HomeMy WebLinkAboutResolution 4937-05-2018 A Resolution
NO. 4937-05-2098
A RESOLUTION OF THE CITY OF FORT WORTH, TEXAS DETERMINING
THE COSTS OF CERTAIN PUBLIC IMPROVEMENTS TO BE FINANCED BY
THE FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 17 (ROCK
CREEK RANCH); ACCEPTING A PRELIMINARY SERVICE AND
ASSESSMENT PLAN UPDATE, INCLUDING PROPOSED UPDATED
ASSESSMENT ROLLS; DIRECTING THE FILING OF THE PROPOSED
UPDATED ASSESSMENT ROLLS WITH THE CITY SECRETARY TO MAKE
AVAILABLE FOR PUBLIC INSPECTION; CALLING A PUBLIC HEARING ON
JUNE 5, 2018 TO CONSIDER AN ORDINANCE LEVYING ADDITIONAL
ASSESSMENTS ON CERTAIN PROPERTY WITHIN THE DISTRICT;
DIRECTING CITY STAFF TO PUBLISH AND MAIL NOTICE OF SAID PUBLIC
HEARING; AND RESOLVING OTHER MATTERS INCIDENT AND RELATED
ITHERETO.
WHEREAS, Chapter 372, Texas Local Government Code (the "Act")authorizes the governing body(the
"City Council") of the City of Fort Worth, Texas (the "City"), to create a public improvement district within the
corporate limits and extraterritorial jurisdiction of the City; and
WHEREAS, on December 6, 2016, the City Council conducted a public hearing to consider a petition
received by the City on November 9, 2016 (the "Petition') requesting the creation of the Fort Worth Public
Improvement District No. 17 (Rock Creek Ranch) (the "District')to undertake the construction of certain public
improvements described in the Petition(the"Authorized Improvements"); and
WHEREAS, on December 13, 2016, the City Council adopted Resolution No. 4724-12-2016 (the
"Authorization Resolution'), authorizing, establishing and creating the District;and
WHEREAS, (1) the City Council previously adopted a Service and Assessment Plan (the "Service and
Assessment Plan")for the District pursuant to Ordinance 22832-08-2017, adopted on August 15, 2017; (2) levied
the Major Improvement Special Assessments (as defined in the Service and Assessment Plan; and (3) issued its
bonds designated "City of Fort Worth, Texas Special Assessment Revenue Bonds, Series 2017 (Fort Worth Public
Improvement District No. 17 (Rock Creek Ranch) Major Improvement Project)" payable from and secured by the
Major Improvement Special Assessments; and
WHEREAS, the City Council now desires to levy additional special assessments (the "Roadway
Improvement Special Assessments") on only the Western Improvement Area of the District (as defined in the
Service and Assessment Plan)for the purposes of financing the costs of certain Roadway Improvements(as defined
in the Service and Assessment Plan); and
WHEREAS,the City Council and the City staff have been presented with a proposed update to the Service
and Assessment Plan for the District, including proposed updates to the assessment rolls attached thereto (the
"Proposed Assessment Roll Updates")(the proposed update to the Service and Assessment Plan and the Proposed
ORTWO
Assessment Roll Update are referred to collectively as, the"Proposed SAP Update"), a copy of which is attached
hereto as Exhibit A and is incorporated herein for all purposes; and
WHEREAS, the Proposed SAP Update sets forth the updated estimated total costs of the Authorized
Improvements to be financed by the District at this time (defined in the Proposed SAP Update as the "Roadway
Improvements") and the Proposed Assessment Rolls Updates state the special assessments to be levied against
each parcel of land in the Western Improvement Area of the District as determined by the assessment methodology
chosen by the City Council and set forth in the Proposed SAP Update; and
WHEREAS, the Roadway Improvements are to be financed by Roadway Improvement Special
Assessments to be levied only on the Western Improvement Area of the District; and
WHEREAS, the Act requires that the Proposed Assessment Rolls Update levying the Roadway
Improvement Special Assessment be filed with the City Secretary of the City(the"City Secretary")and be subject
to public inspection; and
WHEREAS, the Act requires that a public hearing(the "Assessment Hearing")be called to consider the
proposed Roadway Improvement Special Assessment and requires the City Council to hear and pass on any
objections to such proposed assessments at, or on the adjournment of,the Assessment Hearing; and
WHEREAS,the Act requires that notice of the Assessment Hearing be published in a newspaper of general
circulation in the City before the tenth (10th) day before the date of the Assessment Hearing and be mailed to
property owners liable for assessment; and
WHEREAS, after all objections have been heard and passed on at the Assessment Hearing, the City
Council may levy Roadway Improvement Special Assessments against the property in the Western Improvement
Area of the District to pay for the Roadway Improvements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS:
SECTION 1. THAT the recitals set forth above in this Resolution are true and correct and are hereby
adopted as findings of the City Council and are incorporated into the body of this Resolution as if fully set forth
herein.
SECTION 2. THAT the City Council does hereby accept the Proposed SAP Update for the District,
including the Proposed Assessment Rolls Update, a copy of which is attached hereto as Exhibit A and is
incorporated herein for all purposes. All capitalized terms not otherwise defined herein shall have the meanings
given to such terms in the Proposed SAP Update.
SECTION 3. THAT the City Council hereby determines that estimated total cost of the Roadway
Improvements to be funded through the Roadway Improvement Special Assessments levied at this time in the
Western Improvement Area of the District is approximately$5,670,000.
SECTION 4. THAT the City Council's final determination and approval of the costs of the Roadway
hnprovements, or any portion thereof, shall be subject to and contingent upon City Council approval of a final
Service and Assessment Plan update which will include final updates to the Assessment Rolls, after the properly
noticed and held Assessment Hearing.
fFoRTMau
SECTION 5. THAT the City Council hereby authorizes and directs the filing of the Proposed SAP Update,
including the Proposed Assessment Rolls Update,with the City Secretary and the same shall be available for public
inspection.
SECTION 6. THAT the City Council hereby authorizes, and calls, a public hearing (the Assessment
Hearing as defined above)to be held on June 5,2018 at or after 7:00 p.m. at City Council Chamber, City Hall, 200
Texas Street, Fort Worth, Texas, at which the City Council shall, among other actions, hear and pass on any
objections to the proposed Roadway Improvement Special Assessments; and, upon the adjournment of the
Assessment Hearing, the City Council will consider an ordinance levying the Roadway Improvement Special
Assessments on the property within the Western Improvement Area of the District(which ordinance shall specify
the method of payment of the assessments).
SECTION 7. THAT the City Council hereby authorizes and directs the City Secretary to publish notice of
the Assessment Hearing in substantially the form attached hereto as Exhibit B and incorporated herein for all
purposes, in a newspaper of general circulation in the City, on or before May 19, 2018, as required by Section
372.016(b) of the Act.
SECTION 8.THAT when the Proposed Assessment Rolls Update are filed with the City Secretary,the City
Council hereby authorizes and directs the City Secretary, on or before May 19, 2018, to mail to owners of property
liable for assessment notice of the Assessment Hearing as required by Section 372.016(c)of the Act.
SECTION 9. THAT City staff is authorized and directed to take such other actions as are required
(including,but not limited to, notice of the public hearing as required by the Texas Open Meetings Act)to place the
Assessment Hearing on the agenda for the June 5, 2018 meeting of the City Council.
SECTION 11. THAT this Resolution shall become effective from and after its date of passage in
accordance with law.
Adopted this 15th day of May, 2018.
ATTES FORT F...........
By.
A-
2
Name: Ronald P. Gonzales
Title: Assistant City Secretary
ORTWO T
EXHIBIT A
PROPOSED SERVICE AND ASSESSMENT PLAN UPDATE
EXHIBIT B
NOTICE OF PUBLIC HEARING
CITY OF FORT WORTH,TEXAS
NOTICE OF PUBLIC HEARING TO CONSIDER
THE LEVY OF ADDITIONAL ASSESSMENTS AGAINST PROPERTY WITHIN
FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 17 (ROCK CREEK RANCH)
Pursuant to Chapter 372, Texas Local Government Code (the "Act"), notice is hereby given that the City Council
of the City of Fort Worth, Texas(the"Cfty")will hold a public hearing(the"Public Hearing")to consider the levy
of assessments against property within Fort Worth Public Improvement District No. 17 (Rock Creek Ranch) (the
"District")to pay for certain improvements therein.
Date,Time and Place of Public Hearine.The Public Hearing will take place on June 5,2018,at or after 7:00 p.m.,
at the City Council Chamber, City Hall,200 Texas Street, Fort Worth, Texas.
General Nature of the Improvements. The general nature of the proposed public improvements, including the
improvements to be reimbursed through the levy of special assessments in the District, includes: (i) roadway
improvements, and(ii)costs related to the creation and administration of the District.
The roadway improvements will benefit only the Western Improvement Area of the District (the "Roadway
Improvements"),and are separate special assessments from those previously levied to pay the costs of certain water
and wastewater improvements benefitting the entire District.
Cost of the Improvements.The estimated total cost of the Roadway Improvements to be funded through the special
assessments levied in the Western Improvement Area of the District is approximately $5,670,000.
Proposed Assessment Roll. The proposed updated assessment rolls providing for the costs of said Roadway
Improvements to be assessed, levied and apportioned against the property within the Western Improvement Area,
and the real and true owner or owners thereof, are on file and are available for public inspection during regular
business hours at the office of the City Secretary at City Hall, 200 Texas Street,Fort Worth, Texas.
Boundaries of the District. The boundaries of the District encompass approximately 1,756 acres, and the District
is generally located along both sides of the Chisolm Trail Parkway south of McPherson Boulevard and north of FM
1187, in Tarrant County, Texas. The boundaries of the District, including the boundaries of the Western
Improvement Area of the District, are more particularly described by a metes and bounds description available at
the Fort Worth City Hall and available for public inspection.
Objections Considered. All written or oral objections will be considered at the Public Hearing.
CERTIFICATE OF ASSISTANT CITY SECRETARY
THE STATE OF TEXAS §
COUNTIES OF TARRANT, DENTON, PARKER,WISE AND JOHNSON §
CITY OF FORT WORTH §
I, the undersigned Assistant City Secretary of the City of Fort Worth, Texas (the "C "), hereby
certify as follows:
1. The City Council of the City convened in Regular Session on May 15, 2018, at the
scheduled meeting place thereof, and the roll was called of the duly constituted officers and members of
said City Council,to-wit:
Betsy Price Mayor
Carlos E.Flores Councilmember(District 2)
Brian Byrd Councilmember(District 3)
Cary Moon Councilmember(District 4)
Gyna Bivens Councilmember(District 5)
Jungus Jordan Councilmember(District 6)
Dennis Shingleton Councilmember(District 7)
Kelly Allen Gray Councilmember(District 8)
Ann Zadeh Councilmember(District 9)
and all of said persons, except b Oh`_b V aA S , were present, thus constituting a quorum.
Whereupon, among other business, the following was transacted at said meeting: the attached Resolution
entitled:
RESOLUTION NO.
A RESOLUTION OF THE CITY OF FORT WORTH, TEXAS DETERMINING THE
COSTS OF CERTAIN PUBLIC IMPROVEMENTS TO BE FINANCED BY THE
FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 17 (ROCK CREEK
RANCH); ACCEPTING A PRELIMINARY SERVICE AND ASSESSMENT PLAN
UPDATE, INCLUDING PROPOSED UPDATED ASSESSMENT ROLLS;
DIRECTING THE FILING OF THE PROPOSED UPDATED ASSESSMENT ROLLS
WITH THE CITY SECRETARY TO MAKE AVAILABLE FOR PUBLIC
INSPECTION; CALLING A PUBLIC HEARING ON JUNE 5, 2018 TO CONSIDER
AN ORDINANCE LEVYING ADDITIONAL ASSESSMENTS ON CERTAIN
PROPERTY WITHIN THE DISTRICT; DIRECTING CITY STAFF TO PUBLISH
AND MAIL NOTICE OF SAID PUBLIC HEARING; AND RESOLVING OTHER
MATTERS INCIDENT AND RELATED THERETO
was duly introduced for consideration and passage. It was then duly moved and seconded that said
resolution be passed; and, after due discussion, said motion, carrying with it the passage of said
Resolution, prevailed and carried by the following vote:
Ayes: i7 Noes: ' _ Abstentions: `
2. A true, full and correct copy of the aforesaid Resolution passed at the meeting described
above is attached to and follows this Certificate; said Resolution has been duly recorded in the official
minutes of said City Council; the above and foregoing paragraph is a true and correct excerpt from said
minutes of said meeting pertaining to the passage of said Resolution; the persons named in the above and
foregoing paragraph, at the time of said meeting and the passage of said Resolution, were the duly
chosen, qualified and acting members of said City Council as indicated therein; each of'said officers and
member was duly and sufficiently notified officially and personally in advance, of the time, place and
purpose of the aforesaid meeting and that said Resolution would be introduced and considered for
passage at said meeting; and said meeting was open to the public, and public notice of the time, place and
purpose of said meeting was given, all as required by Chapter 551 of the Texas Government Code.
[Signature Page Follows]
SIGNED AND SEALED this -day of 12018,
T Listant City Secretary U
City of Fort Worth.Texas
A
(Cl A
Signature Page to Assistant Certificate of Secretary
Fort Worth Public
Improvement District No. 17
(Rock Creek Ranch)
Preliminary Service and Assessment Plan
August 15, 2017
As Updated for Roadway Improvement Bonds on
May 2018
For additional information,please contact:
Initial PID Administrator:
Municap, Inc.
222 W Las Colinas Blvd, Suite 1650E
Irving,TX 75039
972-444-2519 main
866-648-8482 toll free
City of Fort Worth:
Department of Financial Management Services
City of Ft. Worth, Texas
200 Texas Street
Ft.Worth,Texas 76102
817.392-8500(office)
2180.021\71999.7
Table of Contents
Section I
PLAN DESCRIPTION AND DEFINED TERMS......................................................................... 3
Section II
PROPERTY INCLUDED IN THE PID....................................................................................... 11
Section III
DESCRIPTION OF THE AUTHORIZED IMPROVEMENTS .................................................. 15
Section IV
ASSESSMENTPLAN..................................................................................................................20
Section V
SERVICEPLAN .......................................................................................................................... 32
Section VI
TERMS OF THE SPECIAL ASSESSMENTS ............................................................................ 36
Section VII
ASSESSMENTROLL.................................................................................................................. 42
Section VIII
MISCELLANEOUS PROVISIONS............................................................................................. 46
Appendix A-I
WESTERN IMPROVEMENT AREA ASSESSMENT ROLL........................................48
Appendix A-2
EASTERN IMROVEMENT AREA ASSESSMENT ROLL....................................................... 51
Appendix A-3
EASTERN IMROVEMENT AREA ASSESSMENT ROLL....................................................... 54
Appendix B
LEGAL DESCRIPTION FOR PROPERTY WITHIN PID......................................................... 55
Appendix B-I
LEGAL DESCRIPTION FOR THE WESTRN IMPROVEMENT AREA................................. 61
Appendix B-2
LEGAL DESCRIPTION FOR THE EASTERN IMPROVEMENT AREA................................ 62
Appendix C
MAP OF AUTHORIZED IMPROVEMENTS ............................................................................ 62
2180.021\71999.7
Section I: Plan Description and Defined Terms
List of Tables
Table II-A
PUBLIC IMPROVEMENT DISTRICT BOUNDARIES............................................................ 12
Table II-B
WESTERN IMPROVEMENT AREA BOUNDARIES............................................................... 13
Table II-C
EASTERN IMPROVEMENT AREA BOUNDARIES................................................................ 14
Table III-A
COSTS OF AUTHORIZED IMPROVEMENTS, NON-PID RELATED IMPROVEMENTS,
AND UNIVERSITY IMPROVEMENTS .................................................................................. .18
Table IV-A
UPDATED COSTS OF UNIVERSITY IMPROVEMENTS
....................................................................................................................21
Table IV-B
WESTERN IMPROVEMENT AREA UPDATED ACTUAL COST ALLOCATION............... 24
Table IV-C
EASTERN IMPROVEMENT AREA UPDATED ACTUAL COST ALLOCATION ............... 24
Table IV-D
UPDATED WESTERN IMPROVEMENT AREA SPECIAL ASSESSMENT ALLOCATION.
....................................................................................................................................................... 28
Table IV-E
UPDATED WESTERN IMPROVEMENT AREA ESTIMATED VALUE TO SPECIAL
ASSESSMENT
RATIOS.......................................................................................................29
Table IV-F
UPDATED EASTERN IMPROVEMENT AREA SPECIAL ASSESSMENT ALLOCATION 30
Table IV-G
UPDATED EASTERN IMPROVEMENT AREA ESTIMATED VALUE TO SPECIAL
ASSESSMENT
RATIOS.......................................................................................................30
Table V-A
UPDATED MAJOR IMPROVEMENTS PID BONDS SOURCES AND USES ....................... 33
Table V-B
ROADWAY IMPROVEMENTS PID BONDS SOURCES AND USES.................................... 34
Table VII-A
UPDATED WESTERN IMPROVEMENT AREA SPECIAL BENEFIT SUMMARY ............. 43
Table VII-B
1
2180.021\71999.7
Section I: Plan Description and Defined Terms
UPDATED WESTERN IMPROVEMENT AREA SPECIAL BENEFIT SUMMARY—
ROADWAY IMPROVEMENTS.................................................................................................44
Table VII-C
UPDATED EASTERN IMPROVEMENT AREA SPECIAL BENEFIT SUMMARY..............45
2
2180.021\71999.7
Section I: Plan Description and Defined Terms
Section I
PLAN DESCRIPTION AND DEFINED TERMS
A. Introduction
1. On December 13, 2016, (the "Creation Date"), the City Council (the "City Council") of
the City of Fort Worth, Texas (the "City") approved Resolution No. 4724-12-2016,
which authorized the creation of the Fort Worth Public Improvement District No. 17
(Rock Creek Ranch) (the "PID") to finance all or a portion of the Actual Costs of the
Authorized Improvements for the benefit of certain property in the PID, all of which is
located within the city limits of the City.
2. Chapter 372 of the Texas Local Government Code (as amended, the "PID Act"), governs
the creation and operation of public improvement districts within the State of Texas. This
Service and Assessment Plan, as updated from time to time, (this "SAP") was prepared
pursuant to the PID Act. The PID Act requires that a service plan "cover a period of at
least five years and must also define the annual indebtedness and the projected costs for
improvements." The PID Act also requires a service plan "be reviewed and updated
annually for the purpose of determining the annual budget for improvements." The
service plan for the PID is described in more detail in Section V herein.
3. The Assessment Rolls for the PID are attached hereto as Appendix A-1 and Appendix
AA=2, and are addressed in Section VII of this SAP. The Special Assessments as shown on
the Assessment Rolls are based on the method for establishing and levying the Special
Assessments described in Sections IV and VI of this SAP.
4. Unless otherwise specified, references in this SAP to a "Section," a "Table," or an
"Appendix" shall mean a Section of, a Table in, or an Appendix to this SAP.
B. Definitions
As used in this SAP, capitalized terms shall have the meanings ascribed to them as follows:
1. "Actual Cost(s)" means, with respect to an Authorized Improvement, the demonstrated,
reasonable, allocable, and allowable costs of constructing such Authorized Improvement,
as specified in a payment request in a form that has been reviewed and approved by the
City. Actual Cost may include (i) the costs incurred for the design, planning, financing,
administration/management, acquisition, installation, construction and/or implementation
of such Authorized Improvement, (ii) the costs incurred in preparing the construction
plans for such Authorized Improvement, (iii) the fees paid for obtaining permits, licenses
or other governmental approvals for such Authorized Improvement, (iv) the Project
Management Fees, (v) the costs incurred for external professional costs, such as
engineering, geotechnical, surveying, land planning, architectural landscapers,
advertising, marketing and research studies, appraisals, legal, accounting and similar
3
2180.021\71999.7
Section I: Plan Description and Defined Terms
professional services related to the Authorized Improvement, (vi) all labor, bonds and
materials, including equipment and fixtures, incurred by contractors, builders and
materialmen in connection with the acquisition, construction or implementation of the
Authorized Improvement, (vii) all related permitting, zoning and authorized approval
expenses, architectural, engineering, legal and consulting fees, financing charges, taxes,
governmental fees and charges, insurance premiums, and miscellaneous expenses, and
(viii) all payments for Administrative Expenses.
2. "Additional Interest" means the 0.50% additional interest charged on the applicable
Special Assessments pursuant to Section 372.018 of the PID Act to fund the Delinquency
and Prepayment Reserve, pursuant to Section W.H.
3. "Administrative Expenses" means the administrative, organizational, maintenance and
operation costs and expenses associated with, or incident to, the administration,
organization, maintenance and operation of the PID, including, but not limited to, the
costs of (i) direct and contracted costs incurred by the City including legal counsel,
engineers, accountants, financial advisors, investment bankers or other consultants and
advisors, (ii) creating and organizing the PID and preparing the Assessment Rolls, (iii)
computing, levying, collecting and transmitting the Special Assessments or the Annual
Installments thereof, (iv) maintaining the record of Special Assessments, including
payments, reallocations and/or cancellations of the Special Assessments or Annual
Installments thereof, (v) investing or depositing the Special Assessments or other monies,
(vi)complying with the PID Act, arbitrage rebate requirements and/or securities
disclosure requirements, (vii) paying the paying agent/registrar's and trustee's fees and
expenses (including the fees and expenses of its legal counsel) related to the PID Bonds,
and (viii) City costs of administering the construction of the Authorized Improvements.
Administrative Expenses shall also include the administrative costs and expenses of
issuing, making debt service payments on, and redeeming PID Bonds; provided,
however, that for the avoidance of doubt, Administrative Expenses do not include
payment of the actual principal of, redemption premium, if any, and interest on PID
Bonds. Annual Administrative Expenses collected and not expended shall be carried
forward and applied to reduce Administrative Expenses in subsequent years to avoid over
collection.
4. "Administrator" means an officer or employee of the City or third party designee of the
City who is not an officer or employee thereof, who shall have the responsibilities
provided for herein, in an Indenture relating to the PID Bonds or in any other agreement
approved by the City Council relating to the PID.
4
2180.021\71999.7
Section I: Plan Description and Defined Terms
5. "Annual Installment" means, with respect to the Assessed Property, each annual
payment of. (i) the applicable Special Assessment (including the principal of and interest
on), as shown on the Special Assessment Rolls attached hereto as Appendix A-1 and
Appendix A-2, as the same may be updated in accordance with this SAP, or in an Annual
Service Plan Update, and calculated as provided in Section VI of this SAP, (ii)
Administrative Expenses, and (iii) Additional Interest designated for the Delinquency and
Prepayment Reserve described in Section IV.H of this SAP.
6. "Annual Service Plan Update" has the meaning set forth in Section V.2 of this SAP.
7. "Assessed Property" or "Assessed Properties" means property within the PID that
benefit from the Authorized Improvements and on which Special Assessments have been
levied as shown on an Assessment Roll (as the same may be updated each year by the
Annual Service Plan Update) and which includes any and all Parcels within the PID other
than Non-Benefitted Property.
8. "Assessment Ordinance" means, as applicable, the Major Improvement Assessment
Ordinance and/or the Roadway Improvements Assessment Ordinance.
9. "Assessment Roll" means, as applicable, each Assessment Roll included in this SAP as
Appendix A-1 and Appendix A-2, as the same may be updated, modified or amended
from time to time in accordance with the procedures set forth herein and in the PID Act,
including updates prepared in connection with the issuance of any PID Bonds or in
connection with any Annual Service Plan Update.
10. "Authorized Improvements" means those improvement, including those listed in Table
III-A and described in Section III.B, authorized by Section 372.003 of the PID Act,
acquired, constructed or installed in accordance with this SAP, and any future updates
and/or amendments, for which Special Assessments are levied against the Assessed
Property that receives a special benefit from such improvements.
11. "City" means the City of Fort Worth, Texas.
12. "City Council'means the duly elected governing body of the City.
13. "City Facilities Agreement" means the City's standard community facilities agreement
or such other form as the City may require to ensure compliance with its "Community
Facilities Agreement (CFA) Policy, Related Ordinance, and Street Design Criteria" last
revised by M&C G-13181, March 20, 2001, as the same may be amended from time to
time.
14. "County" means Tarrant County, Texas.
15. "Delinquency and Prepayment Reserve" has the meaning set forth in Section IV.H of
this SAP.
5
2180.021\71999.7
Section I: Plan Description and Defined Terms
16. "Delinquent Collection Costs" means interest, penalties and expenses incurred or
imposed with respect to any delinquent Special Assessment, or an Annual Installment
thereof, in accordance with the PID Act which includes the costs related to pursuing
collection of such delinquent Special Assessment, or an Annual Installment thereof, and
the costs related to foreclosing the lien against the Assessed Property, including
attorney's fees to the extent permitted under Texas Law.
17. "Developer" means Walton Development & Management TX, LLC, a Delaware limited
liability company or their respective successors and assigns.
18. "Eastern Improvement Area" means the approximately 833 acres of land within the
PID located east of Chisolm Trail Parkway and shown on Table II-C.
19. "Eastern Improvement Area Assessment Roll" means the Eastern Improvement Area
Assessment Roll included in this SAP as Appendix A-2, as the same may be updated,
modified or amended from time to time in accordance with the procedures set forth
herein and in the PID Act, including updates prepared in connection with the issuance of
PID Bonds or in connection with any Annual Service Plan Update. The Eastern
Improvement Area Assessment Roll includes the portion of the Major Improvement
Assessment allocable to the Eastern Improvement Area.
20. "Indenture" means, as applicable, the Major Improvement Bonds Indenture and/or the
Roadway Improvement Bonds Indenture, or any Indenture related to the refinancing of
such Bonds.
21. "Lot" means (i) for any portion of the Property for which a subdivision plat has been
recorded in the official real property records of the County, a tract of land described as a
"lot" in such subdivision plat, and (ii) for any portion of the Property for which a
subdivision plat has not been recorded in the official real property records of the County,
a tract of land anticipated to be described as a"lot" in a final recorded subdivision plat.
22. "Land Use" means a classification of final building Lots with similar characteristics (e.g.
commercial, light industrial, multifamily residential, single family residential or other
uses), as determined or approved by the Administrator and confirmed by the City
Council. In the case of single family residential Lots, the Land Use shall be further
defined by classifying the residential Lots based on the front footage of the Lot, as
determined by the Administrator and approved by the City Council as part of its Annual
Service Plan Update. If any change in Land Use requires a change in zoning or other
entitlement process, such change must be approved by the City prior to any change in the
SAP.
23. "Major Improvements" means, collectively, the Water Improvements and the Sanitary
Sewer Improvements described in Section III.B.
24. "Major Improvement Assessment Ordinance" means Assessment Ordinance No.
22832-08-2017 adopted by the City Council on August 15, 2017 which initially approved
this SAP and levied the Major Improvement Special Assessments.
6
2180.021\71999.7
Section I: Plan Description and Defined Terms
25. "Major Improvement Special Assessments" means the Special Assessments levied
pursuant to the Major Improvement Assessment Ordinance on the Eastern Improvement
Area and the Western Improvement Area for the Major Improvements, as shown in the
Assessment Rolls.
26. "Major Improvement Bonds" means the City of Fort Worth, Texas, Special
Assessment Revenue Bonds, Series 2017 (Fort Worth Public Improvement District No.
17 (Rock Creek Ranch) Major Improvement Project) in original principal amount of
$12,685,000, issued by the City under Ordinance No. 22833-08-2017 on August 15, 2017
and secured solely by the Major Improvement Special Assessments levied on the
Assessed Property within the Eastern Improvement Area and the Western Improvement
Area to finance the Water Improvements and the Sanitary Sewer Improvements.
27. "Major Improvement Bonds Indenture" means that certain Indenture of Trust, dated
August 15, 2017, as modified, supplemented or amended from time to time, authorizing
the issuance of, and setting forth the terms and other provisions relating to the Major
Improvement Bonds, including the collection of Assessments and/or Annual Installments
for the repayment of Bonds.
28. "Mandatory Prepayment" "has the meaning set forth in Section VI.0 of this SAP.
29. "Maximum Special Assessment per Unit" means, for each Land Use category, the
Special Assessment per unit amounts that will be determined by the PID Administrator
and the City at the time that the initial Owner of the Assessed Property enters into a
contract for sale of any portion of the Assessed Property to an unaffiliated third party,
excluding the University and the City.
30. "Non-Benefitted Property" means Parcels that accrue no special benefit from the
Authorized Improvements being funded through the PID, including Public Property, such
as the University Property, and easements that create an exclusive use for a public utility
property. Property identified as Non-Benefitted Property at the time the Special
Assessments (i) are imposed or(ii) are reallocated pursuant to a subdivision of a parcel, is
not assessed. Assessed Property converted to Non-Benefitted Property, if the Special
Assessments may not be reallocated pursuant to the provisions herein, remains subject to
the Special Assessments and requires the Special Assessments to be prepaid as provided
for in Section VI.C.
31. "Non-PID Related Improvements" means those improvements described in Section
III.B.4 which, although constructed at the same time as Authorized Improvements, do
not benefit the Assessed Property and are not paid for by the PID but will be paid by
either the City or other property owners not located within the PID.
32. "Owner(s)" means Walton Texas, LP; WUSF 4 Rock Creek, LP, WUSF Rock Creek
East, LP or any other entity affiliated with Walton International Group (USA), Inc., or
their respective successors and assigns.
7
2180.021\71999.7
Section I: Plan Description and Defined Terms
33. "Parcel" means a defined portion of the Property identified by either a tax map
identification number assigned by the Tarrant County Appraisal District for real property
tax purposes, by metes and bounds description, by lot and block number in a final
subdivision plat recorded in the official real property records of the County, or by any
other means determined by the City Council.
34. "PID" means the Fort Worth Public Improvement District No. 17 (Rock Creek Ranch)
created by the City pursuant to Resolution No. 4724-12-2016 approved December 13,
2016.
35. "PID Act" means Chapter 372 of the Texas Local Government Code, as amended.
36. "PID Bonds" means any bonds secured by Special Assessments levied against Assessed
Property within the PID that may be issued to finance Authorized Improvements,
including the Major Improvement Bonds and the Roadway Improvements Bonds, if any.
The term PID Bonds also includes any refunding bonds, as contemplated by Section
VI.E.3.d.
37. "PID Reimbursement Agreement" means the "PID Reimbursement Agreement - Fort
Worth Public Improvement District No. 17 (Rock Creek Ranch)" approved by the City
on August 15, 2017, as amended by the Roadway Financing Agreement.
38. "Prepayment Costs" mean interest and expenses to the date of prepayment, plus any
additional expenses related to the prepayment allowed by applicable law, reasonably
expected to be incurred by or imposed upon the City as a result of any prepayment of a
Special Assessment.
39. "Project Engineer" means Goodwin& Marshall, Inc.
40. "Project Management Fees"means the fees as agreed to by the City and the Developer
for costs incurred by the Developer for the design, construction and installation of such
Authorized Improvement exclusive of any costs related to issuing PID bonds or otherwise
financing such Authorized Improvement. The Project Management Fees are set forth in
clauses a and b of Section III.13.3. No Project Management Fees will be paid in excess of
such estimates.
41. "Property" means the approximately 1,756 acres of land depicted and described by
metes and bounds on Exhibit A to Resolution No. 4724-12-2016 as adopted by City
Council on December 13, 2016 and is legally described in Appendix B to this SAP and is
depicted in Table II.A of this SAP.
42. "Public Property" means real property, located within the boundaries of the PID owned
by or irrevocably offered and accepted for dedication to the federal government, the State
of Texas, the County, the City, a school district, a public university, a public utility
provider or any other political subdivision or public agency, whether in fee simple,
8
2180.021\71999.7
Section I: Plan Description and Defined Terms
through an easement, by plat or otherwise. Public Property includes the University
Property.
43. "Roadway Improvement Assessment Ordinance" means Assessment Ordinance No.
-—
adopted by the City Council on [May _, 20181 which approved the
updates to the SAP relating to the issuance of the Roadway Improvement Bonds and
levied the Roadway Improvement Special Assessments.
44. "Roadway Improvement Bonds Indenture" means that certain Indenture of Trust,
dated , 2018, as modified, supplemented or amended from time to time,
authorizing the issuance of, and setting forth the terms and other provisions relating to the
Roadway Improvement Bonds, including the collection of Assessments and/or Annual
Installments for the repayment of Bonds.
45. "Roadway Improvement Bonds" means the City of Fort Worth, Texas Special
Assessment Revenue Bonds, Series 2018 (Fort Worth Public Improvement District No.
17 (Rock Creek Ranch) Roadway Improvement Project) secured by Roadway
Improvement Special Assessments levied on the Assessed Property within the Western
Improvement Area to finance the Roadway Improvements for the benefit of such
Assessed Property in the Western Improvement Area.
46. "Roadway Improvement Special Assessment" means the Special Assessment levied
pursuant to the Roadway Improvement Assessment Ordinance on the Assessed Property
within the Western Improvement Area for the Roadway Improvements, as shown in the
Western Improvement Area Assessment Roll.
47. "Roadway Improvements" means those Authorized Improvements described in Section
III.B.3.b of this SAP.
48. "Roadway Financing Agreement" means that certain "Financing Agreement and
Limited Amendment to PID Reimbursement Agreement – City of Fort Worth / Rock
Creek Ranch / Chisolm Trail Ranch – Brewer Road Project" by and among the City,
Walton Development & Management TX, LLC, and WM Sub CTR, LP, a Texas limited
partnership, dated as of [ , 20181, which sets forth the parties agreement as to
the financing of the Roadway Improvements and the Non-PID Related Improvements as
described Section III.B.4.b.
49. "Sanitary Sewer Improvements" has the meaning set forth in Section III.B.3.a.ii of
this SAP.
50. "Service and Assessment Plan" or "SAP" means this Fort Worth Public Improvement
District No. 17 (Rock Creek Ranch) Service and Assessment Plan approved by the City
Council pursuant to the Major Improvement Assessment Ordinance, updated to include
the Roadway Improvement Special Assessment pursuant to the Roadway Improvement
Assessment Ordinance, and as otherwise amended, supplemented or updated by the City
Council from time to time.
9
2180.021\71999.7
Section I: Plan Description and Defined Terms
51. "Special Assessment" means, as applicable, the Major Improvement Special
Assessments and/or the Roadway Improvement Special Assessments levied against a
Parcel imposed pursuant to an Assessment Ordinance and the provisions herein, as shown
on any Assessment Roll, subject to reallocation upon the subdivision or reduction of such
Parcel according to the provisions hereof and the PID Act.
52. "Trustee" means the trustee as specified in the applicable Indenture, and any successor
thereto permitted under such Indenture.
53. "University Improvements" has the meaning set forth in Section IV.A.2.
54. "University Property" is approximately 80 acres of land and is Public Property and
Non-Benefitted Property, as described in Section IVA.2.
55. "Water Improvements" has the meaning set forth in Section III.B.3.a.ii of this SAP.
56. "Western Improvement Area" means the approximately 923 acres of land, within the
PID located west of Chisolm Trail Parkway as shown on Table II-B.
57. "Western Improvement Area Assessment Roll" means the Western Improvement Area
Assessment Roll included in this SAP as Appendix A-1, may be updated, modified or
amended from time to time in accordance with the procedures set forth herein and in the
PID Act, including updates prepared in connection with the issuance of PID Bonds or in
connection with any Annual Service Plan Update. The Western Improvement Area
Assessment Roll includes the portion of the Major Improvement Special Assessment
allocable to the Western Improvement Area and the Roadway Improvement Special
Assessment.
10
2180.021\71999.7
Section II: Property Included in the PID
Section II
PROPERTY INCLUDED IN THE PID
A. Property Included in the PID
1. The PID is comprised of the Property shown in Table II-A, which is legally described in
Appendix B. The PID, encompassing approximately 1,756 acres, is located entirely
within the corporate limits of the City. It is anticipated that the Property will be
developed to include approximately 4,919 single family residential homes, approximately
2,520 multi-family residential units, approximately 3,778,830 square feet of commercial
space and approximately 960,000 square feet planned as a public university.
2. The Western Improvement Area, encompassing approximately 923 acres is depicted on
Table II-B and will include approximately 2,471 single family residential homes,
approximately 2,520 multi-family residential units, and approximately 1,274,130 square
feet of commercial space. The Western Improvement Area includes the University
Property, which will include approximately 960,000 square feet planned as the Tarleton
State University — Fort Worth campus. No improvements benefitting the University
Property will be financed by Special Assessments in the PID. The Western Improvement
Area, save and except for the University Property, is legally described and the Parcels
within the Western Improvement Area are shown in Appendix B-1.
3. The Eastern Improvement Area, encompassing approximately 833 acres is depicted on
Table II-C and will include approximately 2,448 single family residential homes and
approximately 2,504,700 square feet of commercial space. The Eastern Improvement
Area is legally described and the Parcels within the Eastern Improvement Area are shown
in Appendix B-2.
11
2180.021171999.7
Section 11: Property Included in the PID
TABLE 11-A
Public Improvement District Boundaries
-11MIS
1/Q-------, W7
1w ak
713M
LLI
It
L
12
2180.021\71999.7
Section 11: Property Included in the PID
TABLE 11-B
Western Improvement Area Boundaries
IrACT at
i a
z f
6.
13
2180.021\71999.7
Section II: Property Included in the PID
TABLE Il-C
Eastern Improvement Area Boundaries
' I
r
x.
i-- �
14
2180.021\71944.7
Section III: Description of Authorized Improvements
Section III
DESCRIPTION OF THE AUTHORIZED IMPROVEMENTS
A. Authorized Improvement Overview
1. Section 372.003 of the PID Act identifies the improvements that a City may choose to
undertake with the establishment of a PID. The Authorized Improvements identified in the
PID Act include:
a) landscaping;
b) erection of fountains, distinctive lighting, and signs;
c) acquiring, constructing, improving, widening, narrowing, closing, or rerouting of
sidewalks or of streets, any other roadways, or their rights-of way;
d) construction or improvement of pedestrian malls;
e) acquisition and installment of pieces of art;
f) acquisition, construction or improvement of libraries;
g) acquisition, construction or improvement of off-street parking facilities;
h) acquisition, construction, improvement or rerouting of mass transportation facilities;
i) acquisition, construction, or improvement of water, wastewater, or drainage facilities or
improvements;
j) the establishment or improvement of parks;
k) projects similar to those listed in Subdivisions (i)-(x)
1) acquisition, by purchase or otherwise, of real property in connection with an authorized
improvement;
m) special supplemental services for improvement and promotion of the district, including
services relating to advertising, promotion, health and sanitation, water and wastewater,
public safety, security, business recruitment, development, recreation and cultural
enhancement;
n) payment of expenses incurred in the establishment, administration and operation of the
district; and
o) the development, rehabilitation, or expansion of affordable housing.
2. The City has determined to undertake the Authorized Improvements described in Section
III.B. Any change to the Authorized Improvements will require the approval of the City.
15
2180.021171999.7
Section III: Description of Authorized Improvements
B. Descriptions and Costs of the Authorized Improvements
1. The Authorized Improvements are described below and depicted in Appendix C. Table III-
A shows the Actual Costs of the Authorized Improvements which are being funded by
Special Assessments levied against Assessed Property in the PID. Table III-A also shows
the actual costs of the University Improvements and the Non-PID Related Improvements,
which are not being funded by the PID. The costs shown in Table III-A may be revised in
Annual Service Plan Updates.
2. The Authorized Improvements confer a special benefit on the Assessed Property within the
PID. The Actual Costs of the Major Improvements are being funded from: (i) the net
proceeds of the Major Improvement Bonds, and (ii) funds deposited by the Developer with
the Trustee for the Major Improvement Bonds. Under the terms of the PID Reimbursement
Agreement, the Developer is responsible for paying any cost overruns for the Major
Improvements. The Actual Costs of the Roadway Improvements are to be funded from: (i)
the net proceeds of the Roadway Improvement Bonds when issued; (ii) funds contributed by
the Developer with the Trustee for the Roadway Improvement Bonds, and (iii) funds
contributed by the City, in accordance with the Roadway Financing Agreement and as
described herein. Under the terms of the Roadway Financing Agreement, the Developer and
the City have agreed to share certain cost overruns related to the Roadway Improvements and
the Developer has agreed to remain solely responsible for certain other cost overruns.
3. The Authorized Improvements are described as follows:
a. Major Improvements
i. Water Improvements - The water improvements ("Water Improvements")
consist of the construction and installation of waterlines, mains, pipes, valves and
appurtenances, necessary for the water distribution system that will service all of
the Assessed Property within the PID. The Water Improvements will be
constructed according to City standards, determined in the City's sole discretion.
The Actual Costs of the Water Improvements are $2,759,319. Included within
such Actual Costs are Project Management Fees of$95,420 which will be paid to
the Developer on a percentage of completion basis.
ii. Sanitary Sewer Improvements - The sanitary sewer improvements ("Sanitary
Sewer Improvements") consist of construction and installation of pipes, service
lines, manholes, encasements and appurtenances necessary to provide sanitary
sewer service to all of the Assessed Property within the PID. The Sanitary Sewer
Improvements will be constructed according to City standards, determined in the
City's sole discretion. The Actual Costs of the Sanitary Sewer Improvements are
$5,724,317. Included within such Actual Costs are Project Management Fees of
$222,039 which will be paid to the Developer on a percentage of completion
basis.
16
2180.021\71999.7
Section III: Description of Authorized Improvements
b. Roadway Improvements
i. Roadway Improvements — The roadway improvements ("Roadway
Improvements") consist of the construction of paving, storm drainage, retaining
walls, signage, and traffic control devices which benefit the Assessed Property
within the Western Improvement Area and the acquisition of right of way within
the Western Improvement Area. The Roadway Improvements are not being
funded by the Major Improvement Bonds, but are being funded by the following
sources: (i) the net proceeds of the Roadway Improvement Bonds, secured by the
Roadway Improvement Special Assessments levied by the Roadway
Improvements Assessment Ordinance, (ii) funds contributed by the Developer
with the Trustee for the Roadway Improvement Bonds, and (iii) funds contributed
by the City, in accordance with the Roadway Financing Agreement and as
described herein in Section IV.A.6. The Roadway Improvements will be
constructed according to City standards, determined in the City's sole discretion.
The Actual Costs of the Roadway Improvements that are to be financed in part
from the net proceeds of the Roadway Improvement Bonds and in part from
separate funds of the City under the terms of the Financing Agreement are
$6,931,647 and do not include the costs of associated University Improvements in
the amount of $657,992 that will paid as described in Section IV.A.2. Of the
Actual Costs of the Roadway Improvements that will be financed from the net
proceeds of the Roadway Improvement Bonds under the terms of the Financing
Agreement, $562,555 will be applied as follows: (i) $342,489 for costs of the
right-of-way (ROW) for the Roadway Improvements, (ii) $83,070 for Project
Management Fees, and (iii) $136,996 financing soft costs of the Developer. The
Actual Costs of the Roadway Improvements do not include the costs of associated
University Improvements in the amount of$657,992 that will paid as described in
Section IV.A.2. The Actual Costs for the Project Management Fees will be paid
to the Developer on a percentage of completion basis.
According to the Developer, the original estimates for the Roadway Improvements were based
on the preliminary designs and projected material costs at the time the initial estimates were
prepared. The original estimates have since been updated by the Project Engineer to reflect
updated designs, changes in City thoroughfare standards for sidewalks, street lights and piping
and current bid prices and such updated costs have been reviewed by the City. Table III-A
below shows the updated Actual costs of the Roadway Improvements.
17
2180.021\71999.7
Section III: Description of Authorized Improvements
,�. Table III-A
Cost of Authorized Improvements,Non-PID Related Improvements and
University Improvements
Actual Costs of University
Authorized Non-PID Related Improvements Total Costs of
_Description Improvemanls[8} Impresrrernenk6(a� Improvements(b)
M r Improvements
Water $2,759,319 $98,570 $155,045 $3,012,934
nitary$O"r $5,724,317 $1,012,477 $331,239 57,068.033
Total Major Improvements $8,483,636 $1,111,047 $486,284 $10,080,967
Idway Improvements
Roadway(c) $6.931,647 $1,874.596 $657,992 $5.464.235
Total Roadway Improvements 55,931,647 $1.874,596 $$657.992 $9.464,235
(a)The Actual Costs of the Major Improvements will be funded by the proceeds of the Major Improvement Bonds,the costs of the Non-PID Related
IM prr,-Vemen45 will be funded by lawfully available funds of the City and private funds of the Developer and the University Improvements will be
lurtdiid by private funds of the Developer.The Actual Costs of the Roadway Improvements will be funded in part by the proceeds of the Roadway
Imprfivernenf Bonds and in part by the City under the terms of the Roadway Financing Agreement The costs of the Non-PID Related Improvements
and the University Improvements will be funded by separate funds of the City and other private funding sources under the terms of the Roadway
r4nancing Agreement
I b)Updated costs provided by the Project Engineer and include project management,soft costs and contingency allocations.According to the
Developer,the Actual Costs for the water and sanitary sewer improvements remains the same as the initial budget and the water improvements
.porticin and the sanitary sewer improvement portion of the Non-PID Related Improvements increased by$98,570 and$187,389,respectively.The
figu res shown In Table III-A will be revised in Annual Service Plan Updates.
Ic I The Roadway Improvements costs of$6,931,617 will be funded by lawfully available funds of the City of Fort Worth In the amount of$3,184,546
and from the net proceeds of the Roadway Bonds in the amount of$3,747,101.The Non-PID Related Improvements(Chisholm Trail improvements)
+m the amount of$1,874,696 will be funded by lawfully available funds of the City in the amount of$1,239,594 and the balance of$635,002 will be
funded with private funds of the developer of the Chisholm Trail Ranch project The City is expected to appropriate its portion of the Roadway
1mPrcvsment%concurrently with the issuance of the Roadway Improvement PID Bonds.The University Roadway Improvements($867,992),will be
Funded with private funds of the Developer deposited with the Trustee for the Roadway Improvement Bonds.The Roadway Improvements also
I nc]Lkd4$375,000 for the acquisition right of way,$90,956 for project management fees and$150,000 in Developer bond financing costs that are
arlooarad between the PID and the University Property based on the total acreage of the University Property within the Western Improvement Area
and the University Property portion of these costs will be funded by the Developer.The total acreage of the University Property is approximately 80
acres and the Wesi.em Improvement Area is approximately 922.763 acres.As a result,the proportional share of the University Property is 8,87%(80
43$,76+3=8.67%rounded I.
4. The Non-PID Related Improvements consist of the following:
a. Sanitary Sewer Improvements:
i. The Non-PID Related Improvements associated with the Sanitary Sewer
Improvements consist of oversizing additions to the system in order to accommodate
future growth in adjacent areas. The Non-PID Related Improvements associated with
the Sanitary Sewer Improvements do not benefit the Assessed Property within the
PID.
ii. The Non-PID Related Improvements associated with the Sanitary Sewer
Improvements in the amount of $1,012,477 will be funded 100% by the City
concurrent with the Actual Costs for the Sanitary Sewer Improvements being funded
by the Developer and the proceeds of the Major Improvement Bonds through one or
more City Facilities Agreement to be executed separate and apart from this SAP.
b. Roadway Improvements
i. The Non-PID Related Improvements associated with the Roadway Improvements
consist of an extension of Brewer Road to serve property not located within the PID.
The Non-PID Related Improvements associated with the Roadway Improvements
serve property not located within the PID and do not provide a special benefit to the
18
2180.021\71999.7
Section III: Description of Authorized Improvements
Assessed Property within the PID; however, such improvements are integral to the
overall development of the Property within the PID.
ii. As set forth in the Roadway Financing Agreement, the Non-PID Related
Improvements associated with the Roadway Improvements are anticipated to be
funded equally by the City and the owners of Chisolm Trail Ranch, an adjoining
development being developed by an affiliate of the Developer.
c. Water Improvements
i. Subsequent to the issuance of the Major Improvement Bonds, additional Non-PID
Related Improvements associated with the Water Improvements consisting of
oversizing additions to the water system were agreed to by the Developer and the City
in order to accommodate future growth in adjacent areas. The Non-PID Related
Improvements associated with the Water Improvements are not required to service
the Assessed Property within the PID.
ii. The Non-PID Related Improvements associated with the Water Improvements in the
amount of$98,570 will be funded 100% by the City concurrent with the Actual Costs
for the Water Improvements being funded by the Developer and the proceeds of the
Major Improvement Bonds through a City Facilities Agreement executed separate
and apart from this SAP.
19
2180.021\71999.7
Section IV: Assessment Plan
Section IV
ASSESSMENT PLAN
A. Introduction
1. The PID Act requires the City Council to apportion the cost of the Authorized Improvements
based on the special benefits conferred to each Parcel from the Authorized Improvements.
The PID Act provides that the Actual Costs may be assessed: (i) equally per front foot or
square foot; (ii) according to the value of the property as determined by the governing body,
with or without regard to improvements on the property; or (iii) in any other manner that
results in imposing equal shares of the cost on property similarly benefited. The PID Act
further provides that the City Council may establish the methods of assessing the special
benefits for various classes of improvements.
2. Certain improvements related to the Authorized Improvements are being constructed on the
University Property. In addition, certain improvements related to the Authorized
Improvements are being constructed elsewhere in the PID which serve the University
Property. These improvements constructed on or otherwise serving the University Property
are referred to herein as the "University Improvements." The costs of the University
Improvements will be funded directly by the Developer. No University Improvements will be
financed by Special Assessments or the proceeds of PID Bonds nor will any Special
Assessments be levied in the future for the purpose of reimbursing the Developer for the
costs of the University Improvements. The University Improvements are being paid from
funds deposited by the Developer concurrently with the issuance of the Major
Improvement Bonds and the Roadway Improvement Bonds and will not be paid by
Special Assessments or the proceeds of PID Bonds; and, therefore, the University
Property shall be treated as Non-Benefitted Property. The actual costs of the University
Improvements related to the Authorized Improvements consisting of the Water
Improvements and Sanitary Sewer Improvements have been determined on the basis of the
estimated usage, as determined by the Project Engineer, of all Authorized Improvements in
the District consisting of Water Improvements and Sanitary Sewer Improvements applicable
to the University Property. The actual costs of the University Improvements related to the
Authorized Improvement benefitting the Western Improvement Area consisting of the
Roadway Improvements has been determined on the basis of the University Property's pro-
rata share of the total acreage of the Western Improvement Area. Table IV-A describes the
updated costs of the University Improvements.
20
2180.021\71999.7
Section IV: Assessment Plan
Table IV-A
Non-Benefitted Area
Updated Non-Benefitted Area Costs of University Improvements-Major Improvements and Roadway Improvements(not to be financed by the PID
City of Fort Chisholm Trail
Worth Non-PID Ranch Non-PID Total Non-PID University
Related Related Related Total Costs- University Authorized Share%
Description Total Costs(a)Improvements Improvements Improvements Project Improvements Improvements (b)
Major Improvements
Water $ 3,012,934 $ 98,570 $ $ 98,570 $ 2,914,364 $ 155,045 $ 2,759,319 5.30%
Sanitary Sewer $ 7,068,033 $ 1,012,477 $ $ 1,012,477 $ 6,055,556 $ 331,239 $ 5,724,317 5.50%
Total Major Improvements $ 10,080,967 $ 1,111,047 $ $ 1,111,047 $ 8,969,920 $ 486,284 $ 8,483,636
Roadway Improvements
Roadway $ 9,464,235 $ 1,239,594 $ 635,002 $ 1,874,596 $ 7,589,639 $ 657,992 $ 6,931,647 8.67%
Total Roadway Improvement $ 9,464,235 $ 1,239,594 $ 635,002 $ 1,874,696 $ 7,589,639 $ 667,992 $ 6,931,647
(a)Total Costs include the Actual Costs of Authorized Improvements,the Non-PID Related Irnprovements and the University Improvements per Table 111-A,
lb)Percentages for the University Property and for the Roadway Improvements based on the University Property's pro-rata share ofthe total Western Improvement Area acreage as shown in Nob
(c)in Table 111-A.
According to the Developer, the original estimates for the Roadway Improvements were
based on the preliminary designs and projected material costs at the time the initial estimates
were prepared. The original estimates have since been updated by the Project Engineer to
reflect updated designs, changes in City thoroughfare standards for sidewalks, street lights
and piping and current bid prices and such updated costs have been reviewed by the City.
Table IV-A above shows the updated Actual costs of the Major Improvements and the
Roadway Improvements (as described in Section III and shown in Table III-A), as well as
the updated costs of the University Improvements related to the Roadway Improvements
based on the University Property's pro-rata share of the total acreage of the Western
Improvement Area as described in Section IV.A.2 above.
Additionally, the Owners and the City anticipate dedicating approximately 12 acres of
property to the City for use as a police, fire or other public facility. Upon such conveyance,
the provisions of Section VI.0 shall apply and a Mandatory Prepayment shall be calculated
in accordance with the terms of this Service and Assessment Plan.
3. The Major Improvements benefit the all of the Assessed Property within the PID (in both the
Eastern Improvement Area and the Western Improvement Area), while the Roadway
Improvements benefit only the Assessed Property within the Western Improvement Area.
The Actual Costs of the Major Improvements were allocated to the Assessed Property in the
District (in both the Eastern Improvement Area and the Western Improvement Area) based
on estimated build out value as described in Section IV.E, below, which resulted in imposing
equal shares of cost on properties similar benefitted. The Actual Costs of the Roadway
Improvements are being allocated solely to the Assessed Property in the Western
Improvement Area because the Roadway Improvements benefit only the Assessed Property
within the Western Improvement Area. The Actual Costs of the Roadway Improvements are
allocated to the Assessed Property within the Western Improvement Area based on updated
estimated build out value calculated in Appendix A-3 based on the updated development
plan provided by the Developer and described in Section IV.E, below, which will result in
imposing equal shares of cost on properties similar benefitted.
4. Table IV-B details the updated allocation of costs of the Authorized Improvements to the
Western Improvement Area Assessed Property based on the updated development plan and
related updated projected build out values shown in Appendix A-3.
21
2180.021\71999.7
Section IV: Assessment Plan
5. Table IV-C details the updated allocation of costs of the Authorized Improvements to the
Eastern Improvement Area Assessed Property based on the updated development plan and
related updated projected build out values shown in Appendix A-3.
6. The Roadway Improvement Assessment Ordinance levying the Roadway Improvement
Special Assessments approves the updates to this Service and Assessment Plan contained
herein, including the updated Assessment Rolls.
7. This Section IV is intended to describe the special benefit conferred upon each Parcel or Lot
as a result of the Authorized Improvements, to provide the basis and justification for the
determination that this special benefit exceeds the amount of the Special Assessments, and to
explain the methodologies by which the City Council allocates and reallocates the special
benefit of the Authorized Improvements to Parcels or Lots so that there is an equal share of
the Actual Cost being apportioned to Parcels or Lots similarly benefited. The determination
by the City Council of the assessment methodology set forth below is the result of the
discretionary exercise by the City Council of its legislative authority and governmental
powers, consistent with the PID Act, and is conclusive and binding on the Owners and all
future owners and developers of any Assessed Property.
B. Special Benefit
1. The Assessed Property must receive a direct and special benefit from the Authorized
Improvements, which must be equal to or greater than the amount of the Special
Assessments.
2. The Major Improvements are provided for the benefit of all of the Assessed Property in the
PID (in both the Eastern Improvement Area and the Western Improvement Area). The
Roadway Improvements are being provided only for the benefit of the Assessed Property in
the Western Improvement Area.
3. When the City Council initially approved this SAP, the Owners owned 100% of the Assessed
Property within the PID. In connection with the issuance of the Major Improvement Bonds,
the Owners executed a consent certificate that acknowledged the Major Improvements confer
a special benefit on the Assessed Property and consented to the levy of the Major
Improvement Special Assessments to pay for the Actual Costs associated therewith.
4. When the City Council approves this SAP update, the Owners will still own 100% of the
Assessed Property within the PID. In connection with the issuance of the Roadway
Improvement Bonds, the Owners will execute a consent certificate that (i) acknowledges that
the Roadway Improvements confer a special benefit on the Assessed Property within the
Western Improvement Area and that the Major Improvements confer a special benefit on the
Assessed Property within the entire PID (in both the Eastern Improvement Area and the
Western Improvement Area), (ii) consents to the levy of the Roadway Improvement Special
Assessments to pay for the Actual Costs of the Roadway Improvements as shown on the
updated Western Improvement Assessment Rolls; and (iii) consents to the reallocation of the
Major Improvement Special Assessments to pay for the Actual Costs of the Major
22
2180.021\71999.7
Section IV: Assessment Plan
Improvements based on the updated development plan and updated estimated build-out value
as shown on the updated Assessment Rolls.
5. If the Special Assessment for the Assessed Property prior to subdivision exceeds the sum of
the Special Assessments for all newly divided Assessed Properties after such reallocation, the
excess amount shall be prepaid as a Mandatory Prepayment as provided under Section VI.0
herein. As of the date of this SAP update, there has been no subdivision of Assessed Property
and no Mandatory Prepayment triggered under Section VI.C.
6. The City Council determined that funding a portion of the Actual Costs for the Major
Improvements through the issuance of the Major Improvement Bonds secured by the Major
Improvement Special Assessments is beneficial to the City and confers a special benefit to
the Assessed Property within the PID. Such special benefit exceeds or equals the amount of
the Major Improvement Special Assessments levied on the Assessed Property within the
PID. This conclusion is supported by the evidence, information, and testimony provided to
the City Council.
7. The Eastern Improvement Area and the Western Improvement Area are separated by the
Chisholm Trail Parkway (the "Parkway"). Within the PID, no roadway access currently
exists through the Parkway to connect the two improvement areas. As a result, the Roadway
Improvements do not provide access and, therefore, consistent with Section IV.B.2 above, do
not confer any special benefit to the Eastern Improvement Area. The City Council has
therefore determined that no special benefit is conferred on the Eastern Improvement
Area by virtue of the Roadway Improvements, and that the Eastern Improvement Area
cannot be assessed any portion of the costs thereof. The City Council has also determined
that funding a portion of the Actual Costs for the Roadway Improvements through the
issuance of the Roadway Improvement Bonds secured by the Roadway Improvement Special
Assessments is beneficial to the City and confers a special benefit to the Assessed Property
within the Western Improvement Area. Such special benefit exceeds or equals the amount of
the Roadway Improvement Special Assessments levied on the Assessed Property within the
Western Improvement Area. This conclusion is supported by the evidence, information, and
testimony provided to the City Council.
C. Allocation of Actual Costs to the Western Improvement Area
Major Improvements
1. In the Major Improvement Assessment Ordinance, the City Council determined that the
Major Improvements benefit all of the Assessed Property within the PID and allocated the
Actual Costs of the Major Improvements to the Western Improvement Area Assessed
Property. As described below, the Actual Costs of the Major Improvements have since been
updated based on the updated development plan and updated estimated build-out value as
shown in Table IV-B. The Actual Costs of the Major Improvements are subject to revision
through the Annual Service Plan Updates, but may not result in increased Special
Assessments except as authorized under this SAP or the PID Act.
23
2180.021\71999.7
Section IV: Assessment Plan
As shown in Appendix A-3 and Table IV-D, the revised total estimated buildout value of Lots
and Parcels within the Western Improvement Area and Eastern Improvement Area are
$1,316,418,000 and $1,235,340,000 respectively, resulting in an estimated $2,551,758,000 in
total buildout value within the PID. Accordingly, the proportionate share of the Major
Improvements consisting of the Water Improvements and Sanitary Sewer Improvements
allocated to the Western Improvement Area is 51.59% ($1,316,418,000 _ $2,551,758,000 =
51.59%). Table IV-B shows the updated allocation of Actual Costs to the Western Improvement
Area.
Table IV-B
Western Improvement Area
1.1~Actual Cost Allocation
City of Fort Chisholm Trail Western
Worth Non-PID Ranch Non- Improvement
Related PID Related University Total Costs- Area Share of
Authorized Improvements Total Costs(a) Improvements Improvements Improvements Project Costs(c)
Water $ 3,012,934 $ 98,570 $ $ 155,045 $ 2,759,319 $ 1,423,496
Sanitary Sewer $ 7,068,033 $ 1,012,477 $ - $ 331,239 $ 5,724,317 $ 2,953,099
Roadway(b) $ 9,464,235 $ 1,239,594 $ 635,002 $ 657,992 $ 6,931,647 $ 6,931,647
Total Authorized Improvement' $ 19,545,202 $ 2,350,641 $ 635,002 $ 1,144,276 $ 15,415,283 $ 11,308,242
lis)See Table III-Aand III-A-1 for details.
#1 The Roadway Improvements costs of$6,931,617 will be funded by lawfully available funds of the City of FortWorth in the amount of$3,184,646 and from the
nat proceeds of the Roadway Bonds in the amount of$3,747,101.The Non-PID Related Improvements in the amount of$1,239,594 will be funded by the Cityand
Ws balance of$635,002 will be funded with private funds of the Developer.The Unlversitylmprovem ants will be fullyfunded with private funds of the
Dvrdspsr.
Percentages for Water and Sanitary Sewer Improvements were detemNned based on the Western Improvement Area's ratio of the revised estimated build nu
of each Lot or Parcel($1,316,418,000 or S1.59%)to the total build out value for all Lots and Parcels within the PID($$551,758,000)and for the Roadway
amertta on the University Propertys pro-rata share of the total Western Improvement Area acreage.Until a Maximum Special Assessment Per Unit Is set
provided in Section VIX of the SAP,the ratios based on the rev lead estimated build out value of each Lot or Parcel are subject to change based on updates
a>q and related gaMwto estimated build out value.
Roadway Improvements
1, The Roadway Improvements will provide a special benefit to only the Western Improvement
Area Assessed Property. The Actual Costs detailed in Table IV-B are updated to reflect the
updated Roadway Improvements budget.
D. Allocation of Actual Costs to the Eastern Improvement Area
1. In the Major Improvement Assessment Ordinance, the City Council determined that the
benefit all of the Assessed Property within the PID and allocated the Actual Costs of the
Major Improvements to the Eastern Improvement Area Assessed Property. As described
below, the Actual Costs of the Major Improvements has been updated based on the updated
development plan and updated estimated build-out value as shown in Table IV-C. The Actual
Costs of the Major Improvements are subject to revision through the Annual Service Plan
Updates, but may not result in increased Special Assessments except as authorized under this
SAP or the PID Act
24
2180.021\71999.7
Section IV: Assessment Plan
Table IV-C
Eastern Improvement Area
Upd%W d Actual Cost Allocation
Chisholm Trail Eastern
City of Fort Worth Ranch Non-PID Improvement
Non-PID Related Related University Total Costs- Area Share of
Authorized Improvements Total Costs i'l Improvements Improvements Improvements Project costs 11)
Water $ 3,012,934 $ 98,570 $ $ 155,045 $ 2,759,319 $ 1,335,823
Sanitary Sewer $ 7,068,033 $ 1,012,477 $ $ 331,239 $ 5,724,317 $ 2,771,218
Roadway IW $ 9,464,235 $ 1,239,594 $ 635,002 $ 657,992 $ 6,931,647 $ -
Total Authorized Im rovements $ 19,545,202 $ 2,350,641 $ 635,002 $ 1,144,276 $ 15,415,283 $ 4,107,041
Ra)See Table IIIA and III-A-1 for details.
I(bl Thr Roadway Improvements costs of$6,931,617 will be funded by lawfully available funds of the City of FortWorth in the amount of 13,164,546 and from the riot proceeds of the
IRma*M trariow in the amount of$3,747,101.The Non-PID Related improvements in the amount of 51,239,594 will be funded bythe City and the balance of$835,002 will be funded
th ptlrlvim ftwAs d thn Developer.The University Improvenrrts will be fully funded with private funds of the Developer.
fs1 Percentages for water and San"Sewer Improverrenrts were determined based on the Eastern Improvement Area's ratio of the revised estimated build out value ofeachlLnt
mrPaPM r$1.Pt m"W st Wil" 14 Ht mall build out value for all Lots and Parcels within the PID($2,551,758,000).Until a Muimum Speclsl Assessment Per Unit is set as
prwok"in Seaton A.E of the SAP,the ratios based on the revised estimated build out value of each Lot or Parcel are subject to change based on updates to tins development
plah and related changes to estimated build out value.
As shown in Appendix A-3 and Table IV-H, the revised total estimated buildout value of Lots
and Parcels within the Western Improvement Area and Eastern Improvement Area are
$1,316,418,000 and $1,235,340,000 respectively, resulting in an estimated $2,551,758,000 in
total buildout value within the PID. Accordingly, the proportionate share of the Major
Improvements consisting of the Water Improvements and Sanitary Sewer Improvements
allocated to the Eastern Improvement Area is 48.41% ($1,235,340,000 - $2,551,758,000 =
48.41%). Table IV-C shows the updated allocation of Actual Cost to the Eastern Improvement
Area.
E. Assessment Methodology
1. The City Council may assess all or a portion of the Actual Costs against Assessed Property
so long as the special benefit conferred upon the Assessed Property by the Authorized
Improvements equals or exceeds the amount of the Special Assessments. All or a portion of
the Actual Costs may be assessed using any methodology that results in the imposition of
equal shares of the Actual Costs on Assessed Property similarly benefited.
For purposes of this SAP, the City Council has determined that the Actual Costs of a portion
of the Major Improvements shall be allocated to the Assessed Property within the PID by
spreading the entire Major Improvement Special Assessment across all of the Assessed
Property within the PID (both the Eastern Improvement Area and Western Improvement
Area) based on the ratio of the estimated build out value of each Land Use therein to the total
build out value for all Land Uses. For purposes of this SAP, the City Council has also
determined that the Actual Costs of a portion of the Roadway Improvements shall be
allocated to the Assessed Property within the Western Improvement Area of the PID by
spreading the entire Roadway Improvement Special Assessment across all of the Assessed
Property within the Western Improvement Area of the PID. Table IV-D summarizes the
assessment methodology described in this Section IV.E.2 for the Major Improvement
Special Assessment and the Roadway Improvement Special Assessment. Table IV-D also
summarizes for each Land Use of Assessed Property within the Western Improvement Area:
(1) the Major Improvement Special Assessment for each Land Use; (2) the projected average
Annual Installment of the Major Improvement Special Assessment for each Land Use; and
25
2180.021\71999.7
Section IV: Assessment Plan
(3) the projected average Annual Installment of the Major Improvement Special Assessment
as an equivalent tax rate for each Land Use based on estimated build out value. Table IV-D
also summarizes for each Land Use of Assessed Property within the Western Improvement
Area: (1) the Roadway Improvement Special Assessment for each Land Use; (2) the
projected average Annual Installment of the Roadway Improvement Special Assessment for
each Land Use; and (3) the projected average Annual Installment of the Roadway
Improvement Special Assessment as an equivalent tax rate for each Land Use based on
estimated build out value. Table IV-D also summarizes for each Land Use of Assessed
Property within the Western Improvement Area: (1) the combined Major Improvement
Special Assessment and Roadway Improvement Special Assessment for each Land Use; (2)
the combined projected average Annual Installment of the Major Improvement Special
Assessment and Roadway Improvement Special Assessment for each Land Use; and (3) the
combined projected average Annual Installment of the Major Improvement Special
Assessment and Roadway Improvement Special Assessment as an equivalent tax rate for
each Land Use based on estimated build out value.
a. The City Council has determined that the benefit to the Assessed Property in the Eastern
Improvement Area and the Western Improvement Area from the Major Improvements is
at least equal to the Major Improvement Special Assessments levied thereon.
b. The Major Improvement Special Assessments and the Annual Installments thereof for
Assessed Property located in the Western Improvement Area are shown on the Western
Improvement Area Assessment Roll attached as Appendix A-1. The Major Improvement
Special Assessments and Annual Installments thereof for Assessed Property located in
the Eastern Improvement Area are shown on the Eastern Improvement Area Assessment
Roll attached as Appendix A-2. No Special Assessment shall be changed except as
authorized by this SAP and the PID Act. Table IV-F summarizes the updated allocation
of the Major Improvement Special Assessment to the Eastern Improvement Area
Assessed Property based on the updated development plan and updated estimated
buildout value provided by the Developer and shown in Appendix A-3. Table IV-G
summarizes the updated estimated build out value to the Major Improvement Special
Assessments ratio for the Eastern Improvement Area Assessed Property based on the
updated development plan and updated estimated buildout value provided by the
Developer and shown in Appendix A-3.
c. The Roadway Improvement Special Assessments are being levied only on the Assessed
Property within the Western Improvement Area of the PID pursuant to the Roadway
Improvement Assessment Ordinance approving this updated Service and Assessment
Plan.
2. In the Major Improvement Bonds Indenture, the City reserved the right to issue Roadway
Improvement Bonds secured by Roadway Improvement Special Assessments levied at a
future date to finance the Roadway Improvements. Pursuant to Section 13.2(c) of the
Indenture for the Major Improvement Bonds, the issuance of Roadway Improvement Bonds
was subject to the following:
26
2180.021\71999.7
Section IV: Assessment Plan
a. There are no delinquent Major Improvement Special Assessments at the time the
Roadway Improvement Bonds are to be issued;
b. The City and Developer are each in full compliance with their respective continuing
disclosure agreements entered into in connection with the Major Improvement Bonds
pursuant to Rule 15c2-12 adopted by the SEC under the Securities Exchange Act of
1934;
c. Either (a)the Major Improvements have been completed, or (b)the Project Engineer shall
have certified in writing to the City prior to the levy of Roadway Improvement Special
Assessments for the Roadway Improvement Bonds, that there are sufficient funds in the
form of cash available to complete the Major Improvements; and
d. The City will have determined that there are sufficient funds in the form of cash on hand
to fund the construction of all of the planned roadway improvements (other than the
Roadway Improvements described herein to be financed by the Roadway Improvement
Bonds) as set forth in the Roadway Improvements Financing Agreement.
In connection with the levy of Roadway Special Assessments and issuance of the Roadway
Bonds, the City has confirmed the above described conditions have all been satisfied.
3. Allocations between Land Use may be updated in an Annual Service Plan Update until the
initial Owner of the Assessed Property sells any portion of the Assessed Property to an
unaffiliated third party, excluding the University and the City, which will then trigger the
determination of and approval of the Maximum Special Assessment per Unit within each
Land Use category. The Developer has agreed with the City, in the PID Reimbursement
Agreement, to provide notice of intent by any Owner to enter into a contract for sale an
unaffiliated third party, excluding the University.
As described in Section IV.E.2.b above, Table IV-D, have been updated based on the updated
development plan.
Table IV-E summarizes the estimated build out value to the Major Improvement Special
Assessments and Roadway Improvement Special Assessment ratios for the Western
Improvement Area.
Table IV-G summarizes the estimated build out value to the Major Improvement Special
Assessments ratios for the Eastern Improvement Area.
27
2180.021\71999.7
Section IV:Assessment Plan
Table IV-D
Western Improvement Area
ilp alnwt'tlil&likodwltlyr 1mlirm+tmiamots apeciat Assessment Allocation b Land Use
Average
% Equivalent Equivalent Tax
Estimated Estimated Allocation Major Special Average Tax Rate(per Rate(per
Improved Build Out Estimated of Total Improvement Average Assessment Annual $1001AV)- $1001AV)-
Land Value Value Per Improved Estimated Build Special Special Annual Per Unit/SF Installment Improved Build Out
Land Use UnitslSF per Unit Unit Land Value Out Value Assessment Assessment Installment (a) Per Unit/SF Land Value Value
SF Residential 2,471 $ 65,000 $ 300,000 $160,615,000 $ 741,300,000 56.3% $ 3,684,285 $ 363,820 $ 1,491.01 $ 147.24 $ 0.23 $ 0.05
Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $ 1,590,198 $ 157,195 $ 631.03 $ 62.38 $ 0.78 $ 0.05
Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $ 1,269,540 $ 125,065 $ 1.00 $ 0.10 $ 1.23 $ 0.05
Total $190,968,040 $1,316,418,000 100.0% $ 6,544,023 $ 646,080 $ 0.34 $ 0.05
Average
% Equivalent Equivalent Tax
Estimated Estimated Allocation Roadway Special Average Tax Rate(per Rate(per
Improved Build Out Estimated of Total Improvement Average Assessment Annual $100/AV)- $100/AV)-
Land Value Value Per Improved Estimated Build Special Special Annual Per Unit/SF Installment Improved Build Out
Land Use Units/SF per Unit Unit Land Value Out Value Assessment Assessment Installment (a) Per Unit/SF Land Value Value
SF Residential 2,471 $ 65,000 $ 300,000 $160,615,000 $ 741,300,000 56.3% $ 3,076,795 $ 328,077 $ 1,245.16 $ 132.77 $ 0.20 $ 0.04
Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $ 1,327,995 $ 141,751 $ 526.98 $ 56.25 $ 0.70 $ 0.04
Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $ 1,060,210 $ 112,778 $ 0.83 $ 0.09 $ 1.11 $ 0.04
Total $190,968,040 $1,316,418,000 100.0% $ 5,465,000 $ 582,606 $ 0.31 $ 0.04
Average
% Equivalent Equivalent Tax
Estimated Estimated Allocation Special Average Tax Rate(per Rate(per
Improved Build Out Estimated of Total Average Assessment Annual $1001")- $100/AV)-
Land Value Value Per Improved Estimated Build Special Total Special Annual Per Unit/SF Installment Improved Build Out
Land Use Units/SF per Unit Unit Land Value Out Value Assessment Assessment Installment (a) Per Unit/SF Land Value Value
SF Residential 2,471 $ 65,000 $ 300,000 $160,615,000 $ 741,300,000 56.3% $ 6,761,080 $ 691,897 $ 2,736.17 $ 280.01 $ 0.43 $ 0.09
Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $ 2,918,193 $ 298,946 $ 1,158.01 $ 118.63 $ 1.48 $ 0.09
Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $ 2,329,750 $ 237,843 $ 1.83 $ 0.19 $ 2.33 $ 0.09
Total $190,968,040 $1,316,418,000 100.0% $ 12,009,023 $ 1,228,686 $ 0.64 S 0.09
"'Ths Special Assessment per Unit will be updated to reflect the Maximum Special Assessment per Unit when determined in accordance with Section VLE of the SAP.Until such time,the number of units and the assessment per
unit in this Table is subject to change with each Annual Service Plan Update based on updates to the development plan and related changes to estimated build out value.
Estimates based on information available as of 311512018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major Improvement Special
Meneverrmt will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms and provisions of the Indenture,PID
mhursemanl Agreement,and other documents related to the Major Improvement Bonds,The above estimate assumes an average 5.07%interest rate and a 20 year term for the Major Improvement Bonds,an estimated 5.7%
tlri'rt rate and a 19 year term on the Roadway Improvement Bonds and annual administrative expense of$79,203 increasing at 2.0%per year.Allocations between Land Use may be updated and reallocated amongst the Asmsead
Ytaparllr in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third parry,excluding the University and the City,which will then trigger
approval of the Maximum Special Assessment per Unit within each Land Use category against each Parcel of Assessed Property.
28
Section IV:Assessment Plan
Table iV-E below summarized the estimated build out value to the Major Improvement Special Assessments and Roadway Improvement Special
Assessment ratios for the Western Improvement Area.
:at31e WE
Westarn vementArea
---- B�RDiArr+a Im - Estimated. Assessm
Estimated Estimated %Allocation Total Major Special Average Improved
Improved Build Out Estimated of Total Improvement Average Assessment Annual Land to Build Out Value
Land Value Value Per Improved Land Estimated Build Special Special Annual Per UnitISF Installment Assessment to Assessment
Land Use Units/SF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per Unit/SF Leverage Leverage
5F Residential 2,471 $ 65,000 $ 300,000 $ 160,615,000 $ 741,300,000 56.3% $3,684,285 $363,820 $1,491.01 $147.24 43.59 201.21
Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $1,590,198 $157,195 $631.03 $62.38 12.68 201.42
Commercial 1,274,130_ $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $1,269,540 $125,065 $1.00 $0.10 8.03 200.72
Total $ 190,968,040 $1,316,418,000 100.0% $6,544,023 $646,080 29.18 201.16
Total
Estimated Estimated %Allocation Roadway Special Average Improved
Improved Build Out Estimated of Total Improvement Average Assessment Annual Land to Build Out Value
Land Value Value Per Improved Land Estimated Build Special Special Annual Per Unit/SF Installment Assessment to Assessment
Land Use Units/SF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per Unit/SF Leverage Leverage
SF Residential 2,471 $ 65,000 $ 300,000 $ 160,615,000 $ 741,300,000 56.3% $3,076,795 $328,077 $1,245.16 $132.77 52.20 240.93
Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $1,327,995 $141,751 $526.98 $56.25 15.18 241.18
Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $1,060,210 $112,778 $0.83 $0.09 9.61 240.35
Total $ 190,968,040 $1,316,418,000 100.0% $5,465,000 $582,606 34.94 240.88
Estimated Estimated %Allocation Special Average Improved
Improved Build Out Estimated of Total Average Assessment Annual Land to Build Out Value
Land Value Value Per Improved Land Estimated Build Special Total Special Annual Per Unit/SF Installment Assessment to Assessment
Land Use Units/SF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per Unit/SF Leverage Leverage
SF Residential 2,471 $ 65,000 $ 300,000 $ 160,615,000 $ 741,300,000 56.3% $6,761,080 $691,897 $2,736.17 $280.01 23.76 109.64
Multifamily 2,520 $ 8,000 $ 127,100 $ 20,160,000 $ 320,292,000 24.3% $2,918,193 $298,946 $1,158.01 $118.63 6.91 109.76
Commercial 1,274,130 $ 8 $ 200 $ 10,193,040 $ 254,826,000 19.4% $2,329,750 $237,843 $1.83 $0.19 4.38 109.38
Total $ 190,968,040 $1,316,418,000 100.0% $12,009,023 $1,228,686 15.90 109.62
The Special Assessment per Unit will be updated to reflect the Maximum Special Assessment per Unit when determined in accordance with Section WE of the SAP.Until such time,the number of units and the assessment per
Unit in this Table is subject to change with each Annual Service Plan Update based on updates to the development plan and related changes to estimated build out value.
W-.Estimates based on information available as of 3/15/2018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major Improvement Special
Alim"ment will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms and provisions of the Indenture,PID
ReYnflunssment Agreement,and other documents related to the Major Improvement Bonds.The above estimate assumes an average 5.07%interest rate and a 20 year term for the Major Improvement Bonds,an estimated 5.7%
1 in{srra rate and a 19 year term on the Roadway Improvement Bonds and annual administrative expense of$79,203 increasing at 2.0%per year.Allocations between Land Use may be updated and reallocated amongst the
Property in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party,excluding the University and the City,which will th 1
tiger approval of the Maximum SpeciW Assessment per Unit within each Wnd Use sB»gpry rtpeiFrd each Parcel of Assessed Pruporty.
29
2180.021\71999.7
Section IV:Assessment Plan
Table IV-F
Eastern Improvement Area
Updated ar Im rovemants Speckai Assessment Allocation
Average
Estimated Equivalent Equivalent
Improved Estimated %Allocation Special Average Tax Rate(per Tax Rate(per
Land Build Out Estimated of Total Total Average Assessment Annual $100/AV)- $100/AV)-
Value per Value Per Improved Estimated Special Special Annual Per Unit/SF Installment Improved Build Out
Land Use Units/SF Unit Unit Land Value Build Out Value Assessment Assessment Installment (a] Per UniVSF Land Value Value
SF Residential 2,446 $65,000 $300,000 $159,120,000 $734,400,000 59.4% $3,650,763 $360,434 $1,491.32 $147.24 $0.23 $0.05
Commercial 2.5(}9,700 $8.00 $200.00 $20.037,800 $500,940,000 40.6% $2,490,214 $245,855 $0.99 $0.10 $1.23 $0.05
Total $179,157,600 $1,235,348,000 100.0% $6,140,977 $606,2118 $0.34 $0.05
NNW
"m Special Assessment per Unit will be updated to reflect the Maximum Special Assessment per Unit when determined in accordance with Section VLE of the SAP.Until such time,the number of units and
the assessment per unit in this Table is subject to change with each Annual Service Plan Update based on updates to the development plan and related changes to estimated build out value.
Note:Estimates based on information available as of 311512018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major
9:mprov9ma-nt Special Assessment will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the
terms and provisions of the Indenture,PID Reimbursement Agreement,and other documents related to the Major Improvement Bonds.The above estimate assumes an average 5.07%interest rate and a 20 year
term for the Major Improvement Bonds and annual administrative expense of$32,097 increasing at 2.0%per year.Allocations between Land Use maybe updated and reallocated amongst the Assessed
Property in an Annual Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party,excluding the University and the City,which
will then trigger approval of the Maximum SpecikJ Assessment per Unit within each Land Use category against each Parcel of Assessed Property
Table IV-G
Eastern Improvement Area
ants Estimated Value to Assessment Ratios
Estimated Estimated %Allocation Special Average improved
Improved Build Out Estimated of Total Average Assessment Annual Land to Build Out Value
Land Value Value Per Improved Land Estimated Build Special Total Special Annual Per UniVSF Installment Assessment to Assessment
Land Use UnitslSF per Unit Unit Value Out Value Assessment Assessment Installment (a) Per UniVSF Leverage Leverage
IsCommerciai
F Residential 2,448 $65,000 $300,000 $159,120,000 $734,400,000 59.4% $3,650,763 $360,434 $1,491.32 $147.24 43.59 201.16
2,504,700 $8.00 $200 $20,037,600 $500,940,000 40.6% $2,490,214 $245,855 $0.99 $0.10 8.05 20116
Total $179,157,600 $1,235,340,000 100.0% $6,140,977 $606,288 29.17 201.16
_Special Assessment per Unit will be upffiffidTo-reg6drfilifflMi mum Special A119109W13M when cleterminca with Section VLE of the SAP.Until such time,the number of units and the
atistassiment per unit in this Table is subject to change with each An nual Service Plan Update based on updates to the development plan and related changes to estimated build out value.
Nola!Estimates based on information available as of 311512018.Although the actual unit counts and estimated unimproved land value may vary from the estimates shown above,the total amount of the Major
Impraramant Special Assessment will not change unless modified in an Annual Service Plan Update approved by the City Council,subject to the terms of this SAP,the PID Act,and in accordance with the terms
and provisions of the Indenture,PID Reimbursement Agreement,and other documents related to the Major Improvement Bonds.The above estimate assumes an average 5.07%Interest rate and a 20 year tern for
than Major Improvement Bonds and annual administrative expense of$32,097 Increasing at 2.0%per year.Allocations between Land Use may be updated and reallocated amongst the Assessed Property In an
AnmW Service Plan Update until the initial Owner of the Assessed Property sells any portion of the Assessed Property to an unaffiliated third party,excluding the University and the City,which will then trigger
approval of the Maximum Spetwi Assessment par Unit within each Land Use category agalnat each Parcel of Assessed .
30
2180.021171999.7
Section IV: Assessment Plan
F. Assessment and Annual Installments
The Special Assessments for the PID Bonds will be levied on each Parcel or Lot according to the
Eastern Improvement Assessment Roll and the Western Improvement Assessment Roll, as
applicable, subject to any revisions made during an Annual Service Plan Update. The first
Annual Installments of the Major Improvement Special Assessments securing the Major
Improvement Bonds were due no later than January 31, 2018; and, subsequent Annual
Installments shall be due no later than January 31 of each year in the amounts shown on the
updated Assessment Rolls until the Major Improvement Special Assessments are paid in full.
The Annual Installments of the Roadway Improvement Special Assessments securing the
Roadway Improvement Bonds are anticipated to be due no later than January 31 of each year
beginning in 2019 in the amounts shown on an update to the Western Improvement Area
Assessment Roll.
G. Administrative Expenses
The cost of administering the PID and collecting the Annual Installments shall be paid for on a
pro rata basis by each Parcel or Lot based on the amount of outstanding Special Assessment
remaining on the Parcel or Lot. The Administrative Expenses shall be collected as part of and in
the same manner as Annual Installments in the amounts shown on the Assessment Rolls attached
hereto as Appendix A-1 and Appendix A-2 which are subject to revision through Annual
Service Plan Updates.
H. Delinquency and Prepayment Reserve
The interest rate on Special Assessments may exceed the interest rate on PID Bonds by the
Additional Interest. The Additional Interest shall be collected as part of each Annual Installment.
Under each Indenture, the Additional Interest shall be deposited into a reserve account and
segregated from other funds of the City (the "Delinquency and Prepayment Reserve
Account") until the balance in the Delinquency and Prepayment Reserve equals a maximum of
5.5% of the outstanding principal balance of the applicable PID Bonds. The Delinquency and
Prepayment Reserve shall be used to pay Prepayment Costs or to cover any deficiencies in the
funds available to pay debt service on the applicable PID Bonds. If, in a given year, a
Delinquency and Prepayment Reserve Account is fully funded, the Additional Interest will be
allocated for the additional purposes set forth in the applicable Indenture, which purposes
include: (i) covering deficiencies in funds available to pay debt service on the applicable PID
Bonds, (ii) paying costs associated with the prepayment of any applicable Special Assessment;
(iii) paying the costs of Administrative Expenses related to the applicable PID Bonds, and/or (iv)
paying the costs associated with the redemption of the applicable PID Bonds.
31
2180.021\71999.7
Section V: Service Plan
Section V
SERVICE PLAN
1. The PID Act requires that a Service Plan (i) cover a period of at least five years, and (ii)
define the annual projected costs and indebtedness for the Authorized Improvements
undertaken within the PID during the five year period. Construction of the Major
Improvements commenced in October 2017 and the Water Improvements are
substantially complete by April 2018 and the Sanitary Sewer Improvements are expected
to be completed by February 2019.
2. The Actual Costs for the Major Improvements plus costs related to the issuance of the
Major Improvement Bonds, and payment of expenses incurred in the establishment,
administration and operation of the PID are shown in Table V-A.
3. The Actual Costs for the Roadway Improvements plus costs related to the issuance of the
Roadway Improvement Bonds, and payment of expenses incurred in the establishment,
administration and operation of the PID are shown in Table V-B.
4. The Service Plan shall be reviewed and updated at least annually for purposes of
determining the annual budget for Administrative Expenses, updating the Actual Costs of
the Authorized Improvements, and updating the Western Improvement Area Assessment
Roll shown on Appendix A-1 and the Eastern Improvement Area Assessment Roll
shown on Appendix A-2. Any update to this SAP is herein referred to as an "Annual
Service Plan Update."
5. Table V-A summarizes the sources and uses of funds required to construct the Major
Improvements, establish the PID, and issue the Major Improvement Bonds. The sources
and uses of funds shown in Table V-A shall be updated each year in the Annual Service
Plan Update to reflect any revisions to the Actual Costs of the Major Improvements.
6. Table V-B summarizes the sources and uses of funds required to construct the Roadway
Improvements and issue the Roadway Improvement Bonds. The sources and uses of
funds shown in Table V-B shall be updated each year in the Annual Service Plan Update
to reflect any revisions to the Actual Costs of the Roadway Improvements.
32
2180.021\71999.7
Section V: Service Plan
Table V-A
Major Improvement Bonds
Sources.and Uses of Funds
Major Non-PID
Improvement University Related
Description Bonds Im rovements Improvements Total
Sources of Funds
Gross Bond Amount $ 12,685,000 $ - $ - $ 12,685,000
City of Fort Worth contribution $ - $ - $ 1,111,047 $ 1,111,047
Net premium $ 70,568 $ - $ - $ 70,568
Developer deposit to property tax account $ 10,000 $ - $ - $ 10,000
Other contribution °1 $ - $ 486,284 $ - $ 486,284
Total Sources $ 12,765,568 $ 486,284 $ 1,111,047 $ 14,362,900
Uses of Funds
Water $ 2,759,319 $ 155,045 $ 98,570 $ 3,012,934
Sanitary sewer $ 5,724,317 $ 331,239 $ 1,012,477 $ 7,068,033
Authorized/Off-Site Improvements Subtotal(b): $ 8,483,636 $ 486,284 $ 1,111,047 $ 10,080,967
Other Fund Deposits:
Debt service reserve fund(c) $ 1,151,119 $ - $ - $ 1..151,119
Capitalized interest(d)
$ 1,898,149 $ - $ - $ 1,898,149
Other Fund Deposits Subtotal: $ 3,049,268 $ - $ - $ 3,049,268
Developer deposit to Property Tax Account $ 10,000 $ - $ - $ 10,000
Costs of issuance(e) $ 844,283 $ - $ - $ 844,283
Underwriter's costs/underwriter counsel�r� $ 378,382 $ $ - $ 378,382
Total uses of funds $ 12,765,569 $ 486,284 $ 1,111,047 $ 14,362,900
f,aTUWK--ft-IRD-V%MburuW6RAgmerriMthe Develcobris obligated to fund any cost overruns
and University Improvements in excess of the funds deposited with the trustee under the Indenture related to the Major
provement Bonds.
(b)See Table III-A,Table IV-A,and Table IV-B for details.
}11%Major Improvement Bonds include a debt service reserve fund calculated at the maximum annual debt service for the
Major Improvement Bonds. Such calculation is in accordance with the IRS rules and the Indenture.
td7 The Major Improvement Bonds include capitalized interest from September 14,2017 through September 30,2020.
{ej Inclusive of prepayment of a portion of the initial year's Administrative Menses.
Calculated at 2.98%of the Gross Bond Amount.
33
2180.021\71999.7
Section V: Service Plan
Table V-B
Roadway Improvement Bonds
Updated Sources and Uses of Funds
Roadway Chisholm Trail University
Improvement Ranch Roadway Road
Description Bonds Improvements Improvements Total
Sources of Funds
Gross bond amount $ 5,465,000 $ - $ - $ 5,465,000
City of Fort Worth contribution(a) $ 3,184,546 $ 1,239,594 $ - $ 4,424,140
Chisholm Trail contribution $ - $ 635,002 $ - $ 635,002
Other contribution(b) $ - $ - $ 657,992 $ 657,992
Total Sources $ 8,649,546 $ 1,874,596 $ 657,992 $ 11,182,134
Uses of Funds
Authorized/Off-Site Improvements(c):
Roadway improvements $ 6,931,647 $ 1,874,596 $ 657,992 $ 9,464,235
Total Authorized/Off-site Improvements $ 6,931,647 $ 1,874,596 $ 657,992 $ 9,464,235
Other Fund Deposits:
Debt service reserve fund(d) $ 517,930 $ - $ - $ 517,930
Capitalized interest(e) $ 682,715 $ - $ - $ 682,715
$ 1,200,645 $ - $ - $ 1,200,645
Costs of issuance(f) $ 353,304 $ - $ - $ 353,304
Underwriter's costs/underwriter counsel(y) $ 163,950 $ - $ - $ 163,950
Total uses $ 8,649,546 $ 1,874,596 $ 657,992 $ 11,182,134
to)The total Roadway Improvement Costs are$9,464,235,which include$6,973,683 in construction costs,$375,000 in ROW,$90,956 in
project management fees,$150,000 in developer financing costs and$1,874,596 in Chisholm Trail improvement casts.The University
share of the Roadway Improvements(excluding the Chisholm Trail improvement cost) is$657,992[($9,464,235-$1,874,596)x 8.67%),
whirti will be funded in full with private funds of the Developer.The City contribution for the Roadway Improvement Costs is$3,184,646.In
addilion.the City contribution for Chisholm Trail improvements is$1,239,594 and the balance of the Chisholm Trail improvement costs,
;1116,9{32($1,874,596-$1,239,594),will be funded with private funds of the Developer.
(b)The Developer will fund all Major Improvements not funded by the Major Improvement Bonds.The Developer and the City will equally
sham any cost overruns for the Roadway Improvements(excluding ROW costs,project management costs,or Developer financing costs)
War the terms of the Roadway Financing Agreement.The Owner's contributions include 100%of the University share of the Roadway
irnpravemeoL Costs,$657,992($7,589,639 x 8.67%).
(c)See Table IIIA,Table IV-A,and Table IV-B for details.
(d)TINa PID Bonds include a debt service reserve fund calculated in accordance with IRS rules.
le)The PID Bonds are expected to include up to 28 months of capitalized interest.
(f)Estimated at 5.6%of the Bond amount inclusive of prepayment of the initial year's Administrative Expenses,subject to change.
�(g)The PID B nd%assume a 3%Underwriter's Discount and Und*,@#Ws Counsel Fee,suttject to drag",
The updated projected Annual Installments of the Major Improvement Special Assessments
relating to the Major Improvements and the updated projected Annual Installments of the
Roadway Improvement Special Assessments relating to the Roadway Improvements for the
Western Improvement Area for the five years following the approval of this SAP updated are
presented in Appendix A-1-C. The Service Plan is being updated to reflect the levy of the
Roadway Improvement Special Assessments and the issuance of the Roadway Improvement
34
2180.021\71999.7
Section V: Service Plan
Bonds. The Annual Installments are subject to revision and shall be updated in Annual Service
Plan Updates to reflect any changes expected for each year.
The updated Annual Installments of the Major Improvement Special Assessments for the Eastern
Improvement Area for the five years after the approval of this SAP update are presented in
Appendix A-2-C. The Annual Installments are subject to revision and shall be updated in the
Annual Service Plan Updates to reflect any changes expected for each year.
35
2180.021\71999.7
Section VI: Terms of the Assessments
Section VI
TERMS OF THE SPECIAL ASSESSMENTS
A. Amount of Maior Improvement Special Assessments and Annual Installments
for Parcels Located Within the Assessed Property
1. The Major Improvement Special Assessments, the Roadway Improvement Special
Assessments, and the projected Annual Installments associated with each of the
foregoing, for the Assessed Property in the Western Improvement Area are shown on the
updated Assessment Roll in Appendix A-1. The Major Improvement Special
Assessments and the projected Annual Installments for the Assessed Property in the
Eastern Improvement Area are shown on the updated Assessment Roll in Appendix A-2.
The Major Improvement Special Assessments, the Roadway Improvement Special
Assessments and Annual Installments shall not be changed except as authorized by this
SAP and by the PID Act.
2. The Annual Installments of the Major Improvement Assessments and the Roadway
Improvement Special Assessments shall be collected in an amount sufficient (i) to pay
the principal and interest on the applicable PID Bonds, (ii) to fund the Delinquency and
Prepayment Reserve for the applicable PID Bonds, and (iii) to cover a proportional share
of the Administrative Expenses for the PID.
B. Reallocation of Special Assessments for Parcels Located Within Assessed
Property
1. Upon Division Prior to Recording of Subdivision Plat
a. Upon the division of any Assessed Property (without the recording of subdivision plat),
the Administrator shall reallocate the Special Assessment for the Assessed Property prior
to the division among the newly divided Assessed Properties per the assessment
methodology as presented in Section IV.E.2.
b. If Lots are not platted in accordance with the approved entitlements, the Special
Assessments for each affected Lot will be allocated in an equitable manner.
c. The reallocation of a Special Assessment for Assessed Property that is a homestead under
Texas law may not exceed the Special Assessment prior to the increase or reallocation.
Any reallocation pursuant to this section shall be reflected in a Service and Assessment
Plan Update approved by the City Council. The reallocation herein shall be considered
an administrative action that will not require the City Council to issue notice and hold a
public hearing.
d. The sum of the Special Assessments for all newly divided Assessed Properties shall equal
the Special Assessment for the Assessed Property prior to subdivision. The calculation
shall be made separately for each newly divided Assessed Property. Any reallocation
36
2180.021\71999.7
Section VI: Terms of the Assessments
pursuant to this section shall be reflected in an update to this SAP approved by the City
Council.
2. Upon Subdivision by a Recorded Subdivision Plat
a. Once a Lot or a Parcel has a Special Assessment applied to it, as shown in Table IV-D
and Table IV-H, and is then subdivided again, such newly subdivided Lots or Parcels
will be the Special Assessment of the applicable Land Use as set forth in Table IV-D and
Table IV-H. In no event will the new subdivision cause the sum of the Special
Assessments for the newly subdivided Land Uses to be greater than the Special
Assessment for the undivided Land Use prior to its subdivision or greater than the
Maximum Special Assessment per Unit.
b. The allocation method used above is to insure there will not be an increase in the Special
Assessment for each specific Lot or Parcel. If Lots or Parcels are not platted in
accordance with the approved entitlements, the Special Assessments for each affected Lot
or Parcel will be allocated in an equitable manner.
3. Upon Consolidation
Upon the consolidation of two or more Assessed Properties, the Special Assessment for
the consolidated Assessed Property shall be the sum of the Special Assessments for the
Assessed Properties prior to consolidation. The reallocation of a Special Assessment for
an Assessed Property that is a homestead under Texas law may not exceed the Special
Assessment for such Assessed Property prior to the reallocation. Any reallocation
pursuant to this section shall be calculated by the Administrator and reflected in an
update to this SAP approved by the City Council. The consolidation of any Assessed
Property as described herein shall be considered an administrative action and will not
require any notice or public hearing(as defined in the PID Act) by the City Council.
4. Upon Transfer between Parcels with Different Uses
a. Should an owner of an Assessed Property choose to transfer the intended land use
between all or a portion of one or more Parcels or Lots, in no event will the transfer cause
the sum of the Special Assessments for the affected Parcels or Lots to be greater than the
Special Assessment for those Parcels or Lots prior to the transfer of use.
b. If uses are transferred among Parcels or Lots, the Special Assessments for each affected
Parcel or Lot will be allocated in an equitable manner.
C. Mandatory Prepayment of Special Assessments
If Assessed Property or a portion thereof is transferred to a party that is exempt from the
payment of the Special Assessment under applicable law, or if an owner causes a Parcel
or portion thereof to become Non-Benefitted Property, the owner of such Parcel or
portion thereof shall pay to the City the full amount of the Special Assessment, plus all
Prepayment Costs, for such Parcel or portion thereof prior to any such transfer or act (a
"Mandatory Prepayment'). Should a Mandatory Prepayment be anticipated under this
37
2180.021\71999.7
Section VI: Terms of the Assessments
Section VI.C, the owner of such Parcel or portion thereof shall notify the City and the
Administrator no later than thirty (30) days prior to the anticipated date of transfer. The
amount of a Mandatory Prepayment of Special Assessment shall be calculated in
accordance with the terms of this Service and Assessment Plan. Following a Mandatory
Prepayment of Special Assessment under this Section, the owner of such Parcel or
portion thereof shall notify the City and the Administrator no later than thirty (30) days
after the date of the payment of the Mandatory Prepayment. The sum of the Special
Assessments for all newly-divided Assessed Properties shall equal the Special
Assessments for the Assessed Property prior to subdivision. If the Special Assessment for
the Assessed Property prior to subdivision exceeds the sum of the Special Assessments
for all newly divided Assessed Properties after such reallocation, the Parcel owner shall
pay the Special Assessment in excess of the Maximum Special Assessment per Unit
amount as a Mandatory Prepayment.
D. Reduction of Special Assessments
1. If after all Authorized Improvements to be funded with PID Bonds have been completed
and the Actual Costs for the Authorized Improvements are less than the Actual Costs
used to calculate the Special Assessments securing such PID Bonds, resulting in excess
PID Bond proceeds, then the City may, at its discretion and in accordance with the
Indenture related to such series of PID Bonds, reduce the Special Assessment securing
the series of PID Bonds for each Assessed Property pro rata such that the sum of the
resulting reduced Special Assessments for all Assessed Properties equals the reduced
Actual Costs and such excess PID Bond proceeds shall be applied to redeem PID Bonds
of such series. The Special Assessments shall not be reduced to an amount less than the
principal amount of the related outstanding series of PID Bonds.
2. Similarly, if any of the Authorized Improvements to be funded with a series of PID
Bonds are not undertaken resulting in excess PID Bond proceeds then the City may, at its
discretion and in accordance with the Indenture related to such series of PID Bonds,
reduce the Special Assessment securing the PID Bonds for each Assessed Property pro-
rata to reflect only the Actual Costs that were expended and apply such excess PID Bond
proceeds as described in the paragraph immediately above. The Special Assessments
shall not be reduced to an amount less than the principal amount of the related
outstanding series of PID Bonds.
E. Payment of Special Assessments
1. Payment in Full
a. The Special Assessment for any Parcel or Lot may be paid in full at any time in
accordance with the PID Act. The payment shall include all Prepayment Costs, if any. If
prepayment in full will result in redemption of PID Bonds, the payment amount shall be
reduced by the applicable portion of the proceeds from a debt service reserve fund
applied to the redemption pursuant to the Indenture, net of any other costs applicable to
the redemption of PID Bonds.
38
2180.021\71999.7
Section VI: Terms of the Assessments
b. If an Annual Installment has been billed prior to payment in full of a Special Assessment,
the Annual Installment shall be due and payable and shall be credited against the payment
in full amount upon payment.
c. Upon payment in full of a Special Assessment and all Prepayment Costs, the City shall
deposit the payment in accordance with the related Indenture; whereupon, the Special
Assessment for the Parcel or Lot shall be reduced to zero, and the Parcel or Lot owner's
obligation to pay the Special Assessment and Annual Installments thereof shall
automatically terminate. The City shall provide the owner of the affected Assessed
Property a recordable "Notice of PID Special Assessment Termination."
2. Partial Payment
a. At the option of a Parcel or Lot owner, the Special Assessment on any Parcel or Lot may
be paid in part in an amount equal to the amount of prepaid Special Assessments plus
Prepayment Costs, if any, with respect thereto. Upon the payment of such amount for a
Parcel or Lot, the Special Assessment for the Parcel or Lot shall be reduced by the
amount of such partial payment in a manner conforming to the provisions of the
Indenture, the Special Assessment Roll shall be updated to reflect such partial payment,
and the obligation to pay the Annual Installment for such Parcel or Lot shall be reduced
to the extent the partial payment is made. For any Partial Payment made, the amount
which is paid may be adjusted if required by the terms of the Indenture to conform with
the denomination of any individual bond.
3. Payment of Annual Installments
a. If a Special Assessment is not paid in full, the PID Act authorizes the City to collect
interest and collection costs on the outstanding Special Assessment. A Special
Assessment for a Parcel or Lot that is not paid in full will be collected in Annual
Installments each year in the amounts shown in the Special Assessment Roll, which
includes interest on the outstanding Special Assessment and Administrative Expenses.
The interest on the Special Assessments or Annual Installments thereof, includes the
interest generated from the Additional Interest Rate as described in Section W.H.
b. The Annual Installments as listed on the Assessment Rolls have been calculated
assuming a weighted average interest rate on the PID Bonds (1) issued as Major
Improvement Bonds of 5.07% and (2) issued as Roadway Improvement Bonds of 5.70%
(� ). The principal amounts of Annual
Installments may not exceed the amounts shown on the Assessment Roll except pursuant
to any amendment or update to this SAP. The interest on the Special Assessments or
Annual Installments thereof, includes the interest generated from the Additional Interest
Rate as described in Section W.H.
c. The Annual Installments shall be reduced to equal the actual costs of repaying the related
series of PID Bonds plus the interest generated from the Additional Interest Rate and
actual Administrative Expenses (as provided for in the definition of such term), taking
39
2180.021\71999.7
Section VI: Terms of the Assessments
into consideration any other available funds for these costs, such as interest income on
account balances.
d. The City reserves and shall have the right and option to refund PID Bonds in accordance
with Section 372.027 of the PID Act and the Indenture related to such PID Bonds. In the
event of issuance of refunding bonds, the Administrator shall recalculate the Annual
Installments, and if necessary, may adjust, or decrease, the amount of the Annual
Installment so that total Annual Installments of Special Assessments will be produced in
annual amounts that are required to pay the debt service on the refunding bonds when due
and payable as required by and established in the ordinance and/or the indenture
authorizing and securing the refunding bonds plus interest generated from the Additional
Interest Rate, and such refunding bonds shall constitute "PID Bonds" for purposes of this
SAP.
F. Collection of Annual Installments
1. The Administrator shall, no less frequently than annually, prepare and submit to the City
Council for its approval, an Annual Service Plan Update to allow for the billing and
collection of Annual Installments, which may be performed by the City, the
Administrator, or a third-party selected by the City. Each Annual Service Plan Update
shall include an updated Assessment Roll and a calculation of the Annual Installment for
each Assessed Property. Administrative Expenses shall be allocated among Assessed
Properties in proportion to the amount of the Annual Installments for the Assessed
Property. Each Annual Installment shall be reduced by any credits applied under the
applicable Indenture, such as capitalized interest, interest earnings on any account
balances, and any other funds available to the Trustee for such purpose, and existing
deposits for a Delinquency and Prepayment Reserve. Annual Installments may be
collected by the City (or such entity to whom the City directs) in the same manner and at
the same time as ad valorem taxes. Annual Installments shall be subject to the penalties,
procedures, and foreclosure sale in case of delinquencies as set forth in the PID Act. The
City Council may provide for other means of collecting the Annual Installments to the
extent permitted under the PID Act. The Special Assessments shall have lien priority as
specified in the PID Act.
Any sale of Assessed Property for nonpayment of the delinquent Annual Installments
shall be subject to the lien established for the remaining unpaid Special Assessment
against such Assessed Property and such Assessed Property may again be sold at a
judicial foreclosure sale if the purchaser thereof fails to make timely payment of the non-
delinquent Annual Installments against such Assessed Property as they become due and
payable.
2. Each Annual Installment, including the interest on the unpaid amount of a Special
Assessment, shall be updated annually. Each Annual Installment together with interest
thereon shall be delinquent if not paid on or before January 31 of the following year. The
initial Annual Installments for the Major Improvement Special Assessments will be due
when billed, and will be delinquent if not paid on or before January 31, 2018.
40
2180.021\71999.7
Section VI: Terms of the Assessments
G. Surplus Funds Remaining in the PID Bond Account
1. If proceeds from a series PID Bonds still remain after all of the Authorized Improvements
to be funded with such PID Bonds are constructed and accepted by the City, the proceeds
may be utilized in accordance with Section VI.D of this SAP.
41
2180.021\71999.7
Section VII: Assessment Roll
Section VII
ASSESSMENT ROLL
A. Assessment Roll
1. The City Council has evaluated each Assessed Property based on numerous factors such as
the applicable zoning for the developable area, the Public Property, the types of Authorized
Improvements, and other development factors deemed relevant by the City Council.
2. The Western Improvement Area Assessed Property was assessed for the special benefits
conferred upon the Assessed Property by the Major Improvements pursuant to the Major
Improvement Assessment Ordinance. The special benefit received by Western Improvement
Area Assessed Property from the Major Improvements, a portion of the costs that relate to
the establishment, administration and operation of the PID, and the Major Improvement
Bonds issuance costs was calculated to be $5,998,703. The par amount of the Major
Improvement Bonds originally allocated to the Western Improvement Area was $5,960,843
which was less than the benefit received by the Assessed Property within the Western
Improvement Area from the Major Improvements.
The original calculated special benefits conferred by the Major Improvements to the Western
Improvement Area Assessed Property have been revised. Pursuant to the updated
development plan and related projected estimated build out values shown in Appendix A-3.
Table VII-A summarizes the revised calculated $6,585,586 in special benefit received by
Assessed Property from the Major Improvements, a portion of the costs that relate to the
establishment, administration and operation of the PID, and the Major Improvement Bonds
issuance costs. The par amount of the Major Improvement Bonds reallocated to the Western
Improvement Area is $6,544,023 which was less than the benefit received by the Assessed
Property within the Western Improvement Area from the Major Improvements.
3. The Special Assessment for each Parcel of Assessed Property within the Western
Improvement Area is calculated based on the allocation methodologies described in Section
IV-D.2. The Western Improvement Area Assessment Roll is attached hereto as Appendix A-
L
42
2180.021\71999.7
Section VII: Assessment Roll
Table VII-A
Western Improvement Area
Major Improvements
Updated Special Benefit Summary
Special Benefit Total Cost
Total Authorized Improvements $ 4,376,595
PID Formation/Bond Cost of Issuance
Debt Service Reserve Fund $ 593,846
Capitalized Interest $ 979,229
Underwriter's Discount/Underwriters Counsel $ 195,203
Cost of Issuance $ 440,713
PID Formation/Bond Cost of Issuance $ 2,208,991
Total Special Benefit $ 6,585,586
Special Benefit
Total Special Benefit $ 6,585,586
Projected PID Special Assessment $ 6,544,023
Excess Benefit $ 41,563
4. The Western Improvement Area Assessed Property will be assessed for the special benefits
conferred upon the Assessed Property by the Roadway Improvements. Table VII-B
summarizes the $8,649,546 in special benefit received by Assessed Property from the
Roadway Improvements, a portion of the costs of relating to the establishment,
administration and operation of the PID, and the Roadway Improvements PID Bonds
issuance costs. The par amount of the Roadway Improvement Bonds fully allocated to the
Western Improvement Area is $5,465,000 which is less than the benefit received by the
Assessed Property within the Western Improvement Area from the Roadway Improvements.
5. The Special Assessment for the Assessed Property within the Western Improvement Area is
calculated based on the allocation methodologies described in Section IV-D.2. The Western
Improvement Area Assessment Roll is attached hereto as Appendix A-1.
43
2180.021171999.7
Section VII: Assessment Roll
Table VII-B
Western Improvement Area
Roadway Improvements
Updated Special Benefit Summary
Special Benefit Total Cost
Total Authorized Improvements $ 6,931,647
PID Formation/Bond Cost of Issuance
Debt Service Reserve Fund $ 517,930
Capitalized Interest $ 682,715
Underwriter's Discount/Underwriters Counsel $ 163,950
Cost of Issuance $ 353,304
PID Formation/Bond Cost of Issuance $ 1,717,899
Total Special Benefit 1 $ 8,649,546
Special Benefit
Total Special Benefit $ 8,649,546
Projected PID Special Assessment $ 5,465,000
Excess Benefit I $ 3,184,546
6. The Eastern Improvement Area Assessed Property was assessed for the special benefits
conferred upon the Assessed Property by the Major Improvements. The special benefit
received by Assessed Property from the Major Improvements, a portion of the costs that
relate to the establishment, administration and operation of the PID, and the Major
Improvement Bonds issuance costs was calculated to be $6,766,865. The par amount of the
Major Improvement Bonds originally allocated to the Eastern Improvement Area was
$6,724,157 which is less than the benefit received by the Assessed Property within the
Eastern Improvement Area from the Major Improvements.
The original calculated special benefits conferred by the Major Improvements to the Eastern
Improvement Area Assessed Property have been revised. Pursuant to the updated
development plan and related projected estimated build out values shown in Appendix A-3.
Table VII-C summarizes the revised calculated $6,179,981 in special benefit received by
Assessed Property from the Major Improvements, a portion of the costs that relate to the
establishment, administration and operation of the PID, and the Major Improvement Bonds
issuance costs. The par amount of the Major Improvement Bonds reallocated to the Eastern
Improvement Area is $6,140,977 which was less than the benefit received by the Assessed
Property within the Western Improvement Area from the Major Improvements.
7. The Special Assessment for the Assessed Property within the Eastern Improvement Area is
calculated based on the allocation methodologies described in Section IV-D.3. The Eastern
Improvement Area Assessment Roll is attached hereto as Appendix A-2.
44
2180.021\71999.7
Section VII: Assessment Roll
Table VII-C
Eastern Improvement Area
Major Improvements
Ypoated Special Benefit Summary
Special Benefit Total Cost
Total Authorized Improvements $ 4,107,041
PID Formation/Bond Cost of Issuance
Debt Service Reserve Fund $ 557,272
Capitalized Interest $ 918,919
Underwriter's Discount/Underwriters Counsel $ 183,180
Cost of Issuance $ 413,569
PID Formation/Bond Cost of Issuance $ 2,072,940
Total Special Benefit $ 6,179,981
Special Benefit
Total Special Benefit $ 6,179,981
Projected PID Special Assessment $ 6,140,977
Excess Benefit $ 39,004
8. The Roadway Improvement Assessment Ordinance levies the Roadway Improvement
Special Assessments securing the Roadway Improvement Bonds in the amounts shown in the
Western Improvement Area Assessment Roll attached to this updated SAP.
B. Annual Assessment Roll Updates
1. The Administrator shall prepare, in consultation with City staff, and shall submit to the City
Council for approval, updates to the Assessment Roll and the Annual Service Plan Update to
reflect changes such as (i) the identification of each Parcel, (ii) the Special Assessment for
each Assessed Property, including any adjustments authorized by this SAP or the PID Act;
(iii) the Annual Installment for the Assessed Property for the year (if the Special Assessment
is payable in installments); and (iv) payments of the Special Assessment, if any, as provided
by Section VLE of this SAP.
2. The Service and Assessment Plan Update shall reflect the actual interest on the PID Bonds
on which the Annual Installments shall be paid plus the Additional Interest Rate, any
reduction in the Special Assessments, and any revisions in the Actual Costs to be funded by
the PID Bonds and Developer funds.
45
2180.021\71999.7
Section VIII: Miscellaneous Provisions
Section VIII
MISCELLANEOUS PROVISIONS
A. Administrative Review
1. The City may elect to designate a third party who is not an officer or employee of the
City to serve as Administrator of the PID.
2. To the extent consistent with the PID Act, if an owner of the Assessed Property claims
that a calculation error has been made in the Assessment Roll, including the calculation
of the Annual Installment, that owner must send a written notice describing the error to
the Administrator no later than thirty (30) days after the date the invoice or other bill for
the Annual Installment is received. If the owner fails to give such notice, such owners
shall be deemed to have accepted the calculation of the Assessment Roll (including the
Annual Installments) and to have waived any objection to the calculation. The
Administrator shall, in consultation with City staff, promptly review the notice, and if
necessary, meet with the Assessed Property owner, consider written and oral evidence
regarding the alleged error and decide whether, in fact, such a calculation error occurred.
3. If the Administrator, in consultation with City staff, determines that a calculation error
has been made and the Assessment Roll should be modified or changed in favor of the
Assessed Property owner, such change or modification shall be presented to the City
Council for approval, to the extent permitted by the PID Act. A cash refund may not be
made for any amount previously paid by the Assessed Property owner (except for the
final year during which the Annual Installment shall be collected),but an adjustment may
be made in the amount of the Annual Installment to be paid in the following year. The
decision of the Administrator regarding a calculation error relating to the Assessment
Roll may be appealed to City Council. Any amendments made to the Assessment Roll
pursuant to calculation errors shall be made pursuant to the PID Act.
B. Termination of Special Assessments
1. Each Special Assessment shall terminate on the date the Special Assessment is paid in full,
including payment of any unpaid Annual Installments and Delinquent Collection Costs, if
any. After the termination of the Special Assessment, and the collection of any delinquent
Annual Installments and Delinquent Collection Costs, the City shall provide the owner of the
affected Parcel a recordable Notice of the PID Special Assessment Termination.
C. Amendments
1. Amendments to this SAP may be made as permitted or required by the PID Act and Texas
law.
46
2180.021\71999.7
Section VIII: Miscellaneous Provisions
D. Administration and Interpretation of Provisions
1. The City Council shall administer(or cause the administration of)the PID, an approved SAP,
and all Annual Service Plan Updates consistent with the PID Act.
E. Severability
1. If any provision, section, subsection, sentence, clause or phrase of an approved SAP, or the
application of same to an Assessed Parcel or any person or set of circumstances is for any
reason held to be unconstitutional, void or invalid, the validity of the remaining portions of
the approved SAP or the application to all or any portion of the Property or other persons or
sets of circumstances shall not be affected thereby, it being the intent of the City Council in
adopting the SAP that no part thereof, or provision or regulation contained herein shall
become inoperative or fail by reason of any unconstitutionality, voidness or invalidity of any
other part hereof, and all provisions of this SAP are declared to be severable for that purpose.
2. If any provision of the SAP is determined by a court to be unenforceable, the unenforceable
provision shall be deleted from the SAP and the unenforceable provision shall, to the extent
possible, be rewritten to be enforceable and to give effect to the intent of the City.
47
2180.021\71999.7
Appendix A-1
Western Improvement Area
Assessment Roll
Exhlbit 4-1 -
Western Improvement Area
UpdatedSpecialAssessmen - r Improvements and Roadway Improvements
Total Major
Improvement Special
Major Roadway Assessment and
Improvement Improvement Roadway
Estimated Build Special Special Improvement Special
Tax Parcel ID Out Value a Assessment b Assessment(b)_ Assessment
4103629,6839851,3710890 $ 1,316,418,000 $ 6,544,023 $ 5,465,000 $ 12,009,023
and 41524853
Total $ 1,316,418,000 $ 8,544,023 $ 6,466,000 $ 12",009,023
(a)Estimated build-out value is based on the estimated build out value shown in Table IV-D calcu using the current
development plan attached as Appendix A-3 and is subject to change.The estimated build out value and updated developm
plans will be provided as part of the Annual Service Plan Update and are subject to change until the Maximum Special
Assessment per Unit is determined in accordance with Section VI.E of the SAP.
(b)The Special Assessments are shown herein collectively for all Parcels within the Western Improvement Area.Until such "
that the Maximum Assessment per Unit is determined based on the applicable development plan and the Major Improveme
Special Assessments and the Roadway Improvement Special Assessments are reallocated to each Parcel,the Annual
Installments due from each Parcel will be calculated as part of each annual service plan update based on updated development
plan to be provided by the Developer.If the Developer is unable to provide an updated development plan for each Parcel within
the Western Improvement Area,the Administrator will use the current development plan shown in Appendix A-3 herein.
2180.021\71999.7
Exhibit A-1-B
Western Improvement Area
Updated Anntttil irnaca)Imetrts-gglor knilanovsmailds and en"
Major Improvement Bonds Road Improvement Bonds Delinquency
8
Net Debt Net Debt Administrative Prepayment Capitalized Annual
Year a Principal Interest(b) Service Principal Interest(b) Service Expenses(c) Reserve Interest Installment d
9/30/2018 $ - $ 318,456 $ 318,456 $ - $ - $ - $ 10,318 $ 32,720 $ (318,456) $ 43,038
9/30/2019 $ $ 330,387 $ 330,387 $ $ 371,210 $ 371,210 $ 79,203 $ 60,045 $ (701,597) $ 139,248
9130/2020 $ $ 330,387 $ 330,387 $ $ 311,505 $ 311,505 $ 80,787 $ 60,045 $ (641,892) $ 140,832
9/30/2021 $ 247,626 $ 330,387 $ 578,012 $ 200,000 $ 311,505 $ 511,505 $ 82,403 $ 60,045 $ $ 1,231,966
9/30/2022 $ 260,523 $ 318,005 $ 578,528 $ 210,000 $ 300,105 $ 510,105 $ 84,051 $ 57,807 $ $ 1,230,491
9/30/2023 $ 273,420 $ 304,979 $ 578,399 $ 220,000 $ 288,135 $ 508,135 $ 85,732 $ 55,454 $ - $ 1,227,721
9/302024 $ 288,897 $ 291,308 $ 580,205 $ 235,000 $ 275,595 $ 510,595 $ 87,447 $ 52,987 $ $ 1,231,234
9/3012025 $ 304,373 $ 276,863 $ 581,237 $ 245,000 $ 262,200 $ 507,200 $ 89,196 $ 50,368 $ $ 1,228,000
9/302026 $ 319,850 $ 261,645 $ 581,495 $ 260,000 $ 248,235 $ 508,235 $ 90,980 $ 47,621 $ $ 1,228,330
9/30/2027 $ 335,326 $ 245,652 $ 580,979 $ 275,000 $ 233,415 $ 508,415 $ 92,799 $ 44,722 $ $ 1,226,915
9/30/2028 $ 353,382 $ 228,886 $ 582,268 $ 290,000 $ 217,740 $ 507,740 $ 94,655 $ 41,670 $ - $ 1,226,333
9/30/2029 $ 371,438 $ 211,217 $ 582,655 $ 310,000 $ 201,210 $ 511,210 $ 96,548 $ 38,453 $ $ 1,228,867
9/30/2030 $ 392,074 $ 192,645 $ 584,719 $ 325,000 $ 183,540 $ 508,540 $ 98,479 $ 35,046 $ $ 1,226,784
9/30/2031 $ 412,709 $ 173,041 $ 585,751 $ 345,000 $ 165,015 $ 510,015 $ 100,449 $ 31,461 $ $ 1,227,675
9/30/2032 $ 435,924 $ 152,406 $ 588,330 $ 365,000 $ 145,350 $ 510,350 $ 102,458 $ 27,672 $ $ 1,228,810
9/30/2033 $ 456,560 $ 130,610 $ 587,169 $ 390,000 $ 124,545 $ 514,545 $ 104,507 $ 23,667 $ - $ 1,229,889
9/30/2034 $ 482,354 $ 107,211 $ 589,565 $ 410,000 $ 102,315 $ 512,315 $ 106,597 $ 19,435 $ $ 1,227,912
9/30/2035 $ 508,148 $ 82,490 $ 590,639 $ 435,000 $ 78,945 $ 513,945 $ 106,729 $ 14,973 $ $ 1,228,285
9/30/2036 $ 536,522 $ 56,447 $ 592,969 $ 460,000 $ 54,150 $ 514,150 $ 110,904 $ 10,257 $ $ 1,228,280
9/30/2037 $ 564,896 $ 28,951 $ 593,,847 $ 490,000 $ 27,930 $ 517,930 $ 113,121 $ 5,274 $ $ 1,230,173
Total $ 6,544,023 $ 4,371,974 $ 10,915897 $ 5,465,0001$ 3,902,645 $ 9,367,645 $ 1,819,365 $ 769,723 $ 1,66t,944 $ 2'1,210,785
(2)The 9/30/m dates represent the fiscal year end for the Bonds. �-
{b)Gross of Capitalized Interest including interest from bond closing through 9/1/2020
, )Preliminary Estimate.Assumes 2%increase per year.The administrative charges will be updated each year in the Annual Service Plan Updates based on actual costs.
Annual Installments are calculated using an average 5.07%interest rate on the Major Improvement Bonds,an estimated average(5.70%)interest rate on the Roadway improvement Bonds,
plus the Additional Interest and estimated Administrative
2180.021\71999.7
Appendix A-1-C
Western Improvement Area
btedness- fry and is
Major Improvement Bonds Roadway Improvement Bonds Delinquency Projected
Period Ending Principal Interest Principal Interest Administrative &Prepayment Capitalized Annual PID
September 30 Payments Expense Payments Expense Expenses Reserve Interest Installments
2018 $0 $318,456 $0 $0 $10,318 $32,720 ($318,456) $43,038
2019 $0 $330,387 $0 $371,210 $79,203 $60,045 ($701,597) $139,248
2020 $0 $330,387 $0 $311,505 $80,787 $60,045 ($641,892) $140,832
2021 $247,626 $330,387 $200,000 $311,505 $82,403 $60,045 $0 $1,231,966
2022 $260,523 $318,005 $210,000 $300,105 $84,051 $57,807 $0 $1,230,491
2023 $273,420 $304,979 $220,000 $288,135 $85,732 $55,454 $0 $1,227,721
Total $781,568 $1,932,601 1 $630,000 $1,582,460 $422,495 $326,117 ($1,661,944) $4,013,297
Notre:The Projected Annual Costs and Indebtedness Installmentsrmation of the PID,the oosts:= aproveent
and Roadway Improvements PID Bonds as well as the administration-E, The debt service amounts are based on an average 5.07%Interest rate and a 211 year Perm for the Major m
Improvement PID Bonds and an estimated average 5.7%and a 19 year tern for the Roadway Improvement PID Bonds.Administrative expenses are estimated to increase at a rate of 2.0%per
yemwill be updatetf each year as pad of the Annual Service Plan lyfpd
2180.021\71999.7
Appendix A-2
Eastern Improvement Area
Assessment Roll
Exhibit A-2-A
Eastern Improvement Area
Updated Special Assessments-Major Improvements
Estimated Build Out Major Improvement
Tax Parcel ID Value (a) Special Assessment(b)
5700908,41295149 and 41291522 $ 1,235,340,000 $ 6,140,977
Total $ 1,235,340,000 $ 6,140,977
(a)Estimated build-out value is based on the estimated build out value shown in Table IV D calculated
using the current development plan attached as Appendix A3 and is subject to change.The estimated
build out value and updated development plans will be provided as part of the Annual Service Plan
Update and are subject to change until the Maximum Special Assessment per Unit is determined in
accordance with Section WE of the SAP.
(b)The Special Assessments are shown herein collectively for all Parcels within the Eastern
Improvement Area.Until such time that the Maximum Assessment per Unit is determined based on the
applicable development plan and the Major Improvement Special Assessments are reallocated to each
Parcel,the Annual Installments due from each Parcel will be calculated as part of each annual service
plan update based on updated development plan to be provided by the Developer.If the Developer is
unable to provide an updated development plan for each Parcel within the Eastern Improvement Area,
the Administrator will use the current development plan shown in Appendix A-3 herein.
2180.021171999.7
Exhibit A-2-13
Eastern Improvement Area
Uptkod Annual Installments-Major Improvements
PID Bonds Delinquency Annual
Net Debt Administrative & Capitalized Installment
Year(a) Principal Interest(b) Service Expenses(c) Prepayment Interest (d)
9/30/2018 $ - $ 298,842 $ 298,842 $ 9,682 $ 30,705 $ (298,842) $ 40,387
9/30/2019 $ - $ 310,038 $ 310,038 $ 32,097 $ 30,705 $ (310,038) $ 62,802
9/30/2020 $ - $ 310,038 $ 310,038 $ 32,739 $ 30,705 $ (310,038) $ 63,444
9/30/2021 $ 232,374 $ 310,038 $ 542,413 $ 33,394 $ 30,705 $ - $ 606,511
9/30/2022 $ 244,477 $ 298,420 $ 542,897 $ 34,061 $ 29,543 $ - $ 606,501
9/30/2023 $ 256,580 $ 286,196 $ 542,776 $ 34,742 $ 28,321 $ - $ 605,839
9/30/2024 $ 271,103 $ 273,367 $ 544,470 $ 35,438 $ 27,038 $ - $ 606,945
9/30/2025 $ 285,627 $ 259,812 $ 545,438 $ 36,146 $ 25,682 $ - $ 607,267
9/30/2026 $ 300,150 $ 245,530 $ 545,680 $ 36,869 $ 24,254 $ - $ 606,804
9/30/2027 $ 314,674 $ 230,523 $ 545,196 $ 37,606 $ 22,753 $ - $ 605,556
9/30/2028 $ 331,618 $ 214,789 $ 546,407 $ 38,358 $ 21,180 $ - $ 605,945
9/30/2029 $ 348,562 $ 198,208 $ 546,770 $ 39,126 $ 19,522 $ - $ 605,417
9/30/2030 $ 367,926 $ 180,780 $ 548,706 $ 39,908 $ 17,779 $ - $ 606,394
9/30/2031 $ 387,291 $ 162,384 $ 549,674 $ 40,706 $ 15,939 $ - $ 606,320
9/30/2032 $ 409,076 $ 143,019 $ 552,095 $ 41,521 $ 14,003 $ - $ 607,619
9/30/2033 $ 428,440 $ 122,565 $ 551,006 $ 42,351 $ 11,958 $ - $ 605,314
9/30/2034 $ 452,646 $ 100,608 $ 553,254 $ 43,198 $ 9,815 $ - $ 606,267
9/30/2035 $ 476,852 $ 77,410 $ 554,261 $ 44,062 $ 7,552 $ - $ 605,875
9/30/2036 $ 503,478 $ 52,971 $ 556,449 $ 44,943 $ 5,168 $ - $ 606,560
9/30/20371 $ 530,104 1 $ 27,168 $ 557,272 $ 45,842 $ 2,651 $ - $ 605,764
Total 1 $ 6,140,977 1 $4,102,705 $ 10,243,682 $ 742,789 $ 405,977 $ (918,919) $ 10,473,530
(a)The 9/30ha dates represent the fiscal year end for the Bonds.
(b)Gross of Capitalized Interest including interest from bond closing through 9/1/2020
(c)Preliminary Estimate.Assumes 2%increase per year.The administrative charges will be revised in Annual Service Plan Updates based on
actual costs.
(d)Annual Installments are calculated assurrrng an average 5.07%interest rate on the Bonds plus the Additional Interest plus Administrative
7
-TA4 Appendix A-2-C
Eastern Improvement Area
UpdoW 5-Year Annual Costs and Indebtedness-lMajor Im,provernefft
Major Improvement Bonds Delinquency Projected
Period Ending Principal Interest Administrative&Prepaymeni Capitalized Annual PID
September 30 Payments Expense Expenses Reserve Interest Installments
2018 $0 $298,842 $9,682 $30,705 ($298,842) $40,387
2019 $0 $310,038 $32,097 $30,705 ($310,038) $62,802
2020 $0 $310,038 $32,739 $30,705 ($310,038) $63,444
2021 $232,374 $310,038 $33,394 $30,705 $0 $606,511
2022 $244,477 $298,420 $34,061 $29,543 $0 $606,501
2023 $256,580 $286,196 $34,742 $28,321 $0 $605,839
Total $733,432 $1,813,572 1 $176,715 1 $180,683 1 ($918,919) 1 $1,985,483
Mote:The Projected Annual Costs and Indebtedness Installments are the expenditures associated with the formation of the PID,the costs of issuance
and repayment of the Major Improvement PID Bonds as well as the administration of the PID.The debt service amounts are based on an average
5,07%interest rate and a 20 year term for the Major Improvement PID Bonds.Administrative expenses are estimated to increase at a rate of 2.0%per
year will be updated each year as part of the Annual Service Plan Updates.
2180.021171494.7
Appendix A-3
Updated Development Plan(as provided by the Developer)
41 ant Area
Projected Build Out Value per Unit or SF $ 300,000 $ 127,100 $ 200 Total Projected
New Parcel ID Old Parcel ID Single Family Units Multifamily Units Commercial SF Build Out Value
4103629 4103629 1,003 0 0
Total Build Out Value $ 300,900,000 $ $ $ 300,900,000
6839851 6839851 391 960 366,949
Total Build Out Value $ 117,300,000 $ 122,016,000 $ 73,389,800 $ 312,705,800
3779114 949 60 132,510
3958817 96 0 774,671
3710890 0 0 0
41017338 0 0 0
3710890"'" 41047362 32 0 0
3779122 0 0 0
4070585 0 1068 0
41291514 0 432 0
Subtotal 1,077 1560 907,181
Total Build Out Value $ 323,100,000 $ 198,276 000 $ 181,436 200 $ 702,812,200
41524853 1 41524853 0 0 0
Grand Total 2,471 2,520 1,274,130 $ 1,316,418,000
**A portion of Tax Parcel#03710890 is zoned"MU-2"High Intensity PAbced-Use allowing"higher density,mixed-use,pedestrian-oriented development
for designated mixed-use growth centers and urban villages"including a variety of housing types among the planned commercial development. If
the Developer's plans change to include high-density multi-family housing,the total assessments will be re-allocated in an Annual Service Plan
Update to include the additional high-density multi-family units which will result in a reduction of the total assessments for the units reflected above.**
Projected Build Out Value per Unit or SF $ 300,000 $ 127,100 $ 200 Total Projected
New Parcel ID Old Parcell!) Single Family Units Multifamily Units Commercial SF Build Out Value
5700908 5700908 304 0 145,362
Total Build Out Value $ 91,200,000 $ - $ 29,072,400 $ 120,272,400
41291549 560 0 1,554,256
3983773 400 0 0
4009576 1,184 0 245,997
41295149 Subtotal 2,144 0 1,800,253
Total Build Out Value $ 643,200,000 $ - $ 360,050,600 $ 1 003,250,600
41291522 4009576 0 0 559,085
Total Build Out Value $ - $ $ 111,817,000 $ 111,817,6ttV 1\71999.7
Grand Total 2,448 0 2,504,700 $ 1,235,340,000
Appendix B
Legal Description for Property within PID
ROCK CREEK P.I.D.
LEGAL DESCRIPTION
TRACT 1
ALL THAT CERTAIN LOT, TRACT, OR PARCEL OF LAND, SITUATED IN A PORTION OF THE JUAN JOSE
ALBIRADO SURVEY,ABSTRACT NO.4,THE JOHN H.BOSTICK SURVEY,ABSTRACT NO. 195,THE J. W. HAYNES
SURVEY, ABSTRACT NO. 787, THE J. W. MUHLINGHAUS SURVEY, ABSTRACT NO. 1157, THE B. F. PACE
SURVEY,ABSTRACT NO. 1254,THE STEPHEN B. WILSON SURVEY,ABSTRACT NO. 1676,CITY OF FORT WORTH,
TARRANT COUNTY,TEXAS, BEING ALL OF THAT CERTAIN CALLED 220.826 ACRE TRACT AND PART OF THAT
CERTAIN CALLED 701.937 ACRE TRACT DESCRIBED IN A DEED TO WUSF 4 ROCK CREEK, LP RECORDED IN
INSTRUMENT NO. D214146610 OF THE DEED RECORDS OF TARRANT COUNTY, TEXAS (DRTCT), AND SAID
842.756 ACRES BEING MORE COMPLETELY DESCRIBED AS TWO PARCELS AS FOLLOWS,TO-WIT:
BEGINNING AT A 1" IRON PIPE FOUND FOR THE NORTHEAST CORNER OF SAID 220.826 ACRE TRACT, THE
SOUTHEAST CORNER OF A CALLED 0.629 ACRE TRACT DESCRIBED IN A DEED TO GABRIEL SOUTHWEST,LLC
RECORDED IN INSTRUMENT NO.D217046244(DRTCT),AND THE WEST LINE OF A CALLED 157.060 ACRE TRACT
DESCRIBED IN A DEED TO FORT WORTH AND CROWLEY PARTNERS, LTD. RECORDED IN INSTRUMENT NO.
D207114613(DRTCT);
THENCE SOUTH 01 DEG. 09 MIN. 30 SEC.EAST ALONG THE EAST LINE OF SAID 220.826 ACRE TRACT AND THE
WEST LINE OF SAID 157.060 ACRE TRACT, A DISTANCE OF 1829.93 FEET TO A SPIKE FOUND WITH WASHER
STAMPED"GORRONDONA"FOR THE MOST EASTERLY SOUTHEAST CORNER OF SAID 220.826 ACRE TRACT;
THENCE SOUTH 89 DEG.07 MIN. 16 SEC. WEST DEPARTING THE WEST LINE OF SAID 157.060 ACRE TRACT AND
CONTINUE ALONG A SOUTH LINE OF SAID 220.826 ACRE TRACT,A DISTANCE OF 63.96 FEET TO A 5/8"CAPPED
IRON ROD FOUND STAMPED"BURY';
THENCE SOUTH 01 DEG.09 MIN.36 SEC.EAST ALONG A SOUTHERLY EAST LINE OF SAID 220.826 ACRE TRACT,
A DISTANCE OF 129.34 FEET TO A 5/8"CAPPED IRON ROD FOUND STAMPED"BURY";
THENCE SOUTH 54 DEG. 54 MIN. 24 SEC. WEST ALONG A SOUTHEAST LINE OF SAID 220.826 ACRE TRACT, A
DISTANCE OF 40.86 FEET TO A 5/8" IRON ROD FOUND FOR THE MOST SOUTHERLY SOUTHEAST CORNER OF
SAID 220.826 ACRE TRACT AND BEING IN THE NORTH LINE OF A CALLED 13.703 ACRE TRACT DESCRIBED IN A
DEED TO TEXAS ELECTRIC SERVICE COMPANY RECORDED IN VOLUME 3569,PAGE 410(DRTCT);
THENCE SOUTH 87 DEG. 37 MIN. 52 SEC. WEST ALONG THE SOUTH LINE OF SAID 220.826 ACRE TRACT AND
THE NORTH LINE OF SAID 13.703 ACRE TRACT,A DISTANCE OF 15.73 FEET TO A 5/8"IRON ROD FOUND;
THENCE NORTH 89 DEG. 52 MIN. 56 SEC. WEST ALONG SAID NORTH AND SOUTH LINES, A DISTANCE OF
4860.60 FEET TO A P.K. NAIL FOUND WITH WASHER STAMPED "BURY" FOR THE SOUTHWEST CORNER OF
SAID 220.826 ACRE TRACT AND THE NORTHWEST CORNER OF SAID 13.703 ACRE TRACT;
THENCE NORTH 00 DEG. 42 MIN. 38 SEC. WEST ALONG THE WEST LINE OF SAID 220.826 ACRE TRACT, A
DISTANCE OF 1894.07 FEET TO A 3/8"IRON ROD FOUND FOR THE NORTHWEST CORNER OF SAME;
THENCE North 89 deg.07 min.20 sec.East along the North line of said 220.826 acre tract,a distance of 978.28 feet to a I"iron
pipe found;
THENCE North 89 deg. 03 min. 46 sec. East along said North line, a distance of 3979.93 feet to the POINT OF BEGINNING,
containing 9,618,027 square feet or 220.800 acres of land,more or less.
89
2180.021\71999.7
TRACT 2A
ALL THAT CERTAIN LOT, TRACT, OR PARCEL OF LAND, SITUATED IN A PORTION OF THE JUAN JOSE
ALBIRADO SURVEY,ABSTRACT NO. 4,THE JOHN H.BOSTICK SURVEY,ABSTRACT NO. 195,THE J. W.HAYNES
SURVEY, ABSTRACT NO. 787, THE J. W. MUHLINGHAUS SURVEY, ABSTRACT NO. 1157, THE B. F. PACE
SURVEY,ABSTRACT NO. 1254,THE STEPHEN B. WILSON SURVEY,ABSTRACT NO. 1676,CITY OF FORT WORTH,
TARRANT COUNTY,TEXAS,BEING ALL OF THAT CERTAIN CALLED 220.826 ACRE TRACT AND PART OF THAT
CERTAIN CALLED 701.937 ACRE TRACT DESCRIBED IN A DEED TO WUSF 4 ROCK CREEK, LP RECORDED IN
INSTRUMENT NO. D214146610 OF THE DEED RECORDS OF TARRANT COUNTY, TEXAS (DRTCT), AND SAID
842.756 ACRES BEING MORE COMPLETELY DESCRIBED AS TWO PARCELS AS FOLLOWS,TO-WIT:
BEGINNING AT A P.K. NAIL FOUND WITH WASHER STAMPED "BURY" FOR THE MOST NORTHERLY
NORTHWEST CORNER OF SAID 701.937 ACRE TRACT AND THE SOUTHWEST CORNER OF A CALLED 13.703
ACRE TRACT DESCRIBED IN A DEED TO TEXAS ELECTRIC SERVICE COMPANY RECORDED IN VOLUME 3569,
PAGE 410(DRTCT),AND BEING IN THE EAST LINE OF TXU ROCKY CREEK SUBSTATION ADDITION RECORDED
IN CABINET A,SLIDE 6910 OF THE PLAT RECORDS OF TARRANT COUNTY,TEXAS(PRTCT);
THENCE SOUTH 89 DEG. 53 MIN. 01 SEC. EAST ALONG THE NORTH LINE OF SAID 701.937 ACRE TRACT AND
THE SOUTH LINE OF SAID 13.703 ACRE TRACT, A DISTANCE OF 4702.41 FEET TO A 5/8" CAPPED IRON ROD
FOUND "ILLEGIBLE" FOR THE NORTHEAST CORNER OF SAID 701.937 ACRE TRACT AND BEING IN THE
NORTHWEST RIGHT-OF-WAY LINE OF STATE HIGHWAY NO. 121 (CHISHOLM TRAIL PARKWAY);
THENCE IN A SOUTHWESTERLY DIRECTION DEPARTING THE SOUTH LINE OF SAID 13.703 ACRE TRACT AND
CONTINUE ALONG THE SOUTHEAST LINE OF SAID 701.937 ACRE TRACT AND THE NORTHWEST RIGHT-OF-
WAY LINE OF SAID STATE HIGHWAY NO. 121 THE FOLLOWING FIVE(5)COURSES;
SOUTH 55 DEG. 05 MIN. 56 SEC. WEST, A DISTANCE OF 412.64 FEET TO A 5/8" CAPPED IRON ROD FOUND
STAMPED"GORRONDONA";
SOUTH 47 DEG. 09 MIN. 45 SEC. WEST, A DISTANCE OF 2000.00 FEET TO A 5/8" CAPPED IRON ROD FOUND
STAMPED"GORRONDONA";
SOUTH 39 DEG. 13 MIN. 20 SEC. WEST, A DISTANCE OF 767.36 FEET TO A 5/8" CAPPED IRON ROD FOUND
STAMPED"GORRONDONA";
SOUTH 47 DEG. 09 MIN. 45 SEC. WEST, A DISTANCE OF 1316.80 FEET TO A 5/8" CAPPED IRON ROD FOUND
STAMPED "GORRONDONA" FOR A POINT OF CURVATURE OF A CIRCULAR CURVE TO THE LEFT, HAVING A
RADIUS OF 5849.58 FEET, A CENTRAL ANGLE OF 24 DEG. 55 MIN. 46 SEC., AND BEING SUBTENDED BY A
CHORD WHICH BEARS SOUTH 34 DEG.41 MIN.51 SEC.WEST-2525.13 FEET;
CONTINUE IN A SOUTHWESTERLY DIRECTION ALONG SAID CURVE TO THE LEFT, A DISTANCE OF 2545.16
FEET TO A 5/8"IRON ROD FOUND;
THENCE NORTH 15 DEG. 42 MIN. 10 SEC. EAST NON-TANGENT TO SAID CURVE, DEPARTING THE SOUTHEAST
LINE OF SAID 701.937 ACRE TRACT AND SAID NORTHWEST RIGHT-OF-WAY LINE,A DISTANCE OF 627.38 FEET
TO A 5/8" CAPPED IRON ROD FOUND STAMPED "STANTEC" FOR A POINT OF CURVATURE OF A CIRCULAR
CURVE TO THE RIGHT, HAVING A RADIUS OF 2340.00 FEET, A CENTRAL ANGLE OF 21 DEG. 21 MIN. 37 SEC.,
AND BEING SUBTENDED BY A CHORD WHICH BEARS NORTH 26 DEG.22 MIN.58 SEC.EAST-867.33 FEET;
THENCE IN A NORTHEASTERLY DIRECTION ALONG SAID CURVE TO THE RIGHT,A DISTANCE OF 872.37 FEET
TO A 5/8"CAPPED IRON ROD FOUND"ILLEGIBLE';
THENCE NORTH 07 DEG. 54 MIN.08 SEC. WEST NON-TANGENT TO SAID CURVE,A DISTANCE OF 14.14 FEET TO
A 5/8"IRON ROD FOUND;
THENCE NORTH 52 DEG. 54 MIN. 31 SEC. WEST, A DISTANCE OF 980.00 FEET TO A 5/8" CAPPED IRON ROD
FOUND STAMPED"BURY";
THENCE SOUTH 82 DEG. 05 MIN. 29 SEC. WEST, A DISTANCE OF 14.14 FEET TO A 5/8" CAPPED IRON ROD
FOUND STAMPED"BURY";
THENCE SOUTH 37 DEG. 05 MIN. 29 SEC. WEST, A DISTANCE OF 101.97 FEET TO A 5/8" CAPPED IRON ROD
FOUND STAMPED "BURY" FOR A POINT OF CURVATURE OF A CIRCULAR CURVE TO THE LEFT, HAVING A
RADIUS OF 470.00 FEET,A CENTRAL ANGLE OF 21 DEG.43 MIN. 51 SEC.,AND BEING SUBTENDED BY A CHORD
WHICH BEARS SOUTH 26 DEG. 13 MIN.34 SEC. WEST- 177.I9 FEET;
THENCE IN A SOUTHWESTERLY DIRECTION ALONG SAID CURVE TO THE LEFT, A DISTANCE OF 178.26 FEET
TO A 5/8"CAPPED IRON ROD FOUND STAMPED"BURY";
89
2180.021\71999.7