Loading...
HomeMy WebLinkAboutContract 50708 Received Date: 5/3/2018 Received Time:2:32 P.M. Developer and Project Information Cover Sheet: Developer Company Name: La Frontera Development,LLC Address, State,Zip Code: 1000 Texas Trail, Grapevine, TX,76061 Phone&Email: 817-416-4847, alburtin@westwoodland.com Authorized Signatory, Title: Gary Hazlewood,President Project Name: La Frontera Phase 2 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: 9313 Block Boat Club Rd Plat Case Number: FP17-075 Plat Name: La Frontera Phase 2 Mapsco: 32A Council District: 7 CFA Number: 2017-127 City Project Number: 101145 To be completed by staff.• Received by: Evelyn Roberts Dace: 05/01/2018 City of Fort Worth,Texas OFfICM RECORD Standard Community Facilities Agreement-La Frontera Phase 2 CATTY 84CMMY CFA Official Release Date: 02.20.2017 Page 1 of 12Me TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 50708 WHEREAS, La Frontera Development, LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as La Frontera Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,Texas ("City"); and WHEREAS,the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section I1, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 O"JCS,RECORD Page 2 of 12 CM SECRETARY ".VJOM;TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®. Sewer(A-1) Z , Paving (B) E _ Storm Drain(B-1) Z. Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 3 of 12 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 4 of 12 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date: 02.20.2017 Page 5 of 12 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 6 of 12 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. R. IMMIGRATION AND NATIONALITY ACT Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(1-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,DEVELOPER'S EMPLOYEES, SUBCONTRACTORS,AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 7 of 12 (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 8 of 12 Cost Summary Sheet Project Name:La Frontera Phase 2 CFA No.: 2017-127 City Project No.: 101145 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 388,246.64 2.Sewer Construction $ 442,214.24 Water and Sewer Construction Total $ 830,460.88 B. TPW Construction 1.Street $ 1,258,678.43 2.Storm Drain $ 640,228.59 3.Street Lights Installed by Developer $ 171,719.00 4. Signals $ - TPW Construction Cost Total $ 2,070,626.02 Total Construction Cost(excluding the fees): $ 2,901,086.90 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 16,609.21 D. Water/Sewer Material Testing Fee(2%) $ 16,609.21 Sub-Total for Water Construction Fees $ 33,218.42 E. TPW Inspection Fee(4%) $ 75,956.28 F. TPW Material Testing(2%) $ 37,978.14 G. Street Light Inspsection Cost $ 6,868.76 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 120,803.18 Total Construction Fees: $ 154,021.60 Choice Financial Guarantee Options,choose one Amount 'ifiark one Bond=100% $ 2,901,086.90 Completion Agreement=100%/Holds Plat $ 2,901,086.90 x Cash Escrow Water/Sanitary Sewer-125% $ 1,038,076.10 Cash Escrow Paving/Storm Drain=125% $ 2,588,282.53 Letter of Credit=125%w/2yr expiration period $ 3,626,358.63 City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 9 of 12 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER La Frontera Development,LLC �esuti 7 C.�iabQ. Jesus J.Chapa(Maypa(May3 Jesus J. Chapa Assistant City Manager �a�ti t Date: May 3,2018 ary azlew0od(%l Name: Gary Hazlewood Recommended by: Title: President , KJ,It, Date: May 1,2018 Evelyn Rabe s(May 1,2018) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form & Legality: administration of this contract, including ensuring all performance and reporting &&VIYX R�ChaZ A2Y requirements. Richard A.McCracken(May3,2018) Richard A. McCracken Assistant City Attorney J iferL Eze'A for(May 2,2018)ZZ M&C No. N/A Name: Janie Morales Date: Title: Development Manager Form 1295: N/A ATTEST: O�FORT. Mary J. r(Ma ,2018) Mary J. Kayser/Ronald GA&W City Secretary/Assistant Cit cre'tacy.,XA� OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-La Frontera Phase 2 FT.WORTH,TX CFA Official Release Date:02.20.2017 Page 10 of 12 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements Water Cost Estimate { Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements Paving Cost Estimate #� Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 11 of 12 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101 145 None City of Fort Worth,Texas Standard Community Facilities Agreement-La Frontera Phase 2 CFA Official Release Date:02.20.2017 Page 12 of 12 00 4243 DAP•&D PROPOSAL Paye 1 or7 SECTION 00 42 43 12/30/2017 Developer Awarded Projects-PROPOSAL FORM CONTRACTED UNIT PRICES LA FRONTERA-PHASE 2 CPN: 101145 UNIT PRICE BID Bidder's Application Propa Item Inrommnon Bi kkA Prod Didlita SpSection No. Measetifkadon Unitof Bid Item Description ure Qiumiry Unit Prig Bid Value No. NIT is WAT R IMPROVEMENTS 1-1 13314.0161 6°Water Pipe 1 33 1112 LF 45 S24.96 $1,123.20 1-2 13311.0261 8"Water Pipe 3311 12 1 LF 1 $,985 1 S30.161 S180,507.60 1-3 13311.0441 12-WalerPipe 33 11 12 U 324 1 $52.00 S16,H8."' 14 3312.3002 W Gate Valve 331220 FA 9 1 $1.083.691 59,753.12 1-5 3312.3003 r Oate Valve 33 1220 FA 21 $1,466, 530,794.40 1-6 9999.0001 Ramon exisOnfiYwater line 331210 LF 12 $29.14 5349.44 1-7 3312.0117 Ctmnert W Fxisffng 4'-12e Water Main 331225 FA 2 $4,017.54 S111.035.04 la 3312.0001 Fre Hydrant 331240 EA 9 54870.4 SB.933.64 IA 3311.0001 Ductile Iron Waw Finings 3311 It TON 6 S5,51104 $33,072 1-10 3305.0109 Traich Sardy 3305 10 LF 6,354 50.32 52,033.28 i-1 t 3312.2003 1'Water Service 3312 10 EA 99 $807.04 5iv,s96 UNIT 1:WAM IMggQygJUM $368,248.84 CITY Of FORT WORTH STANDARD CONSTRICTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS Fenn Version Ap.il 2 2014 00 42 42.CONTRACTED UN11 PRICES-L1 ERONTERA.PHASE 2.201313B-12-3117Rie 004243 DAP•WD PROPOSAL F*02sf7 SECTION 00 42 43 12/3020 17 DavLfopEr Awarded Pro*ts-PROPOSAL FORM CONTRACTED IFNIT PRICES LA FRONTERA-PHASE 2 CPN: 101145 UNIT PRICE BID Biddees Application Project item Infomution Bidders Ptoposal Bidlin Speeirmstion Unit of Bid NO. Deseripti0n section Na Measure Qmmity Unit Prig Bid Value 1Vo. 2-1 13331.4115 8'Sewer Pipe 33 31 20 LF 5,810 1 S36.921 5214,505.20 2.2 3331.4116 8-Sewer PjM CSB Baekftll 33 11 10 LF 122 S62.401 $7,612.84 2.3 3305-0116 Calerae Enurement(for 273 IF for 8"Sewer Pipe) 330510 CY 10 5260.00 sum-ON 24 3339.1001 4'Manhole 333920 EA 30 $3,116 $94,380.00 2-5 3339.1102 5'Drop Manhole 333920 EA 1 S1,091.201 58,091. 2.6 3339.1002 4'Drop Mardnk 332920 EA 3 SS.673-24 517,019.60 2-7 3339.1003 4'Extra Depth Manhole 333920 1 VF 120 3186.161 $22,339.20 24 3331.3101 I'Server Service,Two-way dnnom 33 31 SO EA 91 5553.2 S50,342 4 29 301,0002 PostCCfVlnapectioa 330131 LF 5,932 S1.04 56,16928 2-1 3301.0101 Man11ole Vwu m Testing 33 01 30 EA 34 5161.2 $5,480.80 2-11 3339.0001 Epoxy Manhole User 333960 VF 30 5152 $5,460.00 r2-12 3305.0109 Trach Ser 33OS10 LF 5,932 51.04 56,169.28 9999.0001 Connect to Fxisting San' Sewer Main 33 11 10 EA 1 52,035.4 52,038.1 T $442,214.24 CTrY OF FORT WORTH STANDARD MINTRUCr10NSPECInCAT1ON DOCUMENTS.DEVELOPER AWARDED PROJECTS Form VvW—APT 2.2014 0042 43.CONTRACTED UNIT►RHES.LA FRONTflU-PHASE 2-242113.342.M30.17s6 OD420 DAP•10 PROPOSAL POP 1 d7 SECTION 00 42 43 1Zr"17 Developer Awarded Projects-PROPOSAL FORM CONTRACTED UNIT PRICES LA IMONTERA-PHASE 2 CPN: 101145 UNIT PRICE BID Bidder's Application Project Ilam laormadon Bidden Pmpo3Rl Bi IW Specillration unit or Bid hem Description Section No. M-- Quentilr unit Price Bid Value No. 3-1 3305.0109 Trench Sorely 330310 LF 3 $1.041 $3,337.36 3.2 3341.0502 54'RCP,Class 111 3341 10 LF 345 S237.931 $12,085.35 3-3 3341.04M 42-RCP,Cuss Bl 3341 10 LF 1,110 $155-531 5172.6383 3.4 3341.0302 30 RCP,Clw Ill 33 41 10 LF 401 590.64 136,346.64 3.5 3341.0205 24'RCP.Cku RI 3341 10 LF 1,353 $73.131 $98,944.89 3.6 3349.5003 20'Curb Inlet 334920 EA 19 S6,W.2SI $124,758.75 3-7 3349.5001 1 d Curb Inlet 334920 1 EA I I54,944.00 54,944. 34 3349.0001 4'Storm Junction Box 33 49 10 1 EA 5 S4.356.90 521,784.5 3-9 3349.0002 5'Storm Junction Box 33 49 10 EA I SS,047. 55,047.00 3-10 3349.0003 6-Storm]unction Box 334910 ZEA I 56,308.75 56.308.753.11 3349.4114 54-C 4-FWA,TXDOT 334940 1 $6,308.75 S6,30.75 3-1 3137.0102 Imp Stone,RiprRp,dry(24.16') 3137W SY 686 5113. 577,723. FAGWI ;840,T2t1.59 CITY OF FORT WORTH STAfWARD CON TRLX-nON SPECa'R'ATRIN DOCUMEN73.[W%'nOP ER AWAROMFROMM Fmrx V.W—Apd23014 00 A243-CONTRACTED UPQT PRRTS-u FRONTM-WASE 2.20137111.17.334ITsb 00 42 43 DAP-4I9PROPOSAL M1ae4 cr7 SECTION 00 42 43 12130/2017 Developer Awarded Projects-PROPOSAL FORM CONTRACTED UNrr PRICES LA FRONTERA-PHASE 2 CPN: 101145 UNIT PRICE BID Bidder's Application Project 11em Information Bidder's Proposal Bidllst Item Descripion Specification Unit of Bid Unit Price Bid Value Na Section No Measure Quantity UNIT IV-PAVING IMPROVE ENT 4-1 3213.0101 6'ConcPvmt 321313 SY 17,153 $3631 $621,110.13 4-2 3211.0501 6'Lime Treatment 321129 SY 19.268 $2.39 $43,660.52 4.3 321 L0400 Hydrate Ltme 32 11 29 TN 274-W 5144.46 $39,58204 4.4 3213.0102 7'Cow Pvmt 32 1313 SY 6.427 $43.05 $276,682.35 4.5 3211.05D2 8'Lime Treatment 321129 SY 6.845 52.74 $18,733.3 4.6 3211.0400 Hydrate Lime 321129 1 TN 137.00 $144.461 519,791.02 9999.0002 Round-Abou(including islands with tubs,striping. 4-7 color stamping of ausarralls, (7'paving and lime,parkway 32 1320 LS 1 $92,187.55 $92,197.55 sidewalks,ramps arc separate bid ilcm). 4-8 3213.0301 4-Concrete Sidewalk(S-foo(width) 321320 SF 12.900 1 S5.321 569,629.00 4-9 3213.0501 Barrier Free Ramp-Type R-1 321320 EA 22 1 SI.660.A S36,527.92 4-10 3213.0504 Barrier Fra Ramp-Type M-2 321320 PA 12 1 S1,575.A S18,906.00 4-111.4003 Furnish At Install Ground Mount pmt w/Stop R 34 41 3D EA 47 1 518,095.00 Directive Sigm 085.00 442,99M99..0001 Street Name Plates for Street Intersection(4-blades) 34 41 30 EA 36 $4135 51,485.00 4-13 9.0002 Stmt barricade(sired dead ads) 3136 00 LF 120 527.23 1 53,267. TOTAL UT IV-PA $1,258,878.43 m if OF POR;WORTH STA.WARDCONSfRLC710NSPECIFICAT10VDOICLxa�MS DEVELOPER AWARDED PROJECTS Fpm Vm—Apo 2.2014 00 4143-CONTRACTED UNIT PRICES-LA FRONTERA.PHASE 2-2013338.12,30-17.1, al Q 43 DAP•HIDPROPOSAL PKe7d7 SECTION OD 42 43 12/30/2017 Dever Awarded Projects-PROPOSAL FORM CONTRACTED UNIT PRICES LI FROMMU-PHASE 2 CPN: 101145 UNIT PRICE BID Bidder's Application Project hero Wonmtion BidderL Pmpoad Bidim Specifmim Unit of Bid Ikm Des ro- �No. QwNtitY Unit Prix Bid Value No. UNU V.STREET L 5-1 3441.1502 FurneisMusmil Gomel Boa,mail,wAid whproe 34 41 10 FA S 5600 53,00000 S-2 3141.3101 Fucnid✓n"I 344120 EA 37 $1,480.25 554,76925 ATBO20BLEDEMMVOLTIL33KBZNLSH lig1R 3-3 3441.3301 Fm AdAmmil Rdwy Ilium Foundation TY 1,2 and 4 34 41 20 EA 37 S1.150.001 $42.550.001 5.4 U05,30 IS FumWnsWI Conduit-Sehedole 80 PVC 2 in.open Ca 1 260533 LP 3440 S8.50 $29,240.00 5-5 3441.3002 Fu+WlwaWl Rdway Mum TY D-25-6 Pok 1 34 41 20 FA 37 $151.75 $31.514.75 Sfi 3441 1623 FumisldlmpD Type ZS Arm 3411 10 FA 37 Si23. 54,625.00 5.7 3441.3401 FumisMR Wl 06 Tripkx Alun Ekctdc Conduetor 3441 10 LF 3440 SIM 56,020.00 $171,719.00 Cr"OF Fat WORTir STAIIDARD Ca.YTRtICt10N fPWWATW DOCUMENTS-DEVELOPER AWARDED PMWn F"Vmum Ara 2 2014 00 43 43•COIrRACTID UW►RIGS•LA FRMTUA-MAU 3-26t33M-II-M FUt 004243 DAP-BID PROPOSAL Pape 6 of 7 SECTION 00 42 43 17/302017 Devebper Awarded Projects-PROPOSAL FORM CONTRACTED UNTr PRICES to FRONTERA-PHASE 3 CPN: 101143 UNIT PRICE BID Bidder's Application Project Item Information Bidder:Proposal Bi list )tem Description Specification Unit of Bid Unit Pnca Bid Value No. Section No. MeasureQ n-gdty UNIT VI.-TRAFFIC SIGNAL IMPRI TS Nan-Applicabk TOTAL UNIT VI: C SIGNAL 1 (Try OPPORT WORTH STANDARD CONSTRUCTION-SPECIFICATION DOCUMENTS,DEVELOPER AWARDED PROIECTS Form V—,..Ap if 12014 0047 43-CMTRACTEU UNIT PRICES-LA FRONIERA-PHASE 2.201333B-12.30-17.As 004243 DAP-Om PROPOSAL IC7 of7 SECTION 00 42 43 12/30/2017 Developer Awarded Projects-PROPOSAL FORM CoN'ruACTED UNIT PRICES LA FRONTERA-PHASE 2 CPN: 101145 UNIT PRICE BID Bidder's Application Project Item Informohon Bidder's Prnposal Bidlis! Item Description Specification Untl of Did Una Price Bid Value Secti No. No Measure QtJanlity Did Summary UNIT I:WATER IMPROVEMENTS $388,246.64 UNIT Il:SANITARY SEWER IMPROVEMENTS $442,214.24 UNIT III:DRAINAGE IMPROVEMENTS $640,228.59 UNIT iV:PAVING IMPROVEMENTS $1,268,678.43 UNIT V.STREET LIGHTING IMPROVEMENTS $171,719.00 Total Construction Bid $2,901,086.90 Contractor agrees to complete WORK for FINAL ACCEPTANCE within p days calendar days After the date when the CONTRACT cemmence-s to ran as provided is the General Conditions. END OF SECTION CJTI OF FORT WOKI H STANDARD CONSTRUCTION SPECIFK'ATJON DOMAENTS-DEVELOPER AWARDED PROJECTS Fera Vmim Apnt 2.:014 M 42 A3-CONTR-t<-TEJ?UNIT PRJC ES-LA FkONtp.RA-rI1,JS�,•201 33�D-J 2-7LL7]cl, 0 � U O L O ,37 �� PROJECT LOCATION BOAT CLUe) ROAD y N.T.S. o < af (rJ O PE i a W 9�et _U Q a �� d HERRING eo 4e U BORT CLUB TIMBER OAKS AD WEST W ; 1220 cv � J Gees z n2AILRIDGE 2 c VtAk �kF ANDASS P� ( W►ND Fsj ���Y �'oG E A G L E BervD vtES�oE�iLL a�? r y a a e M OU N T A I N L A K E 5K EKE E w� v z o �o CITY PROJECT NO. 101145 WATER NO. 56008-0600430-101145-001580 LOCATION MAP SANITARY SEWER NO. 56008-0700430-101145-001380 STREET/STORM DRAIN NO. W-2525 "LA FRONTERA - PHASE 2" x-24706 WELCH EN0INEERlN0, INC. CONSUL TING ENGINEERS LA MILAGRO DRIB Irw v p m".ew `\� �..w 1 _Q cps,., , RgNcyQ c0, RT,pq EL COUNA iI \ DRIVE e. / Irw --+ LA FRONTERA - i "PHASE 1" 1Li FRONTERA VISTA DRIVE X. Ii a cpfL�r► �V Q� li it � � �•,� � �/ �_, --- ---- -------- ------ BOAT CLUB ROAD (F.M. NO.1220) l 100% DEVELOPER'S COST T� 12' AND 8' WATER LINES. FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES SCALE. 1'=400' EXHIBIT "A" CITY PROJECT NO. 101145 WATER NO. 56008-0600430-101145-001580 WATER IMPROVEMENTS SANITARY SEWER NO. 56008-0700430-101145-001380 "SLA FRONTERA — PHASE 2" STIREET06 TORM DRAIN NO. w-2525 WELCH EN0INEERW0, INC. CONSUL 77NG ENGINEERS VEXI,j J / E ..2/4- i f fzz PROP. 8'SS Q- LA MILAG DRIVE r r \ .PROP. 8'SS PROP. WSS e PROP.j"SS \ PROP. 8•SS O ROP. 8'SS� ROP. 8' \\\ XISi. 24' ROP. 8 S i 1 I ___� \` M/ PROP. e•ss EL R LI I Q• j / T �� PR�P.BISS I�� \ 1 ! I XISi. 24' ROP. 8'SS SII _F- €IST;8'S$ �;95' T� `\\PROP. 8•SS 1 1 0 EXIST. 8155!/ C��/`/ LA FRONTERA w. "Ss _ PHASE 1 -, __ ! 2� \ I EAST. — L--- / XIST.�1Z I OST. SS !/ : / \ 8' , I EXIST. 8•SS IT--- FORGE MAIN �(,- I I �E)9ST. 1.3455 I I ST. 8'55 I I I I �I //�� •!� i ` \� / Iff FRONTEF2A VISTA DRIVE IST,ass t ST. 12.55 , 71 !XIS i ,2- i I�I1�1 rl�_ V�'� ; "R __________ 4 MAIN E1asi res Fara I fl I T. 36 BOAT CLUB ROAD (F.M. NO.1220) • 100% DEVELOPER'S COST 8" SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES SCALE: 1'-400' EXHIBIT "A-i" CITY PROJECT NO. 101145 WATER NO. 56008-0600430-101145-001580 SANITARY SEWER IMPROVEMENTS SANITARY SEWER NO. 56008-0700430-101145-001380 "LA FRONTERA - PHASE 2" STREET/STORM7M DRAIN N0. W-2525 WELCH ENOMEERWO, I NC. CONSUL 77NG ENGINEERS v 1 O O L O ) N � � � PROJECT �,��°� LOCATION BOAT CLU ROAD N.T.S. y O Q l- 0 W oy�e< Q HERRING v BOAT CLUB WEST TIMBER C, S ROAD ,LI 1220 MEW w > Z _� gees = R TRAILRIDGE c ►LACUNEf ANDOM q ( N1ND ff ��� � CC BEND y EAGLE °� ILL M O U N T A I N L A K E E H►Gw► CITY PROJECT NO. 101145 WATER NO. 56008-0600430-101145-001580 LOCATION MAP SANITARY SEWER NO. 56008-0700430-101145-001380 "LA FRONTERA - PHASE 2" X—T247T06STORM DRAIN LA0. W-2525 WELCH ENG G, INC. CONSULTING ENGINEERS LA MfLAGRO DRIVE VAMAME 3r B—B� / COLINA cyDRJlI .. O LA FRONTERA 2� PHASE 1so f}—_ = FE OWTERA VISTA(' \ IDRIVE /� (sd wer>I I1 v2 ----- Inl BOAT CLUB ROAD (F.M. NO.1220) mac--- (l i mfr-aF-Winn 10OX DEVELOPER'S COST 6' PAVEMENT W/2X CROSS SLOPE ON 6' LIME SUBGRADE ® 10OX DEVELOPER'S COST 7' PAVEMENT W/2X CROSS SLOPE ON 8' LIME SUBGRADE SCALE: 1"=400' EXHIBIT »B» CITY PROJECT NO. 101145 WATER NO. 56008-0600430-101145-001580 PAVING IMPROVEMENTS SANITARY SEWER NO. 56008-0700430-101145-001380 "LA FRONTERA — PHASE 2" X 24 06M DRAIN N0. w-2525 WELCH ENCxHqEERINCT, I NC. CONSUL TING ENGINEERS LA MILAGRO \ DRIVE24RW \\\\\ `40 24'RCP %J a \\\ Rfp V Q y� \ / 4'" `4 �/ 4' \ 4 o 24 I 4 4r,�W �a EL BOLI 1 4 2a 'RW z4 t r r 4 x s °`h / LA FRONTERA4 � i EX 30'" - PHASE 1 Fah-- I I-f �t�Lal�4 r q OR/�� `. 4 m. RaFr 'RONTERA VISTA DRIVE C-3 24 / IX 4 4 4 t4 / a (sr ivvY u 0 ..24'RW 11 Y noon- 12'4''RW�^�.� �� I BOAT CLUB ROAD (F.M. NO.1220) I J ` \ X 10'. 15, OR 20' INLET 10OX DEVELOPER'S COST STORM SEWER AND INLET AND ASSOCIATED APPURTENANCES SCALE: 1"-400' EXHIBIT 991B-199 CITY PROJECT NO. 101145 WATER NO. 56008-0600430-101145-001580 STORM DRAIN IMPROVEMENTS SANITARY SEWER NO. 56008-0700430-101145-001380 "LA FRONTERA - PHASE 2" �4ET/STORM DRAIN NO. W-2525 WELCH ENGHgEERIN0, I NC, CONSUL TING ENGINEERS \ LA MILAGRO DRIVE Q. ,��\ q cy� EL C U I � � I�\ M��4 R I Q _ I / LA FRONTERA— ma o v / PHASE 1 \\ 71 KA O ————-- n —'" �/ BOAT CLUB ROAD (F.M. N0.1220) I \,C i< *-- PROPOSED STREET LIGHT (100% DEVELOPER'S COST) D-- PROPOSED STREET SIGN (100% DEVELOPER'S COST) ■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST) SCALE: 1'=400' CITY PROJECT NO. 101145 EXHIBIT C SANI99 IITTAR NO. N0. 56008-0700430-101145-001380 1 STREET LIGHTS STREET/STORM DRAIN NO. W-2525 X-24706 "LA FRONTERA — PHASE 2" WELCH ENGINEERING, INC. CONSUL 771VG ENGINEERS COMPLETION AGREEMENT—LENDER FUNDED This Completion Agreement("Agreement)is made and entered into by and among the City of Fort Worth ("City"), and La a Texas Lirrxtted.,T.iabiity Company("Developei"), and Independent Bank of Te-a ("Lender*'), effective as of the date subscribed by the City's City Manager or Assistant City Manager. The City, the Developer and the Lender are hereinafter collectively called the "Parties". WITNESSETH: WHEREAS, the Developer owns that certain tract of real property that contains approximately 3-1290 Jacres that is located in the City, the legal description of which tract of real property is marked Exhibit "A"—Legal Description, attached hereto and incorporated herein for all purposes("Property"); and WHEREAS,the Developer intends to develop the Property as an addition to the City through plat FP 17-075 or FS<.,N ; and WHEREAS, the Developer and the City have entered into a Community Facilities Agreement relating to the development of La Frontera Phase 2("C"]`A"); and WHEREAS, the City has required certain assurances of the availability of funds to complete the water and sewer utilities, streets/paving, storm drain, street lights and street signs for the development of the Property("Improvements"), and WHEREAS, in order to provide such assurances as have been required by the City, the Lender has agreed to advance certain funds to the City for Hard Costs (which term is hereinafter defined)subject to,and in accordance with,the terms,provisions and conditions of this Agreement; and WHEREAS, the Developer has granted to the Lender as additional security for the Loan (which term is hereinafter defined) a security interest in all plans and specifications for the development of the Property (collectively,the "Plans"); and WHEREAS, the Parties desire to set forth the terms and conditions of such accommodations as are described above. NOW THEREFORE,for and in consideration of the benefits to be derived from the mutual observance by the Parties of the terms and conditions hereof, and for and in consideration of Ten City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 1 of 16 Dollars($10.00)and other good and valuable consideration,the receipt, adequacy and sufficiency of which are hereby acknowledged,the Parties agree as follows: 1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for this Agreement and they are incorporated into this Agreement for all purposes. 2. The Completion Amount. The City and the Developer agree that the Hard Costs required to complete the Improvements in the aggregate should not exceed the sum of Two Million Nine Hundred One Thousand Eighty Six and ninety cents Dollars ($2,901,086.90), hereinafter called the "Completion Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of the Improvements may vary as a result of change orders agreed to by the Parties, but such variances for the purposes of this Agreement shall not affect the Completion Amount as used herein. 3. Adjustments to the Completion Amount. The Lender may from time to time make advances to the Developer for the development of the Property under the development loan that has been made by the Lender to the Developer for the purpose of financing the costs of constructing the Improvements for the Property (the "Loan") subject to, and in accordance with, the terms, conditions and provisions of the Loan Documents (which term is hereinafter defined)evidencing and securing the Loan. Some of those advances shall be for Hard Costs as specified in the "Approved Budget" relating to the Loan, a copy of which Approved Budget is marked Exhibit "B", attached hereto and incorporated herein for all purposes, with the Hard Costs line items highlighted. The term"Hard Costs" shall mean the actual costs of construction and installation of the Improvements. To the extent that advances under the Loan are for the payment of Hard Costs, the Completion Amount shall be deemed reduced, dollar for dollar. The Lender may withhold statutory retainage from any advances under the Loan or pursuant to this Agreement. All such retainage withheld, to the extent it is attributable to Hard Costs, shall also reduce the Completion Amount dollar for dollar. All retainage withheld by the Lender for Hard Costs that are advanced to the City pursuant to this Agreement shall be released to the City as provided in the Texas Property Code upon expiration of the statutory retainage period. 4. Completion by the Developer. The Developer agrees to complete the Improvements on or before the date for completion that is established in the Loan Documents plus City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 2 of 16 thirty (30) days (the "Completion Date"), in accordance with the CFA,the Plans approved by the Lender and the City and all documents evidencing or securing the Loan (collectively, the "Loan Documents"). For the purposes of this Agreement, the development of the Property shall be deemed complete upon acceptance by the City of the Improvements. The City shall promptly notify the Lender and the Developer upon such acceptance. 5. Completion by the CitX. In the event that either: (A) the development of the Property is not completed by the Completion Date for any reason whatsoever,or(B)the Developer is in default under the Loan, then the Lender, at its sole option, may request the City to complete development.The City may, at its sole option and at the cost and expense of the Developer,within 10 days from receipt of Lender's request, notify Lender that it will undertake to complete the Improvements and the City shall then commence, pursue, and complete the Improvements in a reasonably timely, diligent and workmanlike manner in accordance with the Plans, subject to the terms of this Agreement. The Lender and the Developer agree that the City may use the Plans as necessary to complete the Improvements. If the City does not timely elect to complete the construction of the Improvements or if the Lender does not request the City to complete construction of the Improvements, then the Lender may at its election terminate this Agreement, or at its option, proceed to complete the Improvements, or foreclose on any of its collateral, or take any and all such action as may be provided under the Loan Documents. 6. Advance of Completion Costs to the City and Delivery of Hard Costs Collateral to the City. In the event the Lender has requested the City and the City has elected to complete the Improvements,Lender shall transfer to the City all remaining undisbursed Hard Costs specified in the Approved Budget within 10 days of the date that the City elected to complete and provided Lender with written notice of such election. The Developer hereby authorizes and instructs the Lender to make the transfer of any remaining undisbursed Hard Costs specified in the Approved Budget to the City within 10 days of notification that the City elects to complete the Improvements. In the event the cost to complete the Improvements exceeds the moneys transferred to the City, City shall notify Lender and Developer in writing of the need of additional funds. The City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 3 of 16 additional funds required to complete the Improvements shall be delivered to the City within 10 business days following notification to Lender and Developer. Failure to deliver the additional funds shall relieve the City of the obligation to complete the Improvements, in which event City shall use the Hard Costs funds in its possession to pay the contractor(s) all funds due it/them. Any remaining undisbursed Hard Costs shall be returned to Lender within a reasonable time. 7. Completion by the Lender. The Lender may, at its discretion, but shall not be obligated to, undertake to complete the Improvements if there is any default under any Loan Documents in lieu of requesting the City to complete the Improvements. If the Lender elects to complete the Improvements, any Hard Costs it expends shall, dollar for dollar, reduce the Completion Amount. 8. Easements. In the event the City or the Lender undertakes the completion of the Improvements, the Developer(and to the extent necessary the Lender) grants to the City and the Lender open access to the Property and shall execute and deliver such temporary easements over and across the entirety of the Property for the purpose of access and use for the completion of the construction of the Improvements in accordance with this Agreement. To the extent requested by the City and the Lender, written temporary construction easements in form acceptable to the City and the Lender shall be executed by the Developer and filed of record. Nothing in this paragraph shall reduce any rights of the Lender or obligations of the Developer under the Loan Documents. 9. Lender's Rights. Nothing in this Agreement shall affect any portion of the Lender's collateral for the Loan or limit or impair the Lender's right to foreclose the same or deal with the collateral as it elects in accordance with the Loan Documents. 10. Satisfaction of the City Requirements. The City agrees that the assurances and covenants contained in this Agreement satisfy all requirements of the City with respect to Developer's performance bond or other financial security in connection with the development of the Property and the completion of the Improvements that are contained in the CFA or in any other agreement relating thereto, and the City hereby accepts the assurances and covenants contained herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the provisions of this Agreement shall control. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 4 of 16 11. Termination. This Agreement shall terminate upon the earlier to occur of the following: (a) acceptance by the City of the Improvements; (b) mutual written agreement of all of the Parties; or(c)the reduction of the Completion Amount to zero. However, release of the plat shall be governed by paragraph 12 hereof and termination pursuant to (b) or (c) of this paragraph 11 shall not require the City to release the plat. 12. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the Property until the Improvements are completed and accepted by the City and all Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence from the Developer showing that all Hard Costs contractors have been paid, including but not necessarily limited to lien waivers and bills paid affidavits,the City shall within a reasonable time file the final plat for the Property in the Plat Records of the county where the Property is located. The purpose of the City retaining the final plat of the Property as provided herein is to guarantee the Developer's obligations under the CFA are completed. 13. Construction Contracts. Developer agrees to include in each Construction contract that it enters into for the completion of the Improvements the following: a. A statement that the City is not holding any security to guarantee any payment for work performed on the Improvements; b.A statement that the Property is private property and that same may be subject to mechanic's and materialman's liens; c. A requirement that each contractor contracting with the Developer release the City from any claim that is related to the Property of the Improvements; and d.A requirement that each contractor contracting with the Developer include in each subcontract the statements contained in a., b., and c. above. 14. Miscellaneous. Non-Assignment of Agreement. This Agreement may not be assigned by any of the Parties without the prior written consent of all the other Parties. Notice. Any notice required or permitted to be delivered under this Agreement shall be deemed received on actual receipt by the appropriate party at the following addresses: (i) Notice to the City shall be addressed and delivered as follows: City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 5 of 16 City of Fort Worth Planning and Development Department 200 Texas Street Fort Worth,Texas 76102 Attention: CFA Division Janie Morales,Development Manager Email: Janie.Morales@fortworthtexas.gov Confirmation Number: 817-392-7810 and/or Attention: CFA Division Email: cfa@fortworthtexas.gov Confirmation Number: 817-392-2025 With a copy thereof addressed and delivered as follows: Richard A. McCracken Office of the City Attorney City of Fort Worth 200 Texas Street Fort Worth,Texas 76102 Confirmation Number: 817-392-7611 (ii) Notice to the Developer shall be addressed and delivered as follows: La Frontes Development LLC 1000 Texas Trail Suite 200_ Grapevine,TX,76021 Email: ghhazlcwood@westwoodland.com (iii) Notice to the Lender shall be addressed and delivered as follows: Independent Bank of Texas 1002 Texan Trail Grapevine,Texas,76051 Email: mstewaid@1btx.com A party may change its address for notice upon prior written notice to the other parties pursuant to the terms hereof. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 6 of 16 Texas Law to Apply. This Agreement shall be construed under and in accordance with the laws of the State of Texas. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective legal representatives, successors and assigns. Legal Construction. In case any one or more of the provisions contained in this Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this Agreement, and this Agreement shall be construed as if such invalid, illegal,or unenforceable provision had never been contained in this Agreement. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of the Parties with respect to the subject matter hereof and supersedes any prior understandings or written or oral agreements among the Parties concerning the subject matter hereof, provided, however, that this Agreement shall not supersede, amend or modify any of the Loan Documents or any portion thereof. Amendment. This Agreement may only be amended by a written instrument executed by all of the Parties to his Agreement. Headings. The headings that are used in this Agreement are used for reference and convenience purposes only and do not constitute substantive matters to be considered in construing the terms and provisions of this Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 7 of 16 ACCORDINGLY,the City of Fort Worth, Developer and Lender have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee.: CITY OF FORT WORTH: DEVELOPER: LaFrontera Development, LLC Jesus J.Chapa(May 3, 18) adla Jesus J. Chapa Cary Hraziewood(May 1,2018) Assistant City Manager Name: Title: n� Date: May 3,2018 Date: May 1,2018 Approved as to Form and Legality: LENDER: Independent Bank of Texas Richard A.McCracken(May 3,2018) Richard A. McCracken NafthewSfieward Assistant City Attorney Matthew Steward(May 1.2018? - Name: Matthew Steward ATTEST: Title: Executive Vice President r Mary J.K r(Ma ,2018) Contract Compliance Manager Mary J. Kayser By signing I acknowledge that I am the City Secretary person responsible for the monitoring and administration of this contract, including M&C: ensuring all performance and reporting Date: requirements. ifer L.Eze cfor(May2,2018) Janie S. Morales Development Manager City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 8 of 16 airaaztewood, the Guarantor of the Development Loan, is executing this Completion Agreement for the sole purpose of acknowledging that advances that are made by the Lender pursuant to this Completion Agreement shall be deemed to be advances that are made under the Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement that was executed by Crary Hazlewood, GUARANTOR aGZ!^L1 HAZ' By: aarry�zlewood(May 1,2018) Name: Title: orm City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 9 of 16 List of Exhibits to the Completion Agreement Attachment 1 —Changes to the Standard Completion Agreement Exhibit A-Legal Description Exhibit B - Approved Budget City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 10 of 16 ATTACHMENT"1" Changes to Standard Completion Agreement None City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 11 of 16 EXHIBIT A STATE OF TEXAS X COUNTY OF TARRANT X WHEREAS,La Frontera Capital Prope lies,LLC. is the owner of a 31.290 acre tract of land situated in the S.E. Merrell Survey,Abstract No. 1009,Tarrant County, Texas,and being a portion of that ce lain tract of land described in deed to La Frontera Capital Prope flies,LLC,recorded in Instrum ent No.D207415540, Deed Records, Tarrant County,Texas. The bearings for this survey are based on the bearings as they appear in Instrument No. D207415540,Deed Records, Tarrant County, Texas. Said 31.290 acres being more paiiicularly described by metes and bounds as follows: BEGINNING at a 112" iron rod found at the most northerly northeast corner of Lot 2X,Block 1 of La Frontera,an addition to the City of Fort Worth,Tarrant County, Texas,recorded in Instrument Number D216260991,Deed Records,Tarrant County,Texas and being in a west line of Lot 21-P,Block 3,Harbour View Estates, an addition to the City of Fort Wmih,Tarrant County,Texas,recorded in Cabinet A, Slide 4488,Plat Records,Tarrant County,Texas; THENCE North 60°25'09" West, along the nmih line of said La Frontera addition,a distance of 2239.01 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set for the point of curvature of a non-tangent curve,concave to the east, having a radius of 470.00 Feet a central angle of 01°09'25" and a chord of 9.49 Feet bearing North 20°33'06" East; THENCE northerly depaiiing said nmih line and continuing over and across said La Frontera Capital Properties,LLC tract, and along said curve, a distance of 9.49 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; THENCE continuing over and across said La Frontera Capital Properties,LLC tract,the following courses and distances; North 68°52'12"West, a distance of 63.78 Feet to a 112"iron rod with plastic cap stamped "RPLS 4818"set; Nmih 60°25'09"West,a distance of 59.43 Feet to a 1/2"iron rod with plastic cap stamped "RPLS 4818"set; North 29°34'51"East, a distance of 132.14 Feet to a 112"iron rod with plastic cap stamped "RPLS 4818"set; North 63°33'56" West, a distance of 39.00 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; -No lih 60°25'09" West,a distance of 81.06 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; No lh 29°34'51"East, a distance of 25.00 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; Nmih 26°26'04" East,a distance of 43.42 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 64°19'45"East, a distance of 12.49 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 63133'56"East,a distance of 139.73 Feet to a 112"iron rod with plastic cap stamped "RPLS 4818"set for the point of curvature of a non-tangent curve, concave to the nmihwest, having a radius of 29.00 Feet a central angle of City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 12 of 16 32°33'24",and a chord of 16.26 Feet bearing North 39°01'19"East; Northeasterly along said curve, a distance of 16.48 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; North 22°44'37" East,a distance of 94.17 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set for the point of curvature of a tangent curve,concave to the west,having a radius of 480.00 Feet a central angle of 01°28'45", and a chord of 12.39 Feet bearing Nofih 22°00'14" Eas City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 13 of 16 Northeasterly along said curve, a distance of 12.39 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 68°44'08" East, a distance of 60.00 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set for the point of curvature of a non-tangent curve, concave to the west, having a radius of 540.00 Feet a central angle of 01°28'45 and a chord of 13.94 Feet bearing South 22°00'14" West; Southerly along said curve, a distance of 13.94 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 22°44'37" West, a distance of 100.73 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 58°09'06" East, a distance of 153.88 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set for the point of curvature of a tangent curve, concave to the southwest, having a radius of 690.50 Feet a central angle of 04°02'37" and a chord of 48.72 Feet bearing South 56°07'47" East; Southeasterly along said curve, a distance of 48.73 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set for the point of curvature of a reverse curve, concave to the northeast, having a radius of 630.00 Feet a central angle of 06'l 8'3 In, and a chord of 69.33 Feet bearing South 57°15'54" East; Southeasterly along said curve, a distance of 69.37 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 60°25'09" East, a distance of 206.25 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; North 29°34'51" East, a distance of 74.32 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; North 26013'23" East, a distance of 71.82 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; North 22105'02" East, a distance of 62.24 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818"set; North 17050'22" East, a distance of 71.81 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; North 13°17'30"East, a distance of 71.81 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; Nmth 08044'38" East, a distance of 71.81 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 83°31'48"East, a distance of 140.00 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set for the point of curvature of a non-tangent curve, concave to the west, having a radius of 1045.00 Feet a central angle of 01'07'18" .and a chord of 20.46 Feet bearing North 05°54'32" East; Nmtherly along said curve, a distance of 20.46 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 84039'07" East, a distance of 50.00 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 38°36'19" East, a distance of 14.33 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 82049'13"East, a distance of 260.06 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; North City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 14 of 16 51°33'16"East, a distance of 13.99 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 82°49'14" East, a distance of 50.02 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 38°25'25" East, a distance of 14.29 Feet to a 1/2"iron rod with plastic cap stamped "RPLS 4818" set; South 82°49'13" East, a distance of 248.90 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; North 53°37'34" East,a distance of 14.50 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 79°24'05"East, a distance of 60.00 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 10°29'05" West, a distance of 1.77 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 79°37'45"East, a distance of 129.34 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set in the said west line of Lot 21-P; THENCE continuing along the said west line of Lot 21-P,the following courses and distances; South 04°33'54" East, a distance of 143.78 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 15°45'33" East, a distance of 100.35 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 34°27'08"East,a distance of 95.36 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 10°43'02" East,a distance of 158.85 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 01°56'01"East, a distance of 187.04 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 19°53'12" East, a distance of 56.16 Feet to a 112" iron rod with plastic cap stamped "RPLS 4818" set; South 64°01'30" East, a distance of 218.17 Feet to a 1/2" iron rod with plastic cap stamped "RPLS 4818" set; South 00010'20" West, a distance of 542.48 Feet to the POINT OF BEGINNING and containing a computed area of 31.290 Acres, more or less. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME CFA Official Release Date:07.01.2015 Page 15 of 16 EXHIBIT B APPROVED BUDGET Section I Water $388,246.64 Sewer $442,214.24 Subtotal $830,460.88 Section II Interior Streets $1,258,678.43 Storm Drains $640,228.59 Subtotal $1,898,907.02 Section III Street Lights $171,719.00 Sub-total $171,719.00 TOTAL $2,901,086.90 City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE CFA Official Release Date:07.01.2015 Page 16 of 16