NOTICE OF PROJECT COMPLETION
(Developer
Projects)
CF/4 Sea"wO -6lZ//,' City Project Ns: 101000
Regarding contract 101000 for LIVE OAK PHASE 3A as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
>
Original Contract Price: v t $290,685.00
t B od
Amount of Approved Change Orders: �� c E c N2
O m
Revised Contract Amount: f° 1 U c�a E
Total Cost Work Completed: N ,460 c c r $290,685.00
d v
N — O 0 7
o yo m
c�
?� cca O m a ayi 'o
V i c O 5 .4:
0J� Cm � Qty d G 7
V 'O
� � E CA. c
O cad cn c -a cn U
r
cc Co R v d C w d cco O � Oy C
*; d m 0 cc
IL V ca
Q-Z''o U)6 LL d y
� UC—LiRd 91=� c U
Recomme eptance Date
Asst. Direc r, PW - Development Services
Accepted 0 Date
® Director, TRANSPORTATION & PUBLIC WORKS
� 0 */
As t. Ci y Manager Date
omme`ii'ts: OFFIc"MCC
�,ECS��p CITY SECRETVVECSNE
µpi _Z 201 FT.WORM,T
. warm+
Rev.9/22
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LIVE OAK PHASE 3A
Contract Limits
Project Type STORM DRAIN
City Project Numbers 101000
DOE Number 1000
Estimate Number 1 Payment Number 1 For Period Ending 4/10/2018
CD
City Secretary Contract Number Contract Time 4CD
Contract Date Days Charged to Date 186
Project Manager NA Contract is 100.00 Complete
Contractor VENUS CONSTRUCTION COMPANY
1426 S.MAIN P O BOX 90
MANSFIELD, TX 76063
Inspectors OWEN / HOUSTON
Tuesday,April 10,2018 Paee I of 4
City Project Numbers 101000 DOE Number 1000
Contract Name LIVE OAK PHASE 3A Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 4/10/2018
Project Funding
STORM DRAIN&BONDS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 54"RCP 89 LF $250.57 $22,300.73 89 $22,300.73
2 48"RCP 100 LF $194.45 $19,445.00 100 $19,445.00
3 42"RCP 195 LF $167.11 $32,586.45 195 $32,586.45
4 36"RCP 272 LF $132.98 $36,170.56 272 $36,170.56
5 24"RCP 257 LF $79.99 $20,557.43 257 $20,557.43
6 21"RCP 151 LF $70.74 $10,681.74 151 $10,681.74
7 6'STACKED MANHOLE 1 EA $7,198.43 $7,198.43 1 $7,198.43
8 4'DROP INLET 2 EA $3,414.64 $6,829.28 2 $6,829.28
9 10'CURB INLET 3 EA $4,152.94 $12,458.82 3 $12,458.82
10 15'CURB INLET 5 EA $5,321.92 $26,609.60 5 $26,609.60
11 4X4 CLOSED RISER W/3 OPENINGS I EA $6,921.57 $6,921.57 1 $6,921.57
12 54"STD SLOPING HEADWALL I EA $3,876.08 $3,876.08 1 $3,876.08
13 24"STD SLOPING HEADWALL 1 EA $1,784.23 $1,784.23 1 $1,784.23
14 42"TXDOT STD PARALLEL HEADWALL 1 EA $14,396.85 $14,396.85 1 $14,396.85
15 LARGE STONE RIPRAP 299 SY $113.21 $33,849.79 299 $33,849.79
16 TRENCH SAFETY 1064 LF $0.32 $340.48 1064 $340.48
17 PAYMENT&PERFORMANCE BONS I LS $13,867.74 $13,867.74 1 $13,867.74
18 MAINTENANCE BOND I LS $20,810.22 $20,810.22 1 $20,810.22
Sub-Total of Previous Unit $290,685.00 $290,685.00
Tuesday,April 10,2018 Page 2 of 4
City Project Numbers 101000 DOE Number 1000
Contract Name LIVE OAK PHASE 3A Estimate Number I
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 4/10/2018
Project Funding
Contract Information Summary
Original Contract Amount $290,685.00
ChanLye Orders
Total Contract Price $290,685.00
( Date L/ ���d Total Cost of Work Completed $290,685.00
Co ractor Less %Retained $0.00
Date Net Earned $290,685.00
/ Earned This Period $290,685.00
Inspection Sup7sorRetainageThisPeriod
$0.00
Date r/ ( v Less Liquidated Damages
rojeagZ�er
Days @ /Day $0.00
ct
Date A"''I�- LessPavement Deficiency $0.00
AsstMo.
Less Penalty $0.00
Date Less Previous Payment $0.00
Director/ ontracting Depa t Plus Material on Hand Less 15% $0.00
Balance Due This Payment $290,685.00
Tuesday,April 10,2018 Page 3 of 4
City Project Numbers 101000 DOE Number 1000
Contract Name LIVE OAK PHASE 3A Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 4/10/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN / HOUSTON Contract Date
Contractor VENUS CONSTRUCTION COMPANY Contract Time 45 CD
1426 S.MAIN P O BOX 90 Days Charged to Date 186 CD
MANSFIELD, TX 76063 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $290,685.00
Less %Retained $0.00
Net Earned $290,685.00
Earned This Period $290,685.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $290,685.00
Tuesday,April 10,2018 Page 4 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.1
NAME OF PROJECT: Live Oak Phase 3A
PROJECT NO.: 101000 CONTRACTOR: Venus Constrution, Inc
DOE NO. N/A
PERIOD FROM 10/09/17 TO: 04/12/18 FINAL INSPECTION DATE: 12-Apr-18
WORK ORDER EFFECTIVE CONTRACT TIME 45 O WD O CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28•
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS 0 0 0 0 186 186
PERIOD
PREVIOUS 0 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 186 186
TO DATE
*REMARKS
' T' -1 -
CONT CTO DATE INSPEC OR DATE
ENGINEERING DEPARTTWNT J Q
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
0
(817)392-7941 •Fax:(817)392-7845
FoRTWORTH REV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Venus Construction Live Oak Phase 3A
Inspector City Project Number
Gary Houston 101000
Construction Components Project Manager
El Water [A Waste Water D Storm Drainage ❑ Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$290,685.00 O Simple OO Routine O Complex
Final Contract Annount Date
$290,685.00 4/12/2018
H)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 1 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]* 100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS ANVARDED)
Inspector Signature Contractor Signature {
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116• (817)392-8306
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 4/12/2018
Name of Contractor Project Name
Venus Construction Live Oak Phase 3A
DOE Inspector Project Manager
Gary Houston Fred Ehia
DOE Number Project Dc:dty Type of Contract
101000 O Simple O Routine O Complex ❑ Water ❑ Waste Water 21 Storm Drainage ❑ Pavement_
Initial Contract Amount Final Contract Amount
$290,685.00 J$290,685.00
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector I Accuracy of Plans to Existing Conditions Ll
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 4
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
-
5 Citizen Complaint Resolution 1 PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs Ll 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments Ll 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENT,(
TRANSPORTATION AND PUBLIC WORKS
(D The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
THE The Guarantee Company of North America USA
GUARANTEE" One Towne Square, Suite 1470
Southfield, Michigan 48076
Phone: 248-281-0281 Fax: 248-750-0431
www.qcna.com
Bond Number 75159318
OWNER ❑
CONSENT OF SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR [I
SURETY ❑
OTHER ❑
PROJECT: Live Oak Phase 3A
(name, address)
TO (Owner) Filc W-2500,"X"#X-24433,Project#101000
351 Development LLC ARCHITECT'S PROJECT NO.
on behalf of Live Oak Creek Municipal Utility District No. I CONTRACT FOR: Water, Sanitary Sewer,&Storm Drain
Improvements for Live Oak Phase 3A
CONTRACT DATE:
CONTRACTOR: Venus Construction Company,Inc. 1426 S.Main Mansfield,TX 76063
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety as it appears in the bond).
The Guarantee Company of North America USA One Towne Square#1470 Southfield,MI 48076 , SURETY COMPANY,
on bond of(here insert name and address of Contractor)
Venus Construction Company,Inc. 1426 S.Main Mansfield,TX 76063 CONTRACTOR,
Hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety Company of any of its obligations to(here insert name and address of Owner)
351 Development LLC on behalf of Live Oak Creek Municipal Utility District No. 1 OWNERS,
As set forth in the said Surety Company's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand this 18th day of April 2018
The Guarantee Company of North America USA
Sur�4Company
r
✓� `
Signa re of Authorized Representative
ATTEST: /� Lloyd Ray Pitts Jr. Attorney-In-Fact
(Seal): Melissa Pitts,Bond Secretary Title
The language in this document confirms exactly to the language used in AIA Document G707—Consent of Surety Company to Final Payment.
THE The Guarantee Company of North America USA
GUARANTEETM Southfield,Michigan
POWER OF ATTORNEY
KNOW ALL BY THESE PRESENTS:That THE GUARANTEE COMPANY OF NORTH AMERICA USA,a corporation organized and existing under the
laws of the State of Michigan,having its principal office in Southfield,Michigan,does hereby constitute and appoint
Lloyd Ray Pitts,Jr.,William D.Birdsong
Pitts Fennell and Associates,LLC dba Pitts Birdsong Fennell&Associates
its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of
indemnity and other writings obligatory in the nature thereof,which are or may be allowed,required or permitted by law,statute,rule,regulation,contract
or otherwise.
The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA
USA as fully and amply,to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the
principal office.
The Power of Attorney is executed and may be certified so,and may be revoked,pursuant to and by authority of Article IX,Section 9.03 of the By-Laws
adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31"day of December,2003.
The President,or any Vice President,acting with any Secretary or Assistant Secretary,shall have power and authority:
1. To appoint Attorney(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto,
bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof;and
2. To revoke,at any time,any such Attorney-in-fact and revoke the authority given,except as provided below
3. In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given
to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of
Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety
company of any of its obligations under its bond.
4. In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given to
the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner—
Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
Further,this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting
duly called and held on the 6th day of December 2011,of which the following is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification
thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and
such signature and seal when so used shall have the same force and effect as though manually affixed.
Jp�Tlec IN WITNESS WHEREOF,THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and
r its corporate seal% to be affixed by its authorized officer,this 2nd day of October,2015.
o ``-'J �p THE GUARANTEE COMPANY OF NORTH AMERICA USA
�OgniAMea`�r
STATE OF MICHIGAN Stephen C.Ruschak,President&Chief Operating Officer Randall Musselman,Secretary
County of Oakland
On this 2nd day of October, 2015 before me came the individuals who executed the preceding instrument, to me personally known, and being by me
duly sworn,said that each is the herein described and authorized officer of The Guarantee Company of North America USA;that the seal affixed to said
instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of
•,.,,
Cynthia A. Takai IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee
N,.x.i Notary Public,State of Michigan Company of North America USA offices the day and year a ova written.
,R County of Oakland
`~ - My Commission Expires February 27, 2018
Acting in Oakland County /
I,Randall Musselman,Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA,do hereby certify that the above and foregoing is a true
and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA,which is still in full force and effect.
b� TEf C. IN WITNESS WHEREOF,I have thereunto set my hand and attached the seal of said Company this 18th day of April 2018
�gn/AYYp`�' Randall Musselman,Secretary
VENUS
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Sam McAda, Vice
President Of Venus Construction Company, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Live Oak Phase 3A
BY
Samuel McAda/Vice President
Subscribed and sworn before me on this date 16th of April, 2017.
EE
VANESSARENFROW
Notary PublicMy Notary ID#128692814
Tarrant, TX Expires July 28,2019
- -I
PO Box 90 - Mansfield, TX 76063 (817) 477-2050 1 FAX (817) 473-9366
WWW.VENUSCONSTRUCTION.COM
s
k
r
d