HomeMy WebLinkAboutContract 48309-AR3 FORT WORTHCity of Fort Worth C"8ECRETARY CONTRACT NO, l �`� , ~ � Construction Allowance Request Breakdown `u i----= Construction CA# 0 Date 2/27/2018 City Sec# 1 48309 Client Project#(s)l City Project No. 100416 FAC#(s) Project Name 2014 C I P Year 2 Contract 5 Description Contractorl Peachtree Construction City Inspector Chris Bell Funding T/PW Water Sewer Select Day Type Allocation Account Totals Original Contract Amount $2,531,477.50 $2,531,477.50 280 Extras to Date Credits to Date Current Contract Amount $2,531,477.50 $2,531,477.50 280 Amount of Proposed Allocation $7,920.00 $0.00 $0.00 $7,920.00 Original Allowance Available for Allocation $123,650.00 $123,650.00 Allowance Funds Previously Allocated $20,768.10 $20,768.10 Remaining Funds Available for this Allocation $102,881.90 $102,881.90 DATION SUMMARY Tree Removal on 8th Street to remove 6 trees in the parkway that will destroy the sidewalk. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX ZD 0 rn O M OD V' O cn m O k _ U — N L C U U cn c o` U N Q 9-- 21 T o 00 � N L � N o a' Z o LL �- a) Q O O °°'' °' cu O u '++ o V � L N LO CO O C (a C:) U o ci N y Z Q) o c U o x cn 0 CD N d W cm _ > E o m c a LEI a_F0 CD Q Q v o 00 o � U � O 0 0 0 0 0 0 0 0 0 0 0 0 (=- 6% 69,C14 61 � fih � N O -0 d Cd N (O ~ c o E, U) LJ N O N v OA (D d C O a=f Q N 0 N OA C to s U 0 rn CD co co 4) � m O U CQ) 1 C _a U U c 0 aa) D CL W c U U 0 >, LLI O U W � � N d m � L � 0 7 N 0 0 o0 a � LL c v 0 3 ° J O O Q opo c ° O V � � N N Z o L ° V5 U co 2 = ::w -�-t O O O U o U _p N O Z5C Z O U g Cl) p U L a5 Lw/ U oN a_ o E, Q a SLC o o U LL- O a o _ 00 r' 2 U Mri 0 U C:) 0 0 0 0 0 0 0 0 0 0 0 69, 6-� 0 � cu a �v ~ o E, U) N 4- 0 N 4J UA ro d C O CLO 4J 4J 4J 4J C ro -F- u U MIWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests co# DATE AMOUNT Total $0.00 CFW Construction Allowance Request Approval CAApp-05 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/100416 - 2014 CIP Year 2 — Contract 5/Contractor/Change Orders/HMAC 2014 CIP Year 2 Contract 5 Construction Allowance Request Breakdown #3.xlsm Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/ForrnPrint.aspx?SiteId=51500&Processld... 5/8/2018 CFW Construction Allowance Request Approval CAApp-05 Page 2 of 3 FORT WORTH. C'ty of Fort Worth ~--. �••-r- Construction Allowance Request Approval (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: 3 Construction Allowance Request Approval No.: CAApp-05 Date Started: 2018-03-12 Date Due: 2018-03-14 City Sec. No.: 48309 Project Name: 100416 - 2014 CIP Year 2 - Contract 5 100416 DOE Numbers: Project Numbers: Project Removal and replacement of nionfunctional driveways, Description: curb&gutter and sidewalks; followed by the pulverization and stabilization of the existing pavement and a 3" HMAC Overlay. Project Manager: Kristian Sugrim City Inspector: Chris Bell Contractor: Peachtree Construction COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 7,920.00 34014-0200431-5740010-100416-0 Total Cost: $ 7,920.00 Total Requested Days: 0 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessId... 5/8/2018 CFW Construction Allowance Request Approval CAApp-05 Page 3 of 3 Approved: Yes Comments: User: Lane Zarate Date: 2018-04-26 4:38 PM Approved: Yes Comments: User: Ricardo Matute Date: 2018-04-30 1:02 PM Approved: Yes Comments: i User: Doug Wiersig F0 � Date: 2018-05-01 6:54 PMC) T Approved: Yes * ..4 Comments: User: Doug Black Date: 2018-05-01 7:34 PM ary .�• lty tary c . Approved: Yes Comments: User: Susan Alanis Date: 2018-05-08 2:16 PM M&C: 1._..- Action Required: OFFICIAL RECORD CITY SECRE AW �e WORTH, TX A https://projectpoint.buzzsaw.com/—bz—web/Forms/FormPrint.aspx?S itel d=5 15 0 O&Processl d... 5/8/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Sug_C" �-- Name of Employee/Signature Project Manager Title This form is N/A as No City Funds are associated with this Contract Kristian Su rim Z Ki&� Printed Name Signatu OFFICIAL RECORD CITY SECRETARY FT.W099,TX