Loading...
HomeMy WebLinkAboutResolution 4937-05-2018 A Resolution NO. 4937-05-2098 A RESOLUTION OF THE CITY OF FORT WORTH, TEXAS DETERMINING THE COSTS OF CERTAIN PUBLIC IMPROVEMENTS TO BE FINANCED BY THE FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 17 (ROCK CREEK RANCH); ACCEPTING A PRELIMINARY SERVICE AND ASSESSMENT PLAN UPDATE, INCLUDING PROPOSED UPDATED ASSESSMENT ROLLS; DIRECTING THE FILING OF THE PROPOSED UPDATED ASSESSMENT ROLLS WITH THE CITY SECRETARY TO MAKE AVAILABLE FOR PUBLIC INSPECTION; CALLING A PUBLIC HEARING ON JUNE 5, 2018 TO CONSIDER AN ORDINANCE LEVYING ADDITIONAL ASSESSMENTS ON CERTAIN PROPERTY WITHIN THE DISTRICT; DIRECTING CITY STAFF TO PUBLISH AND MAIL NOTICE OF SAID PUBLIC HEARING; AND RESOLVING OTHER MATTERS INCIDENT AND RELATED ITHERETO. WHEREAS, Chapter 372, Texas Local Government Code (the "Act")authorizes the governing body(the "City Council") of the City of Fort Worth, Texas (the "City"), to create a public improvement district within the corporate limits and extraterritorial jurisdiction of the City; and WHEREAS, on December 6, 2016, the City Council conducted a public hearing to consider a petition received by the City on November 9, 2016 (the "Petition') requesting the creation of the Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) (the "District')to undertake the construction of certain public improvements described in the Petition(the"Authorized Improvements"); and WHEREAS, on December 13, 2016, the City Council adopted Resolution No. 4724-12-2016 (the "Authorization Resolution'), authorizing, establishing and creating the District;and WHEREAS, (1) the City Council previously adopted a Service and Assessment Plan (the "Service and Assessment Plan")for the District pursuant to Ordinance 22832-08-2017, adopted on August 15, 2017; (2) levied the Major Improvement Special Assessments (as defined in the Service and Assessment Plan; and (3) issued its bonds designated "City of Fort Worth, Texas Special Assessment Revenue Bonds, Series 2017 (Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) Major Improvement Project)" payable from and secured by the Major Improvement Special Assessments; and WHEREAS, the City Council now desires to levy additional special assessments (the "Roadway Improvement Special Assessments") on only the Western Improvement Area of the District (as defined in the Service and Assessment Plan)for the purposes of financing the costs of certain Roadway Improvements(as defined in the Service and Assessment Plan); and WHEREAS,the City Council and the City staff have been presented with a proposed update to the Service and Assessment Plan for the District, including proposed updates to the assessment rolls attached thereto (the "Proposed Assessment Roll Updates")(the proposed update to the Service and Assessment Plan and the Proposed ORTWO Assessment Roll Update are referred to collectively as, the"Proposed SAP Update"), a copy of which is attached hereto as Exhibit A and is incorporated herein for all purposes; and WHEREAS, the Proposed SAP Update sets forth the updated estimated total costs of the Authorized Improvements to be financed by the District at this time (defined in the Proposed SAP Update as the "Roadway Improvements") and the Proposed Assessment Rolls Updates state the special assessments to be levied against each parcel of land in the Western Improvement Area of the District as determined by the assessment methodology chosen by the City Council and set forth in the Proposed SAP Update; and WHEREAS, the Roadway Improvements are to be financed by Roadway Improvement Special Assessments to be levied only on the Western Improvement Area of the District; and WHEREAS, the Act requires that the Proposed Assessment Rolls Update levying the Roadway Improvement Special Assessment be filed with the City Secretary of the City(the"City Secretary")and be subject to public inspection; and WHEREAS, the Act requires that a public hearing(the "Assessment Hearing")be called to consider the proposed Roadway Improvement Special Assessment and requires the City Council to hear and pass on any objections to such proposed assessments at, or on the adjournment of,the Assessment Hearing; and WHEREAS,the Act requires that notice of the Assessment Hearing be published in a newspaper of general circulation in the City before the tenth (10th) day before the date of the Assessment Hearing and be mailed to property owners liable for assessment; and WHEREAS, after all objections have been heard and passed on at the Assessment Hearing, the City Council may levy Roadway Improvement Special Assessments against the property in the Western Improvement Area of the District to pay for the Roadway Improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. THAT the recitals set forth above in this Resolution are true and correct and are hereby adopted as findings of the City Council and are incorporated into the body of this Resolution as if fully set forth herein. SECTION 2. THAT the City Council does hereby accept the Proposed SAP Update for the District, including the Proposed Assessment Rolls Update, a copy of which is attached hereto as Exhibit A and is incorporated herein for all purposes. All capitalized terms not otherwise defined herein shall have the meanings given to such terms in the Proposed SAP Update. SECTION 3. THAT the City Council hereby determines that estimated total cost of the Roadway Improvements to be funded through the Roadway Improvement Special Assessments levied at this time in the Western Improvement Area of the District is approximately$5,670,000. SECTION 4. THAT the City Council's final determination and approval of the costs of the Roadway hnprovements, or any portion thereof, shall be subject to and contingent upon City Council approval of a final Service and Assessment Plan update which will include final updates to the Assessment Rolls, after the properly noticed and held Assessment Hearing. fFoRTMau SECTION 5. THAT the City Council hereby authorizes and directs the filing of the Proposed SAP Update, including the Proposed Assessment Rolls Update,with the City Secretary and the same shall be available for public inspection. SECTION 6. THAT the City Council hereby authorizes, and calls, a public hearing (the Assessment Hearing as defined above)to be held on June 5,2018 at or after 7:00 p.m. at City Council Chamber, City Hall, 200 Texas Street, Fort Worth, Texas, at which the City Council shall, among other actions, hear and pass on any objections to the proposed Roadway Improvement Special Assessments; and, upon the adjournment of the Assessment Hearing, the City Council will consider an ordinance levying the Roadway Improvement Special Assessments on the property within the Western Improvement Area of the District(which ordinance shall specify the method of payment of the assessments). SECTION 7. THAT the City Council hereby authorizes and directs the City Secretary to publish notice of the Assessment Hearing in substantially the form attached hereto as Exhibit B and incorporated herein for all purposes, in a newspaper of general circulation in the City, on or before May 19, 2018, as required by Section 372.016(b) of the Act. SECTION 8.THAT when the Proposed Assessment Rolls Update are filed with the City Secretary,the City Council hereby authorizes and directs the City Secretary, on or before May 19, 2018, to mail to owners of property liable for assessment notice of the Assessment Hearing as required by Section 372.016(c)of the Act. SECTION 9. THAT City staff is authorized and directed to take such other actions as are required (including,but not limited to, notice of the public hearing as required by the Texas Open Meetings Act)to place the Assessment Hearing on the agenda for the June 5, 2018 meeting of the City Council. SECTION 11. THAT this Resolution shall become effective from and after its date of passage in accordance with law. Adopted this 15th day of May, 2018. ATTES FORT F........... By. A- 2 Name: Ronald P. Gonzales Title: Assistant City Secretary ORTWO T EXHIBIT A PROPOSED SERVICE AND ASSESSMENT PLAN UPDATE EXHIBIT B NOTICE OF PUBLIC HEARING CITY OF FORT WORTH,TEXAS NOTICE OF PUBLIC HEARING TO CONSIDER THE LEVY OF ADDITIONAL ASSESSMENTS AGAINST PROPERTY WITHIN FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 17 (ROCK CREEK RANCH) Pursuant to Chapter 372, Texas Local Government Code (the "Act"), notice is hereby given that the City Council of the City of Fort Worth, Texas(the"Cfty")will hold a public hearing(the"Public Hearing")to consider the levy of assessments against property within Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) (the "District")to pay for certain improvements therein. Date,Time and Place of Public Hearine.The Public Hearing will take place on June 5,2018,at or after 7:00 p.m., at the City Council Chamber, City Hall,200 Texas Street, Fort Worth, Texas. General Nature of the Improvements. The general nature of the proposed public improvements, including the improvements to be reimbursed through the levy of special assessments in the District, includes: (i) roadway improvements, and(ii)costs related to the creation and administration of the District. The roadway improvements will benefit only the Western Improvement Area of the District (the "Roadway Improvements"),and are separate special assessments from those previously levied to pay the costs of certain water and wastewater improvements benefitting the entire District. Cost of the Improvements.The estimated total cost of the Roadway Improvements to be funded through the special assessments levied in the Western Improvement Area of the District is approximately $5,670,000. Proposed Assessment Roll. The proposed updated assessment rolls providing for the costs of said Roadway Improvements to be assessed, levied and apportioned against the property within the Western Improvement Area, and the real and true owner or owners thereof, are on file and are available for public inspection during regular business hours at the office of the City Secretary at City Hall, 200 Texas Street,Fort Worth, Texas. Boundaries of the District. The boundaries of the District encompass approximately 1,756 acres, and the District is generally located along both sides of the Chisolm Trail Parkway south of McPherson Boulevard and north of FM 1187, in Tarrant County, Texas. The boundaries of the District, including the boundaries of the Western Improvement Area of the District, are more particularly described by a metes and bounds description available at the Fort Worth City Hall and available for public inspection. Objections Considered. All written or oral objections will be considered at the Public Hearing. CERTIFICATE OF ASSISTANT CITY SECRETARY THE STATE OF TEXAS § COUNTIES OF TARRANT, DENTON, PARKER,WISE AND JOHNSON § CITY OF FORT WORTH § I, the undersigned Assistant City Secretary of the City of Fort Worth, Texas (the "C "), hereby certify as follows: 1. The City Council of the City convened in Regular Session on May 15, 2018, at the scheduled meeting place thereof, and the roll was called of the duly constituted officers and members of said City Council,to-wit: Betsy Price Mayor Carlos E.Flores Councilmember(District 2) Brian Byrd Councilmember(District 3) Cary Moon Councilmember(District 4) Gyna Bivens Councilmember(District 5) Jungus Jordan Councilmember(District 6) Dennis Shingleton Councilmember(District 7) Kelly Allen Gray Councilmember(District 8) Ann Zadeh Councilmember(District 9) and all of said persons, except b Oh`_b V aA S , were present, thus constituting a quorum. Whereupon, among other business, the following was transacted at said meeting: the attached Resolution entitled: RESOLUTION NO. A RESOLUTION OF THE CITY OF FORT WORTH, TEXAS DETERMINING THE COSTS OF CERTAIN PUBLIC IMPROVEMENTS TO BE FINANCED BY THE FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 17 (ROCK CREEK RANCH); ACCEPTING A PRELIMINARY SERVICE AND ASSESSMENT PLAN UPDATE, INCLUDING PROPOSED UPDATED ASSESSMENT ROLLS; DIRECTING THE FILING OF THE PROPOSED UPDATED ASSESSMENT ROLLS WITH THE CITY SECRETARY TO MAKE AVAILABLE FOR PUBLIC INSPECTION; CALLING A PUBLIC HEARING ON JUNE 5, 2018 TO CONSIDER AN ORDINANCE LEVYING ADDITIONAL ASSESSMENTS ON CERTAIN PROPERTY WITHIN THE DISTRICT; DIRECTING CITY STAFF TO PUBLISH AND MAIL NOTICE OF SAID PUBLIC HEARING; AND RESOLVING OTHER MATTERS INCIDENT AND RELATED THERETO was duly introduced for consideration and passage. It was then duly moved and seconded that said resolution be passed; and, after due discussion, said motion, carrying with it the passage of said Resolution, prevailed and carried by the following vote: Ayes: i7 Noes: ' _ Abstentions: ` 2. A true, full and correct copy of the aforesaid Resolution passed at the meeting described above is attached to and follows this Certificate; said Resolution has been duly recorded in the official minutes of said City Council; the above and foregoing paragraph is a true and correct excerpt from said minutes of said meeting pertaining to the passage of said Resolution; the persons named in the above and foregoing paragraph, at the time of said meeting and the passage of said Resolution, were the duly chosen, qualified and acting members of said City Council as indicated therein; each of'said officers and member was duly and sufficiently notified officially and personally in advance, of the time, place and purpose of the aforesaid meeting and that said Resolution would be introduced and considered for passage at said meeting; and said meeting was open to the public, and public notice of the time, place and purpose of said meeting was given, all as required by Chapter 551 of the Texas Government Code. [Signature Page Follows] SIGNED AND SEALED this -day of 12018, T Listant City Secretary U City of Fort Worth.Texas A (Cl A Signature Page to Assistant Certificate of Secretary Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) Preliminary Service and Assessment Plan August 15, 2017 As Updated for Roadway Improvement Bonds on May 2018 For additional information,please contact: Initial PID Administrator: Municap, Inc. 222 W Las Colinas Blvd, Suite 1650E Irving,TX 75039 972-444-2519 main 866-648-8482 toll free City of Fort Worth: Department of Financial Management Services City of Ft. Worth, Texas 200 Texas Street Ft.Worth,Texas 76102 817.392-8500(office) 2180.021\71999.7 Table of Contents Section I PLAN DESCRIPTION AND DEFINED TERMS......................................................................... 3 Section II PROPERTY INCLUDED IN THE PID....................................................................................... 11 Section III DESCRIPTION OF THE AUTHORIZED IMPROVEMENTS .................................................. 15 Section IV ASSESSMENTPLAN..................................................................................................................20 Section V SERVICEPLAN .......................................................................................................................... 32 Section VI TERMS OF THE SPECIAL ASSESSMENTS ............................................................................ 36 Section VII ASSESSMENTROLL.................................................................................................................. 42 Section VIII MISCELLANEOUS PROVISIONS............................................................................................. 46 Appendix A-I WESTERN IMPROVEMENT AREA ASSESSMENT ROLL........................................48 Appendix A-2 EASTERN IMROVEMENT AREA ASSESSMENT ROLL....................................................... 51 Appendix A-3 EASTERN IMROVEMENT AREA ASSESSMENT ROLL....................................................... 54 Appendix B LEGAL DESCRIPTION FOR PROPERTY WITHIN PID......................................................... 55 Appendix B-I LEGAL DESCRIPTION FOR THE WESTRN IMPROVEMENT AREA................................. 61 Appendix B-2 LEGAL DESCRIPTION FOR THE EASTERN IMPROVEMENT AREA................................ 62 Appendix C MAP OF AUTHORIZED IMPROVEMENTS ............................................................................ 62 2180.021\71999.7 Section I: Plan Description and Defined Terms List of Tables Table II-A PUBLIC IMPROVEMENT DISTRICT BOUNDARIES............................................................ 12 Table II-B WESTERN IMPROVEMENT AREA BOUNDARIES............................................................... 13 Table II-C EASTERN IMPROVEMENT AREA BOUNDARIES................................................................ 14 Table III-A COSTS OF AUTHORIZED IMPROVEMENTS, NON-PID RELATED IMPROVEMENTS, AND UNIVERSITY IMPROVEMENTS .................................................................................. .18 Table IV-A UPDATED COSTS OF UNIVERSITY IMPROVEMENTS ....................................................................................................................21 Table IV-B WESTERN IMPROVEMENT AREA UPDATED ACTUAL COST ALLOCATION............... 24 Table IV-C EASTERN IMPROVEMENT AREA UPDATED ACTUAL COST ALLOCATION ............... 24 Table IV-D UPDATED WESTERN IMPROVEMENT AREA SPECIAL ASSESSMENT ALLOCATION. ....................................................................................................................................................... 28 Table IV-E UPDATED WESTERN IMPROVEMENT AREA ESTIMATED VALUE TO SPECIAL ASSESSMENT RATIOS.......................................................................................................29 Table IV-F UPDATED EASTERN IMPROVEMENT AREA SPECIAL ASSESSMENT ALLOCATION 30 Table IV-G UPDATED EASTERN IMPROVEMENT AREA ESTIMATED VALUE TO SPECIAL ASSESSMENT RATIOS.......................................................................................................30 Table V-A UPDATED MAJOR IMPROVEMENTS PID BONDS SOURCES AND USES ....................... 33 Table V-B ROADWAY IMPROVEMENTS PID BONDS SOURCES AND USES.................................... 34 Table VII-A UPDATED WESTERN IMPROVEMENT AREA SPECIAL BENEFIT SUMMARY ............. 43 Table VII-B 1 2180.021\71999.7 Section I: Plan Description and Defined Terms UPDATED WESTERN IMPROVEMENT AREA SPECIAL BENEFIT SUMMARY— ROADWAY IMPROVEMENTS.................................................................................................44 Table VII-C UPDATED EASTERN IMPROVEMENT AREA SPECIAL BENEFIT SUMMARY..............45 2 2180.021\71999.7 Section I: Plan Description and Defined Terms Section I PLAN DESCRIPTION AND DEFINED TERMS A. Introduction 1. On December 13, 2016, (the "Creation Date"), the City Council (the "City Council") of the City of Fort Worth, Texas (the "City") approved Resolution No. 4724-12-2016, which authorized the creation of the Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) (the "PID") to finance all or a portion of the Actual Costs of the Authorized Improvements for the benefit of certain property in the PID, all of which is located within the city limits of the City. 2. Chapter 372 of the Texas Local Government Code (as amended, the "PID Act"), governs the creation and operation of public improvement districts within the State of Texas. This Service and Assessment Plan, as updated from time to time, (this "SAP") was prepared pursuant to the PID Act. The PID Act requires that a service plan "cover a period of at least five years and must also define the annual indebtedness and the projected costs for improvements." The PID Act also requires a service plan "be reviewed and updated annually for the purpose of determining the annual budget for improvements." The service plan for the PID is described in more detail in Section V herein. 3. The Assessment Rolls for the PID are attached hereto as Appendix A-1 and Appendix AA=2, and are addressed in Section VII of this SAP. The Special Assessments as shown on the Assessment Rolls are based on the method for establishing and levying the Special Assessments described in Sections IV and VI of this SAP. 4. Unless otherwise specified, references in this SAP to a "Section," a "Table," or an "Appendix" shall mean a Section of, a Table in, or an Appendix to this SAP. B. Definitions As used in this SAP, capitalized terms shall have the meanings ascribed to them as follows: 1. "Actual Cost(s)" means, with respect to an Authorized Improvement, the demonstrated, reasonable, allocable, and allowable costs of constructing such Authorized Improvement, as specified in a payment request in a form that has been reviewed and approved by the City. Actual Cost may include (i) the costs incurred for the design, planning, financing, administration/management, acquisition, installation, construction and/or implementation of such Authorized Improvement, (ii) the costs incurred in preparing the construction plans for such Authorized Improvement, (iii) the fees paid for obtaining permits, licenses or other governmental approvals for such Authorized Improvement, (iv) the Project Management Fees, (v) the costs incurred for external professional costs, such as engineering, geotechnical, surveying, land planning, architectural landscapers, advertising, marketing and research studies, appraisals, legal, accounting and similar 3 2180.021\71999.7 Section I: Plan Description and Defined Terms professional services related to the Authorized Improvement, (vi) all labor, bonds and materials, including equipment and fixtures, incurred by contractors, builders and materialmen in connection with the acquisition, construction or implementation of the Authorized Improvement, (vii) all related permitting, zoning and authorized approval expenses, architectural, engineering, legal and consulting fees, financing charges, taxes, governmental fees and charges, insurance premiums, and miscellaneous expenses, and (viii) all payments for Administrative Expenses. 2. "Additional Interest" means the 0.50% additional interest charged on the applicable Special Assessments pursuant to Section 372.018 of the PID Act to fund the Delinquency and Prepayment Reserve, pursuant to Section W.H. 3. "Administrative Expenses" means the administrative, organizational, maintenance and operation costs and expenses associated with, or incident to, the administration, organization, maintenance and operation of the PID, including, but not limited to, the costs of (i) direct and contracted costs incurred by the City including legal counsel, engineers, accountants, financial advisors, investment bankers or other consultants and advisors, (ii) creating and organizing the PID and preparing the Assessment Rolls, (iii) computing, levying, collecting and transmitting the Special Assessments or the Annual Installments thereof, (iv) maintaining the record of Special Assessments, including payments, reallocations and/or cancellations of the Special Assessments or Annual Installments thereof, (v) investing or depositing the Special Assessments or other monies, (vi)complying with the PID Act, arbitrage rebate requirements and/or securities disclosure requirements, (vii) paying the paying agent/registrar's and trustee's fees and expenses (including the fees and expenses of its legal counsel) related to the PID Bonds, and (viii) City costs of administering the construction of the Authorized Improvements. Administrative Expenses shall also include the administrative costs and expenses of issuing, making debt service payments on, and redeeming PID Bonds; provided, however, that for the avoidance of doubt, Administrative Expenses do not include payment of the actual principal of, redemption premium, if any, and interest on PID Bonds. Annual Administrative Expenses collected and not expended shall be carried forward and applied to reduce Administrative Expenses in subsequent years to avoid over collection. 4. "Administrator" means an officer or employee of the City or third party designee of the City who is not an officer or employee thereof, who shall have the responsibilities provided for herein, in an Indenture relating to the PID Bonds or in any other agreement approved by the City Council relating to the PID. 4 2180.021\71999.7 Section I: Plan Description and Defined Terms 5. "Annual Installment" means, with respect to the Assessed Property, each annual payment of. (i) the applicable Special Assessment (including the principal of and interest on), as shown on the Special Assessment Rolls attached hereto as Appendix A-1 and Appendix A-2, as the same may be updated in accordance with this SAP, or in an Annual Service Plan Update, and calculated as provided in Section VI of this SAP, (ii) Administrative Expenses, and (iii) Additional Interest designated for the Delinquency and Prepayment Reserve described in Section IV.H of this SAP. 6. "Annual Service Plan Update" has the meaning set forth in Section V.2 of this SAP. 7. "Assessed Property" or "Assessed Properties" means property within the PID that benefit from the Authorized Improvements and on which Special Assessments have been levied as shown on an Assessment Roll (as the same may be updated each year by the Annual Service Plan Update) and which includes any and all Parcels within the PID other than Non-Benefitted Property. 8. "Assessment Ordinance" means, as applicable, the Major Improvement Assessment Ordinance and/or the Roadway Improvements Assessment Ordinance. 9. "Assessment Roll" means, as applicable, each Assessment Roll included in this SAP as Appendix A-1 and Appendix A-2, as the same may be updated, modified or amended from time to time in accordance with the procedures set forth herein and in the PID Act, including updates prepared in connection with the issuance of any PID Bonds or in connection with any Annual Service Plan Update. 10. "Authorized Improvements" means those improvement, including those listed in Table III-A and described in Section III.B, authorized by Section 372.003 of the PID Act, acquired, constructed or installed in accordance with this SAP, and any future updates and/or amendments, for which Special Assessments are levied against the Assessed Property that receives a special benefit from such improvements. 11. "City" means the City of Fort Worth, Texas. 12. "City Council'means the duly elected governing body of the City. 13. "City Facilities Agreement" means the City's standard community facilities agreement or such other form as the City may require to ensure compliance with its "Community Facilities Agreement (CFA) Policy, Related Ordinance, and Street Design Criteria" last revised by M&C G-13181, March 20, 2001, as the same may be amended from time to time. 14. "County" means Tarrant County, Texas. 15. "Delinquency and Prepayment Reserve" has the meaning set forth in Section IV.H of this SAP. 5 2180.021\71999.7 Section I: Plan Description and Defined Terms 16. "Delinquent Collection Costs" means interest, penalties and expenses incurred or imposed with respect to any delinquent Special Assessment, or an Annual Installment thereof, in accordance with the PID Act which includes the costs related to pursuing collection of such delinquent Special Assessment, or an Annual Installment thereof, and the costs related to foreclosing the lien against the Assessed Property, including attorney's fees to the extent permitted under Texas Law. 17. "Developer" means Walton Development & Management TX, LLC, a Delaware limited liability company or their respective successors and assigns. 18. "Eastern Improvement Area" means the approximately 833 acres of land within the PID located east of Chisolm Trail Parkway and shown on Table II-C. 19. "Eastern Improvement Area Assessment Roll" means the Eastern Improvement Area Assessment Roll included in this SAP as Appendix A-2, as the same may be updated, modified or amended from time to time in accordance with the procedures set forth herein and in the PID Act, including updates prepared in connection with the issuance of PID Bonds or in connection with any Annual Service Plan Update. The Eastern Improvement Area Assessment Roll includes the portion of the Major Improvement Assessment allocable to the Eastern Improvement Area. 20. "Indenture" means, as applicable, the Major Improvement Bonds Indenture and/or the Roadway Improvement Bonds Indenture, or any Indenture related to the refinancing of such Bonds. 21. "Lot" means (i) for any portion of the Property for which a subdivision plat has been recorded in the official real property records of the County, a tract of land described as a "lot" in such subdivision plat, and (ii) for any portion of the Property for which a subdivision plat has not been recorded in the official real property records of the County, a tract of land anticipated to be described as a"lot" in a final recorded subdivision plat. 22. "Land Use" means a classification of final building Lots with similar characteristics (e.g. commercial, light industrial, multifamily residential, single family residential or other uses), as determined or approved by the Administrator and confirmed by the City Council. In the case of single family residential Lots, the Land Use shall be further defined by classifying the residential Lots based on the front footage of the Lot, as determined by the Administrator and approved by the City Council as part of its Annual Service Plan Update. If any change in Land Use requires a change in zoning or other entitlement process, such change must be approved by the City prior to any change in the SAP. 23. "Major Improvements" means, collectively, the Water Improvements and the Sanitary Sewer Improvements described in Section III.B. 24. "Major Improvement Assessment Ordinance" means Assessment Ordinance No. 22832-08-2017 adopted by the City Council on August 15, 2017 which initially approved this SAP and levied the Major Improvement Special Assessments. 6 2180.021\71999.7 Section I: Plan Description and Defined Terms 25. "Major Improvement Special Assessments" means the Special Assessments levied pursuant to the Major Improvement Assessment Ordinance on the Eastern Improvement Area and the Western Improvement Area for the Major Improvements, as shown in the Assessment Rolls. 26. "Major Improvement Bonds" means the City of Fort Worth, Texas, Special Assessment Revenue Bonds, Series 2017 (Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) Major Improvement Project) in original principal amount of $12,685,000, issued by the City under Ordinance No. 22833-08-2017 on August 15, 2017 and secured solely by the Major Improvement Special Assessments levied on the Assessed Property within the Eastern Improvement Area and the Western Improvement Area to finance the Water Improvements and the Sanitary Sewer Improvements. 27. "Major Improvement Bonds Indenture" means that certain Indenture of Trust, dated August 15, 2017, as modified, supplemented or amended from time to time, authorizing the issuance of, and setting forth the terms and other provisions relating to the Major Improvement Bonds, including the collection of Assessments and/or Annual Installments for the repayment of Bonds. 28. "Mandatory Prepayment" "has the meaning set forth in Section VI.0 of this SAP. 29. "Maximum Special Assessment per Unit" means, for each Land Use category, the Special Assessment per unit amounts that will be determined by the PID Administrator and the City at the time that the initial Owner of the Assessed Property enters into a contract for sale of any portion of the Assessed Property to an unaffiliated third party, excluding the University and the City. 30. "Non-Benefitted Property" means Parcels that accrue no special benefit from the Authorized Improvements being funded through the PID, including Public Property, such as the University Property, and easements that create an exclusive use for a public utility property. Property identified as Non-Benefitted Property at the time the Special Assessments (i) are imposed or(ii) are reallocated pursuant to a subdivision of a parcel, is not assessed. Assessed Property converted to Non-Benefitted Property, if the Special Assessments may not be reallocated pursuant to the provisions herein, remains subject to the Special Assessments and requires the Special Assessments to be prepaid as provided for in Section VI.C. 31. "Non-PID Related Improvements" means those improvements described in Section III.B.4 which, although constructed at the same time as Authorized Improvements, do not benefit the Assessed Property and are not paid for by the PID but will be paid by either the City or other property owners not located within the PID. 32. "Owner(s)" means Walton Texas, LP; WUSF 4 Rock Creek, LP, WUSF Rock Creek East, LP or any other entity affiliated with Walton International Group (USA), Inc., or their respective successors and assigns. 7 2180.021\71999.7 Section I: Plan Description and Defined Terms 33. "Parcel" means a defined portion of the Property identified by either a tax map identification number assigned by the Tarrant County Appraisal District for real property tax purposes, by metes and bounds description, by lot and block number in a final subdivision plat recorded in the official real property records of the County, or by any other means determined by the City Council. 34. "PID" means the Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) created by the City pursuant to Resolution No. 4724-12-2016 approved December 13, 2016. 35. "PID Act" means Chapter 372 of the Texas Local Government Code, as amended. 36. "PID Bonds" means any bonds secured by Special Assessments levied against Assessed Property within the PID that may be issued to finance Authorized Improvements, including the Major Improvement Bonds and the Roadway Improvements Bonds, if any. The term PID Bonds also includes any refunding bonds, as contemplated by Section VI.E.3.d. 37. "PID Reimbursement Agreement" means the "PID Reimbursement Agreement - Fort Worth Public Improvement District No. 17 (Rock Creek Ranch)" approved by the City on August 15, 2017, as amended by the Roadway Financing Agreement. 38. "Prepayment Costs" mean interest and expenses to the date of prepayment, plus any additional expenses related to the prepayment allowed by applicable law, reasonably expected to be incurred by or imposed upon the City as a result of any prepayment of a Special Assessment. 39. "Project Engineer" means Goodwin& Marshall, Inc. 40. "Project Management Fees"means the fees as agreed to by the City and the Developer for costs incurred by the Developer for the design, construction and installation of such Authorized Improvement exclusive of any costs related to issuing PID bonds or otherwise financing such Authorized Improvement. The Project Management Fees are set forth in clauses a and b of Section III.13.3. No Project Management Fees will be paid in excess of such estimates. 41. "Property" means the approximately 1,756 acres of land depicted and described by metes and bounds on Exhibit A to Resolution No. 4724-12-2016 as adopted by City Council on December 13, 2016 and is legally described in Appendix B to this SAP and is depicted in Table II.A of this SAP. 42. "Public Property" means real property, located within the boundaries of the PID owned by or irrevocably offered and accepted for dedication to the federal government, the State of Texas, the County, the City, a school district, a public university, a public utility provider or any other political subdivision or public agency, whether in fee simple, 8 2180.021\71999.7 Section I: Plan Description and Defined Terms through an easement, by plat or otherwise. Public Property includes the University Property. 43. "Roadway Improvement Assessment Ordinance" means Assessment Ordinance No. -— adopted by the City Council on [May _, 20181 which approved the updates to the SAP relating to the issuance of the Roadway Improvement Bonds and levied the Roadway Improvement Special Assessments. 44. "Roadway Improvement Bonds Indenture" means that certain Indenture of Trust, dated , 2018, as modified, supplemented or amended from time to time, authorizing the issuance of, and setting forth the terms and other provisions relating to the Roadway Improvement Bonds, including the collection of Assessments and/or Annual Installments for the repayment of Bonds. 45. "Roadway Improvement Bonds" means the City of Fort Worth, Texas Special Assessment Revenue Bonds, Series 2018 (Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) Roadway Improvement Project) secured by Roadway Improvement Special Assessments levied on the Assessed Property within the Western Improvement Area to finance the Roadway Improvements for the benefit of such Assessed Property in the Western Improvement Area. 46. "Roadway Improvement Special Assessment" means the Special Assessment levied pursuant to the Roadway Improvement Assessment Ordinance on the Assessed Property within the Western Improvement Area for the Roadway Improvements, as shown in the Western Improvement Area Assessment Roll. 47. "Roadway Improvements" means those Authorized Improvements described in Section III.B.3.b of this SAP. 48. "Roadway Financing Agreement" means that certain "Financing Agreement and Limited Amendment to PID Reimbursement Agreement – City of Fort Worth / Rock Creek Ranch / Chisolm Trail Ranch – Brewer Road Project" by and among the City, Walton Development & Management TX, LLC, and WM Sub CTR, LP, a Texas limited partnership, dated as of [ , 20181, which sets forth the parties agreement as to the financing of the Roadway Improvements and the Non-PID Related Improvements as described Section III.B.4.b. 49. "Sanitary Sewer Improvements" has the meaning set forth in Section III.B.3.a.ii of this SAP. 50. "Service and Assessment Plan" or "SAP" means this Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) Service and Assessment Plan approved by the City Council pursuant to the Major Improvement Assessment Ordinance, updated to include the Roadway Improvement Special Assessment pursuant to the Roadway Improvement Assessment Ordinance, and as otherwise amended, supplemented or updated by the City Council from time to time. 9 2180.021\71999.7 Section I: Plan Description and Defined Terms 51. "Special Assessment" means, as applicable, the Major Improvement Special Assessments and/or the Roadway Improvement Special Assessments levied against a Parcel imposed pursuant to an Assessment Ordinance and the provisions herein, as shown on any Assessment Roll, subject to reallocation upon the subdivision or reduction of such Parcel according to the provisions hereof and the PID Act. 52. "Trustee" means the trustee as specified in the applicable Indenture, and any successor thereto permitted under such Indenture. 53. "University Improvements" has the meaning set forth in Section IV.A.2. 54. "University Property" is approximately 80 acres of land and is Public Property and Non-Benefitted Property, as described in Section IVA.2. 55. "Water Improvements" has the meaning set forth in Section III.B.3.a.ii of this SAP. 56. "Western Improvement Area" means the approximately 923 acres of land, within the PID located west of Chisolm Trail Parkway as shown on Table II-B. 57. "Western Improvement Area Assessment Roll" means the Western Improvement Area Assessment Roll included in this SAP as Appendix A-1, may be updated, modified or amended from time to time in accordance with the procedures set forth herein and in the PID Act, including updates prepared in connection with the issuance of PID Bonds or in connection with any Annual Service Plan Update. The Western Improvement Area Assessment Roll includes the portion of the Major Improvement Special Assessment allocable to the Western Improvement Area and the Roadway Improvement Special Assessment. 10 2180.021\71999.7 Section II: Property Included in the PID Section II PROPERTY INCLUDED IN THE PID A. Property Included in the PID 1. The PID is comprised of the Property shown in Table II-A, which is legally described in Appendix B. The PID, encompassing approximately 1,756 acres, is located entirely within the corporate limits of the City. It is anticipated that the Property will be developed to include approximately 4,919 single family residential homes, approximately 2,520 multi-family residential units, approximately 3,778,830 square feet of commercial space and approximately 960,000 square feet planned as a public university. 2. The Western Improvement Area, encompassing approximately 923 acres is depicted on Table II-B and will include approximately 2,471 single family residential homes, approximately 2,520 multi-family residential units, and approximately 1,274,130 square feet of commercial space. The Western Improvement Area includes the University Property, which will include approximately 960,000 square feet planned as the Tarleton State University — Fort Worth campus. No improvements benefitting the University Property will be financed by Special Assessments in the PID. The Western Improvement Area, save and except for the University Property, is legally described and the Parcels within the Western Improvement Area are shown in Appendix B-1. 3. The Eastern Improvement Area, encompassing approximately 833 acres is depicted on Table II-C and will include approximately 2,448 single family residential homes and approximately 2,504,700 square feet of commercial space. The Eastern Improvement Area is legally described and the Parcels within the Eastern Improvement Area are shown in Appendix B-2. 11 2180.021171999.7 Section 11: Property Included in the PID TABLE 11-A Public Improvement District Boundaries -11MIS 1/Q-------, W7 1w ak 713M LLI It L 12 2180.021\71999.7 Section 11: Property Included in the PID TABLE 11-B Western Improvement Area Boundaries IrACT at i a z f 6. 13 2180.021\71999.7 Section II: Property Included in the PID TABLE Il-C Eastern Improvement Area Boundaries ' I r x. i-- � 14 2180.021\71944.7 Section III: Description of Authorized Improvements Section III DESCRIPTION OF THE AUTHORIZED IMPROVEMENTS A. Authorized Improvement Overview 1. Section 372.003 of the PID Act identifies the improvements that a City may choose to undertake with the establishment of a PID. The Authorized Improvements identified in the PID Act include: a) landscaping; b) erection of fountains, distinctive lighting, and signs; c) acquiring, constructing, improving, widening, narrowing, closing, or rerouting of sidewalks or of streets, any other roadways, or their rights-of way; d) construction or improvement of pedestrian malls; e) acquisition and installment of pieces of art; f) acquisition, construction or improvement of libraries; g) acquisition, construction or improvement of off-street parking facilities; h) acquisition, construction, improvement or rerouting of mass transportation facilities; i) acquisition, construction, or improvement of water, wastewater, or drainage facilities or improvements; j) the establishment or improvement of parks; k) projects similar to those listed in Subdivisions (i)-(x) 1) acquisition, by purchase or otherwise, of real property in connection with an authorized improvement; m) special supplemental services for improvement and promotion of the district, including services relating to advertising, promotion, health and sanitation, water and wastewater, public safety, security, business recruitment, development, recreation and cultural enhancement; n) payment of expenses incurred in the establishment, administration and operation of the district; and o) the development, rehabilitation, or expansion of affordable housing. 2. The City has determined to undertake the Authorized Improvements described in Section III.B. Any change to the Authorized Improvements will require the approval of the City. 15 2180.021171999.7 Section III: Description of Authorized Improvements B. Descriptions and Costs of the Authorized Improvements 1. The Authorized Improvements are described below and depicted in Appendix C. Table III- A shows the Actual Costs of the Authorized Improvements which are being funded by Special Assessments levied against Assessed Property in the PID. Table III-A also shows the actual costs of the University Improvements and the Non-PID Related Improvements, which are not being funded by the PID. The costs shown in Table III-A may be revised in Annual Service Plan Updates. 2. The Authorized Improvements confer a special benefit on the Assessed Property within the PID. The Actual Costs of the Major Improvements are being funded from: (i) the net proceeds of the Major Improvement Bonds, and (ii) funds deposited by the Developer with the Trustee for the Major Improvement Bonds. Under the terms of the PID Reimbursement Agreement, the Developer is responsible for paying any cost overruns for the Major Improvements. The Actual Costs of the Roadway Improvements are to be funded from: (i) the net proceeds of the Roadway Improvement Bonds when issued; (ii) funds contributed by the Developer with the Trustee for the Roadway Improvement Bonds, and (iii) funds contributed by the City, in accordance with the Roadway Financing Agreement and as described herein. Under the terms of the Roadway Financing Agreement, the Developer and the City have agreed to share certain cost overruns related to the Roadway Improvements and the Developer has agreed to remain solely responsible for certain other cost overruns. 3. The Authorized Improvements are described as follows: a. Major Improvements i. Water Improvements - The water improvements ("Water Improvements") consist of the construction and installation of waterlines, mains, pipes, valves and appurtenances, necessary for the water distribution system that will service all of the Assessed Property within the PID. The Water Improvements will be constructed according to City standards, determined in the City's sole discretion. The Actual Costs of the Water Improvements are $2,759,319. Included within such Actual Costs are Project Management Fees of$95,420 which will be paid to the Developer on a percentage of completion basis. ii. Sanitary Sewer Improvements - The sanitary sewer improvements ("Sanitary Sewer Improvements") consist of construction and installation of pipes, service lines, manholes, encasements and appurtenances necessary to provide sanitary sewer service to all of the Assessed Property within the PID. The Sanitary Sewer Improvements will be constructed according to City standards, determined in the City's sole discretion. The Actual Costs of the Sanitary Sewer Improvements are $5,724,317. Included within such Actual Costs are Project Management Fees of $222,039 which will be paid to the Developer on a percentage of completion basis. 16 2180.021\71999.7 Section III: Description of Authorized Improvements b. Roadway Improvements i. Roadway Improvements — The roadway improvements ("Roadway Improvements") consist of the construction of paving, storm drainage, retaining walls, signage, and traffic control devices which benefit the Assessed Property within the Western Improvement Area and the acquisition of right of way within the Western Improvement Area. The Roadway Improvements are not being funded by the Major Improvement Bonds, but are being funded by the following sources: (i) the net proceeds of the Roadway Improvement Bonds, secured by the Roadway Improvement Special Assessments levied by the Roadway Improvements Assessment Ordinance, (ii) funds contributed by the Developer with the Trustee for the Roadway Improvement Bonds, and (iii) funds contributed by the City, in accordance with the Roadway Financing Agreement and as described herein in Section IV.A.6. The Roadway Improvements will be constructed according to City standards, determined in the City's sole discretion. The Actual Costs of the Roadway Improvements that are to be financed in part from the net proceeds of the Roadway Improvement Bonds and in part from separate funds of the City under the terms of the Financing Agreement are $6,931,647 and do not include the costs of associated University Improvements in the amount of $657,992 that will paid as described in Section IV.A.2. Of the Actual Costs of the Roadway Improvements that will be financed from the net proceeds of the Roadway Improvement Bonds under the terms of the Financing Agreement, $562,555 will be applied as follows: (i) $342,489 for costs of the right-of-way (ROW) for the Roadway Improvements, (ii) $83,070 for Project Management Fees, and (iii) $136,996 financing soft costs of the Developer. The Actual Costs of the Roadway Improvements do not include the costs of associated University Improvements in the amount of$657,992 that will paid as described in Section IV.A.2. The Actual Costs for the Project Management Fees will be paid to the Developer on a percentage of completion basis. According to the Developer, the original estimates for the Roadway Improvements were based on the preliminary designs and projected material costs at the time the initial estimates were prepared. The original estimates have since been updated by the Project Engineer to reflect updated designs, changes in City thoroughfare standards for sidewalks, street lights and piping and current bid prices and such updated costs have been reviewed by the City. Table III-A below shows the updated Actual costs of the Roadway Improvements. 17 2180.021\71999.7 Section III: Description of Authorized Improvements ,�. Table III-A Cost of Authorized Improvements,Non-PID Related Improvements and University Improvements Actual Costs of University Authorized Non-PID Related Improvements Total Costs of _Description Improvemanls[8} Impresrrernenk6(a� Improvements(b) M r Improvements Water $2,759,319 $98,570 $155,045 $3,012,934 nitary$O"r $5,724,317 $1,012,477 $331,239 57,068.033 Total Major Improvements $8,483,636 $1,111,047 $486,284 $10,080,967 Idway Improvements Roadway(c) $6.931,647 $1,874.596 $657,992 $5.464.235 Total Roadway Improvements 55,931,647 $1.874,596 $$657.992 $9.464,235 (a)The Actual Costs of the Major Improvements will be funded by the proceeds of the Major Improvement Bonds,the costs of the Non-PID Related IM prr,-Vemen45 will be funded by lawfully available funds of the City and private funds of the Developer and the University Improvements will be lurtdiid by private funds of the Developer.The Actual Costs of the Roadway Improvements will be funded in part by the proceeds of the Roadway Imprfivernenf Bonds and in part by the City under the terms of the Roadway Financing Agreement The costs of the Non-PID Related Improvements and the University Improvements will be funded by separate funds of the City and other private funding sources under the terms of the Roadway r4nancing Agreement I b)Updated costs provided by the Project Engineer and include project management,soft costs and contingency allocations.According to the Developer,the Actual Costs for the water and sanitary sewer improvements remains the same as the initial budget and the water improvements .porticin and the sanitary sewer improvement portion of the Non-PID Related Improvements increased by$98,570 and$187,389,respectively.The figu res shown In Table III-A will be revised in Annual Service Plan Updates. Ic I The Roadway Improvements costs of$6,931,617 will be funded by lawfully available funds of the City of Fort Worth In the amount of$3,184,546 and from the net proceeds of the Roadway Bonds in the amount of$3,747,101.The Non-PID Related Improvements(Chisholm Trail improvements) +m the amount of$1,874,696 will be funded by lawfully available funds of the City in the amount of$1,239,594 and the balance of$635,002 will be funded with private funds of the developer of the Chisholm Trail Ranch project The City is expected to appropriate its portion of the Roadway 1mPrcvsment%concurrently with the issuance of the Roadway Improvement PID Bonds.The University Roadway Improvements($867,992),will be Funded with private funds of the Developer deposited with the Trustee for the Roadway Improvement Bonds.The Roadway Improvements also I nc]Lkd4$375,000 for the acquisition right of way,$90,956 for project management fees and$150,000 in Developer bond financing costs that are arlooarad between the PID and the University Property based on the total acreage of the University Property within the Western Improvement Area and the University Property portion of these costs will be funded by the Developer.The total acreage of the University Property is approximately 80 acres and the Wesi.em Improvement Area is approximately 922.763 acres.As a result,the proportional share of the University Property is 8,87%(80 43$,76+3=8.67%rounded I. 4. The Non-PID Related Improvements consist of the following: a. Sanitary Sewer Improvements: i. The Non-PID Related Improvements associated with the Sanitary Sewer Improvements consist of oversizing additions to the system in order to accommodate future growth in adjacent areas. The Non-PID Related Improvements associated with the Sanitary Sewer Improvements do not benefit the Assessed Property within the PID. ii. The Non-PID Related Improvements associated with the Sanitary Sewer Improvements in the amount of $1,012,477 will be funded 100% by the City concurrent with the Actual Costs for the Sanitary Sewer Improvements being funded by the Developer and the proceeds of the Major Improvement Bonds through one or more City Facilities Agreement to be executed separate and apart from this SAP. b. Roadway Improvements i. The Non-PID Related Improvements associated with the Roadway Improvements consist of an extension of Brewer Road to serve property not located within the PID. The Non-PID Related Improvements associated with the Roadway Improvements serve property not located within the PID and do not provide a special benefit to the 18 2180.021\71999.7 Section III: Description of Authorized Improvements Assessed Property within the PID; however, such improvements are integral to the overall development of the Property within the PID. ii. As set forth in the Roadway Financing Agreement, the Non-PID Related Improvements associated with the Roadway Improvements are anticipated to be funded equally by the City and the owners of Chisolm Trail Ranch, an adjoining development being developed by an affiliate of the Developer. c. Water Improvements i. Subsequent to the issuance of the Major Improvement Bonds, additional Non-PID Related Improvements associated with the Water Improvements consisting of oversizing additions to the water system were agreed to by the Developer and the City in order to accommodate future growth in adjacent areas. The Non-PID Related Improvements associated with the Water Improvements are not required to service the Assessed Property within the PID. ii. The Non-PID Related Improvements associated with the Water Improvements in the amount of$98,570 will be funded 100% by the City concurrent with the Actual Costs for the Water Improvements being funded by the Developer and the proceeds of the Major Improvement Bonds through a City Facilities Agreement executed separate and apart from this SAP. 19 2180.021\71999.7 Section IV: Assessment Plan Section IV ASSESSMENT PLAN A. Introduction 1. The PID Act requires the City Council to apportion the cost of the Authorized Improvements based on the special benefits conferred to each Parcel from the Authorized Improvements. The PID Act provides that the Actual Costs may be assessed: (i) equally per front foot or square foot; (ii) according to the value of the property as determined by the governing body, with or without regard to improvements on the property; or (iii) in any other manner that results in imposing equal shares of the cost on property similarly benefited. The PID Act further provides that the City Council may establish the methods of assessing the special benefits for various classes of improvements. 2. Certain improvements related to the Authorized Improvements are being constructed on the University Property. In addition, certain improvements related to the Authorized Improvements are being constructed elsewhere in the PID which serve the University Property. These improvements constructed on or otherwise serving the University Property are referred to herein as the "University Improvements." The costs of the University Improvements will be funded directly by the Developer. No University Improvements will be financed by Special Assessments or the proceeds of PID Bonds nor will any Special Assessments be levied in the future for the purpose of reimbursing the Developer for the costs of the University Improvements. The University Improvements are being paid from funds deposited by the Developer concurrently with the issuance of the Major Improvement Bonds and the Roadway Improvement Bonds and will not be paid by Special Assessments or the proceeds of PID Bonds; and, therefore, the University Property shall be treated as Non-Benefitted Property. The actual costs of the University Improvements related to the Authorized Improvements consisting of the Water Improvements and Sanitary Sewer Improvements have been determined on the basis of the estimated usage, as determined by the Project Engineer, of all Authorized Improvements in the District consisting of Water Improvements and Sanitary Sewer Improvements applicable to the University Property. The actual costs of the University Improvements related to the Authorized Improvement benefitting the Western Improvement Area consisting of the Roadway Improvements has been determined on the basis of the University Property's pro- rata share of the total acreage of the Western Improvement Area. Table IV-A describes the updated costs of the University Improvements. 20 2180.021\71999.7 Section IV: Assessment Plan Table IV-A Non-Benefitted Area Updated Non-Benefitted Area Costs of University Improvements-Major Improvements and Roadway Improvements(not to be financed by the PID City of Fort Chisholm Trail Worth Non-PID Ranch Non-PID Total Non-PID University Related Related Related Total Costs- University Authorized Share% Description Total Costs(a)Improvements Improvements Improvements Project Improvements Improvements (b) Major Improvements Water $ 3,012,934 $ 98,570 $ $ 98,570 $ 2,914,364 $ 155,045 $ 2,759,319 5.30% Sanitary Sewer $ 7,068,033 $ 1,012,477 $ $ 1,012,477 $ 6,055,556 $ 331,239 $ 5,724,317 5.50% Total Major Improvements $ 10,080,967 $ 1,111,047 $ $ 1,111,047 $ 8,969,920 $ 486,284 $ 8,483,636 Roadway Improvements Roadway $ 9,464,235 $ 1,239,594 $ 635,002 $ 1,874,596 $ 7,589,639 $ 657,992 $ 6,931,647 8.67% Total Roadway Improvement $ 9,464,235 $ 1,239,594 $ 635,002 $ 1,874,696 $ 7,589,639 $ 667,992 $ 6,931,647 (a)Total Costs include the Actual Costs of Authorized Improvements,the Non-PID Related Irnprovements and the University Improvements per Table 111-A, lb)Percentages for the University Property and for the Roadway Improvements based on the University Property's pro-rata share ofthe total Western Improvement Area acreage as shown in Nob (c)in Table 111-A. According to the Developer, the original estimates for the Roadway Improvements were based on the preliminary designs and projected material costs at the time the initial estimates were prepared. The original estimates have since been updated by the Project Engineer to reflect updated designs, changes in City thoroughfare standards for sidewalks, street lights and piping and current bid prices and such updated costs have been reviewed by the City. Table IV-A above shows the updated Actual costs of the Major Improvements and the Roadway Improvements (as described in Section III and shown in Table III-A), as well as the updated costs of the University Improvements related to the Roadway Improvements based on the University Property's pro-rata share of the total acreage of the Western Improvement Area as described in Section IV.A.2 above. Additionally, the Owners and the City anticipate dedicating approximately 12 acres of property to the City for use as a police, fire or other public facility. Upon such conveyance, the provisions of Section VI.0 shall apply and a Mandatory Prepayment shall be calculated in accordance with the terms of this Service and Assessment Plan. 3. The Major Improvements benefit the all of the Assessed Property within the PID (in both the Eastern Improvement Area and the Western Improvement Area), while the Roadway Improvements benefit only the Assessed Property within the Western Improvement Area. The Actual Costs of the Major Improvements were allocated to the Assessed Property in the District (in both the Eastern Improvement Area and the Western Improvement Area) based on estimated build out value as described in Section IV.E, below, which resulted in imposing equal shares of cost on properties similar benefitted. The Actual Costs of the Roadway Improvements are being allocated solely to the Assessed Property in the Western Improvement Area because the Roadway Improvements benefit only the Assessed Property within the Western Improvement Area. The Actual Costs of the Roadway Improvements are allocated to the Assessed Property within the Western Improvement Area based on updated estimated build out value calculated in Appendix A-3 based on the updated development plan provided by the Developer and described in Section IV.E, below, which will result in imposing equal shares of cost on properties similar benefitted. 4. Table IV-B details the updated allocation of costs of the Authorized Improvements to the Western Improvement Area Assessed Property based on the updated development plan and related updated projected build out values shown in Appendix A-3. 21 2180.021\71999.7 Section IV: Assessment Plan 5. Table IV-C details the updated allocation of costs of the Authorized Improvements to the Eastern Improvement Area Assessed Property based on the updated development plan and related updated projected build out values shown in Appendix A-3. 6. The Roadway Improvement Assessment Ordinance levying the Roadway Improvement Special Assessments approves the updates to this Service and Assessment Plan contained herein, including the updated Assessment Rolls. 7. This Section IV is intended to describe the special benefit conferred upon each Parcel or Lot as a result of the Authorized Improvements, to provide the basis and justification for the determination that this special benefit exceeds the amount of the Special Assessments, and to explain the methodologies by which the City Council allocates and reallocates the special benefit of the Authorized Improvements to Parcels or Lots so that there is an equal share of the Actual Cost being apportioned to Parcels or Lots similarly benefited. The determination by the City Council of the assessment methodology set forth below is the result of the discretionary exercise by the City Council of its legislative authority and governmental powers, consistent with the PID Act, and is conclusive and binding on the Owners and all future owners and developers of any Assessed Property. B. Special Benefit 1. The Assessed Property must receive a direct and special benefit from the Authorized Improvements, which must be equal to or greater than the amount of the Special Assessments. 2. The Major Improvements are provided for the benefit of all of the Assessed Property in the PID (in both the Eastern Improvement Area and the Western Improvement Area). The Roadway Improvements are being provided only for the benefit of the Assessed Property in the Western Improvement Area. 3. When the City Council initially approved this SAP, the Owners owned 100% of the Assessed Property within the PID. In connection with the issuance of the Major Improvement Bonds, the Owners executed a consent certificate that acknowledged the Major Improvements confer a special benefit on the Assessed Property and consented to the levy of the Major Improvement Special Assessments to pay for the Actual Costs associated therewith. 4. When the City Council approves this SAP update, the Owners will still own 100% of the Assessed Property within the PID. In connection with the issuance of the Roadway Improvement Bonds, the Owners will execute a consent certificate that (i) acknowledges that the Roadway Improvements confer a special benefit on the Assessed Property within the Western Improvement Area and that the Major Improvements confer a special benefit on the Assessed Property within the entire PID (in both the Eastern Improvement Area and the Western Improvement Area), (ii) consents to the levy of the Roadway Improvement Special Assessments to pay for the Actual Costs of the Roadway Improvements as shown on the updated Western Improvement Assessment Rolls; and (iii) consents to the reallocation of the Major Improvement Special Assessments to pay for the Actual Costs of the Major 22 2180.021\71999.7 Section IV: Assessment Plan Improvements based on the updated development plan and updated estimated build-out value as shown on the updated Assessment Rolls. 5. If the Special Assessment for the Assessed Property prior to subdivision exceeds the sum of the Special Assessments for all newly divided Assessed Properties after such reallocation, the excess amount shall be prepaid as a Mandatory Prepayment as provided under Section VI.0 herein. As of the date of this SAP update, there has been no subdivision of Assessed Property and no Mandatory Prepayment triggered under Section VI.C. 6. The City Council determined that funding a portion of the Actual Costs for the Major Improvements through the issuance of the Major Improvement Bonds secured by the Major Improvement Special Assessments is beneficial to the City and confers a special benefit to the Assessed Property within the PID. Such special benefit exceeds or equals the amount of the Major Improvement Special Assessments levied on the Assessed Property within the PID. This conclusion is supported by the evidence, information, and testimony provided to the City Council. 7. The Eastern Improvement Area and the Western Improvement Area are separated by the Chisholm Trail Parkway (the "Parkway"). Within the PID, no roadway access currently exists through the Parkway to connect the two improvement areas. As a result, the Roadway Improvements do not provide access and, therefore, consistent with Section IV.B.2 above, do not confer any special benefit to the Eastern Improvement Area. The City Council has therefore determined that no special benefit is conferred on the Eastern Improvement Area by virtue of the Roadway Improvements, and that the Eastern Improvement Area cannot be assessed any portion of the costs thereof. The City Council has also determined that funding a portion of the Actual Costs for the Roadway Improvements through the issuance of the Roadway Improvement Bonds secured by the Roadway Improvement Special Assessments is beneficial to the City and confers a special benefit to the Assessed Property within the Western Improvement Area. Such special benefit exceeds or equals the amount of the Roadway Improvement Special Assessments levied on the Assessed Property within the Western Improvement Area. This conclusion is supported by the evidence, information, and testimony provided to the City Council. C. Allocation of Actual Costs to the Western Improvement Area Major Improvements 1. In the Major Improvement Assessment Ordinance, the City Council determined that the Major Improvements benefit all of the Assessed Property within the PID and allocated the Actual Costs of the Major Improvements to the Western Improvement Area Assessed Property. As described below, the Actual Costs of the Major Improvements have since been updated based on the updated development plan and updated estimated build-out value as shown in Table IV-B. The Actual Costs of the Major Improvements are subject to revision through the Annual Service Plan Updates, but may not result in increased Special Assessments except as authorized under this SAP or the PID Act. 23 2180.021\71999.7 Section IV: Assessment Plan As shown in Appendix A-3 and Table IV-D, the revised total estimated buildout value of Lots and Parcels within the Western Improvement Area and Eastern Improvement Area are $1,316,418,000 and $1,235,340,000 respectively, resulting in an estimated $2,551,758,000 in total buildout value within the PID. Accordingly, the proportionate share of the Major Improvements consisting of the Water Improvements and Sanitary Sewer Improvements allocated to the Western Improvement Area is 51.59% ($1,316,418,000 _ $2,551,758,000 = 51.59%). Table IV-B shows the updated allocation of Actual Costs to the Western Improvement Area. Table IV-B Western Improvement Area 1.1~Actual Cost Allocation City of Fort Chisholm Trail Western Worth Non-PID Ranch Non- Improvement Related PID Related University Total Costs- Area Share of Authorized Improvements Total Costs(a) Improvements Improvements Improvements Project Costs(c) Water $ 3,012,934 $ 98,570 $ $ 155,045 $ 2,759,319 $ 1,423,496 Sanitary Sewer $ 7,068,033 $ 1,012,477 $ - $ 331,239 $ 5,724,317 $ 2,953,099 Roadway(b) $ 9,464,235 $ 1,239,594 $ 635,002 $ 657,992 $ 6,931,647 $ 6,931,647 Total Authorized Improvement' $ 19,545,202 $ 2,350,641 $ 635,002 $ 1,144,276 $ 15,415,283 $ 11,308,242 lis)See Table III-Aand III-A-1 for details. #1 The Roadway Improvements costs of$6,931,617 will be funded by lawfully available funds of the City of FortWorth in the amount of$3,184,646 and from the nat proceeds of the Roadway Bonds in the amount of$3,747,101.The Non-PID Related Improvements in the amount of$1,239,594 will be funded by the Cityand Ws balance of$635,002 will be funded with private funds of the Developer.The Unlversitylmprovem ants will be fullyfunded with private funds of the Dvrdspsr. Percentages for Water and Sanitary Sewer Improvements were detemNned based on the Western Improvement Area's ratio of the revised estimated build nu of each Lot or Parcel($1,316,418,000 or S1.59%)to the total build out value for all Lots and Parcels within the PID($$551,758,000)and for the Roadway amertta on the University Propertys pro-rata share of the total Western Improvement Area acreage.Until a Maximum Special Assessment Per Unit Is set provided in Section VIX of the SAP,the ratios based on the rev lead estimated build out value of each Lot or Parcel are subject to change based on updates a>q and related gaMwto estimated build out value. Roadway Improvements 1, The Roadway Improvements will provide a special benefit to only the Western Improvement Area Assessed Property. The Actual Costs detailed in Table IV-B are updated to reflect the updated Roadway Improvements budget. D. Allocation of Actual Costs to the Eastern Improvement Area 1. In the Major Improvement Assessment Ordinance, the City Council determined that the benefit all of the Assessed Property within the PID and allocated the Actual Costs of the Major Improvements to the Eastern Improvement Area Assessed Property. As described below, the Actual Costs of the Major Improvements has been updated based on the updated development plan and updated estimated build-out value as shown in Table IV-C. The Actual Costs of the Major Improvements are subject to revision through the Annual Service Plan Updates, but may not result in increased Special Assessments except as authorized under this SAP or the PID Act 24 2180.021\71999.7 Section IV: Assessment Plan Table IV-C Eastern Improvement Area Upd%W d Actual Cost Allocation Chisholm Trail Eastern City of Fort Worth Ranch Non-PID Improvement Non-PID Related Related University Total Costs- Area Share of Authorized Improvements Total Costs i'l Improvements Improvements Improvements Project costs 11) Water $ 3,012,934 $ 98,570 $ $ 155,045 $ 2,759,319 $ 1,335,823 Sanitary Sewer $ 7,068,033 $ 1,012,477 $ $ 331,239 $ 5,724,317 $ 2,771,218 Roadway IW $ 9,464,235 $ 1,239,594 $ 635,002 $ 657,992 $ 6,931,647 $ - Total Authorized Im rovements $ 19,545,202 $ 2,350,641 $ 635,002 $ 1,144,276 $ 15,415,283 $ 4,107,041 Ra)See Table IIIA and III-A-1 for details. I(bl Thr Roadway Improvements costs of$6,931,617 will be funded by lawfully available funds of the City of FortWorth in the amount of 13,164,546 and from the riot proceeds of the IRma*M trariow in the amount of$3,747,101.The Non-PID Related improvements in the amount of 51,239,594 will be funded bythe City and the balance of$835,002 will be funded th ptlrlvim ftwAs d thn Developer.The University Improvenrrts will be fully funded with private funds of the Developer. fs1 Percentages for water and San"Sewer Improverrenrts were determined based on the Eastern Improvement Area's ratio of the revised estimated build out value ofeachlLnt mrPaPM r$1.Pt m"W st Wil" 14 Ht mall build out value for all Lots and Parcels within the PID($2,551,758,000).Until a Muimum Speclsl Assessment Per Unit is set as prwok"in Seaton A.E of the SAP,the ratios based on the revised estimated build out value of each Lot or Parcel are subject to change based on updates to tins development plah and related changes to estimated build out value. As shown in Appendix A-3 and Table IV-H, the revised total estimated buildout value of Lots and Parcels within the Western Improvement Area and Eastern Improvement Area are $1,316,418,000 and $1,235,340,000 respectively, resulting in an estimated $2,551,758,000 in total buildout value within the PID. Accordingly, the proportionate share of the Major Improvements consisting of the Water Improvements and Sanitary Sewer Improvements allocated to the Eastern Improvement Area is 48.41% ($1,235,340,000 - $2,551,758,000 = 48.41%). Table IV-C shows the updated allocation of Actual Cost to the Eastern Improvement Area. E. Assessment Methodology 1. The City Council may assess all or a portion of the Actual Costs against Assessed Property so long as the special benefit conferred upon the Assessed Property by the Authorized Improvements equals or exceeds the amount of the Special Assessments. All or a portion of the Actual Costs may be assessed using any methodology that results in the imposition of equal shares of the Actual Costs on Assessed Property similarly benefited. For purposes of this SAP, the City Council has determined that the Actual Costs of a portion of the Major Improvements shall be allocated to the Assessed Property within the PID by spreading the entire Major Improvement Special Assessment across all of the Assessed Property within the PID (both the Eastern Improvement Area and Western Improvement Area) based on the ratio of the estimated build out value of each Land Use therein to the total build out value for all Land Uses. For purposes of this SAP, the City Council has also determined that the Actual Costs of a portion of the Roadway Improvements shall be allocated to the Assessed Property within the Western Improvement Area of the PID by spreading the entire Roadway Improvement Special Assessment across all of the Assessed Property within the Western Improvement Area of the PID. Table IV-D summarizes the assessment methodology described in this Section IV.E.2 for the Major Improvement Special Assessment and the Roadway Improvement Special Assessment. Table IV-D also summarizes for each Land Use of Assessed Property within the Western Improvement Area: (1) the Major Improvement Special Assessment for each Land Use; (2) the projected average Annual Installment of the Major Improvement Special Assessment for each Land Use; and 25 2180.021\71999.7 Section IV: Assessment Plan (3) the projected average Annual Installment of the Major Improvement Special Assessment as an equivalent tax rate for each Land Use based on estimated build out value. Table IV-D also summarizes for each Land Use of Assessed Property within the Western Improvement Area: (1) the Roadway Improvement Special Assessment for each Land Use; (2) the projected average Annual Installment of the Roadway Improvement Special Assessment for each Land Use; and (3) the projected average Annual Installment of the Roadway Improvement Special Assessment as an equivalent tax rate for each Land Use based on estimated build out value. Table IV-D also summarizes for each Land Use of Assessed Property within the Western Improvement Area: (1) the combined Major Improvement Special Assessment and Roadway Improvement Special Assessment for each Land Use; (2) the combined projected average Annual Installment of the Major Improvement Special Assessment and Roadway Improvement Special Assessment for each Land Use; and (3) the combined projected average Annual Installment of the Major Improvement Special Assessment and Roadway Improvement Special Assessment as an equivalent tax rate for each Land Use based on estimated build out value. a. The City Council has determined that the benefit to the Assessed Property in the Eastern Improvement Area and the Western Improvement Area from the Major Improvements is at least equal to the Major Improvement Special Assessments levied thereon. b. The Major Improvement Special Assessments and the Annual Installments thereof for Assessed Property located in the Western Improvement Area are shown on the Western Improvement Area Assessment Roll attached as Appendix A-1. The Major Improvement Special Assessments and Annual Installments thereof for Assessed Property located in the Eastern Improvement Area are shown on the Eastern Improvement Area Assessment Roll attached as Appendix A-2. No Special Assessment shall be changed except as authorized by this SAP and the PID Act. Table IV-F summarizes the updated allocation of the Major Improvement Special Assessment to the Eastern Improvement Area Assessed Property based on the updated development plan and updated estimated buildout value provided by the Developer and shown in Appendix A-3. Table IV-G summarizes the updated estimated build out value to the Major Improvement Special Assessments ratio for the Eastern Improvement Area Assessed Property based on the updated development plan and updated estimated buildout value provided by the Developer and shown in Appendix A-3. c. The Roadway Improvement Special Assessments are being levied only on the Assessed Property within the Western Improvement Area of the PID pursuant to the Roadway Improvement Assessment Ordinance approving this updated Service and Assessment Plan. 2. In the Major Improvement Bonds Indenture, the City reserved the right to issue Roadway Improvement Bonds secured by Roadway Improvement Special Assessments levied at a future date to finance the Roadway Improvements. Pursuant to Section 13.2(c) of the Indenture for the Major Improvement Bonds, the issuance of Roadway Improvement Bonds was subject to the following: 26 2180.021\71999.7 Section IV: Assessment Plan a. There are no delinquent Major Improvement Special Assessments at the time the Roadway Improvement Bonds are to be issued; b. The City and Developer are each in full compliance with their respective continuing disclosure agreements entered into in connection with the Major Improvement Bonds pursuant to Rule 15c2-12 adopted by the SEC under the Securities Exchange Act of 1934; c. Either (a)the Major Improvements have been completed, or (b)the Project Engineer shall have certified in writing to the City prior to the levy of Roadway Improvement Special Assessments for the Roadway Improvement Bonds, that there are sufficient funds in the form of cash available to complete the Major Improvements; and d. The City will have determined that there are sufficient funds in the form of cash on hand to fund the construction of all of the planned roadway improvements (other than the Roadway Improvements described herein to be financed by the Roadway Improvement Bonds) as set forth in the Roadway Improvements Financing Agreement. In connection with the levy of Roadway Special Assessments and issuance of the Roadway Bonds, the City has confirmed the above described conditions have all been satisfied. 3. Allocations between Land Use may be updated in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party, excluding the University and the City, which will then trigger the determination of and approval of the Maximum Special Assessment per Unit within each Land Use category. The Developer has agreed with the City, in the PID Reimbursement Agreement, to provide notice of intent by any Owner to enter into a contract for sale an unaffiliated third party, excluding the University. As described in Section IV.E.2.b above, Table IV-D, have been updated based on the updated development plan. Table IV-E summarizes the estimated build out value to the Major Improvement Special Assessments and Roadway Improvement Special Assessment ratios for the Western Improvement Area. Table IV-G summarizes the estimated build out value to the Major Improvement Special Assessments ratios for the Eastern Improvement Area. 27 2180.021\71999.7 Section IV:Assessment Plan Table IV-D Western Improvement Area ilp alnwt'tlil&likodwltlyr 1mlirm+tmiamots apeciat Assessment Allocation b Land Use Average % Equivalent Equivalent Tax Estimated Estimated Allocation Major Special Average Tax Rate(per Rate(per Improved Build Out Estimated of Total Improvement Average Assessment Annual $1001AV)- $1001AV)- Land Value Value Per Improved Estimated Build Special Special Annual Per Unit/SF Installment Improved Build Out Land Use UnitslSF per Unit Unit Land Value Out Value Assessment Assessment Installment (a) Per Unit/SF Land Value Value SF Residential 2,471 $ 65,000 $ 300,000 $160,615,000 $ 741,300,000 56.3% $ 3,684,285 $ 363,820 $ 1,491.01 $ 147.24 $ 0.23 $ 0.05 Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $ 1,590,198 $ 157,195 $ 631.03 $ 62.38 $ 0.78 $ 0.05 Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $ 1,269,540 $ 125,065 $ 1.00 $ 0.10 $ 1.23 $ 0.05 Total $190,968,040 $1,316,418,000 100.0% $ 6,544,023 $ 646,080 $ 0.34 $ 0.05 Average % Equivalent Equivalent Tax Estimated Estimated Allocation Roadway Special Average Tax Rate(per Rate(per Improved Build Out Estimated of Total Improvement Average Assessment Annual $100/AV)- $100/AV)- Land Value Value Per Improved Estimated Build Special Special Annual Per Unit/SF Installment Improved Build Out Land Use Units/SF per Unit Unit Land Value Out Value Assessment Assessment Installment (a) Per Unit/SF Land Value Value SF Residential 2,471 $ 65,000 $ 300,000 $160,615,000 $ 741,300,000 56.3% $ 3,076,795 $ 328,077 $ 1,245.16 $ 132.77 $ 0.20 $ 0.04 Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $ 1,327,995 $ 141,751 $ 526.98 $ 56.25 $ 0.70 $ 0.04 Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $ 1,060,210 $ 112,778 $ 0.83 $ 0.09 $ 1.11 $ 0.04 Total $190,968,040 $1,316,418,000 100.0% $ 5,465,000 $ 582,606 $ 0.31 $ 0.04 Average % Equivalent Equivalent Tax Estimated Estimated Allocation Special Average Tax Rate(per Rate(per Improved Build Out Estimated of Total Average Assessment Annual $1001")- $100/AV)- Land Value Value Per Improved Estimated Build Special Total Special Annual Per Unit/SF Installment Improved Build Out Land Use Units/SF per Unit Unit Land Value Out Value Assessment Assessment Installment (a) Per Unit/SF Land Value Value SF Residential 2,471 $ 65,000 $ 300,000 $160,615,000 $ 741,300,000 56.3% $ 6,761,080 $ 691,897 $ 2,736.17 $ 280.01 $ 0.43 $ 0.09 Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $ 2,918,193 $ 298,946 $ 1,158.01 $ 118.63 $ 1.48 $ 0.09 Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $ 2,329,750 $ 237,843 $ 1.83 $ 0.19 $ 2.33 $ 0.09 Total $190,968,040 $1,316,418,000 100.0% $ 12,009,023 $ 1,228,686 $ 0.64 S 0.09 "'Ths Special Assessment per Unit will be updated to reflect the Maximum Special Assessment per Unit when determined in accordance with Section VLE of the SAP.Until such time,the number of units and the assessment per unit in this Table is subject to change with each Annual Service Plan Update based on updates to the development plan and related changes to estimated build out value. Estimates based on information available as of 311512018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major Improvement Special Meneverrmt will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms and provisions of the Indenture,PID mhursemanl Agreement,and other documents related to the Major Improvement Bonds,The above estimate assumes an average 5.07%interest rate and a 20 year term for the Major Improvement Bonds,an estimated 5.7% tlri'rt rate and a 19 year term on the Roadway Improvement Bonds and annual administrative expense of$79,203 increasing at 2.0%per year.Allocations between Land Use may be updated and reallocated amongst the Asmsead Ytaparllr in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third parry,excluding the University and the City,which will then trigger approval of the Maximum Special Assessment per Unit within each Land Use category against each Parcel of Assessed Property. 28 Section IV:Assessment Plan Table iV-E below summarized the estimated build out value to the Major Improvement Special Assessments and Roadway Improvement Special Assessment ratios for the Western Improvement Area. :at31e WE Westarn vementArea ---- B�RDiArr+a Im - Estimated. Assessm Estimated Estimated %Allocation Total Major Special Average Improved Improved Build Out Estimated of Total Improvement Average Assessment Annual Land to Build Out Value Land Value Value Per Improved Land Estimated Build Special Special Annual Per UnitISF Installment Assessment to Assessment Land Use Units/SF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per Unit/SF Leverage Leverage 5F Residential 2,471 $ 65,000 $ 300,000 $ 160,615,000 $ 741,300,000 56.3% $3,684,285 $363,820 $1,491.01 $147.24 43.59 201.21 Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $1,590,198 $157,195 $631.03 $62.38 12.68 201.42 Commercial 1,274,130_ $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $1,269,540 $125,065 $1.00 $0.10 8.03 200.72 Total $ 190,968,040 $1,316,418,000 100.0% $6,544,023 $646,080 29.18 201.16 Total Estimated Estimated %Allocation Roadway Special Average Improved Improved Build Out Estimated of Total Improvement Average Assessment Annual Land to Build Out Value Land Value Value Per Improved Land Estimated Build Special Special Annual Per Unit/SF Installment Assessment to Assessment Land Use Units/SF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per Unit/SF Leverage Leverage SF Residential 2,471 $ 65,000 $ 300,000 $ 160,615,000 $ 741,300,000 56.3% $3,076,795 $328,077 $1,245.16 $132.77 52.20 240.93 Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $1,327,995 $141,751 $526.98 $56.25 15.18 241.18 Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $1,060,210 $112,778 $0.83 $0.09 9.61 240.35 Total $ 190,968,040 $1,316,418,000 100.0% $5,465,000 $582,606 34.94 240.88 Estimated Estimated %Allocation Special Average Improved Improved Build Out Estimated of Total Average Assessment Annual Land to Build Out Value Land Value Value Per Improved Land Estimated Build Special Total Special Annual Per Unit/SF Installment Assessment to Assessment Land Use Units/SF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per Unit/SF Leverage Leverage SF Residential 2,471 $ 65,000 $ 300,000 $ 160,615,000 $ 741,300,000 56.3% $6,761,080 $691,897 $2,736.17 $280.01 23.76 109.64 Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $2,918,193 $298,946 $1,158.01 $118.63 6.91 109.76 Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $2,329,750 $237,843 $1.83 $0.19 4.38 109.38 Total $ 190,968,040 $1,316,418,000 100.0% $12,009,023 $1,228,686 15.90 109.62 The Special Assessment per Unit will be updated to reflect the Maximum Special Assessment per Unit when determined in accordance with Section WE of the SAP.Until such time,the number of units and the assessment per Unit in this Table is subject to change with each Annual Service Plan Update based on updates to the development plan and related changes to estimated build out value. W-.Estimates based on information available as of 3/15/2018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major Improvement Special Alim"ment will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms and provisions of the Indenture,PID ReYnflunssment Agreement,and other documents related to the Major Improvement Bonds.The above estimate assumes an average 5.07%interest rate and a 20 year term for the Major Improvement Bonds,an estimated 5.7% 1 in{srra rate and a 19 year term on the Roadway Improvement Bonds and annual administrative expense of$79,203 increasing at 2.0%per year.Allocations between Land Use may be updated and reallocated amongst the Property in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party,excluding the University and the City,which will th 1 tiger approval of the Maximum SpeciW Assessment per Unit within each Wnd Use sB»gpry rtpeiFrd each Parcel of Assessed Pruporty. 29 2180.021\71999.7 Section IV:Assessment Plan Table IV-F Eastern Improvement Area Updated ar Im rovemants Speckai Assessment Allocation Average Estimated Equivalent Equivalent Improved Estimated %Allocation Special Average Tax Rate(per Tax Rate(per Land Build Out Estimated of Total Total Average Assessment Annual $100/AV)- $100/AV)- Value per Value Per Improved Estimated Special Special Annual Per Unit/SF Installment Improved Build Out Land Use Units/SF Unit Unit Land Value Build Out Value Assessment Assessment Installment (a] Per UniVSF Land Value Value SF Residential 2,446 $65,000 $300,000 $159,120,000 $734,400,000 59.4% $3,650,763 $360,434 $1,491.32 $147.24 $0.23 $0.05 Commercial 2.5(}9,700 $8.00 $200.00 $20.037,800 $500,940,000 40.6% $2,490,214 $245,855 $0.99 $0.10 $1.23 $0.05 Total $179,157,600 $1,235,348,000 100.0% $6,140,977 $606,2118 $0.34 $0.05 NNW "m Special Assessment per Unit will be updated to reflect the Maximum Special Assessment per Unit when determined in accordance with Section VLE of the SAP.Until such time,the number of units and the assessment per unit in this Table is subject to change with each Annual Service Plan Update based on updates to the development plan and related changes to estimated build out value. Note:Estimates based on information available as of 311512018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major 9:mprov9ma-nt Special Assessment will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms and provisions of the Indenture,PID Reimbursement Agreement,and other documents related to the Major Improvement Bonds.The above estimate assumes an average 5.07%interest rate and a 20 year term for the Major Improvement Bonds and annual administrative expense of$32,097 increasing at 2.0%per year.Allocations between Land Use maybe updated and reallocated amongst the Assessed Property in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party,excluding the University and the City,which will then trigger approval of the Maximum SpecikJ Assessment per Unit within each Land Use category against each Parcel of Assessed Property Table IV-G Eastern Improvement Area ants Estimated Value to Assessment Ratios Estimated Estimated %Allocation Special Average improved Improved Build Out Estimated of Total Average Assessment Annual Land to Build Out Value Land Value Value Per Improved Land Estimated Build Special Total Special Annual Per UniVSF Installment Assessment to Assessment Land Use UnitslSF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per UniVSF Leverage Leverage IsCommerciai F Residential 2,448 $65,000 $300,000 $159,120,000 $734,400,000 59.4% $3,650,763 $360,434 $1,491.32 $147.24 43.59 201.16 2,504,700 $8.00 $200 $20,037,600 $500,940,000 40.6% $2,490,214 $245,855 $0.99 $0.10 8.05 20116 Total $179,157,600 $1,235,340,000 100.0% $6,140,977 $606,288 29.17 201.16 _Special Assessment per Unit will be upffiffidTo-reg6drfilifflMi mum Special A119109W13M when cleterminca with Section VLE of the SAP.Until such time,the number of units and the atistassiment per unit in this Table is subject to change with each An nual Service Plan Update based on updates to the development plan and related changes to estimated build out value. Nola!Estimates based on information available as of 311512018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major Impraramant Special Assessment will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms and provisions of the Indenture,PID Reimbursement Agreement,and other documents related to the Major Improvement Bonds.The above estimate assumes an average 5.07%Interest rate and a 20 year tern for than Major Improvement Bonds and annual administrative expense of$32,097 Increasing at 2.0%per year.Allocations between Land Use may be updated and reallocated amongst the Assessed Property In an AnmW Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party,excluding the University and the City,which will then trigger approval of the Maximum Spetwi Assessment par Unit within each Land Use category agalnat each Parcel of Assessed . 30 2180.021171999.7 Section IV: Assessment Plan F. Assessment and Annual Installments The Special Assessments for the PID Bonds will be levied on each Parcel or Lot according to the Eastern Improvement Assessment Roll and the Western Improvement Assessment Roll, as applicable, subject to any revisions made during an Annual Service Plan Update. The first Annual Installments of the Major Improvement Special Assessments securing the Major Improvement Bonds were due no later than January 31, 2018; and, subsequent Annual Installments shall be due no later than January 31 of each year in the amounts shown on the updated Assessment Rolls until the Major Improvement Special Assessments are paid in full. The Annual Installments of the Roadway Improvement Special Assessments securing the Roadway Improvement Bonds are anticipated to be due no later than January 31 of each year beginning in 2019 in the amounts shown on an update to the Western Improvement Area Assessment Roll. G. Administrative Expenses The cost of administering the PID and collecting the Annual Installments shall be paid for on a pro rata basis by each Parcel or Lot based on the amount of outstanding Special Assessment remaining on the Parcel or Lot. The Administrative Expenses shall be collected as part of and in the same manner as Annual Installments in the amounts shown on the Assessment Rolls attached hereto as Appendix A-1 and Appendix A-2 which are subject to revision through Annual Service Plan Updates. H. Delinquency and Prepayment Reserve The interest rate on Special Assessments may exceed the interest rate on PID Bonds by the Additional Interest. The Additional Interest shall be collected as part of each Annual Installment. Under each Indenture, the Additional Interest shall be deposited into a reserve account and segregated from other funds of the City (the "Delinquency and Prepayment Reserve Account") until the balance in the Delinquency and Prepayment Reserve equals a maximum of 5.5% of the outstanding principal balance of the applicable PID Bonds. The Delinquency and Prepayment Reserve shall be used to pay Prepayment Costs or to cover any deficiencies in the funds available to pay debt service on the applicable PID Bonds. If, in a given year, a Delinquency and Prepayment Reserve Account is fully funded, the Additional Interest will be allocated for the additional purposes set forth in the applicable Indenture, which purposes include: (i) covering deficiencies in funds available to pay debt service on the applicable PID Bonds, (ii) paying costs associated with the prepayment of any applicable Special Assessment; (iii) paying the costs of Administrative Expenses related to the applicable PID Bonds, and/or (iv) paying the costs associated with the redemption of the applicable PID Bonds. 31 2180.021\71999.7 Section V: Service Plan Section V SERVICE PLAN 1. The PID Act requires that a Service Plan (i) cover a period of at least five years, and (ii) define the annual projected costs and indebtedness for the Authorized Improvements undertaken within the PID during the five year period. Construction of the Major Improvements commenced in October 2017 and the Water Improvements are substantially complete by April 2018 and the Sanitary Sewer Improvements are expected to be completed by February 2019. 2. The Actual Costs for the Major Improvements plus costs related to the issuance of the Major Improvement Bonds, and payment of expenses incurred in the establishment, administration and operation of the PID are shown in Table V-A. 3. The Actual Costs for the Roadway Improvements plus costs related to the issuance of the Roadway Improvement Bonds, and payment of expenses incurred in the establishment, administration and operation of the PID are shown in Table V-B. 4. The Service Plan shall be reviewed and updated at least annually for purposes of determining the annual budget for Administrative Expenses, updating the Actual Costs of the Authorized Improvements, and updating the Western Improvement Area Assessment Roll shown on Appendix A-1 and the Eastern Improvement Area Assessment Roll shown on Appendix A-2. Any update to this SAP is herein referred to as an "Annual Service Plan Update." 5. Table V-A summarizes the sources and uses of funds required to construct the Major Improvements, establish the PID, and issue the Major Improvement Bonds. The sources and uses of funds shown in Table V-A shall be updated each year in the Annual Service Plan Update to reflect any revisions to the Actual Costs of the Major Improvements. 6. Table V-B summarizes the sources and uses of funds required to construct the Roadway Improvements and issue the Roadway Improvement Bonds. The sources and uses of funds shown in Table V-B shall be updated each year in the Annual Service Plan Update to reflect any revisions to the Actual Costs of the Roadway Improvements. 32 2180.021\71999.7 Section V: Service Plan Table V-A Major Improvement Bonds Sources.and Uses of Funds Major Non-PID Improvement University Related Description Bonds Im rovements Improvements Total Sources of Funds Gross Bond Amount $ 12,685,000 $ - $ - $ 12,685,000 City of Fort Worth contribution $ - $ - $ 1,111,047 $ 1,111,047 Net premium $ 70,568 $ - $ - $ 70,568 Developer deposit to property tax account $ 10,000 $ - $ - $ 10,000 Other contribution °1 $ - $ 486,284 $ - $ 486,284 Total Sources $ 12,765,568 $ 486,284 $ 1,111,047 $ 14,362,900 Uses of Funds Water $ 2,759,319 $ 155,045 $ 98,570 $ 3,012,934 Sanitary sewer $ 5,724,317 $ 331,239 $ 1,012,477 $ 7,068,033 Authorized/Off-Site Improvements Subtotal(b): $ 8,483,636 $ 486,284 $ 1,111,047 $ 10,080,967 Other Fund Deposits: Debt service reserve fund(c) $ 1,151,119 $ - $ - $ 1..151,119 Capitalized interest(d) $ 1,898,149 $ - $ - $ 1,898,149 Other Fund Deposits Subtotal: $ 3,049,268 $ - $ - $ 3,049,268 Developer deposit to Property Tax Account $ 10,000 $ - $ - $ 10,000 Costs of issuance(e) $ 844,283 $ - $ - $ 844,283 Underwriter's costs/underwriter counsel�r� $ 378,382 $ $ - $ 378,382 Total uses of funds $ 12,765,569 $ 486,284 $ 1,111,047 $ 14,362,900 f,aTUWK--ft-IRD-V%MburuW6RAgmerriMthe Develcobris obligated to fund any cost overruns and University Improvements in excess of the funds deposited with the trustee under the Indenture related to the Major provement Bonds. (b)See Table III-A,Table IV-A,and Table IV-B for details. }11%Major Improvement Bonds include a debt service reserve fund calculated at the maximum annual debt service for the Major Improvement Bonds. Such calculation is in accordance with the IRS rules and the Indenture. td7 The Major Improvement Bonds include capitalized interest from September 14,2017 through September 30,2020. {ej Inclusive of prepayment of a portion of the initial year's Administrative Menses. Calculated at 2.98%of the Gross Bond Amount. 33 2180.021\71999.7 Section V: Service Plan Table V-B Roadway Improvement Bonds Updated Sources and Uses of Funds Roadway Chisholm Trail University Improvement Ranch Roadway Road Description Bonds Improvements Improvements Total Sources of Funds Gross bond amount $ 5,465,000 $ - $ - $ 5,465,000 City of Fort Worth contribution(a) $ 3,184,546 $ 1,239,594 $ - $ 4,424,140 Chisholm Trail contribution $ - $ 635,002 $ - $ 635,002 Other contribution(b) $ - $ - $ 657,992 $ 657,992 Total Sources $ 8,649,546 $ 1,874,596 $ 657,992 $ 11,182,134 Uses of Funds Authorized/Off-Site Improvements(c): Roadway improvements $ 6,931,647 $ 1,874,596 $ 657,992 $ 9,464,235 Total Authorized/Off-site Improvements $ 6,931,647 $ 1,874,596 $ 657,992 $ 9,464,235 Other Fund Deposits: Debt service reserve fund(d) $ 517,930 $ - $ - $ 517,930 Capitalized interest(e) $ 682,715 $ - $ - $ 682,715 $ 1,200,645 $ - $ - $ 1,200,645 Costs of issuance(f) $ 353,304 $ - $ - $ 353,304 Underwriter's costs/underwriter counsel(y) $ 163,950 $ - $ - $ 163,950 Total uses $ 8,649,546 $ 1,874,596 $ 657,992 $ 11,182,134 to)The total Roadway Improvement Costs are$9,464,235,which include$6,973,683 in construction costs,$375,000 in ROW,$90,956 in project management fees,$150,000 in developer financing costs and$1,874,596 in Chisholm Trail improvement casts.The University share of the Roadway Improvements(excluding the Chisholm Trail improvement cost) is$657,992[($9,464,235-$1,874,596)x 8.67%), whirti will be funded in full with private funds of the Developer.The City contribution for the Roadway Improvement Costs is$3,184,646.In addilion.the City contribution for Chisholm Trail improvements is$1,239,594 and the balance of the Chisholm Trail improvement costs, ;1116,9{32($1,874,596-$1,239,594),will be funded with private funds of the Developer. (b)The Developer will fund all Major Improvements not funded by the Major Improvement Bonds.The Developer and the City will equally sham any cost overruns for the Roadway Improvements(excluding ROW costs,project management costs,or Developer financing costs) War the terms of the Roadway Financing Agreement.The Owner's contributions include 100%of the University share of the Roadway irnpravemeoL Costs,$657,992($7,589,639 x 8.67%). (c)See Table IIIA,Table IV-A,and Table IV-B for details. (d)TINa PID Bonds include a debt service reserve fund calculated in accordance with IRS rules. le)The PID Bonds are expected to include up to 28 months of capitalized interest. (f)Estimated at 5.6%of the Bond amount inclusive of prepayment of the initial year's Administrative Expenses,subject to change. �(g)The PID B nd%assume a 3%Underwriter's Discount and Und*,@#Ws Counsel Fee,suttject to drag", The updated projected Annual Installments of the Major Improvement Special Assessments relating to the Major Improvements and the updated projected Annual Installments of the Roadway Improvement Special Assessments relating to the Roadway Improvements for the Western Improvement Area for the five years following the approval of this SAP updated are presented in Appendix A-1-C. The Service Plan is being updated to reflect the levy of the Roadway Improvement Special Assessments and the issuance of the Roadway Improvement 34 2180.021\71999.7 Section V: Service Plan Bonds. The Annual Installments are subject to revision and shall be updated in Annual Service Plan Updates to reflect any changes expected for each year. The updated Annual Installments of the Major Improvement Special Assessments for the Eastern Improvement Area for the five years after the approval of this SAP update are presented in Appendix A-2-C. The Annual Installments are subject to revision and shall be updated in the Annual Service Plan Updates to reflect any changes expected for each year. 35 2180.021\71999.7 Section VI: Terms of the Assessments Section VI TERMS OF THE SPECIAL ASSESSMENTS A. Amount of Maior Improvement Special Assessments and Annual Installments for Parcels Located Within the Assessed Property 1. The Major Improvement Special Assessments, the Roadway Improvement Special Assessments, and the projected Annual Installments associated with each of the foregoing, for the Assessed Property in the Western Improvement Area are shown on the updated Assessment Roll in Appendix A-1. The Major Improvement Special Assessments and the projected Annual Installments for the Assessed Property in the Eastern Improvement Area are shown on the updated Assessment Roll in Appendix A-2. The Major Improvement Special Assessments, the Roadway Improvement Special Assessments and Annual Installments shall not be changed except as authorized by this SAP and by the PID Act. 2. The Annual Installments of the Major Improvement Assessments and the Roadway Improvement Special Assessments shall be collected in an amount sufficient (i) to pay the principal and interest on the applicable PID Bonds, (ii) to fund the Delinquency and Prepayment Reserve for the applicable PID Bonds, and (iii) to cover a proportional share of the Administrative Expenses for the PID. B. Reallocation of Special Assessments for Parcels Located Within Assessed Property 1. Upon Division Prior to Recording of Subdivision Plat a. Upon the division of any Assessed Property (without the recording of subdivision plat), the Administrator shall reallocate the Special Assessment for the Assessed Property prior to the division among the newly divided Assessed Properties per the assessment methodology as presented in Section IV.E.2. b. If Lots are not platted in accordance with the approved entitlements, the Special Assessments for each affected Lot will be allocated in an equitable manner. c. The reallocation of a Special Assessment for Assessed Property that is a homestead under Texas law may not exceed the Special Assessment prior to the increase or reallocation. Any reallocation pursuant to this section shall be reflected in a Service and Assessment Plan Update approved by the City Council. The reallocation herein shall be considered an administrative action that will not require the City Council to issue notice and hold a public hearing. d. The sum of the Special Assessments for all newly divided Assessed Properties shall equal the Special Assessment for the Assessed Property prior to subdivision. The calculation shall be made separately for each newly divided Assessed Property. Any reallocation 36 2180.021\71999.7 Section VI: Terms of the Assessments pursuant to this section shall be reflected in an update to this SAP approved by the City Council. 2. Upon Subdivision by a Recorded Subdivision Plat a. Once a Lot or a Parcel has a Special Assessment applied to it, as shown in Table IV-D and Table IV-H, and is then subdivided again, such newly subdivided Lots or Parcels will be the Special Assessment of the applicable Land Use as set forth in Table IV-D and Table IV-H. In no event will the new subdivision cause the sum of the Special Assessments for the newly subdivided Land Uses to be greater than the Special Assessment for the undivided Land Use prior to its subdivision or greater than the Maximum Special Assessment per Unit. b. The allocation method used above is to insure there will not be an increase in the Special Assessment for each specific Lot or Parcel. If Lots or Parcels are not platted in accordance with the approved entitlements, the Special Assessments for each affected Lot or Parcel will be allocated in an equitable manner. 3. Upon Consolidation Upon the consolidation of two or more Assessed Properties, the Special Assessment for the consolidated Assessed Property shall be the sum of the Special Assessments for the Assessed Properties prior to consolidation. The reallocation of a Special Assessment for an Assessed Property that is a homestead under Texas law may not exceed the Special Assessment for such Assessed Property prior to the reallocation. Any reallocation pursuant to this section shall be calculated by the Administrator and reflected in an update to this SAP approved by the City Council. The consolidation of any Assessed Property as described herein shall be considered an administrative action and will not require any notice or public hearing(as defined in the PID Act) by the City Council. 4. Upon Transfer between Parcels with Different Uses a. Should an owner of an Assessed Property choose to transfer the intended land use between all or a portion of one or more Parcels or Lots, in no event will the transfer cause the sum of the Special Assessments for the affected Parcels or Lots to be greater than the Special Assessment for those Parcels or Lots prior to the transfer of use. b. If uses are transferred among Parcels or Lots, the Special Assessments for each affected Parcel or Lot will be allocated in an equitable manner. C. Mandatory Prepayment of Special Assessments If Assessed Property or a portion thereof is transferred to a party that is exempt from the payment of the Special Assessment under applicable law, or if an owner causes a Parcel or portion thereof to become Non-Benefitted Property, the owner of such Parcel or portion thereof shall pay to the City the full amount of the Special Assessment, plus all Prepayment Costs, for such Parcel or portion thereof prior to any such transfer or act (a "Mandatory Prepayment'). Should a Mandatory Prepayment be anticipated under this 37 2180.021\71999.7 Section VI: Terms of the Assessments Section VI.C, the owner of such Parcel or portion thereof shall notify the City and the Administrator no later than thirty (30) days prior to the anticipated date of transfer. The amount of a Mandatory Prepayment of Special Assessment shall be calculated in accordance with the terms of this Service and Assessment Plan. Following a Mandatory Prepayment of Special Assessment under this Section, the owner of such Parcel or portion thereof shall notify the City and the Administrator no later than thirty (30) days after the date of the payment of the Mandatory Prepayment. The sum of the Special Assessments for all newly-divided Assessed Properties shall equal the Special Assessments for the Assessed Property prior to subdivision. If the Special Assessment for the Assessed Property prior to subdivision exceeds the sum of the Special Assessments for all newly divided Assessed Properties after such reallocation, the Parcel owner shall pay the Special Assessment in excess of the Maximum Special Assessment per Unit amount as a Mandatory Prepayment. D. Reduction of Special Assessments 1. If after all Authorized Improvements to be funded with PID Bonds have been completed and the Actual Costs for the Authorized Improvements are less than the Actual Costs used to calculate the Special Assessments securing such PID Bonds, resulting in excess PID Bond proceeds, then the City may, at its discretion and in accordance with the Indenture related to such series of PID Bonds, reduce the Special Assessment securing the series of PID Bonds for each Assessed Property pro rata such that the sum of the resulting reduced Special Assessments for all Assessed Properties equals the reduced Actual Costs and such excess PID Bond proceeds shall be applied to redeem PID Bonds of such series. The Special Assessments shall not be reduced to an amount less than the principal amount of the related outstanding series of PID Bonds. 2. Similarly, if any of the Authorized Improvements to be funded with a series of PID Bonds are not undertaken resulting in excess PID Bond proceeds then the City may, at its discretion and in accordance with the Indenture related to such series of PID Bonds, reduce the Special Assessment securing the PID Bonds for each Assessed Property pro- rata to reflect only the Actual Costs that were expended and apply such excess PID Bond proceeds as described in the paragraph immediately above. The Special Assessments shall not be reduced to an amount less than the principal amount of the related outstanding series of PID Bonds. E. Payment of Special Assessments 1. Payment in Full a. The Special Assessment for any Parcel or Lot may be paid in full at any time in accordance with the PID Act. The payment shall include all Prepayment Costs, if any. If prepayment in full will result in redemption of PID Bonds, the payment amount shall be reduced by the applicable portion of the proceeds from a debt service reserve fund applied to the redemption pursuant to the Indenture, net of any other costs applicable to the redemption of PID Bonds. 38 2180.021\71999.7 Section VI: Terms of the Assessments b. If an Annual Installment has been billed prior to payment in full of a Special Assessment, the Annual Installment shall be due and payable and shall be credited against the payment in full amount upon payment. c. Upon payment in full of a Special Assessment and all Prepayment Costs, the City shall deposit the payment in accordance with the related Indenture; whereupon, the Special Assessment for the Parcel or Lot shall be reduced to zero, and the Parcel or Lot owner's obligation to pay the Special Assessment and Annual Installments thereof shall automatically terminate. The City shall provide the owner of the affected Assessed Property a recordable "Notice of PID Special Assessment Termination." 2. Partial Payment a. At the option of a Parcel or Lot owner, the Special Assessment on any Parcel or Lot may be paid in part in an amount equal to the amount of prepaid Special Assessments plus Prepayment Costs, if any, with respect thereto. Upon the payment of such amount for a Parcel or Lot, the Special Assessment for the Parcel or Lot shall be reduced by the amount of such partial payment in a manner conforming to the provisions of the Indenture, the Special Assessment Roll shall be updated to reflect such partial payment, and the obligation to pay the Annual Installment for such Parcel or Lot shall be reduced to the extent the partial payment is made. For any Partial Payment made, the amount which is paid may be adjusted if required by the terms of the Indenture to conform with the denomination of any individual bond. 3. Payment of Annual Installments a. If a Special Assessment is not paid in full, the PID Act authorizes the City to collect interest and collection costs on the outstanding Special Assessment. A Special Assessment for a Parcel or Lot that is not paid in full will be collected in Annual Installments each year in the amounts shown in the Special Assessment Roll, which includes interest on the outstanding Special Assessment and Administrative Expenses. The interest on the Special Assessments or Annual Installments thereof, includes the interest generated from the Additional Interest Rate as described in Section W.H. b. The Annual Installments as listed on the Assessment Rolls have been calculated assuming a weighted average interest rate on the PID Bonds (1) issued as Major Improvement Bonds of 5.07% and (2) issued as Roadway Improvement Bonds of 5.70% (� ). The principal amounts of Annual Installments may not exceed the amounts shown on the Assessment Roll except pursuant to any amendment or update to this SAP. The interest on the Special Assessments or Annual Installments thereof, includes the interest generated from the Additional Interest Rate as described in Section W.H. c. The Annual Installments shall be reduced to equal the actual costs of repaying the related series of PID Bonds plus the interest generated from the Additional Interest Rate and actual Administrative Expenses (as provided for in the definition of such term), taking 39 2180.021\71999.7 Section VI: Terms of the Assessments into consideration any other available funds for these costs, such as interest income on account balances. d. The City reserves and shall have the right and option to refund PID Bonds in accordance with Section 372.027 of the PID Act and the Indenture related to such PID Bonds. In the event of issuance of refunding bonds, the Administrator shall recalculate the Annual Installments, and if necessary, may adjust, or decrease, the amount of the Annual Installment so that total Annual Installments of Special Assessments will be produced in annual amounts that are required to pay the debt service on the refunding bonds when due and payable as required by and established in the ordinance and/or the indenture authorizing and securing the refunding bonds plus interest generated from the Additional Interest Rate, and such refunding bonds shall constitute "PID Bonds" for purposes of this SAP. F. Collection of Annual Installments 1. The Administrator shall, no less frequently than annually, prepare and submit to the City Council for its approval, an Annual Service Plan Update to allow for the billing and collection of Annual Installments, which may be performed by the City, the Administrator, or a third-party selected by the City. Each Annual Service Plan Update shall include an updated Assessment Roll and a calculation of the Annual Installment for each Assessed Property. Administrative Expenses shall be allocated among Assessed Properties in proportion to the amount of the Annual Installments for the Assessed Property. Each Annual Installment shall be reduced by any credits applied under the applicable Indenture, such as capitalized interest, interest earnings on any account balances, and any other funds available to the Trustee for such purpose, and existing deposits for a Delinquency and Prepayment Reserve. Annual Installments may be collected by the City (or such entity to whom the City directs) in the same manner and at the same time as ad valorem taxes. Annual Installments shall be subject to the penalties, procedures, and foreclosure sale in case of delinquencies as set forth in the PID Act. The City Council may provide for other means of collecting the Annual Installments to the extent permitted under the PID Act. The Special Assessments shall have lien priority as specified in the PID Act. Any sale of Assessed Property for nonpayment of the delinquent Annual Installments shall be subject to the lien established for the remaining unpaid Special Assessment against such Assessed Property and such Assessed Property may again be sold at a judicial foreclosure sale if the purchaser thereof fails to make timely payment of the non- delinquent Annual Installments against such Assessed Property as they become due and payable. 2. Each Annual Installment, including the interest on the unpaid amount of a Special Assessment, shall be updated annually. Each Annual Installment together with interest thereon shall be delinquent if not paid on or before January 31 of the following year. The initial Annual Installments for the Major Improvement Special Assessments will be due when billed, and will be delinquent if not paid on or before January 31, 2018. 40 2180.021\71999.7 Section VI: Terms of the Assessments G. Surplus Funds Remaining in the PID Bond Account 1. If proceeds from a series PID Bonds still remain after all of the Authorized Improvements to be funded with such PID Bonds are constructed and accepted by the City, the proceeds may be utilized in accordance with Section VI.D of this SAP. 41 2180.021\71999.7 Section VII: Assessment Roll Section VII ASSESSMENT ROLL A. Assessment Roll 1. The City Council has evaluated each Assessed Property based on numerous factors such as the applicable zoning for the developable area, the Public Property, the types of Authorized Improvements, and other development factors deemed relevant by the City Council. 2. The Western Improvement Area Assessed Property was assessed for the special benefits conferred upon the Assessed Property by the Major Improvements pursuant to the Major Improvement Assessment Ordinance. The special benefit received by Western Improvement Area Assessed Property from the Major Improvements, a portion of the costs that relate to the establishment, administration and operation of the PID, and the Major Improvement Bonds issuance costs was calculated to be $5,998,703. The par amount of the Major Improvement Bonds originally allocated to the Western Improvement Area was $5,960,843 which was less than the benefit received by the Assessed Property within the Western Improvement Area from the Major Improvements. The original calculated special benefits conferred by the Major Improvements to the Western Improvement Area Assessed Property have been revised. Pursuant to the updated development plan and related projected estimated build out values shown in Appendix A-3. Table VII-A summarizes the revised calculated $6,585,586 in special benefit received by Assessed Property from the Major Improvements, a portion of the costs that relate to the establishment, administration and operation of the PID, and the Major Improvement Bonds issuance costs. The par amount of the Major Improvement Bonds reallocated to the Western Improvement Area is $6,544,023 which was less than the benefit received by the Assessed Property within the Western Improvement Area from the Major Improvements. 3. The Special Assessment for each Parcel of Assessed Property within the Western Improvement Area is calculated based on the allocation methodologies described in Section IV-D.2. The Western Improvement Area Assessment Roll is attached hereto as Appendix A- L 42 2180.021\71999.7 Section VII: Assessment Roll Table VII-A Western Improvement Area Major Improvements Updated Special Benefit Summary Special Benefit Total Cost Total Authorized Improvements $ 4,376,595 PID Formation/Bond Cost of Issuance Debt Service Reserve Fund $ 593,846 Capitalized Interest $ 979,229 Underwriter's Discount/Underwriters Counsel $ 195,203 Cost of Issuance $ 440,713 PID Formation/Bond Cost of Issuance $ 2,208,991 Total Special Benefit $ 6,585,586 Special Benefit Total Special Benefit $ 6,585,586 Projected PID Special Assessment $ 6,544,023 Excess Benefit $ 41,563 4. The Western Improvement Area Assessed Property will be assessed for the special benefits conferred upon the Assessed Property by the Roadway Improvements. Table VII-B summarizes the $8,649,546 in special benefit received by Assessed Property from the Roadway Improvements, a portion of the costs of relating to the establishment, administration and operation of the PID, and the Roadway Improvements PID Bonds issuance costs. The par amount of the Roadway Improvement Bonds fully allocated to the Western Improvement Area is $5,465,000 which is less than the benefit received by the Assessed Property within the Western Improvement Area from the Roadway Improvements. 5. The Special Assessment for the Assessed Property within the Western Improvement Area is calculated based on the allocation methodologies described in Section IV-D.2. The Western Improvement Area Assessment Roll is attached hereto as Appendix A-1. 43 2180.021171999.7 Section VII: Assessment Roll Table VII-B Western Improvement Area Roadway Improvements Updated Special Benefit Summary Special Benefit Total Cost Total Authorized Improvements $ 6,931,647 PID Formation/Bond Cost of Issuance Debt Service Reserve Fund $ 517,930 Capitalized Interest $ 682,715 Underwriter's Discount/Underwriters Counsel $ 163,950 Cost of Issuance $ 353,304 PID Formation/Bond Cost of Issuance $ 1,717,899 Total Special Benefit 1 $ 8,649,546 Special Benefit Total Special Benefit $ 8,649,546 Projected PID Special Assessment $ 5,465,000 Excess Benefit I $ 3,184,546 6. The Eastern Improvement Area Assessed Property was assessed for the special benefits conferred upon the Assessed Property by the Major Improvements. The special benefit received by Assessed Property from the Major Improvements, a portion of the costs that relate to the establishment, administration and operation of the PID, and the Major Improvement Bonds issuance costs was calculated to be $6,766,865. The par amount of the Major Improvement Bonds originally allocated to the Eastern Improvement Area was $6,724,157 which is less than the benefit received by the Assessed Property within the Eastern Improvement Area from the Major Improvements. The original calculated special benefits conferred by the Major Improvements to the Eastern Improvement Area Assessed Property have been revised. Pursuant to the updated development plan and related projected estimated build out values shown in Appendix A-3. Table VII-C summarizes the revised calculated $6,179,981 in special benefit received by Assessed Property from the Major Improvements, a portion of the costs that relate to the establishment, administration and operation of the PID, and the Major Improvement Bonds issuance costs. The par amount of the Major Improvement Bonds reallocated to the Eastern Improvement Area is $6,140,977 which was less than the benefit received by the Assessed Property within the Western Improvement Area from the Major Improvements. 7. The Special Assessment for the Assessed Property within the Eastern Improvement Area is calculated based on the allocation methodologies described in Section IV-D.3. The Eastern Improvement Area Assessment Roll is attached hereto as Appendix A-2. 44 2180.021\71999.7 Section VII: Assessment Roll Table VII-C Eastern Improvement Area Major Improvements Ypoated Special Benefit Summary Special Benefit Total Cost Total Authorized Improvements $ 4,107,041 PID Formation/Bond Cost of Issuance Debt Service Reserve Fund $ 557,272 Capitalized Interest $ 918,919 Underwriter's Discount/Underwriters Counsel $ 183,180 Cost of Issuance $ 413,569 PID Formation/Bond Cost of Issuance $ 2,072,940 Total Special Benefit $ 6,179,981 Special Benefit Total Special Benefit $ 6,179,981 Projected PID Special Assessment $ 6,140,977 Excess Benefit $ 39,004 8. The Roadway Improvement Assessment Ordinance levies the Roadway Improvement Special Assessments securing the Roadway Improvement Bonds in the amounts shown in the Western Improvement Area Assessment Roll attached to this updated SAP. B. Annual Assessment Roll Updates 1. The Administrator shall prepare, in consultation with City staff, and shall submit to the City Council for approval, updates to the Assessment Roll and the Annual Service Plan Update to reflect changes such as (i) the identification of each Parcel, (ii) the Special Assessment for each Assessed Property, including any adjustments authorized by this SAP or the PID Act; (iii) the Annual Installment for the Assessed Property for the year (if the Special Assessment is payable in installments); and (iv) payments of the Special Assessment, if any, as provided by Section VLE of this SAP. 2. The Service and Assessment Plan Update shall reflect the actual interest on the PID Bonds on which the Annual Installments shall be paid plus the Additional Interest Rate, any reduction in the Special Assessments, and any revisions in the Actual Costs to be funded by the PID Bonds and Developer funds. 45 2180.021\71999.7 Section VIII: Miscellaneous Provisions Section VIII MISCELLANEOUS PROVISIONS A. Administrative Review 1. The City may elect to designate a third party who is not an officer or employee of the City to serve as Administrator of the PID. 2. To the extent consistent with the PID Act, if an owner of the Assessed Property claims that a calculation error has been made in the Assessment Roll, including the calculation of the Annual Installment, that owner must send a written notice describing the error to the Administrator no later than thirty (30) days after the date the invoice or other bill for the Annual Installment is received. If the owner fails to give such notice, such owners shall be deemed to have accepted the calculation of the Assessment Roll (including the Annual Installments) and to have waived any objection to the calculation. The Administrator shall, in consultation with City staff, promptly review the notice, and if necessary, meet with the Assessed Property owner, consider written and oral evidence regarding the alleged error and decide whether, in fact, such a calculation error occurred. 3. If the Administrator, in consultation with City staff, determines that a calculation error has been made and the Assessment Roll should be modified or changed in favor of the Assessed Property owner, such change or modification shall be presented to the City Council for approval, to the extent permitted by the PID Act. A cash refund may not be made for any amount previously paid by the Assessed Property owner (except for the final year during which the Annual Installment shall be collected),but an adjustment may be made in the amount of the Annual Installment to be paid in the following year. The decision of the Administrator regarding a calculation error relating to the Assessment Roll may be appealed to City Council. Any amendments made to the Assessment Roll pursuant to calculation errors shall be made pursuant to the PID Act. B. Termination of Special Assessments 1. Each Special Assessment shall terminate on the date the Special Assessment is paid in full, including payment of any unpaid Annual Installments and Delinquent Collection Costs, if any. After the termination of the Special Assessment, and the collection of any delinquent Annual Installments and Delinquent Collection Costs, the City shall provide the owner of the affected Parcel a recordable Notice of the PID Special Assessment Termination. C. Amendments 1. Amendments to this SAP may be made as permitted or required by the PID Act and Texas law. 46 2180.021\71999.7 Section VIII: Miscellaneous Provisions D. Administration and Interpretation of Provisions 1. The City Council shall administer(or cause the administration of)the PID, an approved SAP, and all Annual Service Plan Updates consistent with the PID Act. E. Severability 1. If any provision, section, subsection, sentence, clause or phrase of an approved SAP, or the application of same to an Assessed Parcel or any person or set of circumstances is for any reason held to be unconstitutional, void or invalid, the validity of the remaining portions of the approved SAP or the application to all or any portion of the Property or other persons or sets of circumstances shall not be affected thereby, it being the intent of the City Council in adopting the SAP that no part thereof, or provision or regulation contained herein shall become inoperative or fail by reason of any unconstitutionality, voidness or invalidity of any other part hereof, and all provisions of this SAP are declared to be severable for that purpose. 2. If any provision of the SAP is determined by a court to be unenforceable, the unenforceable provision shall be deleted from the SAP and the unenforceable provision shall, to the extent possible, be rewritten to be enforceable and to give effect to the intent of the City. 47 2180.021\71999.7 Appendix A-1 Western Improvement Area Assessment Roll Exhlbit 4-1 - Western Improvement Area UpdatedSpecialAssessmen - r Improvements and Roadway Improvements Total Major Improvement Special Major Roadway Assessment and Improvement Improvement Roadway Estimated Build Special Special Improvement Special Tax Parcel ID Out Value a Assessment b Assessment(b)_ Assessment 4103629,6839851,3710890 $ 1,316,418,000 $ 6,544,023 $ 5,465,000 $ 12,009,023 and 41524853 Total $ 1,316,418,000 $ 8,544,023 $ 6,466,000 $ 12",009,023 (a)Estimated build-out value is based on the estimated build out value shown in Table IV-D calcu using the current development plan attached as Appendix A-3 and is subject to change.The estimated build out value and updated developm plans will be provided as part of the Annual Service Plan Update and are subject to change until the Maximum Special Assessment per Unit is determined in accordance with Section VI.E of the SAP. (b)The Special Assessments are shown herein collectively for all Parcels within the Western Improvement Area.Until such " that the Maximum Assessment per Unit is determined based on the applicable development plan and the Major Improveme Special Assessments and the Roadway Improvement Special Assessments are reallocated to each Parcel,the Annual Installments due from each Parcel will be calculated as part of each annual service plan update based on updated development plan to be provided by the Developer.If the Developer is unable to provide an updated development plan for each Parcel within the Western Improvement Area,the Administrator will use the current development plan shown in Appendix A-3 herein. 2180.021\71999.7 Exhibit A-1-B Western Improvement Area Updated Anntttil irnaca)Imetrts-gglor knilanovsmailds and en" Major Improvement Bonds Road Improvement Bonds Delinquency 8 Net Debt Net Debt Administrative Prepayment Capitalized Annual Year a Principal Interest(b) Service Principal Interest(b) Service Expenses(c) Reserve Interest Installment d 9/30/2018 $ - $ 318,456 $ 318,456 $ - $ - $ - $ 10,318 $ 32,720 $ (318,456) $ 43,038 9/30/2019 $ $ 330,387 $ 330,387 $ $ 371,210 $ 371,210 $ 79,203 $ 60,045 $ (701,597) $ 139,248 9130/2020 $ $ 330,387 $ 330,387 $ $ 311,505 $ 311,505 $ 80,787 $ 60,045 $ (641,892) $ 140,832 9/30/2021 $ 247,626 $ 330,387 $ 578,012 $ 200,000 $ 311,505 $ 511,505 $ 82,403 $ 60,045 $ $ 1,231,966 9/30/2022 $ 260,523 $ 318,005 $ 578,528 $ 210,000 $ 300,105 $ 510,105 $ 84,051 $ 57,807 $ $ 1,230,491 9/30/2023 $ 273,420 $ 304,979 $ 578,399 $ 220,000 $ 288,135 $ 508,135 $ 85,732 $ 55,454 $ - $ 1,227,721 9/302024 $ 288,897 $ 291,308 $ 580,205 $ 235,000 $ 275,595 $ 510,595 $ 87,447 $ 52,987 $ $ 1,231,234 9/3012025 $ 304,373 $ 276,863 $ 581,237 $ 245,000 $ 262,200 $ 507,200 $ 89,196 $ 50,368 $ $ 1,228,000 9/302026 $ 319,850 $ 261,645 $ 581,495 $ 260,000 $ 248,235 $ 508,235 $ 90,980 $ 47,621 $ $ 1,228,330 9/30/2027 $ 335,326 $ 245,652 $ 580,979 $ 275,000 $ 233,415 $ 508,415 $ 92,799 $ 44,722 $ $ 1,226,915 9/30/2028 $ 353,382 $ 228,886 $ 582,268 $ 290,000 $ 217,740 $ 507,740 $ 94,655 $ 41,670 $ - $ 1,226,333 9/30/2029 $ 371,438 $ 211,217 $ 582,655 $ 310,000 $ 201,210 $ 511,210 $ 96,548 $ 38,453 $ $ 1,228,867 9/30/2030 $ 392,074 $ 192,645 $ 584,719 $ 325,000 $ 183,540 $ 508,540 $ 98,479 $ 35,046 $ $ 1,226,784 9/30/2031 $ 412,709 $ 173,041 $ 585,751 $ 345,000 $ 165,015 $ 510,015 $ 100,449 $ 31,461 $ $ 1,227,675 9/30/2032 $ 435,924 $ 152,406 $ 588,330 $ 365,000 $ 145,350 $ 510,350 $ 102,458 $ 27,672 $ $ 1,228,810 9/30/2033 $ 456,560 $ 130,610 $ 587,169 $ 390,000 $ 124,545 $ 514,545 $ 104,507 $ 23,667 $ - $ 1,229,889 9/30/2034 $ 482,354 $ 107,211 $ 589,565 $ 410,000 $ 102,315 $ 512,315 $ 106,597 $ 19,435 $ $ 1,227,912 9/30/2035 $ 508,148 $ 82,490 $ 590,639 $ 435,000 $ 78,945 $ 513,945 $ 106,729 $ 14,973 $ $ 1,228,285 9/30/2036 $ 536,522 $ 56,447 $ 592,969 $ 460,000 $ 54,150 $ 514,150 $ 110,904 $ 10,257 $ $ 1,228,280 9/30/2037 $ 564,896 $ 28,951 $ 593,,847 $ 490,000 $ 27,930 $ 517,930 $ 113,121 $ 5,274 $ $ 1,230,173 Total $ 6,544,023 $ 4,371,974 $ 10,915897 $ 5,465,0001$ 3,902,645 $ 9,367,645 $ 1,819,365 $ 769,723 $ 1,66t,944 $ 2'1,210,785 (2)The 9/30/m dates represent the fiscal year end for the Bonds. �- {b)Gross of Capitalized Interest including interest from bond closing through 9/1/2020 , )Preliminary Estimate.Assumes 2%increase per year.The administrative charges will be updated each year in the Annual Service Plan Updates based on actual costs. Annual Installments are calculated using an average 5.07%interest rate on the Major Improvement Bonds,an estimated average(5.70%)interest rate on the Roadway improvement Bonds, plus the Additional Interest and estimated Administrative 2180.021\71999.7 Appendix A-1-C Western Improvement Area btedness- fry and is Major Improvement Bonds Roadway Improvement Bonds Delinquency Projected Period Ending Principal Interest Principal Interest Administrative &Prepayment Capitalized Annual PID September 30 Payments Expense Payments Expense Expenses Reserve Interest Installments 2018 $0 $318,456 $0 $0 $10,318 $32,720 ($318,456) $43,038 2019 $0 $330,387 $0 $371,210 $79,203 $60,045 ($701,597) $139,248 2020 $0 $330,387 $0 $311,505 $80,787 $60,045 ($641,892) $140,832 2021 $247,626 $330,387 $200,000 $311,505 $82,403 $60,045 $0 $1,231,966 2022 $260,523 $318,005 $210,000 $300,105 $84,051 $57,807 $0 $1,230,491 2023 $273,420 $304,979 $220,000 $288,135 $85,732 $55,454 $0 $1,227,721 Total $781,568 $1,932,601 1 $630,000 $1,582,460 $422,495 $326,117 ($1,661,944) $4,013,297 Notre:The Projected Annual Costs and Indebtedness Installmentsrmation of the PID,the oosts:= aproveent and Roadway Improvements PID Bonds as well as the administration-E, The debt service amounts are based on an average 5.07%Interest rate and a 211 year Perm for the Major m Improvement PID Bonds and an estimated average 5.7%and a 19 year tern for the Roadway Improvement PID Bonds.Administrative expenses are estimated to increase at a rate of 2.0%per yemwill be updatetf each year as pad of the Annual Service Plan lyfpd 2180.021\71999.7 Appendix A-2 Eastern Improvement Area Assessment Roll Exhibit A-2-A Eastern Improvement Area Updated Special Assessments-Major Improvements Estimated Build Out Major Improvement Tax Parcel ID Value (a) Special Assessment(b) 5700908,41295149 and 41291522 $ 1,235,340,000 $ 6,140,977 Total $ 1,235,340,000 $ 6,140,977 (a)Estimated build-out value is based on the estimated build out value shown in Table IV D calculated using the current development plan attached as Appendix A3 and is subject to change.The estimated build out value and updated development plans will be provided as part of the Annual Service Plan Update and are subject to change until the Maximum Special Assessment per Unit is determined in accordance with Section WE of the SAP. (b)The Special Assessments are shown herein collectively for all Parcels within the Eastern Improvement Area.Until such time that the Maximum Assessment per Unit is determined based on the applicable development plan and the Major Improvement Special Assessments are reallocated to each Parcel,the Annual Installments due from each Parcel will be calculated as part of each annual service plan update based on updated development plan to be provided by the Developer.If the Developer is unable to provide an updated development plan for each Parcel within the Eastern Improvement Area, the Administrator will use the current development plan shown in Appendix A-3 herein. 2180.021171999.7 Exhibit A-2-13 Eastern Improvement Area Uptkod Annual Installments-Major Improvements PID Bonds Delinquency Annual Net Debt Administrative & Capitalized Installment Year(a) Principal Interest(b) Service Expenses(c) Prepayment Interest (d) 9/30/2018 $ - $ 298,842 $ 298,842 $ 9,682 $ 30,705 $ (298,842) $ 40,387 9/30/2019 $ - $ 310,038 $ 310,038 $ 32,097 $ 30,705 $ (310,038) $ 62,802 9/30/2020 $ - $ 310,038 $ 310,038 $ 32,739 $ 30,705 $ (310,038) $ 63,444 9/30/2021 $ 232,374 $ 310,038 $ 542,413 $ 33,394 $ 30,705 $ - $ 606,511 9/30/2022 $ 244,477 $ 298,420 $ 542,897 $ 34,061 $ 29,543 $ - $ 606,501 9/30/2023 $ 256,580 $ 286,196 $ 542,776 $ 34,742 $ 28,321 $ - $ 605,839 9/30/2024 $ 271,103 $ 273,367 $ 544,470 $ 35,438 $ 27,038 $ - $ 606,945 9/30/2025 $ 285,627 $ 259,812 $ 545,438 $ 36,146 $ 25,682 $ - $ 607,267 9/30/2026 $ 300,150 $ 245,530 $ 545,680 $ 36,869 $ 24,254 $ - $ 606,804 9/30/2027 $ 314,674 $ 230,523 $ 545,196 $ 37,606 $ 22,753 $ - $ 605,556 9/30/2028 $ 331,618 $ 214,789 $ 546,407 $ 38,358 $ 21,180 $ - $ 605,945 9/30/2029 $ 348,562 $ 198,208 $ 546,770 $ 39,126 $ 19,522 $ - $ 605,417 9/30/2030 $ 367,926 $ 180,780 $ 548,706 $ 39,908 $ 17,779 $ - $ 606,394 9/30/2031 $ 387,291 $ 162,384 $ 549,674 $ 40,706 $ 15,939 $ - $ 606,320 9/30/2032 $ 409,076 $ 143,019 $ 552,095 $ 41,521 $ 14,003 $ - $ 607,619 9/30/2033 $ 428,440 $ 122,565 $ 551,006 $ 42,351 $ 11,958 $ - $ 605,314 9/30/2034 $ 452,646 $ 100,608 $ 553,254 $ 43,198 $ 9,815 $ - $ 606,267 9/30/2035 $ 476,852 $ 77,410 $ 554,261 $ 44,062 $ 7,552 $ - $ 605,875 9/30/2036 $ 503,478 $ 52,971 $ 556,449 $ 44,943 $ 5,168 $ - $ 606,560 9/30/20371 $ 530,104 1 $ 27,168 $ 557,272 $ 45,842 $ 2,651 $ - $ 605,764 Total 1 $ 6,140,977 1 $4,102,705 $ 10,243,682 $ 742,789 $ 405,977 $ (918,919) $ 10,473,530 (a)The 9/30ha dates represent the fiscal year end for the Bonds. (b)Gross of Capitalized Interest including interest from bond closing through 9/1/2020 (c)Preliminary Estimate.Assumes 2%increase per year.The administrative charges will be revised in Annual Service Plan Updates based on actual costs. (d)Annual Installments are calculated assurrrng an average 5.07%interest rate on the Bonds plus the Additional Interest plus Administrative 7 -TA4 Appendix A-2-C Eastern Improvement Area UpdoW 5-Year Annual Costs and Indebtedness-lMajor Im,provernefft Major Improvement Bonds Delinquency Projected Period Ending Principal Interest Administrative&Prepaymeni Capitalized Annual PID September 30 Payments Expense Expenses Reserve Interest Installments 2018 $0 $298,842 $9,682 $30,705 ($298,842) $40,387 2019 $0 $310,038 $32,097 $30,705 ($310,038) $62,802 2020 $0 $310,038 $32,739 $30,705 ($310,038) $63,444 2021 $232,374 $310,038 $33,394 $30,705 $0 $606,511 2022 $244,477 $298,420 $34,061 $29,543 $0 $606,501 2023 $256,580 $286,196 $34,742 $28,321 $0 $605,839 Total $733,432 $1,813,572 1 $176,715 1 $180,683 1 ($918,919) 1 $1,985,483 Mote:The Projected Annual Costs and Indebtedness Installments are the expenditures associated with the formation of the PID,the costs of issuance and repayment of the Major Improvement PID Bonds as well as the administration of the PID.The debt service amounts are based on an average 5,07%interest rate and a 20 year term for the Major Improvement PID Bonds.Administrative expenses are estimated to increase at a rate of 2.0%per year will be updated each year as part of the Annual Service Plan Updates. 2180.021171494.7 Appendix A-3 Updated Development Plan(as provided by the Developer) 41 ant Area Projected Build Out Value per Unit or SF $ 300,000 $ 127,100 $ 200 Total Projected New Parcel ID Old Parcel ID Single Family Units Multifamily Units Commercial SF Build Out Value 4103629 4103629 1,003 0 0 Total Build Out Value $ 300,900,000 $ $ $ 300,900,000 6839851 6839851 391 960 366,949 Total Build Out Value $ 117,300,000 $ 122,016,000 $ 73,389,800 $ 312,705,800 3779114 949 60 132,510 3958817 96 0 774,671 3710890 0 0 0 41017338 0 0 0 3710890"'" 41047362 32 0 0 3779122 0 0 0 4070585 0 1068 0 41291514 0 432 0 Subtotal 1,077 1560 907,181 Total Build Out Value $ 323,100,000 $ 198,276 000 $ 181,436 200 $ 702,812,200 41524853 1 41524853 0 0 0 Grand Total 2,471 2,520 1,274,130 $ 1,316,418,000 **A portion of Tax Parcel#03710890 is zoned"MU-2"High Intensity PAbced-Use allowing"higher density,mixed-use,pedestrian-oriented development for designated mixed-use growth centers and urban villages"including a variety of housing types among the planned commercial development. If the Developer's plans change to include high-density multi-family housing,the total assessments will be re-allocated in an Annual Service Plan Update to include the additional high-density multi-family units which will result in a reduction of the total assessments for the units reflected above.** Projected Build Out Value per Unit or SF $ 300,000 $ 127,100 $ 200 Total Projected New Parcel ID Old Parcell!) Single Family Units Multifamily Units Commercial SF Build Out Value 5700908 5700908 304 0 145,362 Total Build Out Value $ 91,200,000 $ - $ 29,072,400 $ 120,272,400 41291549 560 0 1,554,256 3983773 400 0 0 4009576 1,184 0 245,997 41295149 Subtotal 2,144 0 1,800,253 Total Build Out Value $ 643,200,000 $ - $ 360,050,600 $ 1 003,250,600 41291522 4009576 0 0 559,085 Total Build Out Value $ - $ $ 111,817,000 $ 111,817,6ttV 1\71999.7 Grand Total 2,448 0 2,504,700 $ 1,235,340,000 Appendix B Legal Description for Property within PID ROCK CREEK P.I.D. LEGAL DESCRIPTION TRACT 1 ALL THAT CERTAIN LOT, TRACT, OR PARCEL OF LAND, SITUATED IN A PORTION OF THE JUAN JOSE ALBIRADO SURVEY,ABSTRACT NO.4,THE JOHN H.BOSTICK SURVEY,ABSTRACT NO. 195,THE J. W. HAYNES SURVEY, ABSTRACT NO. 787, THE J. W. MUHLINGHAUS SURVEY, ABSTRACT NO. 1157, THE B. F. PACE SURVEY,ABSTRACT NO. 1254,THE STEPHEN B. WILSON SURVEY,ABSTRACT NO. 1676,CITY OF FORT WORTH, TARRANT COUNTY,TEXAS, BEING ALL OF THAT CERTAIN CALLED 220.826 ACRE TRACT AND PART OF THAT CERTAIN CALLED 701.937 ACRE TRACT DESCRIBED IN A DEED TO WUSF 4 ROCK CREEK, LP RECORDED IN INSTRUMENT NO. D214146610 OF THE DEED RECORDS OF TARRANT COUNTY, TEXAS (DRTCT), AND SAID 842.756 ACRES BEING MORE COMPLETELY DESCRIBED AS TWO PARCELS AS FOLLOWS,TO-WIT: BEGINNING AT A 1" IRON PIPE FOUND FOR THE NORTHEAST CORNER OF SAID 220.826 ACRE TRACT, THE SOUTHEAST CORNER OF A CALLED 0.629 ACRE TRACT DESCRIBED IN A DEED TO GABRIEL SOUTHWEST,LLC RECORDED IN INSTRUMENT NO.D217046244(DRTCT),AND THE WEST LINE OF A CALLED 157.060 ACRE TRACT DESCRIBED IN A DEED TO FORT WORTH AND CROWLEY PARTNERS, LTD. RECORDED IN INSTRUMENT NO. D207114613(DRTCT); THENCE SOUTH 01 DEG. 09 MIN. 30 SEC.EAST ALONG THE EAST LINE OF SAID 220.826 ACRE TRACT AND THE WEST LINE OF SAID 157.060 ACRE TRACT, A DISTANCE OF 1829.93 FEET TO A SPIKE FOUND WITH WASHER STAMPED"GORRONDONA"FOR THE MOST EASTERLY SOUTHEAST CORNER OF SAID 220.826 ACRE TRACT; THENCE SOUTH 89 DEG.07 MIN. 16 SEC. WEST DEPARTING THE WEST LINE OF SAID 157.060 ACRE TRACT AND CONTINUE ALONG A SOUTH LINE OF SAID 220.826 ACRE TRACT,A DISTANCE OF 63.96 FEET TO A 5/8"CAPPED IRON ROD FOUND STAMPED"BURY'; THENCE SOUTH 01 DEG.09 MIN.36 SEC.EAST ALONG A SOUTHERLY EAST LINE OF SAID 220.826 ACRE TRACT, A DISTANCE OF 129.34 FEET TO A 5/8"CAPPED IRON ROD FOUND STAMPED"BURY"; THENCE SOUTH 54 DEG. 54 MIN. 24 SEC. WEST ALONG A SOUTHEAST LINE OF SAID 220.826 ACRE TRACT, A DISTANCE OF 40.86 FEET TO A 5/8" IRON ROD FOUND FOR THE MOST SOUTHERLY SOUTHEAST CORNER OF SAID 220.826 ACRE TRACT AND BEING IN THE NORTH LINE OF A CALLED 13.703 ACRE TRACT DESCRIBED IN A DEED TO TEXAS ELECTRIC SERVICE COMPANY RECORDED IN VOLUME 3569,PAGE 410(DRTCT); THENCE SOUTH 87 DEG. 37 MIN. 52 SEC. WEST ALONG THE SOUTH LINE OF SAID 220.826 ACRE TRACT AND THE NORTH LINE OF SAID 13.703 ACRE TRACT,A DISTANCE OF 15.73 FEET TO A 5/8"IRON ROD FOUND; THENCE NORTH 89 DEG. 52 MIN. 56 SEC. WEST ALONG SAID NORTH AND SOUTH LINES, A DISTANCE OF 4860.60 FEET TO A P.K. NAIL FOUND WITH WASHER STAMPED "BURY" FOR THE SOUTHWEST CORNER OF SAID 220.826 ACRE TRACT AND THE NORTHWEST CORNER OF SAID 13.703 ACRE TRACT; THENCE NORTH 00 DEG. 42 MIN. 38 SEC. WEST ALONG THE WEST LINE OF SAID 220.826 ACRE TRACT, A DISTANCE OF 1894.07 FEET TO A 3/8"IRON ROD FOUND FOR THE NORTHWEST CORNER OF SAME; THENCE North 89 deg.07 min.20 sec.East along the North line of said 220.826 acre tract,a distance of 978.28 feet to a I"iron pipe found; THENCE North 89 deg. 03 min. 46 sec. East along said North line, a distance of 3979.93 feet to the POINT OF BEGINNING, containing 9,618,027 square feet or 220.800 acres of land,more or less. 89 2180.021\71999.7 TRACT 2A ALL THAT CERTAIN LOT, TRACT, OR PARCEL OF LAND, SITUATED IN A PORTION OF THE JUAN JOSE ALBIRADO SURVEY,ABSTRACT NO. 4,THE JOHN H.BOSTICK SURVEY,ABSTRACT NO. 195,THE J. W.HAYNES SURVEY, ABSTRACT NO. 787, THE J. W. MUHLINGHAUS SURVEY, ABSTRACT NO. 1157, THE B. F. PACE SURVEY,ABSTRACT NO. 1254,THE STEPHEN B. WILSON SURVEY,ABSTRACT NO. 1676,CITY OF FORT WORTH, TARRANT COUNTY,TEXAS,BEING ALL OF THAT CERTAIN CALLED 220.826 ACRE TRACT AND PART OF THAT CERTAIN CALLED 701.937 ACRE TRACT DESCRIBED IN A DEED TO WUSF 4 ROCK CREEK, LP RECORDED IN INSTRUMENT NO. D214146610 OF THE DEED RECORDS OF TARRANT COUNTY, TEXAS (DRTCT), AND SAID 842.756 ACRES BEING MORE COMPLETELY DESCRIBED AS TWO PARCELS AS FOLLOWS,TO-WIT: BEGINNING AT A P.K. NAIL FOUND WITH WASHER STAMPED "BURY" FOR THE MOST NORTHERLY NORTHWEST CORNER OF SAID 701.937 ACRE TRACT AND THE SOUTHWEST CORNER OF A CALLED 13.703 ACRE TRACT DESCRIBED IN A DEED TO TEXAS ELECTRIC SERVICE COMPANY RECORDED IN VOLUME 3569, PAGE 410(DRTCT),AND BEING IN THE EAST LINE OF TXU ROCKY CREEK SUBSTATION ADDITION RECORDED IN CABINET A,SLIDE 6910 OF THE PLAT RECORDS OF TARRANT COUNTY,TEXAS(PRTCT); THENCE SOUTH 89 DEG. 53 MIN. 01 SEC. EAST ALONG THE NORTH LINE OF SAID 701.937 ACRE TRACT AND THE SOUTH LINE OF SAID 13.703 ACRE TRACT, A DISTANCE OF 4702.41 FEET TO A 5/8" CAPPED IRON ROD FOUND "ILLEGIBLE" FOR THE NORTHEAST CORNER OF SAID 701.937 ACRE TRACT AND BEING IN THE NORTHWEST RIGHT-OF-WAY LINE OF STATE HIGHWAY NO. 121 (CHISHOLM TRAIL PARKWAY); THENCE IN A SOUTHWESTERLY DIRECTION DEPARTING THE SOUTH LINE OF SAID 13.703 ACRE TRACT AND CONTINUE ALONG THE SOUTHEAST LINE OF SAID 701.937 ACRE TRACT AND THE NORTHWEST RIGHT-OF- WAY LINE OF SAID STATE HIGHWAY NO. 121 THE FOLLOWING FIVE(5)COURSES; SOUTH 55 DEG. 05 MIN. 56 SEC. WEST, A DISTANCE OF 412.64 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED"GORRONDONA"; SOUTH 47 DEG. 09 MIN. 45 SEC. WEST, A DISTANCE OF 2000.00 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED"GORRONDONA"; SOUTH 39 DEG. 13 MIN. 20 SEC. WEST, A DISTANCE OF 767.36 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED"GORRONDONA"; SOUTH 47 DEG. 09 MIN. 45 SEC. WEST, A DISTANCE OF 1316.80 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED "GORRONDONA" FOR A POINT OF CURVATURE OF A CIRCULAR CURVE TO THE LEFT, HAVING A RADIUS OF 5849.58 FEET, A CENTRAL ANGLE OF 24 DEG. 55 MIN. 46 SEC., AND BEING SUBTENDED BY A CHORD WHICH BEARS SOUTH 34 DEG.41 MIN.51 SEC.WEST-2525.13 FEET; CONTINUE IN A SOUTHWESTERLY DIRECTION ALONG SAID CURVE TO THE LEFT, A DISTANCE OF 2545.16 FEET TO A 5/8"IRON ROD FOUND; THENCE NORTH 15 DEG. 42 MIN. 10 SEC. EAST NON-TANGENT TO SAID CURVE, DEPARTING THE SOUTHEAST LINE OF SAID 701.937 ACRE TRACT AND SAID NORTHWEST RIGHT-OF-WAY LINE,A DISTANCE OF 627.38 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED "STANTEC" FOR A POINT OF CURVATURE OF A CIRCULAR CURVE TO THE RIGHT, HAVING A RADIUS OF 2340.00 FEET, A CENTRAL ANGLE OF 21 DEG. 21 MIN. 37 SEC., AND BEING SUBTENDED BY A CHORD WHICH BEARS NORTH 26 DEG.22 MIN.58 SEC.EAST-867.33 FEET; THENCE IN A NORTHEASTERLY DIRECTION ALONG SAID CURVE TO THE RIGHT,A DISTANCE OF 872.37 FEET TO A 5/8"CAPPED IRON ROD FOUND"ILLEGIBLE'; THENCE NORTH 07 DEG. 54 MIN.08 SEC. WEST NON-TANGENT TO SAID CURVE,A DISTANCE OF 14.14 FEET TO A 5/8"IRON ROD FOUND; THENCE NORTH 52 DEG. 54 MIN. 31 SEC. WEST, A DISTANCE OF 980.00 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED"BURY"; THENCE SOUTH 82 DEG. 05 MIN. 29 SEC. WEST, A DISTANCE OF 14.14 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED"BURY"; THENCE SOUTH 37 DEG. 05 MIN. 29 SEC. WEST, A DISTANCE OF 101.97 FEET TO A 5/8" CAPPED IRON ROD FOUND STAMPED "BURY" FOR A POINT OF CURVATURE OF A CIRCULAR CURVE TO THE LEFT, HAVING A RADIUS OF 470.00 FEET,A CENTRAL ANGLE OF 21 DEG.43 MIN. 51 SEC.,AND BEING SUBTENDED BY A CHORD WHICH BEARS SOUTH 26 DEG. 13 MIN.34 SEC. WEST- 177.I9 FEET; THENCE IN A SOUTHWESTERLY DIRECTION ALONG SAID CURVE TO THE LEFT, A DISTANCE OF 178.26 FEET TO A 5/8"CAPPED IRON ROD FOUND STAMPED"BURY"; 89 2180.021\71999.7