 13 the work contemplated under the Contract Documents. 14 15 1.2.2. Nonresident Bidder:Any person,firm,partnership,company,association,or 16 corporation acting directly through a duly authorized representative,submitting a 17 bid for performing the work contemplated under the Contract Documents whose 18 principal place of business is not in the State of Texas. 19 -- 20 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided)makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 26 resulting from the Bidders use of incomplete sets of Bidding Documents. 27 28 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 29 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant - 30 for any other use. 31 32 33 34 35 36 not pfequa4fied(even if im&efteady opened)sh.A-11- 37 fellows- i-38 39 , 40 , 41 . 42 43 44 . 45 46 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 002113-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 2 ,in it's sele 3 , 4 5 to assist the City in eyaluatiRg and assessing the ability of the appafefA low biddef(s�* 6 7 the s6pulated fiffie ffame.Based upon the City's 8 9 City Getme4l. Fagdfe to submit the additional infeffnation, 10 11 �. 12 13 3.4.In addition fe pmquehfieation, 14 . 15 'r 16 4. Examination of Bidding and Contract Documents,Other Related Data,and Site 17 18 4.1.Before submitting a Bid,each Bidder shall: 19 20 4.1.1. Examine and carefully study the Contract Documents and other related data 21 identified in the Bidding Documents(including"technical data"referred to.in 22 Paragraph 4.2.below).No information given by City or any representative of the 23 City other than that contained in the Contract Documents and officially 24 promulgated addenda thereto,shall be binding upon the City. 25 26 4.1.2.Visit the site to become familiar with and satisfy Bidder as to the general,local and 27 site conditions that may affect cost,progress,performance or furnishing of the 28 Work. 29 30 4.1.3. Consider federal,state and local Laws and Regulations that may affect cost, 31 progress,performance or furnishing of the Work. 32 33 4.1.4. < >Be advised,City,in accordance with Title VI of the Civil Rights Act of 1964, 34 78 Stat.252,42 U.S.C.2000d to 2000d-4 and Title 49,Code of Federal 35 Regulations,Department of Transportation,Subtitle A,Office of the Secretary,Part 36 21,Nondiscrimination in Federally-assisted programs of the Department of 37 Transportation issued pursuant to such Act,hereby notifies all bidders that it will 38 affirmatively insure that in any contract entered into pursuant to this advertisement, 39 minority business enterprises will be afforded full opportunity to submit bids in 40 response to this invitation and will not be discriminated against on the grounds of 41 race,color,or national origin in consideration of award. 42 43 4.1.5. Study all: (i)reports of explorations and tests of subsurface conditions at or 44 contiguous to the Site and all drawings of physical conditions relating to existing 45 surface or subsurface structures at the Site(except Underground Facilities)that 46 have been identified in the Contract Documents as containing reliable"technical 47 data"and(ii)reports and drawings of Hazardous Environmental Conditions,if any, 48 at the Site that have been identified in the Contract Documents as containing 49 reliable"technical data." 50 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 _ 002113-3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.6.Be advised that the Contract Documents on file with the City shall constitute all of 2 the information which the City will furnish.All additional information and data 3 which the City will supply after promulgation of the formal Contract Documents 4 shall be issued in the form of written addenda and shall become part of the Contract 5 Documents just as though such addenda were actually written into the original 6 Contract Documents.No information given by the City other than that contained in 7 the Contract Documents and officially promulgated addenda thereto,shall be 8 binding upon the City. 9 10 4.1.7.Perform independent research,investigations,tests,borings,and such other means 11 as may be necessary to gain a complete knowledge of the conditions which will be 12 encountered during the construction of the project.On request,City may provide 13 each Bidder access to the site to conduct such examinations,investigations, 4 14 explorations,tests and studies as each Bidder deems necessary for submission of a 15 Bid. Bidder must fill all holes and clean up and restore the site to its former 16 conditions upon completion of such explorations,investigations,tests and studies. 17 18 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the 19 cost of doing the Work,time required for its completion,and obtain all information 20 required to make a proposal.Bidders shall rely exclusively and solely upon their 21 own estimates,investigation,research,tests,explorations,and other data which are 22 necessary for full and complete information upon which the proposal is to be based. 23 It is understood that the submission of a proposal is prima-facie evidence that the 24 Bidder has made the investigation,examinations and tests herein required.Claims 25 for additional compensation due to variations between conditions actually 26 encountered in construction and as indicated in the Contract Documents will not be 27 allowed. 28 29 4.1.9. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or 30 between the Contract Documents and such other related documents.The Contractor 31 shall not take advantage of any gross error or omission in the Contract Documents, 32 and the City shall be permitted to make such corrections or interpretations as may 33 be deemed necessary for fulfillment of the intent of the Contract Documents. 34 35 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of: . 36 37 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 38 the site which have been utilized by City in preparation of the Contract Documents. 39 The logs of Soil Borings,if any,on the plans are for general information only. 40 Neither the City nor the Engineer guarantee that the data shown is representative of 41 conditions which actually exist. 42 43 4.2.2. those drawings of physical conditions in or relating to existing surface and 44 subsurface structures(except Underground Facilities)which are at or contiguous to 45 the site that have been utilized by City in preparation of the Contract Documents. 46 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 2 on request. Those reports and drawings may not be part of the Contract 3 Documents,but the"technical data"contained therein upon which Bidder is entitled 4 to rely as provided in Paragraph 4.02.of the General Conditions has been identified 5 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 6 responsible for any interpretation or conclusion drawn from any"technical data"or 7 any other data,interpretations,opinions or information. 8 -� 9 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 10 that Bidder has complied with every requirement of this Paragraph 4,(ii)that without 11 exception the Bid is premised upon performing and furnishing the Work required by the 12 Contract Documents and applying the specific means,methods,techniques,sequences or 13 procedures of construction(if any)that may be shown or indicated or expressly required 14 by the Contract Documents,(iii)that Bidder has given City written notice of all 15 conflicts,errors,ambiguities and discrepancies in the Contract Documents and the 16 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 17 etc.,have not been resolved through the interpretations by City as described in 18 Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate 19 and convey understanding of all terms and conditions for performing and furnishing the 20 Work. 21 22 4.4.The provisions of this Paragraph 4,inclusive,do not apply to Asbestos,Polychlorinated 23 biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 24 Paragraph 4.06.of the General Conditions,unless specifically identified in the Contract 25 Documents. 26 27 S. Availability of Lands for Work,Etc. 28 29 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 30 access thereto and other lands designated for use by Contractor in performing the Work 31 are identified in the Contract Documents. All additional lands and access thereto 32 required for temporary construction facilities,construction equipment or storage of 33 materials and equipment to be incorporated in the Work are to be obtained and paid for 34 by Contractor. Easements for permanent structures or permanent changes in existing 35 facilities are to be obtained and paid for by City unless otherwise provided in the 36 Contract Documents. 37 38 5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed 39 in Paragraph SC 4.01 of the Supplementary Conditions.In the event the necessary right- 40 of-way,easements,and/or permits are not obtained,the City reserves the right to cancel 41 the award of contract at any time before the Bidder begins any construction work on the 42 project. 43 44 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 45 way,easements,and/or permits,and shall submit a schedule to the City of how _ 46 construction will proceed in the other areas of the project that do not require permits 47 and/or easements. 48 49 6. Interpretations and Addenda 50 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 ® 002113-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 3 received after this day may not be responded to.Interpretations or clarifications 4 considered necessary by City in response to such questions will be issued by Addenda 5 delivered to all parties recorded by City as having received the Bidding Documents. 6 Only questions answered by formal written Addenda will be binding. Oral and other 7 interpretations or clarifications will be without legal effect. 8 9 Address questions to: 10 11 City of Fort Worth 12 1000 Throckmorton Street 13 Fort Worth,TX 76102 14 Attn: Tariqul Islam,Transportation&Public Works 15 Fax: 817-392-7969 16 Email:tariqul.islam@fortworthtexas.gov Phone: 817-392-2486 17 18 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 19 City. 20 21 Addenda or clarifications may be posted via Buzzsaw at: 22 https://projectR2int.buzzsaw.com/client/fortworthgov/Infrastructure%20Projects/2014%20CIP%2OStreet% 23 20Reconstruction%20-%2OContract%201> 24 25 6.3.A prebid conference may be held at the time and place indicated in the Advertisement or 26 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 27 Project. Bidders are encouraged to attend and participate in the conference. City will 28 transmit to all prospective Bidders of record such Addenda as City considers necessary 29 in response to questions arising at the conference. Oral statements may not be relied 30 upon and will not be binding or legally effective. 31 32 7. Bid Security 33 34 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 35 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 36 the requirements of Paragraphs 5.01 of the General Conditions. 37 38 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 39 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 40 Agreement within 10 days after the Notice of Award,City may consider Bidder to be in 41 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 42 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 43 other Bidders whom City believes to have a reasonable chance of receiving the award 44 will be retained by City until final contract execution. 45 46 8. Contract Times 47 The number of days within which,or the dates by which,Milestones are to be achieved in 48 accordance with the General Requirements and the Work is to be completed and ready for 49 Final Acceptance is set forth in the Agreement,or incorporated therein by reference to the 50 attached Bid Form. 51 CrrY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 002113-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 9. Liquidated Damages 2 Provisions for liquidated damages are set forth in the Agreement. 3 4 10. Substitute and"Or-Equal"Items 5 The Contract,if awarded,will be on the basis of materials and equipment described in the 6 Bidding Documents without consideration of possible substitute or"or-equal"items. 7 Whenever it is indicated or specified in the Bidding Documents that a"substitute"or"or- 8 equal"item of material or equipment may be furnished or used by Contractor if acceptable to 9 City,application for such acceptance will not be considered by City until after the Effective 10 Date of the Agreement. The procedure for submission of any such application by Contractor 11 and consideration by City is set forth in Paragraphs 6.05A.,6.05B.and 6.05C.of the General 12 Conditions and is supplemented in Section 0125 00 of the General Requirements. 13 14 11. Subcontractors,Suppliers and Others 15 16 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No.20020- 17 12-2011 (as amended),the City has goals for the participation of minority business 18 and/or small business enterprises in City contracts.A copy of the Ordinance can be - 19 obtained from the Office of the City Secretary.The Bidder shall submit the MBE and 20 SBE Utilization Form,Subcontractor/Supplier Utilization Form,Prime Contractor 21 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 22 Venture Form as appropriate.The Forms including documentation must be received 23 by the City no later than 5:00 P.M.CST,five(5)City business days after the bid 24 opening date.The Bidder shall obtain a receipt from the City as evidence the 25 documentation was received.Failure to comply shall render the bid as non- 26 responsive. 27 28 11.2. No Contractor shall be required to employ any Subcontractor,Supplier,other person 29 or organization against whom Contractor has reasonable objection. 30 31 12. Bid Form 32 33 12.1. The Bid Form is included with the Bidding Documents;additional copies may be 34 obtained from the City. 35 36 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 37 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 38 the Bid Form. A Bid price shall be indicated for each Bid item,alternative,and unit 39 price item listed therein. In the case of optional alternatives,the words"No Bid," 40 "No Change,"or"Not Applicable"may be entered.Bidder shall state the prices, 41 written in ink in both words and numerals,for which the Bidder proposes to do the 42 work contemplated or furnish materials required.All prices shall be written legibly. 43 In case of discrepancy between price in written words and the price in written 44 numerals,the price in written words shall govern. 45 46 12,3. Bids by corporations shall be executed in the corporate name by the president or a 47 vice-president or other corporate officer accompanied by evidence of authority to 48 sign. The corporate seal shall be affixed. The corporate address and state of 49 incorporation shall be shown below the signature. 50 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 2 partner,whose title must appear under the signature accompanied by evidence of 3 authority to sign. The official address of the partnership shall be shown below the 4 signature. 5 6 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 7 member and accompanied by evidence of authority to sign. The state of formation of 8 the firm and the official address of the firm shall be shown. 9 10 12.6. Bids by individuals shall show the Bidder's name and official address. 12 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 13 indicated on the Bid Form. The official address of the joint venture shall be shown. 14 15 12.8. All names shall be typed or printed in ink below the signature. 16 17 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 18 which shall be filled in on the Bid Form. 19 20 12.10. Postal and e-mail addresses and telephone number for communications regarding the 21 Bid shall be shown. 22 23 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 24 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 25 to State Law Non Resident Bidder. 26 27 13. Submission of Bids - 28 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 29 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 30 addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, 31 marked with the City Project Number,Project title,the name and address of Bidder,and 32 accompanied by the Bid security and other required documents. If the Bid is sent through the 33 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 34 with the notation"BID ENCLOSED"on the face of it. 35 36 14. Modification and Withdrawal of Bids 37 w. 38 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 39 withdrawn prior to the time set for bid opening. A request for withdrawal must be 40 made in writing by an appropriate document duly executed in the manner that a Bid 41 must be executed and delivered to the place where Bids are to be submitted at any 42 time prior to the opening of Bids.After all Bids not requested for withdrawal are 43 opened and publicly read aloud,the Bids for which a withdrawal request has been 44 properly filed may,at the option of the City,be returned unopened. 45 46 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 47 time set for the closing of Bid receipt. 48 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 15. Opening of Bids 2 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 3 abstract of the amounts of the base Bids and major alternates(if any)will be made available 4 to Bidders after the opening of Bids. 5 6 16. Bids to Remain Subject to Acceptance 7 All Bids will remain subject to acceptance for the time period specified for Notice of Award 8 and execution and delivery of a complete Agreement by Successful Bidder. City may,at 9 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 10 11 17. Evaluation of Bids and Award of Contract �- 12 13 17.1. City reserves the right to reject any or all Bids,including without limitation the rights 14 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids _ 15 and to reject the Bid of any Bidder if City believes that it would not be in the best 16 interest of the Project to make an award to that Bidder,whether because the Bid is 17 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 18 meet any other pertinent standard or criteria established by City. City also reserves -� 19 the right to waive informalities not involving price,contract time or changes in the 20 Work with the Successful Bidder. Discrepancies between the multiplication of units 21 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 22 between the indicated sum of any column of figures and the correct sum thereof will 23 be resolved in favor of the correct sum. Discrepancies between words and figures 24 will be resolved in favor of the words. 25 26 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 27 among the Bidders,Bidder is an interested party to any litigation against City, 28 City or Bidder may have a claim against the other or be engaged in litigation, 29 Bidder is in arrears on any existing contract or has defaulted on a previous 30 contract,Bidder has performed a prior contract in an unsatisfactory manner,or 31 Bidder has uncompleted work which in the judgment of the City will prevent or 32 hinder the prompt completion of additional work if awarded. 33 34 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and 35 other persons and organizations proposed for those portions of the Work as to which — 36 the identity of Subcontractors, Suppliers,and other persons and organizations must 37 be submitted as provided in the Contract Documents or upon the request of the City. 38 City also may consider the operating costs,maintenance requirements,performance 39 data and guarantees of major items of materials and equipment proposed for 40 incorporation in the Work when such data is required to be submitted prior to the 41 Notice of Award. 42 43 17.3. City may conduct such investigations as City deems necessary to assist in the 44 evaluation of any Bid and to establish the responsibility,qualifications,'and financial 45 ability of Bidders,proposed Subcontractors,Suppliers and other persons and 46 organizations to perform and furnish the Work in accordance with the Contract 47 Documents to City's satisfaction within the prescribed time. 48 49 17.4. Contractor shall perform with his own organization,work of a value not less than 50 35%of the value embraced on the Contract,unless otherwise approved by the City. 51 CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 002113-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.5. If the Contract is to be awarded,it will be awarded to lowest responsible and 2 responsive Bidder whose evaluation by City indicates that the award will be in the 3 best interests of the City. _. 4 5 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 6 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 7 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 8 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 9 comparable contract in the state in which the nonresident's principal place of 10 business is located. AW 11 12 17.7. A contract is not awarded until formal City Council authorization.If the Contract is 13 to be awarded,City will award the Contract within 90 days after the day of the Bid 14 opening unless extended in writing. No other act of City or others will constitute 15 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by 16 the City. 17 18 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 19 20 18. Signing of Agreement 21 When City issues a Notice of Award to the Successful Bidder,it will be accompanied by the 22 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 23 Contractor shall sign and deliver the required number of counterparts of the Agreement to 24 City with the required Bonds,Certificates of Insurance,and all other required documentation. 25 City shall thereafter deliver one fully signed counterpart to Contractor. 26 27 28 29 END OF SECTION CITY OF FORT WORTH 2014 CIP SIDEWALK CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised November 27,2012 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 1 SECTION 00 3513 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder,offeror,or respondent(hereinafter also referred to as"you")to a City of Fort Worth 5 (also referred to as "City") procurement are required to complete Conflict of Interest 6 Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form)below pursuant to state law.This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work.The referenced forms may be downloaded from the website links provided below. 10 11 htlp://www.ethics.state.tx.us/forms/CIO.pdf 12 13 hqp://www.ethics.state.tx.us/forms/CIS.pdf 14 15 [] CIQ Form is on file with City Secretary 16 17 [] CIQ Form is being provided to the City Secretary 18 19 CIS Form is on File with City Secretary 20 21 CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 27 By: 28 Company (Please Print) 29 .. 30 Signature: 31 Address 32 33 Title: " 34 City/State/Zip (Please Print) 35 36 37 END OF SECTION CITY OF FORT WORTH ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2014 CIP SIDEWALK CONTRACT 1 Revised March 27,2012 02406 00 513 BID ORM Page of 8 SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder,offeror,or respondent(hereinafter also referred to as"you")to a City of Fort Worth (also referred to as"City')procurement are required to complete Conflict of Interest Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure Statement(the attached CIS Form)below pursuant to state law.This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work.The referenced forms may also be downloaded from the website links provided below. http://www.ethics.state.tx.us/forms/CIQ.pdf httl2://www.ethics.state.tx.us/forms/CIS.pdf ❑ CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary 0 CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: P.C. Contractors LLC By: Chase Patterson PO Box 470930 Signature:�? Fort Worth,Tx 76147 Title: President END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Revised Bid--ropcsal wo*k k 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 1 SECTION 00 35 13 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder, offeror, or respondent(hereinafter also referred to as "you")to a City of Fort Worth 5 (also referred to as "City") procurement are required to complete Conflict of Interest 6 Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form) below pursuant to state law. This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work.The referenced forms may be downloaded from the website links provided below. 10 11 ht!V://www.ethics.state.tx.us/forms/CLQ.Vdf 12 13 httl2://www.ethics.state.tx.us/forms/CIS.12df 14 15 0 CIQ Form is on file with City Secretary 16 17 [•] CIQ Form is being provided to the City Secretary 18 19 CIS Form is on File with City Secretary 20 21 CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 27 � - �` _ .�'L • 01'�Y?n�l7�C� 1-�--L-� By: 28 Company (Please, 29 30 Pb' �� Signature: 31 Address 32 33 Title: P�-tS)6QV4- 34 City/State/Zip (Please Print) 35 36 37 END OF SECTION CITY OF FORT WORTH ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 4SIDEWALK CONTRACT 1 0240066 Revised March 27,2012 02 00 41 00 BID FORM Page 1 of 8 SECTION 00 41 00 BID FORM TO: The City Manager clo:The Purchasing Department 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: 2014 CIP CONCRETE SIDEWALK CONTRACT 1 AT VARIOUS LOCATIONS City Project No.: 02406 Units/Sections: SIDEWALK IMPROVEMENT 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance,will do so pending contract award,and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organizati n, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering,giving,receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. 'collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. 'coercive practice"means harming or threatening to harm,directly or indirectly,persons or their props to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 410000 43 13_00 42 4300 43 3700 45 12_00 35 13—Revised Bid Proposal Workbook 00 41 00 BID FORM Page 2 of 8 3. Rrequalifieatme The BaddeF acknowledges that the following work types must be perfOFFned only by pFequalified reAtFartors and subeentFastemi a. b. C. d. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 180 calendar days after the date when the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones)within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form,Section 00 4100 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form,Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37 e. MWBE Forms(optional at time of bid) f. Prequalifleation Statement,Serstaon 00 46 12 g. Conflict of Interest Affidavit,Section 00 35 13 'If necessary,CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the sp ce provided below,please enter the total bid amount for this project. Only this figure will be read publicly by the City ate bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid $653,667.87 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00_00 43 13 00 42 43_00 43 37_00 45 12 00 35 13—Revised Bid Proposal Workbook 00 41 00 BID FORM Page 3 of 8 7. Bid Submittal This Bid is submitted on 2-12-15 by the entity named below. Respectfully submitte Receipt is acknowledged of Initial the following Addenda: By: -' Addendum No. 1: (Signature) Addendum No.2: Addendum No.3: Chase Patterson Addendum No.4: (Printed Name) Title: President Company: P.C.Contractors LLC Corporate Seal: Address: PO Box 470930 Fort Worth,Tx 76147 State of Incorporation: Tx I _ Email: Chase _occontractorsllc.com Phone: 817-343-4792 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 410000 4313_00 42 4300 43 37_00 4512_00 3513_Revised Bid Proposal 7 00 42 43 BID PROPOSAL Page 1 of 1 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantity 1 3305.0108 Miscellaneous Adjustment(Utilities) 33 05 14 LS 1 $ 6,000.00 $6,000.00 .. 2 0241.1300 Remove Concrete Curb&Gutter 0241 15 LF 506 $ 2.19 $1,108.14 3 3216.0102 7"Concrete Curb&Gutter 32 16 13 LF 651 $ 18.00 $11,718.00 4 0241.0401 Remove Concrete Driveway 0241 13 SF 850 $ 1.03 $875.50 5 3213.0401 6"Concrete Driveway 32 13 20 SF 850 $ 3.73 $3,170.50 7 0241.0100 Remove Sidewalk 0241 13 SF 947 $ 0.74 $700.78 8 3213.0301 4"Conc Sidewalk 32 13 20 SF 38,265 $ 3.90 $149,233.50 9 3213.0311 4"Conc Sidewalk,Adjacent to Curb 33 13 20 SF 10,200 $ 4.34 $44,268.00 10 3213.0303 6"Conc Sidewalk 32 13 20 SF j 1,910 $ 5.24 $10,008.40 11 3232.0100 Concrete Retaining Wall with Sidewalk,Face 32 32 13 SF 3,725 $ 30.85 $114,916.25 12 3232.0101 Concrete Retaining Wall with Sidewalk,Sidewalk 32 32 13 SF 18,625 $ 8.88 $165,390.00 13 9999.0000 4"Concrete Sidewalk with Flume per Detail 32 13 20 EA 1 $ 310.00 $310.00 14 10241.0300 Remove ADA Ramp 0241 13 EA 13 $ 376.00 $4,888.00 15 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 12 $ 1,264.00 $15,168.00 16 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 20 $ 1,137.00 $22,740.00 17 3213.0507 Barrier Free Ramp,Type P-2 32 13 20 EA 31 $ 1,179.00 $36,549.00 18 3213.0510 Barrier Free Ramp,Type C-3 32 13 20 EA 1 $ 965.00 $965.00 19 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 2 $ 241.00 $482.00 20 3305.0111 Valve Box Adjustment 33 05 14 EA 2 $ 100.00 $200.00 21 3305.0108 Miscellaneous Structure Adjustment(Water Meter Box) 33 05 14 EA 2 $ 100.00 $200.00 22 3217.0001 4"Solid White Thermoplastic(HAS)Lane Lines 32 17 23 LF 100 $ 6.61 $661.00 23 3217.5001 Curb Address Painting 32 17 25 EA 4 $ 78.00 $312.00 24 13292.0100 Block Sod Placement 32 92 13 SY 6,720 $ 4.89 $32,860.80 25 3110.0102 6"-12"Tree Removal 31 1000 EA 7 $ 264.00 $1,848.00 26 3110.0103 12"-18"Tree Removal 31 1000 EA 5 $ 819.00 $4,095.00 27 9999.0096 Paving Construction Allowance EA 1 $25,000.00 $25,000.00 Total Bid $653,667.87 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Forth Revised 20120120 00 410000 43 13_00 42 43_00 43 37_00 45 12_00 35 13-Revised Bid Proposal Workbook -' 4337 VENDOR COMPLIANCE TO LAW 7of8 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas)bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications.The failure of nonresident bidders to do so will automatically disqualify that bidder.Resident bidders must check the box in Section B. A. Nonresident bidders in the State of our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. B. The principal place of business of oyr company or our parent company or majority owner is in the State of Texas. C� BIDDER: P.C.Contractors LLC By: Chase Patterson Z PO Box 470930 4� Fort Worth,Tx (Signature) 76147 Title: President Date: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 00 410000 43 13_00 42 4300 43 37_00 45 12_00 35 13 Revised Bid Proposal 7 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. GG01-539590-0202003 Contractor further certifies that,pursuant to Texas Labor 6 Code, Section 406.096(b),as amended, it will provide to City its subcontractor's certificates of 7 compliance with worker's compensation coverage. 8 9 CONTRACTOR: 1 111 c o �y: 3�.0-. C �oY.. 1- 12 Companry2��� (Ple 13 `�Jl�x 14 � �� _ Signatur . 15 Address16 ,� ` - 17 l�X� �X �Q �``� Title: C'�-CS Z 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME the undersigned authority, on this day personally appeared 26 �. ,known to me to be the person whose name is 27 subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of .cC-4"r'�CA-0 Y-- L-1-- for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 GIVEN UNDER MY HAND AND SEAL OF OFFICE this 1C7 day of 1 32 , 20 � 4 33 34 UA 35 36 f'llglics � Notary Public in and for the e o exas 37 a 38q�oFP, ; END OF SECTION 10- 39 CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRA�T 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 004540-1 MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL Page 1 of 1 1 SECTION 00 45 40 2 MINORITY BUSINESS ENTERPRISE GOAL 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal 5 may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE 6 subcontracting goal is not applicable. 7 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 10 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 11 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 12 13 MBE PROJECT GOAL 14 The City's MBE goal on this project is 16% of the total bid (Base bid applies to Parks and 15 Community Services). Note: If both MBE and SBE subcontracting goals are established for this 16 project,then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be 17 deemed responsive. 18 19 COMPLIANCE TO BID SPECIFICATIONS 20 On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are 21 required to comply with the intent of the City's Business Diversity Ordinance by one of the 22 following: 23 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation,or 24 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or 25 3. Good Faith Effort documentation,or; 26 4. Waiver documentation. 27 Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non- 28 responsive.Any questions,please contact the M/WBE Office at(817)392-6104. 29 30 SUBMITTAL OF REQUIRED DOCUMENTATION 31 The applicable documents must be received by the Managing Department, within the following 32 times allocated, in order for the entire bid to be considered responsive to the specifications. The 33dfferor shall deliver the MBE documentation in person to the appropriate employee of the Managing 34 Department and obtain a date/time receipt Such receipt shall be evidence that the City received the .... 35 documentation in the time allocated. A faxed co ` will not be accepted: 1. Subcontractor Utilization Form,if goal is met received by 5:00 p.m., five (5) City business days after or exceeded: the bid opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form,if participation is less than the bid opening date,exclusive of the bid opening date. statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m, five (5) City business days after Utilization Form,if no MBE participation: the bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if firm will received by 5:00 p.m., five (5) City business days after perform all subcontracting/supplier work: the bid o ening date,exclusive of the bid opening date. 5.•Joint Venture Form,if utilizing a joint venture received by 5:00 p.m., five (5) City business days after to meet or exceed goal. the bid opening date,exclusive of the bid opening date. 36 END OF SECTION CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Reyised December 20,2012 005243-1 Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT,authorized on APRIL 21,2015 is made by and between the City of Forth 4 Worth,a Texas home rule municipality,acting by and through its duly authorized City Manager, 5 ("City"),and P.C.CONTRACTORS,LLC,authorized to do business in Texas,acting by and 6 through its duly authorized representative,("Contractor"). 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1.WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2.PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: t 15 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 16 City Project NO.02370 17 Article 3.CONTRACT TIlVIE 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 180 days after the date when the 23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 24 3.3 Liquidated damages 25 Contractor recognizes that time is of the essence of this Agreement and that City will 26 suffer financial loss if the Work is not completed within the times specified in Paragraph 27 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 28 General Conditions. The Contractor also recognizes the delays, expense and difficulties 29 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 30 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 31 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 32 City Six Hundred Fifty Dollars ($650.00) for each day that expires after the time 33 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 34 Acceptance. CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO.02406 Revised August 17,20I2 005243-2 Agreement 4 Page 2 of 4 35 Article 4.CONTRACT PRICE 36 City agrees to pay Contractor for performance of the Work in accordance with the Contract 37 Documents an amount in current funds of SIX HUNDRED FIFTY THREE THOUSAND SIX 38 HUNDRED SIXTY SEVEN DOLLARS AND EIGHTY SEVEN CENTS($653,667.87). 39 Article 5.CONTRACT DOCUMENTS 40 5.1 CONTENTS: 41 A. The Contract Documents which comprise the entire agreement between City and 42 Contractor concerning the Work consist of the following: 43 1. This Agreement. 44 2. Attachments to this Agreement: 45 a. Bid Form 46 1) Proposal Form 47 2) Vendor Compliance to State Law Non-Resident Bidder 48 3) Prequalification Statement 49 4) State and Federal documents(project specific) 50 b. Current Prevailing Wage Rate Table 51 c. Insurance ACORD Form(s) 52 d. Payment Bond 53 e. Performance Bond 54 f. Maintenance Bond 55 g. Power of Attorney for the Bonds 56 h. Worker's Compensation Affidavit 57 i. MBE and/or SBE Commitment Form 58 3. General Conditions. 59 4. Supplementary Conditions. 60 5. Specifications specifically made a part of the Contract Documents by attachment 61 or, if not attached, as incorporated by reference and described in the Table of 62 Contents of the Project's Contract Documents. 63 6. Drawings. 64 7. Addenda. 65 8. Documentation submitted by Contractor prior to Notice of Award. 66 9. The following which may be delivered or issued after the Effective Date of the 67 Agreement and, if issued,become an incorporated part of the Contract Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. 72 73 CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTR,kCT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO.D2406 Revised August 17,2012 005243-3 Agreement Page 3 of 4 74 Article 6.INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of,the work and services to be performed 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or proven that all or some of the damages being 81 sought were caused, in whole or in part,by any act,omission or negligence of the city. 82 This indemnity provision is intended to include, without limitation, indemnity for 83 costs,expenses and legal fees incurred by the city in defending against such claims and 84 causes of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless,at its own expense, 87 the city,its officers,servants and employees,from and against any and all loss,damage 88 or destruction of property of the city,arising out of,or alleged to arise out of,the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification 91 provision is specifically intended to operate and be effective even if it is alleged or 92 proven that all or some of the damages being sought were caused,in whole or in part, 93 by any act,omission or negligence of the city. 94 95 Article 7.MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 98 have the meanings indicated in the General Conditions. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the City. 102 7.3 Successors and Assigns. 103 City and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon CITY and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of }- 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO.02406 Revised August 17,2012 005243-4 i Agreement - Page 4 of 4 115 7.6 Other Provisions. 116 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 117 classified, promulgated and set out by the City, a copy of which is attached hereto and 4 118 made a part hereof the same as if it were copied verbatim herein. 119 7.7 Authority to Sign. 120 Contractor shall attach evidence of authority to sign Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 3 127 Contractor: City of Fort Worth e Ccs -Fro-c ims L c- C- / By: h Fernando Costa By: Assistant City Manager (Signature) Date / S Attes o (Printed Name) Sf City ary � (Se (Nd�) �Title: ��'2s -�! Address: Vii•-rr- /,.1�� � rj� M&C Date: City/State/Zip: A prove s to Form and Legality: Date Douglas W.Back Assistant City Attorney 128 129 130 "7 RECOMMENDED: 131 132 133 134 Douglas . Wiersig, P.E. 135 136 OFFICIAL RECORD Transportation and Public Works 137 CITY SECRETARY FT.WORTH,TX A. CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO.02406 Revised August 17,2012 0061 13-1 PERFORMANCE BOND Page 1 of 2 1 SECTION 00 6113 2 PERFORMANCE BOND Bond No: PB11509800672 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we,P.C.CONTRACTORS,LLC,known as"Principal"herein and 8 Philadelphia Indemnity Insurance Company ,a corporate surety(sureties, if more than r 9 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 10 or more), are held and firmly bound unto the City of Fort Worth,a municipal corporation created 11 pursuant to the laws of Texas,known as"City"herein, in the penal sum of, SIX HUNDRED 12 FIFTY THREE THOUSAND SIX HUNDRED SIXTY SEVEN DOLLARS AND EIGHTY 13 SEVEN CENTS($653,667.87), lawful money of the United States,to be paid in Fort Worth, 14 Tarrant County,Texas for the payment of which sum well and truly to be made,we bind 15 ourselves, our heirs,executors,administrators, successors and assigns,jointly and severally, 16 firmly by these presents. 17 WHEREAS,the Principal has entered into a certain written contract with the City 18 awarded the 21 day of APRIL,2015,which Contract is hereby referred to and made a part hereof 19 for all purposes as if fully set forth herein,to furnish all materials,equipment labor and other 20 accessories defined by law, in the prosecution of the Work, including any Change Orders, as 21 provided for in said Contract designated as 2014 CIP CONCRETE SIDEWALK,CONTRACT 1, 22 CITY PROJECT NO. 02406 23 NOW,THEREFORE,the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work, including Change Orders,under the Contract,according to the plans, 26 specifications,and contract documents therein referred to,and as well during any period of 27 extension of the Contract that may be granted on the part of the City,then this obligation shall be 28 and become null and void,otherwise to remain in full force and effect. 29 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 30 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 31 Worth Division. CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTI LACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 0061 13-2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code,as amended,and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 1st day of 6 May ,20 15 . 7 PRINCIPAL: 8 P.C. Contractors, LLC 9 10 I1 BY: i 12 Signature 13 A7rEST) 14 15 Chase Patterson, President 1 ti ---(Principal)Principal)Secretary Name and Title 17 18 Address: 102 West Hidden Meadow Court 19 Cresson, Texas 76035 20 21 _ 22 Witness as to Principal 23 SURETY: 24 Philadelphia Indemnity Insurance Company 25 26 27 BY: 28 Signa e 29 30 Tom Young, Attorney-in-Fact 31 Name and Title 32 33 Address: One Bala Plaza, Suite 100 34 Bala Cynwyd, Pennsylvania 19004 35 36 37 Witness as to Surety Telephone Number: 877-438-7459 38 39 40 41 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided, 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 0061 14-1 PAYMENT BOND Page 1 of 2 1 SECTION 00 6114 Bond No: PB11509800672 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, P.C. CONTRACTORS, LLC, known as "Principal" herein, and 8 Philadelphia Indemnity Insurance Company a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the 12 penal sum of SIX HUNDRED FIFTY THREE THOUSAND SIX HUNDRED SIXTY 13 SEVEN DOLLARS AND EIGHTY SEVEN CENTS (5653,667,87), lawful money of the 14 United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum 15 well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and 16 assigns,jointly and severally,firmly by these presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 21 day of APRIL, 2015, which Contract is hereby referred to and made a part hereof for all 19 purposes as if fully set forth herein, to furnish all materials, equipment, labor and other 20 accessories as defined by law, in the prosecution of the Work as provided for in said Contract and 21 designated as 2014 CIP CONCRETE SIDEWALK,CONTRACT 1,CITY PROJECT NO 02406. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTI tACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 0061 14-2 PAYMENT BOND Page 2 of 2 1 IN WITNESS WHEREOF,the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 1 St day of 3 May ,20 15 4 PRINCIPAL: P.C. Contractors, LLC ATI --. BY: h— Signature Chase Patterson, President cepa)Secretary Name and Title Address: 102 West Hidden Meadow Court Cresson, Texas 76035 Witness as to Principal SURETY: Philadelphia Indemnity Insurance Company ATTEST: BY: Signature Ate- Tom Young, Attorney-in-Fact 'Surety) Secretary c Name and Title Address: One Bala Plaza, Suite 100 Bala Cynwyd, Pennsylvania 19004 Diane Brown Witness as to Surety Telephone Number: 877-438-7459 S 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address,both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT WORTH 2014 CEP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 0061 19-1 MAINTENANCE BOND Page I of 3 1 SECTION 00 6119 Bond No: PB11509800672 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we P.C.CONTRACTORS,LLC,known as"Principal"herein and 9 Philadelphia Indemnity Insurance Company ,a corporate surety(sureties, if more than 10 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one I I or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 12 pursuant to the laws of the State of Texas,known as"City"herein,in the sum of SIX 13 HUNDRED FIFTY THREE THOUSAND SIX HUNDRED SIXTY SEVEN DOLLARS 14 AND EIGHTY SEVEN CENTS (5653,667.87), lawful money of the United States,to be paid in 15 Fort Worth,Tarrant County,Texas,for payment of which sum well and truly be made unto the 16 City and its successors,we bind ourselves,our heirs,executors,administrators,successors and 17 assigns,jointly and severally,firmly by these presents. 18 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded 20 the 21 day of APRIL,2015,which Contract is hereby referred to and a made part hereof for all 21 purposes as if fully set forth herein,to furnish all materials,equipment labor and other accessories 22 as defined by law,in the prosecution of the Work, including any Work resulting from a duly 23 authorized Change Order(collectively herein,the"Work")as provided for in said contract and 24 designated as 2014 CIP CONCRETE SIDEWALK,CONTRACT 1,CITY PROJECT NO 02406; 25 and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2)years 30 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 31 32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,COW LACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 0061 19-2 MAINTENANCE BOND Page 2 of 3 1 2 NOW THEREFORE, the condition of this obligation is such that if Principal shall 3 remedy any defective Work,for which timely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void; otherwise to remain in 5 full force and effect. 6 7 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond; and 11 12 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 14 Worth Division; and is 16 PROVIDED FURTHER,that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 20 CITY OF FORT WORTH 2014 CIP CONCRETE SIDEWALK,CONTI LACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 0061 19-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 1 st day of 3 May 220 15 4 5 PRINCIPAL: 6 P.C. Contractors, LLC 7 8 9 10 Signature 11 A ST: 12 13Chase Patterson, President 14 . 1pal)Secretary Name and Title 15 16 Address: 102 West Hidden Meadow Court 17 Cresson, Texas 76035 18 ' 19 20 Witness as to Principal 21 SURETY: 22 Philadelphia Indemnity Insurance Company 23 24 25 BY: 26 Signature 27 28 Tom Young, Attorney-in-Fact 29 ATTEST: Name and Title 30 31 Address: One Bala Plaza, Suite 100 32 (Surety)Secretary Bala Cynwyd. Pennsylvania 19004 33 34 Diane Brown 35 Witness as to Surety Telephone Number: 877-438-7459 36 37 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH 2014 CEP CONCRETE SIDEWALK,CONTRACT 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02406 Revised July 1,2011 Z044 PHILADELPHIA INDEMNITY INSURANCE COMPANY Bond No: PB11509 00672 One Bala Plaza,Suite 100 aw Bala Cynwyd,PA 19004 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: that PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation org ized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint: Jared Young,Fred A.Thetford,Jr.,"Tobin Tucker, om Young and Fred A.Thetford,Ill of Contract Bond Agency,LLC. Its true and lawful Attorney(s)in fact with full authority to execute on its behalf bonds,undertakings,recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed$25,000,000 This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Dir ctors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the I`day of July,2011. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company to: (1) Appoint Attorney(s) in Fact and authorize the Attorney(s) in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and biding upon the Company in the future with the respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIG 14ED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 7TH DAY OF FEBRUARY 2013. 1927 - ,5._C9 (Seal) Robert D.O'Leary Jr„President&CEO Philadelphia Indemnity Insurance Company On this 7`h day of February 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me dulysv orn said th he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrui ient is the Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed. COMMONWEALTH MM FEHNMVANIA NOTARIAL SEAL DANIELLE Mwy Twp.,W,Notary Pub11c �(/J Lower Marian T .,tabntgom Cou /� Commission Marcl►�2019 Notary Public: wm residing at: Bala Cynwyd.PA (Notary Seal) My commission expires: March 22,2016 I,CraigP.Keller,Executive Vice President,Chief Financial Officer and Secretary ary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify th the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto are true and correct and are still in full force and effe t.I do further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 1 St day of May .20 1 Craig P.Keller,Executive Vice President,Chief Financial Officer&Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY J IMPORTANT NOTICE ADVISO IMPORTANTE To obtain information or make a complaint: Para obener informacion o para someter una You may call the Surety's toll free telephone queja: Usted puede Ilamar al numero de number for information or to make a telefono gratis de para informacion o para complaint at: someter una queja al: 1-877-438-7459 1-877-438-7459 You may also write Philadelphia Indemnity Usted tanbien puede escribir a Philadelphia Insurance Company at: Indemnity Insurance Company at: One Bala Plaza, Suite 100 One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 Bala Cynwyd, PA 19004 Attention: Senior Vice President and Attention: Senior Vice President and Director of Surety Director of Surety You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on Seguros de Texas para obtener information companies, coverage, rights or complaints acerca de companias, coberturas, derechos at: o quejas al: 1-800-252-3439. 1-800-252-3439 You may write the Texas Department of Puede escribir al Departmento de Seguros Insurance at: de Texas: P.O. Box 149104 P.O. Box 149104 Austin, TX 78714-9104 Austin, TX 78714-9104 Fax# 512-475-1771 Fax# 512-475-1771 Web: httr)://www.tdi.state.tx.us Web: httr)://www.tdi.state.tx.us Email: ConsumerProtectionCcD-tdi.state.tx.us Email: Co nsumerProtection(-)-tdi.state.t&.-ys PREMIUM OR CLAIM DISPUTES: Should DISPUTAS SOBRE PRIMAS 0 you have a dispute concerning your RECLAMOS: Si tiene una disputa premium or about a claim, you should concerniente a su prima o a un reclamo, contact the Surety first. If the dispute is not debe comunicarse con el Surety primero. Si resolved, you may contact the Texas no se resuelve la disputa, puede entoncIs Department of Insurance. comunicarrse con el departamento (TDI), ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: Este This notice is for information only and does aviso es solo para proposito de informacion not become a part or condition of the y no se convierte en parte o condicion del attached document. documento adjunto. DATE(MM/DD/YYYY) /7 CERTIFICATE OF LIABILITY INSURANCE 4/29/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NA EAC Jared Young CONTRACT BOND AGENCY PHONE Fnx (817)731-2568 .(817)731-3117 PO Box 100096 EDDRL FSS.jyoung@contractbond.net Fort Worth, TX 76185 INSURERS AFFORDING COVERAGE NAIC# INSUR RA: Continental Casualty INSURED P.C. Contractors, LLC INSURERS: Transportation Insurance Company JNSURER Valley Forge Insurance Company P.O. Box 470930 INSURER D: Fort Worth, TX 76147 (817) 343-4792 1 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: a THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE INSR WVD POLICYNUMBER MMLIDYYYY MEFF M/DD/YYYy LIMITS " GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 UAMAUENIEU X COMMERCIAL GENERAL LIABILITY PR Moccurrence) $ 100 000 CLAIMS-MADE 0 OCCUR MED EXP(Anyoneperson) $ 5,000 A Y Y 5099238361 12/23/2014 2/23/2015 PERSONAL BADV INJURY $ 1,000 000 GENERAL AGGREGATE $ $1,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $ 2,000,000 POLICY X PRO- Deductible $ $1,000 AUTOMOBILE LIABILITY COMBINED accident) IN L LIMIT1,00 ,000 X ANYAUTO BODILY INJURY(Per person) $ ALLOWNED SCHEDULED $ AUTOS AUTOS Y Y 12/23/2014 2/23/2015 BODILY INJURY(Per accident) $ NON-OWNED 5099238330 PROPERTY AMAG $ X HIRED AUTOS X AUTOS (Par accident) a IETENTION R X OCCUR EACH OCCURRENCE $ 5,000,000 A CLAIMS-MADE Y Y AGGREGATE $ 5,000,000 5099238358 12/23/2014 2/23/2015 WORKERS COMPENSATION WCST'MIT 0" AND EMPLOYERS'LIABILITY Q ANY PROPRIETOR/PARTNERIEXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 C OFFICER/MEMBER EXCLUDED? N NJ Y (Mandatory In NH) 5099238344 12/23/2014 2/23/2015 E.L.DISEASE-EA EMPLOYEE $ 1,000,000 �. If yes,describe under 1'.00.0,000 O SCRI PTI F OPERATION below DISEASE-POLICY LIMIT DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additlonal Remarks Schedule,If more space Is required) Project No. 02406. 20145 CIP Sidwalk Contract 1. Additional Insured in favor of The City of Fort Worth, its Officers and Employees applies to all policies except Workers Compensation when required by written contract. General Liability policy T includes primary and non-contributory terms as required by written contract. Waiver of Subrogation in favor of The City of Fort Worth applies to all policies when required by written contract. Umbrella policy is follow term form to GL, Auto and Employers Liability policies. This insurance shall not be cancelled, limited in scope or coverage, cancelled or non-renewed, until after thirty (30) days prior written notice has been given to the City of Fort Worth. CERTIFICATE D CANCELLATION City of Fort Worth (8) 1000 ThrOC�CIIlorton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Fort Worth, TX 76102 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZE REPRESENTATIVE 1988 2010 ACORD CO PORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered arks of A RD STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De=nba2l,2012 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 —Definitions and Terminology................................................ .............1 ............................................. 1.01 Defined Terms...............................................................................................................................l 1.02 Terminology.................................................................................:................................................6 Article2—Preliminary Matters.........................................................................................................................7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time;Notice to Proceed................................................................7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference.......................................:..................................................................8 2.06 Public Meeting..............................................................................................................................8 2.07 Initial Acceptance of Schedules....................................................................................................8 Article 3—Contract Documents: Intent,Amending,Reuse............................................................................8 3.01 Intent.................. ........................................................................................................................8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................11 Article 4—Availability of Lands; Subsurface and Physical Conditions;Hazardous Environmental Conditions;Reference Points...........................................................................................................11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions..........................................................................................12 _ 4.03 Differing Subsurface or Physical Conditions........................................................................ 12 4.04 Underground Facilities..................:............................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5—Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers 5.02 Performance,Payment,and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance;Option to Replace...........................................................19 Article 6—Contractor's Responsibilities........................................................................................................19 — 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De=n1er21,2012 6.02 Labor;Working Hours................................................................................................................20 6.03 Services,Materials,and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and"Or-Equals".......................................................................................................21 a. 6.06 Concerning Subcontractors,Suppliers,and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas................................................................................... .............28 6.13 Record Documents.......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative..................................................................................................................30 T 6.16 Hazard Communication Programs .............................................................................................30 6.17 Emergencies and/or Rectification...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services..............................................................................34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article 7-Other Work at the Site...................................................................................................................35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36, Article 8-City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due............................................................................................................................36 8.04 Lands and Easements;Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections,Tests,and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program...............................................................................................37 Article 9-City's Observation Status During Construction...........................................................................37 9.01 City's Project Representative.....................................................................................................37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 i i CITY OF FORT WORTH STANDARD CONSTRUCTTON SPECIFCATION DOCUMENTS Revision:De=iba2l,2012 Article 10-Changes in the Work, Claims;Extra Work................................................................................38 10.01 Authorized Changes in the Work...............................................................................................38 10.02 Unauthorized Changes in the Work........................................... ...........39 ..................................... 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 �. 10.06 Contract Claims Process.............................................................................................................40 Article 11 -Cost of the Work; Allowances;Unit Price Work;Plans Quantity Measurement......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work................................... .................................44 ...................................................... 11.04 Plans Quantity Measurement......................................................................................................45 1 Article 12-Change of Contract Price;Change of Contract Time.................................................................46 �+ 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13-Tests and Inspections;Correction,Removal or Acceptance of Defective Work......................48 13.01 Notice of Defects ........................................................................................................................48 13.02 Access to Work...........................................................................................................................48 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................50 13.08 Acceptance of Defective Work...................................................................................................51 13.09 City May Correct Defective Work.............................................................................................51 Article 14-Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization............................................:...........................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance...................................................................... ...........55 ........................................ 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................56 14.09 Waiver of Claims ..........57 -- .............................................................................................................. Article 15-Suspension of Work and Termination........................................................................................57 15.01 City May Suspend Work.............................................................................................................57 15.02 City May Terminate for Cause..............................................:....................................................58 15.03 City May Terminate For Convenience........................................................................................60 Article16-Dispute Resolution......................................................................................................................61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decanba21,2012 Article17—Miscellaneous..............................................................................................................................62 17.01 Giving Notice..............................................................................................................................62 17.02 Computation of Times................................................................................................................62 17.03 Cumulative Remedies.................................................................................................................62 17.04 Survival of Obligations..............:................................................................................................63 17.05 Headings......................................................................................................................................63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decenbc21,2012 f 00 72 00-1 General Conditions Page 1 of 63 ARTICLE 1–DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed ` below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct,or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award–Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form,if any,and the Bid Form with any supplements. 10.Business Day–A business day is defined as a day that the City conducts normal business, generally Monday through Friday,except for federal or state holidays observed by the City. 11.Buzzsaw–City's on-line,electronic document management and collaboration system. 12. Calendar Day–A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deccnber2l,2012 007200-1 Geneml 07200- Geneml Condition Page 2 of 6 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date -. of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and s chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts _ involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney–The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. -� 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager – The officially appointed and authorized City Manager of the City of Fort Worth,Texas,or his duly authorized representative. = 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract.A demand for money or services by a third party is not a Contract Claim. 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations,representations,or agreements,whether written or oral. 20. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in ¢. accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). _ 22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones,if any and(ii)complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decemba2l,2012 007200-1 General Conditions Page 3 of 63 25.Damage Claims -A demand for money or services arising from the Project or Site from a third party,City or Contractor exclusive of a Contract Claim. 26.Day or day-A day,unless otherwise defined,shall mean a Calendar Day. 27.Director of Aviation -The officially appointed Director of the Aviation Department of the City of Fort Worth,Texas,or his duly appointed representative,assistant, or agents. 28.Director of Parks and Community Services -The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth,Texas, or his duly appointed representative,assistant,or agents. 29.Director of Planning and Development- The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative,assistant,or agents. 30.Director of Transportation Public Works - The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative,assistant,or agents. 31.Director of Water Department- The officially appointed Director of the Water Department of the City of Fort Worth,Texas,or his duly appointed representative,assistant,or agents. 32.Drawings—That part of the Contract Documents prepared or approved by Engineer which �- graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33.Effective Date of the Agreement—The date indicated in the Agreement on which it becomes .. effective,but if no such date is indicated,it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34.Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work - Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents.Extra work shall be part of the Work. 36.Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time,or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37.Final Acceptance - The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dwmrba2l,2012 007200-1 General Condition] Page 4 of 63 38.Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. _ 40.Hazardous Environmental Condition The presence at the Site of Asbestos, PCBs p Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities of circumstances that may present a substantial danger to persons or property exposed thereto. 41.Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous o� possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42.Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having _. jurisdiction. 43.Liens—Charges, security interests, or encumbrances upon Project funds, real property, or .— personal property. 44.Major Item—An Item of work included in the Contract Documents that has a total cost equal to or greater than 5%of the original Contract Price or$25,000 whichever is less. 17 45.Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47.Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform th Work specified in Contract Documents. r 48.PCBs—Polychlorinated biphenyls. 49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans—See definition of Drawings. CTIY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deeanba2l,2012 007200-1 � General Conditions Page 5 of 63 51.Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52.Project—The Work to be performed under the Contract Documents. 53.Project Representative—The authorized representative of the City who will be assigned to the Site. 54.Public Meeting – An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55.Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954(42 USC Section 2011 et seq.)as amended from time to time. 56.Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday duu Friday(excluding legal holidays). 57.Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions �. of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands fiuuished by City which are designated for the use of Contractor. 61. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62.Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decan1w21,2012 0072 Do- General Condition Page 6 of 6 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted b� Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. = 65. Superintendent—The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends of supplements these General Conditions. 67. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wireg, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water,wastewater,storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours—Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday,as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and famishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day—A working day is defined as a day,not including Saturdays, Sundays,or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but,when used in the Bidding Requirements or Contract Documents,have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dwanba2l,2012 00 7200-1 General Conditions Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents(unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory,faulty,or deficient in that it: a. does not conform to the Contract Documents;or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents;or c. has been damaged prior to City's written acceptance. D. Furnish, Install,Perform,Provide: 1. The word "Fumish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2—PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time;Notice to Proceed The Contract Time will continence to run on the day indicated in the Notice to Proceed.A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De=rba21,2012 00 72 General Condidifi Page 8 of 6 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City id accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required v by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labo , documentation, services, materials, or equipment that reasonably may be inferred from th Contract Documents or from prevailing custom or trade usage as being required to produce th indicated result will be provided whether or not specifically called for, at no additional cost t City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may b� written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decwbw21,2012 007200-1 General Conditions Page 9 of 63 s section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is i provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications,Codes,Laws,and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations,whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids),except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a t Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work. Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain ai written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work. If, during the # performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation,(b) any standard, specification,manual, or code,or(c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De=nber2l,2012 007200-1 General Conditions { Page 10 of 153 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, Or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions o the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, o discrepancy between the provisions of the Contract Documents and the provisions of an standard,specification,manual, or the instruction of any Supplier(whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shal� govern over Specifications, Supplementary Conditions shall govern over General Condition and Specifications, and quantities shown on the Plans shall govern over those shown in thl proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations an deviations in the Work not involving a change in Contract Price or Contract Time, may b� authorized,by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal(subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, o� other documents (or copies of any thereof) prepared by or bearing the seal of Engine , including electronic media editions;or 2. reuse any such Drawings, Specifications,other documents, or copies thereof on extensions °� the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dec TA=2l,2012 007200-1 General Conditions Page 11 or 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the _ Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions,the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the,hard copies,the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS;REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary .Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way,and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed,adjusted,and/or relocated by others. B. Upon reasonable written request, City shall famish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De=Tba2l,2012 oorz00- General Condition Page 12 of 6 C. Contractor shall provide for all additional lands and access thereto that may be required fol construction facilities or storage of materials and equipment. r 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface of subsurface structures at the Site(except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors,members,partners, employees, agents,consultants,or subcontractors with respect to: _ 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto;or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations,opinions,or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any"technical data"on which Contractor is entitled to r rely as provided in Paragraph 4.02 is materially inaccurate;or 2. is of such a nature as to require a change in the Contract Documents;or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contra Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Da=nber21,2012 007200-1 General Conditions Page 13 of 63 _ then Contractor shall, promptly after becoming aware thereof and before further disturbing the T subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A),notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if. 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site;or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the. Site is based on information and data famished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities,including City,during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. �. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 Genera 07200- Generral Condidoni Page 14 of 6 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A�, identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document th consequences of the existence or location of the Underground Facility. Contractor shall b: responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments,and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly o willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the ful cost for replacing such points plus 25% will be charged against the Contractor, and the ful amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawing known to City relating to Hazardous Environmental Conditions that have been identified at th� Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon th accuracy of the "technical data" contained in such reports and drawings, but such reports ani drawings are not Contract Documents. Such "technical data" is identified in the Supplement Conditions. Contractor may not make any Contract Claim against City, or any of their office directors,members,partners, employees,agents,consultants,or subcontractors with respect to: �. 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decernber2l,2012 007200-1 General Conditions Page 15 of 63 ^ construction to be employed by Contractor and safety precautions and programs incident thereto;or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings;or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations,opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors,Suppliers,or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City(and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action,if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and-delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a �. reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entityfrom and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. W- CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dc=nba21,2012 007200-1J General Conditions Page 16 of 63 ARTICLE 5—BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained b Contractor shall be obtained from surety or insurance companies that are duly licensed or authorize in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualification as may be provided in the Supplementary Conditions. 5.02 Performance,Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as securi to protect the City against any defects in any portion of the Work described in the Contrac Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Fina Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and s as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent o its right to do business is terminated in the State of Texas or it ceases to meet the requirements o Paragraph 5.02.C, Contractor shall promptly notify City and shall,within 30 days after the eve giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified iy the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured)which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in tho Supplementary Conditions as"Additional Insured"on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De21,2012 007200-1 General Conditions Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement,which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M.Best Property&Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of L`- Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating'is below that required,written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the"occurrence basis". If coverage is underwritten on a claims-made basis,the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall -� state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period,whichever is — longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage,nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders'equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decanber2l,2012 007200-1 General Condi6on� Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups,must also be approved by City. _. 11. Any deductible in excess of$5,000.00, for any policy that does not provide coverage on first-dollar basis,must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and t9 make reasonable adjustments to insurance coverage's and their limits when deeme necessary and prudent by the City based upon changes in statutory law, court decision or th claims history of the industry as well as of the contracting party to the City. The City shal be required to provide prior notice of 90 days, and the insurance adjustments shall b incorporated into the Work by Change Order. 13. City shall be entitled,upon written request and without expense, to receive copies of policie and endorsements thereto and may make any reasonable requests for deletion or revision 0 1 modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established b law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers'Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being perf6rmed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or-by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefi� acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations,personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO)policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decanba2l,2012 007200-1 General Conditions Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto', defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work,or by anyone F for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured.There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. �- ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means,methods,techniques,sequences,and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decanber2l,2012 007200-1 General Condition Page 20 of 61 _ B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. Th Superintendent will be Contractor's representative at the Site and shall have authority to act o behalf of Contractor. All communication given to or received from the Superintendent shall b binding on Contractor. 4 C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction a required by the Contract Documents. Contractor shall at all times maintain good discipline an -- order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Wo, at the Site shall be performed during Regular Working Hours. Contractor will not permit th performance of Work beyond Regular Working Hours or for Weekend Working Hours withou City's written consent (which will not be unreasonably withheld). Written request (by letter o electronic communication)to perform Work: y 1. for beyond Regular Working Hours request must be made by noon at least two(2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services,Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume f64 responsibility for all services,materials, equipment, labor,transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, s temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing,start-up,and completion of the Work- B. orkB. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of -` required tests)as to the source,kind,and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decen=21,2012