Loading...
HomeMy WebLinkAboutContract 50757 CITY SECRETARY __..L_ CONTRACT NO., STORMWATER FACILITY MAINTENANCE AGREEMENT WATER QUALITY DEVICES THIS AGREEMENT, made and entered into this < U day of , 2018, by and between FW Waterside Land, LLC, acting by and through Fremon Baker, hereinafter referred to as "Landowner", and the City of Fort Worth, hereinafter referred to as "City". WITNESSETH WHEREAS, the Landowner is the owner of certain real property described as an approximately 3.9305 acre tract located in the EVAN H. BURKE Survey, Abstract 160, and the JAMES ROGERS Survey, Abstract 1265, Tarrant County, Texas according to the deed recorded in Volume 388-132, Page 49, Deed Records, Tarrant County, Texas, hereinafter called the "Property". WHEREAS, the Landowner is proceeding to build on and develop the Property according to the Site Plan/Subdivision Plan known as Lot 1 Block O, WATERSIDE ADDITION hereinafter called the "Plan', which is expressly made a part hereof, as approved or to be approved by the City and the Landowner provides for management of Stormwater and its runoff quality within the confines of the Property; and WHEREAS, this Agreement shall run with the land and apply to the Landowner, its successors and assigns. The term "Landowner" shall refer to the then-current legal owner of the Property and/or the Facility as same are herein defined; and WHEREAS, the Landowner has determined that on-site Stormwater Management Facilities to control sediment, nutrients, trash, debris and other floatable materials ("Facility") should be constructed and maintained on a portion of the Property; and RECEiVEG OFFICIAL RECORD cIlry SECRETARY "1N0�E0RT y wolff"+U �IrYSEDR STORMWATER FACILITY MAINTENANCE AGREEMENT �. an Rev.12/29/2014 WHEREAS, the City requires that the Facility, whether one or more, as shown on the Plan be constructed and adequately maintained by the Landowner the locations of which are as shown in the attached Exhibit "A" ("Facility Property"); NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows: 1. The Landowner shall adequately construct and maintain the Facility at no expense to the City of Fort Worth in accordance with the design specifications for the Facility, attached as Exhibit "B", and the current standards then in force and effect in the City of Fort Worth and with the Operations and Maintenance Plan attached to this Agreement as Exhibit "C". The Facility includes all structures required to control the quality of the storm water. Adequate maintenance is herein defined as good working condition so that these facilities are performing their designed functions. Maintenance forms provided by the City, or an equivalent provided by the manufacturer of the Facility, attached to this Agreement as Exhibit "U', are to be used to establish what good working condition is acceptable to the City. 2. If the Landowner contracts the maintenance of the Facility with a third-party, Landowner shall provide a copy of the contract to the City at the time this Agreement is executed It shall be the Landowner's responsibility to ensure that the contracting party is properly qualified to maintain the Facility and to provide any updates to the contract as a part of the annual inspection report discussed immediately below. 3. The Landowner shall inspect or shall cause to be inspected the Facility at frequency specified by the manufacturer or annually, if not specified by the manufacturer, using the inspection form in Exhibit C or equivalent by manufacturer, and shall be compiled and submitted to the City annually. The purpose of the inspection is to assure safe and proper functioning of the Facility. The inspection shall cover the entire Facility. Components of the STORMWATER FACILITY MAINTENANCE AGREEMENT 2 Rev.12/29/2014 Facility which need maintenance or replacement to perform their design function, shall be noted in the inspection report along with the corrective actions to be taken. The corrections identified in the inspection report must be corrected within 45 days, and corrections once made shall be so noted in the next inspection form 4. The Landowner hereby grants permission to the City, its authorized agents and employees, to enter upon the Property to inspect the Facility whenever the City deems necessary. The inspection may involve follow-up on reported deficiencies and/or to respond to citizen complaints. The City shall provide the Landowner copies of the inspection findings and a directive to commence with maintenance and repairs if necessary. 5. In the event the Landowner fails to maintain the Facility as specified herein, the City, its authorized agents and employees, may enter upon the Facility Property and take whatever stens necessary to correct deficiencies identified in the inspection report to protect public health, safety and welfare and to charge the costs of such maintenance and repairs to the Landowner. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair the Facility, and in no event shall this Agreement be construed to impose any such obligation on the City, such obligation is the Landowner's. 6. The Landowner will perform the work necessary to keep the Facility in good working order as appropriate. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the Landowner shall reimburse the City upon demand, within thirty (30) days of receipt thereof, for all actual costs incurred by the City hereunder. In the event that Landowner fails to pay the City for the costs incurred under this section, the City shall impress a lien for the costs of such work upon other lots owned by the Landowner. Such lien shall be perfected by filing in the office of the County Clerk of the county in which the Facility lies, an affidavit identifying STORMWATER FACILITY MAINTENANCE AGREEMENT 3 Rev.12/29/2014 the real property to be charged with such lien, stating the amount thereof, and making reference to this Agreement. 7. This Agreement imposes no liability of any kind whatsoever on the City. THE LANDOWNER AGREES TO HOLD THE CITY HARMLESS FROM ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO OPERATE PROPERLY. LANDOWNER COVENANTS AND AGREES AND DOES HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH, ITS AGENTS, SERVANTS AND EMPLOYEES FROM AND AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH MIGHT ARISE, FROM THE FAILURE OF LANDOWNER TO: PROPERLY INSTALL, MAINTAIN AND REPAIR THE FACILITY, OR ANY DAMAGES CAUSED TO PERSON OR PROPERTY DUE TO (1) FLOODING ATTRIBUTED TO THE FACILITY OR (2) IMPROPER INSTALLATION, MAINTENANCE AND REPAIR OF THE FACILITY , . 8. Landowner covenants and agrees that no habitable building shall be erected within the drainage easement outlined on Exhibit "A" but this paragraph shall not preclude construction of other improvements within the drainage easement, which do not impede access to the Facility. This Agreement shall be recorded among the land records of Tarrant County, Texas, shall constitute a covenant running with the land, and shall be binding on the Landowner, its administrators, executors, assigns, heirs and any other successors in interests, including any property owners association. [SIGNATURE PAGE FOLLOWS] STORMWATER FACILITY MAINTENANCE AGREEMENT 4 Rev.12/29/2014 Executed this _ ' ' "'day of April, 2018. Landowner FW WATERSIDE LAND, LLC A Delaware limited liability company By: FW Waterside Partners LLC, a Delaware limited liability company, its sole member By: Trademark Waterside, L.P., A Texas limited partnership, its Managing Member By: TW Genpar, LLC, a Texas limited liability company, its a artner B Name: r m i e Title: Seni Vice Pre ' ent STATE OF TEXAS § COUNTY OF TARRANT § jf r Before me, the undersigned authority on this � �ay of April, 2018, personally appeared Fremon Baker, known to me toe the person whose name is subscribed to the foregoing instrument and acknowledged to me that the same is the act of FW Waterside Land, LLC, and that he executed the same as its Senior Vice President and as the act of such Corporation and for the purpose and consideration expressed in the foregoing instrument. PY PUe�� KIMBERLY L. SYKORA Notary Public,State of Texas ' Notary ublic, tate of Te s Comm.Expires 04-23-2021 Notary ID 12315194 STORMWATER FACILITY MAINTENANCE AGREEMENT 5 Rev.12/29/2014 City of Fort Worth 64 Jesus J. Chapa Assistant City Manager App d as to Form and Legality 'Assistant City Attortidy A--EST 0 awn Oty Secretary STATE OF TEXAS COUNTY OF TARRANT This instrument was acknowledged before me on v /JD by Jesus J. Chapa, Assistant City Manager of the City of Fort Worth, c(n 4half of the City of Fort Worth. MARIA S.SANCHEZ # 56 My Notary ID#2256490 erl 9 T�oia/y Public, State of Texas Expires December 19,2021] OFFICIAL RECORD CITY 81CROTARY FT.WORtHo TX STORMWATER FACILITY MAINTENANCE AGREEMENT 6 Rev.12/29/2014 ContractCompliance Manager By signing I acknowledge that I am the rersoia responsible torthe monitoring and administration of this contract, including .,.�,,.A Z aL and' ez—L,i ,. vayJ...ily� i�+ylvly.LlGLLyvy�vu yvj donfS�y�+�.I t.L1L�1yLv1y W. Jame S. iviorales Develoament Nlanaaer EXHIBIT "A" INSERT LEGAL DESCRIPTION STORMWATER FACILITY MAINTENANCE AGREEMENT 7 Rev.12/29/2014 BEING a tract of land situated in the EVAN H. BURKE SURVEY,Abstract No. 160, City of Fort Worth,Tarrant County,Texas and being part of Lot 1, Block O of Waterside Addition,an addition to the City of Fort Worth,Tarrant County,Texas according to the plat thereof recorded in Instrument No. D217101002 of the Official Public Records of Tarrant County, Texas; embracing a part of the portion of Phase 3, Tract 1, being a 15.131 acres to FW Waterside Land LLC County Clerk Instrument No. 214224895 Commencing at a 5/8"capped iron rod with cap stamped "KHA" recovered at the southwest comer of said Lot 1, Block O and on the north line of said Lot 2112A, Block 4 Country Day Meadows, Fourth Filing Volume 388-161, Page53 Deed Records of Tarrant County Texas, and then run S 75005'06" E, along the south line of said Lot 1 and the north line of said Lot 2R2A, a distance of 168.93 feet,from which a Y,"iron rod found bears S 75°05'06" E,a distance of 27.09 feet,and over and across said Lot 1, N 14°54'54"E,a distance of 20.70 feet to the southwest and POINT OF BEGINNING of easement being described; THENCE N 0003'35"E, a distance of 27.17 feet to a pointfor comer, THENCE S 89056'25"E,a distance of 27.17 feet to a point for comer; THENCE S 0°03'35"W,a distance of 27.17 feet to a point for corner, THENCE N 89056'25"W,a distance of 27.17 feet to the POINT OF BEGINNING and containing 738 square feet or 0.0169 of an acre of land. Basis for bearings are based on the Texas Coordinate System of the North American Datum of 1983 (2011) EPOCH 2010, North Central Zone 4202(US Survey feet)from GPS observations using the RTK Cooperative Network. Drainage Easement SHOWING A PART OF OF TSL' LOT 1, Block O JAMES PAUL WARD rG17t R`�•� WATERSIDE ADDITION REGISTERED PROFESSIONAL •JAMES PAUL�1f'.9Q. City of Fort Worth, Tarrant County, Texas LAND SURVEYOR NO.5606 "'f"" "•"••••�••• 801 CHERRY STREET UNIT 11f'•:>.�56S SUITE 950 ` s%j Kimley* Horn 2d'••'"'• FORT WORTH,TEXAS 76102 801 Cherry Street,Unit 11.0 950 Tel.No.(817)335-6511 PH. 817-335-6511 Fort Worth,Texas 76102 FIRM N 10194040 www.kirnley-honnzom ral yawn Checked by e e Proied N4he paul.ward@kimley-hom.com �$ � A FCN JPW 0411IN20111 061171083 1OF2 WARD,PAUL 4118/2018 12:42 PM K:WTW S 061171083-WAATERSIDE LOT 1 BLOCK O1DWG\061171083 WATERSIDE DRAINAGE EASEMENT BLOCK 0 2.DWG 0 30 60 PORTION OF PHASE 3, I NORTH GRAPHIC SCALE 9r FEET TRACT 1 I 15.131 ACRES TO FW WATERSIDE LAND LLC PORTION OF PHASE 3, COUNTY CLERK TRACT 1 DOCUMENT NO.214224895 Q 15.131 ACRES TO FW OPRTCT WATERSIDE LAND LLC COUNTY CLERK IL DOCUMENT NO. 214224895 LOT 1, BLOCK O 5V CIRR O OPRTCT / WATERSIDE ADDITION 'KHAN _ INSTRUMENT NO. D217101002 C� OPRTCT / 5/B"CIRR .KHA. I W IJ m 20'WIDE ACCESS PATHWAY Q LINE TABLE DRAINAGE EASEMENT 0.0169 OF AN ACRE NO. BEARING LENGTH 738 SQ. FT. L1 N00003'35"E 27.17 Q L2 S89'56'2WE 27.17" I ❑ P.O.B. ? �+ L3 S00°03'35'W 27.17 I 5/8"CIRR � P.0.C. f�J LA N89°58'25"W 27.17' 'KHAN �$ t-. L4 L5 N75'05'06"W 168.93' Z ® _ +J _ to L6 S75'05'06"E 27.09' vi O w 1/2'IRF L7 S14'54'54"W 20.70' o O=a J m2LLtO�j is ( ` Q ° O w LOT 2-R-1,BLOCK 4 �y LL 2 COUNTRY DAY MEADOWS, m 0 0 FOURTH FILING U VOLUME 388-154,PAGE 98 "XN FOUND DRTCT LOT 1-R-2-R,BLOCK 4 518"CIRR COUNTRY DAY MEADOWS, 'MAN I FOURTH FILING VOLUME 388-213,PAGE 24 I DRTCT I Drainage Easement LEGEND SHOWING A PART OF P.O.B.=POINT OF BEGINNING LOT 1, Block O CIRR=CAPPED IRON ROD RECOVERED W/"KHA"CAP WATERSIDE ADDITION IRF=IRON ROD FOUND City of Fort worth, Tarrant County, Texas OPRTCT=OFFICIAL PUBLIC RECORDS TARRANT COUNTY,TEXAS PRTCT=PLAT RECORDS TARRANT COUNTY,TEXAS DRTCT=DEED RECORDS TARRANT COUNTY,TEXAS Kiml e >>> Horn NOTES 801 Cherry Street.Unit 11.M 950 Tei.M.(817)335.6511 Fon Worth,Texas 76102 FIRM p 10194040 www.kimley-hom com Bearing system based on the Texas Coordinate System of 1983, s_�e I Drown by I Checked by DateProject No, sheet No North Central Zone(4202),North American Datum of 1983. r=wFCN JPW 04118no18 061171083 2 OF 2 ML...raFYM..rrnrrrrr.w.. ._. ..wrWa,r.r.e,r»rTw.w,r.nw._.+rr.w.ivu vw,t,nTrr,rtl nSw.YwvInNMM.awsFW.bw+a1 w, _ _ —nrrr.rxw r Y-T��svwar tr�'iwwtwrrrr�, wr+u.r,r�arrr wYwrr r • r —•w•r rr —rr..rgiw,rrr rxr+._ rrMnr..r,Frw,wvu�a.nnv,.rrrutagVM Waw� r'rp nwYrvrp_rrwrsurrw..rrwa arbrr-r.��,riwariran•�r«wN�..ti�u• 4— " -iwMirw rwrt+wvry—_— rr��nri,.,—'w.�w`ro�ww '—rwuq� ,a'raArru rw—r isnwr~ruwi, ,"rirww urionsar++i�u� —a w�Mna,�ww ii wwrrwr,vr r w wwrr,varrSwrr..,....,—.wrv.rrr,wrr r.r. ._ •• rar_..r. �aS-Te7 w.��.���°irrurwe�.+e rM,Fair,°pi,w�iwMi�..�.t�+"wF�w.�i.i✓r wF�i,s� 'r Y—«�rL`�r m r �.�+r-Mr..r..r.aMv.rrlFr.FwF/rwwarww„ _ •• ^�,w '•r1,r.w.e.ww,r,W rr—ir�. r LO'.YOO[H W,Fw, Y qr.4+. ....v.uv .r wrrw,.rrrm�.Yrwrwu LcT1.NAORI LOT 1.aLORJ L011.KOPJf R LOT I,LOGRL Lm 1.womr .—.r..rr...,r. �rt r rV,,.xvWWwrMVr rrrrraurwarrrV LOT i�e,OOKK • — .r Va»rw UWI.eLOCKO _�A..aa,w ,Ip_rwa„rr4Fwvbwwr.,r.+r+r+ia, _r+—r�wr� w�++r rnrw.,...r,r i�+.rr.,rr+. 1w—aai Ys WMOYunWFwoeOr,''Ni,erin%.wr..vC N�MM.wYM,ru4.a wrriiFrew.rwtwY' r ew,rwr w~_ N 0rws,N.nr.L0..4r FwrewYFMFYm Ywew naii��vi�iuw'��—�,t sw.u�•—wrwr.�wVnlwnw M,ww,wf Mu.w,.NraYw ,�y,�,arw®r._.w. .,r .w_wrr»rr,rwrr,.»,rr.rr rrrr, rFwMF.Rvv„aFFyrn'rVSWwsYFre„Ie®} N M,rPw.tla..frrrrSFrFr,wt_,ww,w Mn-,+aMma�i,lirilwi,YiM�iW rRa-w1 •rV rV.,r..V.r IM�6.tNrwVMiMnngrMLrn i.L��—a�w�sLriwmw4r~.rr f��w`.rri,rrrr—� w�Y,.nrr,rtr,trvalSrrM Y4nMrwF„MkVNMrb.,L IIIeL ,nrrr.r„rr.r�_�rr WM���VMnIrYr.�ir„swwumr,.�t,w'MYwrrrNr,9al.r .y rjr .nrrr..wrwnrw.rrr Rnrr,VrWrwrv,er,rVW+rwrWrrarWwwrr, 1Y,rarM+tr�w+w'w Vrwrrsa,war.rewrrgw.rnwm».rw , wrV. w s�isra, rrr M.rtnrt,r ; ,+r.rr—w�..r.war...rrr.rr rauvvn Trrr a rn N'NwM,rrw.rrw.F,w W,ws.W rn,nw.r_ewt,rr+r NF�.r .r,wr.rr..rur—..arr,rrmar,,.rr ruyrr.,rw.rrwr �K� e,.,' p����p��� rwvrwwr,�urwwuN.wvw„nw,1r_.rVwlwww,.W r — nMvsrn�aF.v,r.wnM.nnv,>snvm �W+On"WMrw..F.i"GMVJp�t�ortFhlleeLiTMi.. 'M•ewr.UO vMrrWNY,r4 MY,erttlrwM'r,M V a,rw,.nJfrwwrwr ,F,ry.l...frwFilFwriM.wFwFN,wrwi7wnwrlFNWrYr,Mr.44.lIiF.ww., rrwr,r.rwr.wwtrrnww,rrrr,rnr.rw.r.rnr,.r � �+yw.�r�'.,w.MtFWnMwIpYFMwrIwiNRnPiw.WFMNwWarMM,lr. �`9IiY��ew...wr�rw.wwu.—a.,arwra—i.+b e�+,�w W�'�u�wwr,o—•1vw tl INDE%TO 9HEET5 1. COVER �+ -------- 2. FLOOD&DRAINAGE EASEMENTS 2 3. WATER&SANITARY SEWER EASEMENTS 4. UnUITIES&PEDESTRIAN&ACCESS _ �. m�Nwne.: rr�m«ru.r • + EASEMENTS :. 1 FINAL PLAT w ,._..rWATERSIDE ADDITION rrrrr.r. r.wr.«....«.a,Y.r..r ,,.-' o T 11,o TI LOT 1,BLOCK H LOT i,BLOCK I 3 CITY lIRM GaYY1,e16M LOT i,BLOCK J I a^' ro,T woRrn Tcw LOT 1,BLOCK K 6 ,a.., rt,.✓`.n,.nw.N. LOT 1,BLOCK L LOT 1,BLOCK M -b ~-.... o LOT 1,BLOCK N ---, tdt;+S>•`- 9�n>aY,w LOT 1,BLOCKO �.;yf,;•.r,r/i,K! DeYetre,OUtW Me EVAN H.BURKESURVEY,AEetr,d No.100, j e W the JAMES ROGERS SURVEY,Ahetrett No-1265 City of Fort Warty,TwmM Cw*,Ti— Ip CASE NO.FP-015429 Apre 2017 MIII-- LNCEwryELrlWY1,,Be,MO Kimley>»Horn oreR xwwrM.l•.c -vfcI MAP -LEurzNo SmHMARXS iww !:j ..�%rl�A, €y{Y�p r JJ� fl r,a. - S,TE X .5 -71FOB errwe 6a 0 R 7 - ---- ---- -----I.Am------- 1,BLOCKL --.74-------- M ATE(WPI q Z- -_Tom I r R -v tm Er 22 I.L us.!� -Of- WATERSIDE ADDITION . ..... FINAL PLAT LOT 1,BLOCK H LOT 1, BLOCK I LOT 1,BLOCK J LOT 1,BLOCK K LOT 1,BLOCK L LOT I BLOCK M LOT I BLOCKINI LOT 1,BLOCK 0 BOV 19A297 ilclml 00 Ofrd m EVAN H.SURKE SURVEY.AbWad No,IM KimlevoHorn vxl*A JAMES RMERS SURVEY Ab$bl4 No.1265 -3 EM City of Fort Wotth,Tw2017 wd Cosity,TemFP-015-129 W1 J*/Awt- VICINITY MAP ... LEGEND SITE 7 P.O'B. 77i F rYlo�tar %. KH P.0.6. 1�u M'I'X�o l7l.r3w— II ., Anv:l* 7 X_ MWAMOMVACtI nO­'_. "L BELMRF DRiWSOUTH _ltet H 2.m. FINAL PLAT WATERSIDE ADDITION LOT 1.BLOCK H LOT I,BLOCK I LOT' BLOCK J LOT :BLOCK K LOT 1,BLOCK L LOT 1,BLOCK M LOT 1.BLOCK IN LOT 1.BLOCK 0 B"v 15.1297 BURSE SURVEY, RV EBROGERaSU E=Ift EVAN N 184 .WDWJM. City of Fort WWW T&rft Cm*.Tft" FP-015-129 WI 2017 tv VICINITY MAP LEGrNO BSNCHMARXS 71, ff SITE 5 MWIX -ITT A, % MAU Xwoo—. Aam. P.O.B. 0�1 3—M PRNAnMN$PACI BELS QR 2t--t-t M M-t SOUTH --,Z7 FINAL PLAT WATERSIDE ADDITION LOT 1,BLOCK H LOT I,BLOCK I LOT 1,BLOCK J LOT 11,BLOCK K IS LOT 1,BLOCK L LOT 1,BLOCK M MR. LOT I BLOCK N LOT 1:BLOCK 0 t EVAN N.BURKE eURYEY,AMtr1ct Ho.180, imlevoHorn -M &MMa JAMESROOERB SURVEY Cay of FW Wbnh,T—ft Cony.T.. FP-016-129 AW 2017 EXHIBIT B This exhibit specifies design and maintenance standards for a structural water quality device (WQ device) located below ground as part of the storm drain network when installed as a part of a development requiring a Stormwater Facilities Maintenance Agreement. The requirements below are in addition to all applicable City's iSWM requirements, City's standard construction plans and specifications, and should be made part of the Stormwater Facilities Maintenance Agreement obligating the property owner to maintain the unit as described in the City's iSWM Criteria Manual, Section 5.5. Additional guidance for WQ devices can be obtained from the NCTCOG iSWM Technical Manual, Site Development Controls chapter. 1). The WQ device will need to be certified as meeting applicable City or Tarrant Regional Water District (TRWD)water quality performance specifications and will require approval by the TRWD. Certifications will be accepted from the Technology Acceptance Reciprocity Partnership (TARP), Technology Assessment Protocol Ecology (TAPE), or other third party testing services to the satisfaction of the SWM/TPW City of Fort Worth. 2). The engineer shall provide the City spreadsheets and/or output from specialized vendor software used to calculate water quality treatment discharges. 3). The engineer shall provide the City electronic CAD (or equivalent) shop drawings of the WQ device. 4). The lowest depth of BMP invert from ground surface shall be no more than 25 feet. Deeper units will require prior approval from the City to ensure that the unit is realistically maintainable by the property owner. 5). Clean out ports and manholes should be designed to allow manual confined space entry within the unit, and should have a minimum inner diameter manhole opening of 30 inches. Manholes shall be constructed to City's 33 49 10-D412 specification. 6). The WQ device itself plus an additional 10 feet perimeter buffer around the WQ device shall be shown as permanent private drainage easement. Additional access for maintenance equipment shall be provided from public Right-of-Way point of entry. WQ devices requiring vactor trucks must have a 20 feet wide access pathway. The City's SWM Department should be consulted for easement requirements if other type of equipment will be used by the property owner to maintain the device. 7). The engineer shall provide special structural designs and sealed report for dimensions and depths exceeding City's standard specifications as follows: Box sections exceeding 60"; wall penetrations exceeding 36" for 4' square boxes, 48" for 5' square boxes, and 60"for 6' and above square boxes; Any part of the BMP exceeding 20' below ground. 8). Engineer shall provide the Operations & Maintenance manual which includes how the unit operates, frequency of inspection and removal of captured debris. Forms for required maintenance from the manufacturer shall be attached to this agreement as Exhibit D. 9). Recommend that the property owner acquire a 2 year warranty on the device. STORMWATER FACILITY MAINTENANCE AGREEMENT 8 ^v\ Rev.12/29/2014 \�' APPENDIX A, CALCULATIONS I� I EXHIBIT B Tarrant Regional Water district � 9��,9 Stormwater Quality Site Development Review Tool u INPUT FIELDS: Data Ently Drainage Area Name Stam Line F Drop Down Be. Impervious Area Acres Land Use% IMPervwus A- Base Load` Drainage Area Land Cover(acres) E%islfhg Tto,a d Fmpervfous E)O-^g F"."d TSS(1bJocW TP(1W g1yr) TN(rW aiyt) E,a.Y(Wadyr} Poatables(7WaNyrJ Vacant 1.97 0.50 5% 0.10 0_n3 16.01 0.10 0.54 6.75E+09 12.86 M.WFamily 0.00 0.00 65% 0.00 0.00 229.10 0.99 5.85 1.7E+11 1931 Roadway 0.0C 0.00 90% 0.00 0.00 507.56 1.22 12,42 8.6E+11 24.41 Camme W 0.00 !.A7 85% 0.00 1.25 223.96 0.78 8.71 1.1E+11 26.57 Total(acresf 1,97 1.97 0.10 1.28 percent rmpervjovs S% 65% bused on preliminary modeling results,subject to change Runoff Calculations Parameter ,itlst§lg Fregnsed Notes' Time of Concentration,t,..(he,,,) 0.25 0.17 Nota:guidvnce providedin!SWM Hydrology Technical Menual Seto-1.2.4(pege 10-8) Curve Number,CN 73.73 94.17 Initial Abstraction,la 0.71 0.12 Ia/P 0.48 0.08 Unit peak discharge,a,;(cfs/mi'/inj 350 850 •Nctc:guidance provided in 1SWM?!ydrology Technical Manual Frg-1.10 jpuye M0-27) Volumetric Runoff Coefficient,R„ 0.10 0.63 Water Quality Protection volume,0,,,(Inches) 0.14 0.95 Water Quality P rotection Valu me,G_(acre-ft) 0.02 D.16 Water Quality Peak FIOW,Q„o(ch) 0.15 1 2.49 EXHIBIT B SECTION ( ) STORM WATER TREATMENT DEVICE 1.0 GENERAL 1.1 This item shall govern the furnishing and installation of the VortSentry HS® by Contech Engineered Solutions LLC, complete and operable as shown and as specified herein, in accordance with the requirements of the plans and contract documents. 1.2 The Contractor shall furnish all labor, equipment and materials necessary to install the storm water treatment device(s) (SWTD) and appurtenances specified in the Drawings and these specifications. 1.3 The manufacturer of the SWTD shall be one that is regularly engaged in the engineering design and production of systems deployed for the treatment of storm water runoff for at least five (5) years and which have a history of successful production, acceptable to the Engineer. In accordance with the Drawings, the SWTD(s) shall be a VortSentry HS® device manufactured by: Contech Engineered Solutions LLC 9025 Centre Pointe Drive West Chester, OH,45069 Tel: 1 800 338 1122 1.4 Related Sections 1.4.1 Section 02240: Dewatering 1.4.2 Section 02260: Excavation Support and Protection 1.4.3 Section 02315: Excavation and Fill 1.4.4 Section 02340: Soil Stabilization 1.5 All components shall be subject to inspection by the engineer at the place of manufacture and/or installation. All components are subject to being rejected or identified for repair if the quality of materials and manufacturing do not comply with the requirements of this specification. Components which have been identified as defective may be subject for repair where final acceptance of the component is contingent on the discretion of the Engineer. 1.6 The manufacturer shall guarantee the SWTD components against all manufacturer originated defects in materials or workmanship for a period of twelve (12) months from the date the components are delivered to the owner for installation. The manufacturer shall upon its determination repair, correct or replace any manufacturer originated defects advised in writing to the manufacturer within the referenced warranty period. The use of SWTD components shall be limited to the application for which it was specifically designed. 1.7 The SWTD manufacturer shall submit to the Engineer of Record a "Manufacturer's Performance Certification" certifying that each SWTD is capable of achieving the specified removal efficiencies listed in these specifications. The certification shall be supported by independent third-party research 1 EXHIBIT B 1.8 No product substitutions shall be accepted unless submitted 10 days prior to project bid date, or as directed by the Engineer of Record. Submissions for substitutions require review and approval by the Engineer of Record, for hydraulic performance, impact to project designs, equivalent treatment performance, and any required project plan and report (hydrology/hydraulic, water quality, stormwater pollution) modifications that would be required by the approving jurisdictions/agencies. Contractor to coordinate with the Engineer of Record any applicable modifications to the project estimates of cost, bonding amount determinations, plan check fees for changes to approved documents, and/or any other regulatory requirements resulting from the product substitution. 2.0 MATERIALS 2.1 Concrete for precast stormwater treatment systems shall conform to ASTM C857 and C478 and meet the following additional requirements 2.1.1 In all cases the wall thickness shall be no less than the minimum thickness necessary to sustain HS20-44(MS18) loading requirements as determined by a Licensed Professional Engineer. 2.1.2 Sections shall have tongue and groove or ship-lap joints with a butyl mastic sealant conforming to ASTM C 990. 2.1.3 Cement shall be Type II Portland cement conforming to ASTM C 150. 2.1.4 All sections shall be cured by an approved method. Sections shall not be shipped until the concrete has attained a compressive strength of 4,000 psi (28 MPa) or until 5 days after fabrication and/or repair, whichever is the longer. 2.1.5 Pipe openings shall be sized to accept pipes of the specified size(s) and material(s), and shall be sealed by the Contractor with a hydraulic cement conforming to ASTM C 595M 2.1.6 Brick or masonry used to build the manhole frame to grade shall conform to ASTM C 32 or ASTM C 139 and shall be installed in conformance with all local requirements. 2.1.7 Casting for manhole frames and covers shall be in accordance with ASTM A48, CL.3513 and AASHTO M105. 2.2 Internal Components and appurtenances shall conform to the following: 2.2.1 All internal components shall be PVC per ASTM D1785, and aluminum alloy 5052-1-132 plate in accordance with ASTM B 209. 2.2.2 A bitumen sealant in conformance with ASTM C 990 shall be utilized in affixing the aluminum bays to the concrete vault. 3.0 PERFORMANCE 3.1 The SWTD shall be capable of achieving an 80% reduction of TSS based on a treatment flow rate or calculation as specified by local regulatory requirements unless otherwise stated. Sizing shall be based on a particle size distribution with mean (d50) of 240 microns unless otherwise stated. 3.2 Treatment capacity shall be additionally defined as the maximum flow rate prior to which bypass of any flow occurs. 2 EXHIBIT B 3.3 Each stormwater treatment system shall have sediment storage and oil storage capacities equal to or greater than that shown in Table 1 for the corresponding model as specified on the project plans. 3.4 In order to not restrict the Owner's ability to maintain the stormwater treatment system,the minimum dimension providing access from the ground surface to the sump chamber shall be 16 inches in diameter 4.0 EXECUTION 4.1 Each Stormwater Treatment System shall be constructed according to the sizes shown on the Drawings and as specified herein. Install at elevations and locations shown on the Drawings or as otherwise directed by the Engineer. 4.2 Place the precast base unit on a granular subbase of minimum thickness of six inches (152 mm) after compaction or of greater thickness and compaction if specified elsewhere. The granular subbase shall be checked for level prior to setting and the precast base section of the trap shall be checked for level at all four corners after it is set. If the slope from any corner to any other corner exceeds 0.5%the base section shall be removed and the granular subbase material re-leveled. 4.3 Prior to setting subsequent sections place bitumen sealant in conformance with ASTM C 990- 91 along the construction joint in the section that is already in place. 4.4 After setting the precast roof section of the stormwater treatment system, set precast concrete manhole riser sections,to the height required to bring the cast iron manhole covers to grade, so that the sections are vertical and in true alignment with a %-inch (6 mm) maximum tolerance allowed. Backfill in a careful manner, bringing the fill up in 6-inch (152 mm) lifts on all sides and compacting the granular bedding to 95% Standard Procter Density per ASTM D698. If leaks appear, clean the inside joints and caulk with lead wool to the satisfaction of the Engineer. Precast sections shall be set in a manner that will result in a watertight joint. In all instances, installation of Stormwater Treatment Systems shall conform to ASTM specification C 891 "Standard Practice for Installation of Underground Precast Utility Structures". 4.5 Holes made in the concrete sections for handling or other purposes shall be plugged with a nonshrink grout or by using grout in combination with concrete plugs. 4.6 Where holes must be cut in the precast sections to accommodate pipes, do all cutting before setting the sections in place to prevent any subsequent jarring which may loosen the mortar joints. The Contractor shall make all pipe connections. 3 �\�I TABLE 1 EXHIBIT B Stormwater Treatment Device Storage Capacities Vortechs Model Minimum Sump Storage Oil Storage Capacity(yd3)/(m3) Capacity(gal)/(L) HS36 0.5(0.4) 75(285) HS48 0.9(0.7) 137(519) HS60 1.5(1.1) 214 810 HS72 2.1(1.6) 308(1167) HS84 2.8(2.1) 412(1560) HS96 3.7(2.8) 544(2060) END OF SECTION 4 A PPENMX B SHOP DRA kNINGS t EXHIBIT B VORTSENTRY HS DESIGN NOTES VH RATED TREATMENT CAPACF'Y IS SHOWN N THE TABLE BE'_OW,ORPERLOCA'-REGU-ATIONLS MAXMUM':IYDRAULOINFERNAIBYPASS CAPACITY VARIES.CONTACT YOUR CONTECH REPRESENTATIVE FOR ADRENAL INFORMATON I HF S I AWARD SOLD COVER CONT IG'J RAT DN IS SHOWN AI TFRNATF.COW CHR.GTNSART AVAEAR:.FA RF LLSTOP BELOW. ALD NINUM TI—GH CONFIGURATION OPTION DESCRIPTION GRATE NLET(NO NLET PPE) GRATE IFLETWFH DIET PIPE A A VORTSENTRY HS GENERAL INFORMATION Fl0W DYp T t�l Typ..l Typ el Depth Appraxlmate 1 + 11Moee1 Manhole T Ttment DIST-- O." D 1 eRm B.1.1-0 N 'mun MAX—P'pe Diameter nU) to IH-rt (N—) DNtence Rv Diameter ND) Flow Rale Bottom A B „ to Inver ° FI a,m crs L;s FT R. Fr n, P) — FI m w Tr, H336 S 9DC 095 ISN *10-1 150 10.,6 3t0 40B 1.2A i59 t]0218)LEAD EO BAFF.E HS48 4 1200 ,.2C 34B ^,125 401 6.G0 LIO 6]5 205] 2e6C0PLAN VIEW 6-B 1.BB ].99 —1 760 SOLD COVER OR HS72 6 1800 3]0 IIAB 1556 5.05 6]5 209 0.15 2]88 000GRATE TTOWET H9B4 ] 2,C0 59C 1580 1895 5.75 ].]5 2:19 10.35 3158 42O 1 NCTOR TO PI—ILLCUNTRACTORTOGROUASE GR O NGS/RGEkSFINISHECRADE IITH40228.1 20.87 636 650 259 11.59 3516 90 12C0 SITE SPECIFIC DATA REQUIREMENTS STRUCU.ED WATER QUALITY FLOYV RATE CFSj F] I PEAK FLOW RATE I119) B B B CITE99II.�.� nL�I YF1 u L ',,. RETURNPERIOD OF PEAK FLOW(YRS) ' f-Y IPE ° OUTLET PIPE I PPE DATA: tE M TFRNL DIA-11(DXX°MAX) (0%X"MAX) ) n r� INLET PPE, - JL ry xn OUTLET PIPE " ♦ RM ELEVATION 3 ❑ A FFLOTATON BALLAST HEIGHT r Ni W ICTH FRAME AND COVER FRAME AND GRATE NG'Es,svecIAL HeoulRemeN)a (DIAMETER VARIES) (24"SQUARE) N.T.S. N.T.S. -PER ENG INLLR OF RECORD ',. GENERAL NOTES G L CONTEC TO PROVIDE ALL MATERIALS JN'-ESS NOTED OTHERWISE 2 DIMENSIONS MARKED WFFQARE REFERENCE DIMENSIONS.ACTUALDMENSIONSMAYVARY. 3 FOR FABRDATION DRAWINGS W FH CETALED STRJCTURE DENISIONS AND WEIGHT.PLEASE CONTACT YOUR _ CONRECHENOIWEFEDSOLJTbi LLCREPRESENRATNE.v.w.CoT-E— A.VOR TSEMRYHSWATEROUALRYSTRJCTL'RESHALLBEINACCORDAf WFHALLDESGNDATAANDNFCRMATION CON AFEDNTIIEDRAW- 5 STRUCTURE SI TALL MEET AASHTO HS20 AND CASTNOS SHALL MEET PASHTO M300 LOAD RATING.ASSUMING GROUNDWATER ELEVATION AT.OR BELOW,THE OUTLET PPE INVERT EL—INONL ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION 1.�� MSTALIATDN NDTE3 z w SJ8-BASE—NF0. UFPIH AN)O NNF(.0 AIONI RD-TONS ARE SITESPECPC DESGN CONSCERATONS CO HFASHAL BE SPE IFF EQUIPMNE ENT O HSCF 2 DNTrRA OR TO PROVIDE ECUPMCNT RH SUFFOIENf LIFTNG AND RCPG-.CAPACITY TO LFT AND SET TILE -1\ YRYH _STRU UF�IIiFTNG LLUT(:IIES PHOV 6JLI:p 3 CONTCACTOIE TO INSTALL.—BEALAM 6EPNEENA1l STRUCTURE BECTONS AIJI AESEMRIE STRUCTURE. 9.CONFRACIORTOPROVIDE,NSTAI.'�.,ANRCROUTPPFS.MATCHPPEINJER'SHELEVATIOSHOWNI _ SECTION A-A s.coMrRACTORTOTAREAPPRornIATENEAsuRESTOASSUREJNFSWATERTcHT'WITNS .HOLDING WATER To r_oWLNE FMERT,V.NMUM.IT IS ESTED THAT ALL JONTS BELOW PPE INVERTS ARE GROU`ED. CONTEGFI' VortSentry' ENOWEEIED AoLUTio 0 LLCVORTSENTRY HS AES=PF STANDARD DETAIL w,. _ �...w.., •^°,��• 902600,r»Punw"oC s°a w e5 z ORMNAGE AREA TABLE 3 ,t FOR',EFERENCE ONLY. PPPPOVEE AS PAPT OF THE-PAVING. GRADING,RRAINAGE.I STRECT LEGEND N GHTING FOR WATERCOURSE GRVE TO SFAVE WATER9RE PHASE If'FLANS, BY OMLPYMORN(GP'P=S1,WP2LNJ ,-' wuo ti l / �.t �e d` /' _ —1 `fit �+' •.I cnao U G i m�x�xi LOCATION OF ` I, \ STORMWATER w QUALITY UNIT z a BENCH MARK LIST 4< 1 `a ® •r •nrwn nn.vnwx Q ,i OE9 MTIFF xRS NTHE—RIMB-PM'D BPT x P --•�,I BB 9013 f:Pf RO FLCw AREA Iw aND 955 rir.wmry w D PCLKnaw w,ar�below. D ERE NEN,.9TE=F FUTURE call.f,,,You C-07 FP-15.129 /� `\.. \\'=__`__ �/ l"" IAJ V,\ 0 -1 7,7 .. ....... 0 > 0 0 r0 > 4 0 c > z Z ---1 m —n 0 q; IMP, J, J, % 44 ............ ——--—--—--—--—-- ------------------------------ j z gpjl In u g. 21 R 111-!144 fi 0os pe, six > a P11 J£ j FI _jBr PROPOSED DRAINAGE WATERSIDE BRYANT RV NI OFFICE Kimley>>>Horn P AREA ....... MA CRY OF FORT WORTH TARRANT COUNTY,TEXAS — I I � l- w � � I-- _... 11 ill _ I , AMR }=LLJ= Er o w LL 3 Fn LOCATION OF p6 STORMWATER �'� �' QUALITY UNIT — 17 ka I m `i I �wnov BENCH MABI(L15T �s Exhibit "C" CITY OF FORT WORTH STORMWATER FACILITY OPERATION , MAINTENANCE & INSPECTION PLAN The only responsibility the City of Fort Worth has in the operation and maintenance of this Facility is inspection. General Maintenance Procedures The structural and functional integrity of the Facility shall be maintained at all times by following the manufacturer recommendations for maintaining the system, or once every 6 months, whichever is of the shorter duration. Disposal of litter, sediment, and debris shall be in accordance with federal, state and local regulations. PREVENTIVE MAINTENANCE/INSPECTION • Visual inspections of all components will be conducted at frequency specified by manufacturer and documented in the manufacturer supplied or City's inspection form (Exhibit C) • The inspection form shall document the condition of the Facility's components, Inspections for each water quality device shall be performed using the form below, or equivalent from the manufacturer of the device. If performing inspections using manufacturer's inspection list, attach to Exhibit C. Written maintenance and repair records shall be maintained by the party or parties signing the attached Agreement and shall be provided to the City annually Inspection forms shall be sent to the following: Storm Water Division, Transportation & Public Works Department, City of Fort Worth 1000 Throckmorton Street, Fort Worth, TX 76103 STORMWATER FACILITY MAINTENANCE AGREEMENT 9 Rev.12/29/2014 Water Quality Device Name: Vendor&Model: Date Inspected: Location: Weather Conditions: Inspected By: Inspection Time: (Regular Time/Hours) (Over Time/Hours) Vehicle ID/#: Inspection Mileage: (Starting) (Ending) (Total) Circle one per question Manhole Lid Work Order Required? Yes No NA Comment: 1. Manhole Base Work Order Required? Yes No NA Comment• 2. Obvious Damage to BMP? Yes No NA Comment: 3. Percentage of Debris`? X10% 10-25% 26-50% 51-75% 76-100% Comment: 4. Offensive Oder Present? Yes No NA Comment: 5. Mosquito Larvae Present?Yes No NA Comment: 6. Oil Sheen Present? Yes No NA Comment: 7, Cleaning Work Order Required? Yes No NA Comment: 8. Water Clarity?Clear Brown Green Black Gray Comment: Utility Fee Credit? Yes No NA Comment: Additional repair or maintenance comments: STORMWATER FACILITY MAINTENANCE AGREEMENT 10 Rev.12/29/2014 Exhibit "D" [City Approved Maintenance Specifications from Manfacturer of Water Quality Device]. STORMWATER FACILITY MAINTENANCE AGREEMENT 11 Rev.12/29/2014 0-54w% NTECHI ENGINEERED SOLUTIONS VortSentry° HS Maintenance Guide �r- r �' I y m VortSentry HS Maintenance The VortSentry HS system should be inspected at regular intervals Cleaning and maintained when necessary to ensure optimum performance. Cleaning of the VortSentry HS should be done during dry weather The rate at which the system collects pollutants will depend more conditions when no flow is entering the system.Cleanout of the heavily on site activities than the size of the unit, i.e., unstable VortSentry HS with a vacuum truck is generally the most effective soils or heavy winter sanding will cause the treatment chamber to and convenient method of excavating pollutants from the system. fill more quickly, but regular sweeping will slow accumulation. Simply remove the manhole cover and insert the vacuum hose into the sump.All pollutants can be removed from this one access Inspection point from the surface with no requirements for Confined Space Inspection is the key to effective maintenance and is easily Entry. performed. Pollutant deposition and transport may vary from year to year and regular inspections will help ensure that the In installations where the risk of petroleum spills is small,liquid system is cleaned out at the appropriate time. At a minimum, contaminants may not accumulate as quickly as sediment. inspections should be performed twice per year(i.e. spring and However,an oil or gasoline spill should be cleaned out fall)however more frequent inspections may be necessary in immediately. Motor oil and other hydrocarbons that accumulate equipment washdown areas and in climates where winter sanding on a more routine basis should be removed when an appreciable operations may lead to rapid accumulations of a large volume layer has been captured.To remove these pollutants, it may be of sediment. It is useful and often required as part of a permit preferable to use adsorbent pads,which solidify the oils.These to keep a record of each inspection.A simple inspection and are usually much easier to remove from the unit individually,and maintenance log form for doing so is available for download at less expensive to dispose than the oil/water emulsion that may be www.contechstormwater.com. created by vacuuming the oily layer. Floating trash can be netted out if you wish to separate it from the other pollutants. The VortSentry HS should be cleaned when the sediment has accumulated to a depth of two feet in the treatment chamber. Manhole covers should be securely seated following cleaning This determination can be made by taking two measurements activities to prevent leakage of runoff into the system from above with a stadia rod or similar measuring device;one measurement and also to ensure proper safety precautions. If anyone physically from the manhole opening to the top of the sediment pile and enters the unit,Confined Space Entry procedures need to be the other from the manhole opening to the water surface. If the followed. difference between these measurements is less than the distance given in Table 1,the VortSentry HS should be maintained to Disposal of all material removed from the VortSentry HS should ensure effective treatment. be done is accordance with local regulations. In many locations, disposal of evacuated sediments may be handled in the same manner as disposal of sediments removed from catch basins or deep sump manholes.Check your local regulations for specific requirements on disposal. Distance Between Water Surface and VortSentry HS Diameter Sediment Storage Oil Spill Storage .• of Storage ..- Sumin m ft • m yd3 m3 gal liter HS36 36 0.9 3.6 1.1 0.5 0.4 83 314 HS48 48 1.2 4.7 1.4 0.9 0.7 158 598 HS60 60 1.5 6 1.8 1.5 1.1 258 978 HS72 72 1.8 7.1 2.2 2.1 1.6 372 1409 HS84 84 2.1 8.4 2.6 2.9 2.2 649 2458 HS96 96 2.4 9.5 2.9 3.7 2.8 845 3199 Table 1:VortSentry HS Maintenance Indicators and Sediment Storage Capacities. VortSentry HS InspectioniMaintenance Log VortSentry HS Model: Location: Describe Water depth Floatable layer Maintenance Date maintenance Comments to shipment' thickness' Personnel performed I I i I I i 1. The water depth to sediment is determined by taking two measurements with a stadia rod:one measurement from the manhole opening to the top of the sediment pile and the other from the manhole opening to the water surface. If the difference between these measurements is less than the distance given in Table 1,the system should be cleaned out. Note:To avoid underestimating the volume of sediment in the chamber,the measuring device must be carefully lowered to the top of the sediment pile. 2. For optimum performance,the system should be cleaned out when the floating hydrocarbon layer accumulates to an appreciable thickness. In the event of an oil spill,the system should be cleaned immediately. EXHIBIT "E" FW Waterside Land, LLC will own, operate, and maintain the Stormwater quality units under this agreement for the life of the stormwater quality units or until this agreement is assigned to another party. Upon assigning this agreement, all maintenance responsibilities and obligations to the City of Fort Worth and to Tarrant County Water District will be transferred to the assignee. STORMWATER FACILITY MAINTENANCE AGREEMENT 12 Rev.12/29/2014