Loading...
HomeMy WebLinkAboutContract 45460-A1 AMENDMENT No.1 CITY SECRETARY , CONTRACT NO,d.' ' TO CITY SECRETARY CONTRACT No. 45460 c\� C� WHEREAS, the City of Fort Worth (CITY) and Baird, Hampton & Brown, (ENGINEER) made and entered into City Secretary Contract No. 45460, (the CONTRACT) which was authorized on the 41:h day of March 2014 in the amount of $ 421, 741; and WHEREAS, the CONTRACT involves engineering services for the following project: Dry Branch Creek Regional Detention Basin; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 30, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $20, 580. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $442, 071. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth OFFICIAL RECORD Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 CITY ONCRITARY Page 1 of 3 �r 0 WOR I Hp'TX,, City of Fort Worth ENGINEER Baird, Hampton & Brown, Inc. b usa Alanis Konstantine Bakintas, PE Assistant City Manager Principal DATE: 5 I I t0 i a-0 I q DATE: 04/26/18 APPROVAL RECOMMENDED: 41� (/J, Douglab W. Wiersig, P E. Director, Transportation & Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance reporting requirements . i Mike enn tt, Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney ATTEST: of F0 7D Mary J. Kayser City Secretary �S OFFICIAL RRCORD City of Fort Worth CITY*11C RIMARY Professional Services Agreement Amendment Template ' CFW Official Release 9/19/2017 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. Amendment No. Department Fund-Account-Center Amount TPW 520020200431 5330500 C00485 CO2880 $20, 580 Total : City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 3 of 3 BAIRD, HAMPTON & BROWN building partners March 30, 2018 Ms. Linda Young,PE, Engineering Manager c/o Mr. Mike Bennett,PE,Prj. Mgr. Storm Water Management Division Transportation and Public Works City of Fort Worth 200 Texas Street Fort Worth,TX 76102 Tel:817-392-2485,Tel:817-392-7891 RE: DRY BRANCH CREEK REGIONAL DETENTION BASIN FIRM LETTER OF MAP REVISION(LOMR) Ms.Young&Mr. Bennett: We are pleased to submit our scope of work and revised fee proposal to assist you with the referenced project.As you know,we are very familiar with Dry Branch Creek, and the recently constructed regional detention basin; and we are confident that we can assist you in a timely and responsible manner. The scope of work consists of assembling the hydrologic and hydraulic models,compiling the required report/documentation, and completing the Letter of Map Revision (LOMR) application necessary to update the Flood Insurance Rate Map(FIRM). As you know,the regional detention basin has been constructed, and an as-built topographic survey has been completed by the City of Fort Worth,and already provided to us. However,we understand the previously utilized HEC-RAS model has been updated,and we will therefore have to update our previous hydraulic study with this new base model. We anticipate updating the FIRM with reduced floodplain limits along Dry Branch Creek,from E. Belknap Street(SH 377) northward and upstream to NE 28th Street,the regional detention basin.The Base Flood Elevation (BFE)was reduced by approximately 0.5-ft or more within these limits;and we are not proposing to extend the LOMR further downstream (or upstream). This LOMR application will be based upon updated hydrology and hydraulics,and FEMA will therefore require a significant($8,250)submittal review fee;and, as discussed,this has not been included as a direct expense within our proposed professional services fee. 3801 William D Tate,Suite 50111 Grapevine,TX 76051 PH:817-2514551)1 FX:817-2514810 TBPE Firm#44,TBPLS Firm#10011300,#10011302,#10194146 engineering J surveying I landscape Dry Branch Creek Regional Detention March 30, 2018 Page 2 of 3 Our efforts provide for updating the previously completed hydraulic model,compiling the necessary hydrologic and hydraulic data and reports,preparing the LOMR application and assisting with the submittal process as follows: Assemble LOMB and Submit to City $13,000...submit to SWM and Floodplain Management Submit LOMR,Address Comments& Resubmit 7,580...coordinated w/Floodplain Management Total for Professional Services $20,580 A detailed breakdown of these fees, in the form of the city's Level of Effort Spreadsheet, is enclosed for your reference.This is a total stipulated amount of Twenty Thousand Five Hundred and Eight($20,580) Dollars; and includes direct expenses(i.e. reproduction, courier,travel,etc.), but not FEMA's LOMR fee. Services not included in the above outlined scope of work consist of, but are not limited to, revising the previously completed hydrologic(HMS) model,extending the LOMR beyond the river reach described above, addressing multiple review cycles with new comments. All work will be performed in accordance with standard industry practices. Additional services, if required/requested and pre-approved,will be provided on an hourly basis and at our standard billing rates. If the scope of services and fee structure meets with your approval,then please sign below,signifying your acceptance,and return a copy for our files.We will consider receipt of this signed agreement as our notice to proceed. We appreciate the opportunity to submit this proposal and look forward to working with you. Thank you, BAIRD, HAMPTON & BROWN U 1( a:::) Konstantine Bakintas, P.E. Principal, Sr. Civil Engineer 3801 William D Tate,Suite 500 1 Grapevine,TX 76051 PH:817-251-8550 I FX:817-251-8810 TBPE Firm#44,TBPLS Firm#10011300,#10011302,#10194146 engineering I surveying I landscape Dry Branch Creek Regional Detention March 30,2018 Page 3 of 3 por. .. ak= Ar _ R CCCLLL �t ,� 26 IL - r a ' I - � uyr n + R F � ' DRY BRANCH CREEK REGIONAL DETENTION BASIN South of NE 28th Street, East of N.Sylvania and West of N Riverside Dr. 3901 William 0 Tate,Suite 500 1 Grapavine,TX 7605111`11:1117-251-115501 M.817-251-8810 TBPE Firm#44,TBPLS Firm#10011300,#10011302,#10194146 engineering I surveying I landscape Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for DRY BRANCH CREEK REGIONAL DETENTION BASIN LETTER OF MAP REVISION(LOMR) City Project No.00485,DOE No.5425 Labor(hours) Total Expense Total Task No. Task Description Project Project Project EIT CADD Admin. Labor Subconsultant Travel FEMA Expense Task Sub Director Manager En ineer & Total Rate 25 175 130 100 0 $gp Cost SBE Non-SBE Repro Fee Cost 1.0 Project Management 4 6 2 0 0 2 $2.330 0 0 50 0 50 $2,380 1.1 Internal Team Meetings 2 2 $610 $0 $610 1.2 QA/QC 2 $450 $0 $450 1.3 Pre-Design Coordination Meeting 2 2 $800 $50 $50 $850 1.4 Project Update Meetings 2 $350 1 $0 $350 1.5 Invoicing 2 $120 $0 $120 2.0 HEC-RAS&HMS Models 4 12 42 16 20 2 $11,780 $0 $0 $250 $0 $250 $12,030 2.1 Review As-Built Topo& Compare to Plans 1 4 $695 $0 $695 2.2 Update Approved Model w/Basin Sections 1 4 $695 $0 $695 2.3 Update RAS Sections w/As-Built Data 1 4 $695 $0 $695 2.4 Execute RAS Model&Document Results 1 6 $955 $0 $955 2.5 Update/Prepare Inundation Map 1 1 6 4 8 $2,220 1 $0 $2,220 2.6 Prepare FIRM Map Revision 1 2 4 4 $1,155 K$250 $1,155 2.7 Execute HMS Model&Document Results 1 8 4 4 $1,935 2.8 Prepare LOMR App.And Report 1 2 fi 4 4 2 $2,195 $2,195 2.9 Submit to City&Attend Review Conference 2 2 $800 $250 $1,050 Address City Review Comments 1 2 $435 $435 3.0 FEMA LOMR 2 12 12 10 4 4 $5,678 $0 $0 $500 $0 $6.170 3.1 Submit&Coordinate w/FEMA 2 2 $470 $250 by City $720 3.2 Address FEMA Review Comments 1 4 8 8 2 $2,925 $2,925 3.3 Coordinate wlCity Regarding Comments 4 $700 $o $700 3.4 Address City Review Comments 1 2 4 2 21 15 5 $0 $1,455 3.5 u mi oor ina e w 2 120 250 250 370 oas $011UU Project Summary Total Hours 154 Total Labor $19,780 Total Expense $800 SBE Subconsultant $0 Non-SBE Subconsultant $0 10%tub Markup $0 SBE Participation 0.0% otall Projectcost Attachment B-Level of Effort Supplement CPN#101119-2018 Bond PMO Official Release Date:6.09.2012 1of1