HomeMy WebLinkAboutContract 47909-FP3 . FORTWORTH,
CITY SECRETARY I
CONTRACT NO. '��Ctrp3
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
(Developer Projects)
i�f, Sea,44ea�
�j11SCity Project Ns: 100389
v U CSfi<t/7q0q
Regarding contract 100389 for ELAN RIVER DISTRICT-PAVING&DRAINAGE as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
n
Original Contract Price: \ $635,706.30
� C,
Amount of Approved Change Orders: Ns 1
Revised Contract Amount: J $635,706.30
Total Cost Work Com A ❑ u �'
p leted: c w a 'a $635,706.30
y t
U � � A
QI C'0 u Gil
1=4 u
++ b
14
V W
AUai ASU id
Recom for Acceptance Date
Asst. Dir r, TPW - Development Services
l g. W. L) I. slz�f�
Accepted Y N6Date
- Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst Cit 8 8 Date
j
Comm -a EFFI ]TX
! � �
l �
Rev.9/22/16
v"�
,
FORT WORTH
CITY OF FORT WORTH
PARTIAL PAYMENT REQUEST
Contract Name ELAN RIVER DISTRICT
Contract Limits
Project Type PAVING&DRAINAGE
City Project Numbers 100389
DOE Number 0389
Estimate Number I Payment Number I For Period Ending 2/28/2018
Project Funding
CD
City Secretary Contract Number Contract Time 821 CD
Contract Date 7/28/2016 Days Charged to Date 567
Project Manager NA Contract is 100.00 Complete
Contractor GREYSTAR DEVELOPMENT&CONSTRUCTION
750 BERING DR.SUITE 200
HOUSTON, TX 44057
Inspectors RODGERS / HERNANDEZ
Friday,March 9,2018 Page 1 of 4
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 2/28/2018
Project Funding
UNIT III:DRAINAGE IMPROVEMENT'S
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 5X3 BOX CULVERT 875 LF $325.00 $284,375.00 875 $284,375.00
2 24"RCP CLASS IIII 250 LF $65.00 $16,250.00 250 $16,250.00
3 21"RCP CLASS III 88 LF $60.00 $5,280.00 88 $5,280.00
4 10'CURB INLET 2 LF $3,400.00 $6,800.00 2 $6,800.00
5 T STACKED MANHOLE 1 EA $6,500.00 $6,500.00 I $6,500.00
6 5'STORM JUNCTION BOX 1 EA $5,800.00 $5,800.00 1 $5,800.00
7 6'STORM JUNCTION BOX 1 EA $6,800.00 $6,800.00 1 $6,800.00
8 10'TYPE 2 INLET I EA $3,650.00 $3,650.00 1 $3,650.00
9 T GRATE INLET 1 EA $4,550.00 $4,550.00 1 $4,550.00
10 CONNECT TO EXISTING RCP 1 EA $2,000.00 $2,000.00 1 $2,000.00
Sub-Total of Previous Unit $342,005.00 $342,005.00
UNIT IV:PAVING IMPROVEMEN'T'S
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 6"CONC PVMT 2300 SY $80.19 $184,437.00 2300 $184,437.00
2 6"CONCRETE DRIVEWAY 420 SY $80.19 $33,679.80 420 $33,679.80
3 REMOVE CONC PVMT 110 SY $12.00 $1,320.00 110 $1,320.00
4 3"ASPHALT PVMT TYPE D 1190 SY $25.55 $30,404.50 1190 $30,404.50
5 6"LIME TREATMENT 2720 SY $13.00 $35,360.00 2720 $35,360.00
6 HYDRATED LIME 50 TN $170.00 $8,500.00 50 $8,500.00
Sub-Total of Previous Unit $293,701.30 $293,701.30
Friday,March 9,2018 Page 2 of 4
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 2/28/2018
Project Funding
Contract Information Summary
Original Contract Amount $635,706.30
ChanLye Orders
Total Contract Price $635,706.30
"fer
Date !y Total Cost of Work Completed $635,706.30
nspection Sup i or Less %Retained $0.00
Net Earned $635,706.30
U"— f Date Earned This Period $635,706.30
Project Manager
Retainage This Period $0.00
LDate Z (0 Less Liquidated Damages
Directal/Contracting Departme Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $635,706.30
Friday,March 9,2018 Page 3 of 4
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number I
Contract Limits Payment Number 1
Project Type PAVING&DRAINAGE For Period Ending 2/28/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors RODGERS / HERNANDEZ Contract Date 7/28/2016
Contractor GREYSTAR DEVELOPMENT&CONSTRUCTION Contract Time 821 CD
750 BERING DR.SUITE 200 Days Charged to Date 567 CD
HOUSTON, TX 44057 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
---------------------------------------
Total Cost of Work Completed $635,706.30
Less %Retained $0.00
Net Earned $635,706.30
Earned This Period $635,706.30
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $635,706.30
Friday,March 9,2018 Page 4 of 4
CONSENT OF SURETY OXVNFR °
TO FINAL PAYMENT ARCHITECT D
CONTRACTOR [�
ALADocun?ent G707 SU.RMI
Bond No. SUR0035672 OTHER 0
TO OVNEfU ARCHITF,CT's PROJECT NO.:
(Name rind addwz)
Elan River District, L.P. and the City of Fort Worth
CONTRACT FOR:
1000 Throckmorton St.
Fort Worth,TX 76102
PROJECT. CONTRACT DATED:
(A'itn,e and adrh...,o
Elan River District, Community Facilities Agreement(CFA) No. 2016-040
In accordance,MTh the provisions of the Contract between the Owner and the Contractor as indicated above,the
flnwil woneand atld,timoj,4ar-rd
Argonaut Insurance Company
13100 Wortham Center Drive, Suite 290
Houston,TX 77065
SURETY,
on bond of
flnsen»ante and address ofConnwcror)
Greystar Development and Construction, L.P. - Elan River District Contractor Series
750 Bering Drive, Suite 200
Houston,TX 77057
CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that tonal payment to the Contractor shall not relieve the Surely of
any of its obligations to
(Otwrtuanteandadd!ssgrowvur)
Elan River District, L.P. and the City of Fort Worth
1000 Throckmorton St.
Fort Worth,TX 76102
OWNER,
as set forth in said Surety's bond.
W WITNESS WHEREOF,the Surety has hereunto set its hand on this date: March 12, 2018
(/,Wljj),jig itijW(&„mnrGjollonwl1Vlss ;nn,ncrkdareanr/war)
Argonaut Ibis ranee Company
(swww ;
By:
(sq, ut,x of ,d,o,zrd r/,r +,zrati,e>1
Attest: Angela M. Tindol Attorney-in-170,
(Sea)): /JI i L --,
Ja . Elwe I,Witness (Pifnied,ra,neandlide)
Surety Phone No. 281-640-7912
G707-1994
Argonaut Insurance Company As-0126508
Deliveries Only: 225 W. Washington, 24th Floor
Chicago, IL 60606
United States Postal Service: P.O. Box 469011, San Antonio, TX 78246
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the Argonaut Insurance Comp9ny,a Corporation duly organized and existing under the laws of the State
of Illinois and having its principal office in the County of Cook,Illinois does hereby nominate,constitute and appoint:
Anu'Jain Sheila J.Montoya,Charles McDaniel Mona D.Weaver Angela M.Tindol Janet M.Elwell AnvelaR.Yanofsky.Shaleen R.LovittJohn
Browning,Justin Tomlin !
Their true and lawful agent(s)and attorneys)-in-fact,each in their separate capacity if more than one is named above,to make;�.ecute,seal and deliver for
and on its behalf as surety,and as its act and deed any and all bonds,contracts,agreements of indemnity and other undertakings in suretyship provided,
however,that the penal sum of any one such instrument executed hereunder shall not exceed the sum of. '
$75.000,000.00 '
This Power of Attorney is granted and is signed and sealed under and by the authority of the following Resolution adopted by the Board of Directors of
Argonaut Insurance Company:
"RESOLVED,That the President,Senior Vice President,Vice President,Assistant Vice President,Secretary,Treasurer and each of them hereby is
authorized to execute powers of attorney,and such authority can be executed by use of facsimile signature,which may be attested or acknowledged by any
officer or attorney,of the Company,qualifying the attorney or attorneys named in the given power of attorney,to execute in behalf of,and acknowledge as
the act and deed of the Argonaut Insurance Company,all bond undertakings and contracts of suretyship,and to affix the corporate seal thereto."
IN WITNESS WHEREOF,Argonaut Insurance Company has caused its official seal to be hereunto affixed and these presents to be signed by its duly
authorized officer on the 8th day of May,2017.
...•••••u,, Argonaut Insurance Company
�k:•• ,ate :rhe by:
* Joshua C.Betz, Senior Vice President
STATE OF TEXAS
COUNTY OF HARRIS SS:
On this 8th day of May,2017 A.D.,before me,a Notary Public of the State of Texas,in and for the County of Harris,duly commissioned and qualified,
came THE ABOVE OFFICER OF THE COMPANY,to me personally known to be the individual and officer described in,and who executed the
preceding instrument,and he acknowledged the execution of same,and being by me duly sworn,deposed and said that he is the officer of the said
Company aforesaid,and that the seal affixed to the preceding instrument is the Corporate Seal of said Company,and the said Corporate Seal and his
signature as officer were duly affixed and subscribed to the said instrument by the authority and direction of the said corporation,and that Resolution
adopted by the Board of Directors of said Company,referred to in the preceding instrument is now in force.
IN TESTIMONY WHEREOF,1 have hereunto set my hand,and affixed my Official Seal at the County of Harris,the day and year first above written.
41hUAn��.-rrk"k�
KATHI EEN M. MEE KS
' =fir• t �Noury Pubtic,6at.01 Tera
Comm.E-01r 07-16-2021 (Notary Public)
"N,)h,,.+; No;pry Ip 667002-b
I,the undersigned Officer of the Argonaut Insurance Company,Illinois Corporation,do hereby certify that the original POWER OF ATTORNEY of which
the foregoing is a full,true and correct copy is still in full force and effect and has not been revoked.
IN WITNESS WHEREOF,I have hereunto set my hand,and affixed the Seal of said Company,on the 12th day of March -_20 18
James Bluzard, Vice President-Surety
�...•.......
THIS DOCUMENT IS NOT VALID UNLESS THE WORDS ARGO POWER OF ATTORNEY AND THE SERIAL NUMBER IN THE UPPER
RIGHT HAND CORNER ARE IN BLUE,AND THE DOCUMENT IS ISSUED ON WATERMARKED PAPER.IF YOU HAVE QUESTIONS
ON AUTHENTICITY OF THIS DOCUMENT CALL(210)321-8400.
AFFIDAVIT
STATE OF Texas
COUNTY OF Harris
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Ross Marshall,
Proejct Director Of Greystar Development&Construction,known to me
to be a credible person, who being by me duly sworn,upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Utility and Paving Improvements to serve Elan River District
BY
Ross Marshall
Subscribed and sworn before me on this date 12th of March, 2018.
,% P�CROS i
.j. ... S
4(1
ul
V P`.•L �
'.�3074�Z'
i F ..•Z,Lp �
i'
Notary Public
Harris, Texas
FORT WORTH,,,.,
TRANSPORTATION AND PUBLIC WORKS
INSPECTION PUNCH LIST
,z LUQ ' c
1. Redo MH's for Type 2 inlet at Sta.6=-36.75. Inlet needs two MH's
Contractor —`
�M1
I spector
C�. S tE`!
FORTWORTHV02,22/0'
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
PROJECT INFORMATION Date: 3/12/2018 ��
Nrnne of Contractor Project Name
Gre star Development and Construction Elan River District
DOEInspector ProjectManager
Hershel Stanley Sutterfield Aaron Lon
DOENumberProjectDlfficulty Type of Contract
N/A CPN 100389 Q Simple Q Routine Q Complex ❑ water ❑ waste water Storm Drainage Q Pavement
Initial ContractArnount Final ContractAmount
$635,706.30 $635,706.30
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accurac of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Com laint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs L 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS& SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECT'OR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
t• T The City of Fort Worth- 1000 Throckmorton Street-Fort Worth,TX 76012-6311
` (817)392-7941 -Fax: (817) 392-7845
'
FORTWORTH 8120"6
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Graystar Develo ment and Construction Elan River District
Inspector City Project Number
Hershel Stanley Sutterfield 100389
Construction Components Project Manager
❑Water ❑Waste Water Q Storm Drainage Pavement Aaron Lon
Initial ContractAmount Project Difficulty
$635,706.30 0 Simple OQ Routine 0 Complex
Final ContractAmount Date
$635,706.30 3/13/2018
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 2 8 4
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 354
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 354
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]*100%) 354 / 448 = 79%
Performance Category Good
<20%=Inadequate 20%to<40%—Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signature I vzled
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TR 76116•(817)392-8306
FORTWORTH rev 03/05/07
TRANSPORTATION &PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Elan River District
PROJECT NO.: 100389 CONTRACTOR: Graystar Development
DOE NO.: N A
PERIOD FROM:08/24/16 TO: 03/13/18 FINAL INSPECTION DATE: 13-Mar-18
WORK ORDER EFFECTIVE:8/24/2016 CONTRACTTIME: 567 Wp Cp
DAYS EADAYS
DAY OF CHARS RSON FOR DAYS DAY OF REASON FOR DAYS
MONTH CREDITED MONTHCHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
THIS &HOLIDAYS &TOO COLD REH
LOCATIONS OTERS * CHARGED DAYS
PERIOD 567 567
PREVIOUS
PERIOD
TOTALS
TO DATE 567 567
*REMARKS:
CONTRACTOR j ATE INSPECTOR DATA
ENGINEERING DEPARTMENT
,° The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845