Loading...
HomeMy WebLinkAboutContract 48498-A4 CITY SECRUARYL CONTRACT N0.J X01 Qh AMENDMENT No . 4 -\ <�6g, o� �G TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Freese & Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No . 48498, (the CONTRACT) which was authorized by M&C C-28046 on the 13th day of December, 2016 in the amount of $386,311 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $6, 963 .00 which was administratively authorized February 28, 2017 , Amendment No . 2 in the amount of $34,592 . 00 which was authorized by M&C C-28316 on August 1, 2017 and Amendment No. 3 which was administratively authorized on October 25, 2017 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Northside IV 24-inch Water Main, along Bowman Roberts Road from Santa Gertrudis Street to Haltom Bailey Boswell Road. WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 13, 2018 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $165,429.00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $636. 477 . 00 OFFICIAL RECORD CITY SECRETARY Page -1- FT.WORTI#,irx 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Freese & Nichols, Inc. �U4CGLB�O� �ey��► Jesus J. Chapa Nicholas Lester, P.E. Assistant City Man/ager Vice President DATE: A 01 -` DATE: APPROVAL RECOMNMNDED: L� ld� Chris Harder, P.E. Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee M&C: C-28684 Title: Project Manager Date: May 15, 2018 (c)As*4Douglas W. Black Senior Assistant City Attorney ATTEST: OF FORS, Mary J. Kayser OFFICIAL RECORD City Secretary * CITY SECRETARY AS FT.WORTH,TX Page -2- ,.REESE Innovative Practical results IF,"I'MICHOLS ', Outstatqding service 4055International Plaza,Suite 200 Fort Worth,Texas 76109 817-735-7300 fax 817-735-7492 www.freese.com March 13,2018 Mr. Roberto Sauceda, P.E. Project Manager City of Fort Worth Water Department 311 West 10`h Street Fort Worth,TX 76102 Re: Additional EMWTP Improvements for Northside IV 24-Inch Water Transmission Main (City Project No. 100277) Dear Mr. Sauceda: Freese and Nichols, Inc. (FNI) is providing this proposal for amendment of the Additional EMWTP Improvements for the Northside IV 24-Inch Water Transmission Main, Project 6N4(City Project Number 100277).The additional scope includes design phase engineering services, bid phase assistance and construction phase general representation services for: • Anew 3-MGD pump in the existing HSP-H-20 slot at Eagle Mountain Water Treatment Plant high service pump station with VFD, mechanical piping, valves, and electrical components in the existing electrical building; • A new 15,000-gallon hydropneumatic tank. The fee for the additional services is for the lump sum of$165,429.00. Freese and Nichols, Inc.appreciates this opportunity and we would like to meet with you to discuss these additional services at your convenience. Original Contract Amount: $386,311.00 Amendment No 1: $6,963.00 Amendment No 2: $34,592.00 Amendment No 3: $43,182.00 Amendment No 4: $165,429.00 Contract Amount to Date $636,477.00 Sincerely, Russell Gibson, P.E. Vice President cc: File Attachments: Attachment A Scope of Services for Amendment#4 04 LOE Spreadsheet NS4 Amendment 4 [FTW166301 T:\1.02 PM\Amendment No.4\Rev 1\Amendment No 4 Letter-r0J.docx ATTACHMENT A SCOPE OF SERVICES for Amendment#4 The scope of services for Amendment 4 to the NS IV contract will include design phase engineering services, bid phase assistance and construction phase general representation services. In 2017, design was completed for the Northside IV 24-inch water transmission main. This scope of work is an amendment to that design contract. The facilities to be designed for this project will generally include improvements to the Eagle Mountain Water Treatment Plant(EMWTP) Phase III expansion with: • A new 3-MGD pump in the existing HSP-H-20 slot at the Eagle Mountain Water Treatment Plant high service pump station with VFD, mechanical piping, valves, and electrical components in the existing electrical building; • A new 15,000-gallon hydropneumatic tank. It is anticipated these design elements will be combined into a single procurement packages. The detailed scope of work is described below. BASIC SERVICES 1. Preliminary and General Items a. Kick-off Meeting-Conduct one meeting with City to confirm the goals,schedule, and deliverables for the project. b. Obtain and Review City-Furnished Front-End Documents-Meet with City to resolve review comments and revise Engineer's standard documents accordingly. 2. Design Phase Services a. Plan Set Cover Sheet— Prepare cover sheet providing the name of the project and a vicinity map and general project layout. b. Civil Design and Drawings-Prepare plan,section and details for installation of the new pump, hydropneumatic tank, and all appurtenances. c. Electrical & Instrumentation Design and Drawings — Provide electrical and instrumentation design to support the new pump addition.Prepare detailed electrical and instrumentation drawings to support the one additional pump,variable frequency drive,transformers, switchgear,and other equipment that will be put into service. Provide electrical and pump pad plans,site plans,one-line diagrams,process and instrumentation diagrams,and SCADA architecture diagrams. a. HVAC Technical Memorandum–Provide an analysis of existing HVAC capacity at the existing Electrical Building 3 to determine if improvements to HVAC are required. d. HVAC Design and Drawings–Provide HVAC design services to support the new pump addition. e. General Detail Sheets — Prepare standard and general detail sheets f. Specification Preparation — Prepare required front-end and technical specifications. g. Prepare Preliminary Opinion of Probable Construction Cost — Create an opinion of probable construction cost based upon the design documents including quantity take-offs for the detailed design and input from equipment manufacturers. h. Design Submittal-A total of five (5)sets of half size (11"x17") design documents will be 1 submitted to City for review. i. Design Review Comments and Workshop-City will consolidate their submittal review comments and provide to the Engineer.The Engineer will incorporate City's comments into subsequent submittals or prepare a written response of disagreement.A workshop will be conducted by Engineer with the City to review the comments. j. Revise Design Documents— Following the Design Workshop and after receipt of City review comments,when applicable, revise Design Documents. Update and finalize all drawings as required. k. Probable Construction Cost Update-The project opinion of probable construction cost will be generated based on quantity take-off of the detailed design of all work items to be included. I. Issue Final Contract Documents-Submit five (5)sets of final documents(with half size drawings). m. TCEQ Report and Coordination–Update the engineering report and submit report and plans to TCEQ. 3. Bid Phase Services It is assumed that the related pump work and hydropneumatic tank work will be bid together. a. Bid Invitation -Coordinate bid letting date,time, and place for the project with City and prepare final Invitation to Bid. b. Advertisement for Bid-Assist and advise City in placing the advertisements of the Invitation to Bid. c. Bidders List- Identify potential contractors and suppliers acceptable to City and distribute copies of invitation to bid. d. Bid Documents Provide an electronic set of Bid Documents for bidding purposes and distribute the contract documents to prospective bidders via City's plan room. e. Plan Holders List- Distribute plan holders lists of recipients of Bid Documents prior to bid opening. Maintain a record of prospective bidders and suppliers to whom contract documents have been issued. f. Interpret Construction Contract Documents-Prepare and issue addenda to the Bid Documents when required. g. Bid Tabulation& Initial Review-Assist City during bid opening, making preliminary. tabulation of bids, and review questionnaires and bids for completeness. h. Bid Review- Review and evaluate the qualifications of the apparent successful bidder and the proposed major or specialty subcontractors.The review and evaluation will include such factors as work previously completed, proposed pump, equipment that is available for the work, publicly available financial resources,technical experience, and responses from references. i. Issue Construction Contract Documents- Prepare and distribute conforming(with all addenda posted).ten copies of the construction contract documents.These services will include review of contractor's bonds,furnishing to the Contractor unsigned construction contract documents, and transmitting the construction contract documents to City for signature and distribution. Conformed drawings will also be provided in electronic format. 4. Construction Phase Services-General Representation It is assumed that the related pump work and hydropneumatic tank work will be bid together. a. Project Administration -Engineer will perform project administration services during the construction phase of the project. By performing these services, Engineer shall not have authority or responsibility to supervise, direct, or control the Contractor's work or the Contractor's means, methods,techniques,sequences,or procedures of construction. 2 Engineer shall not have authority or responsibility for safety precautions and programs incident to the Contractor's work or failure of the Contractor to comply with laws, regulations, rules, ordinances,codes or orders applicable to the Contractor furnishing and performing the work.Specific services to be performed by Engineer are as follows: L Review Contractor's Insurance Certificates- Review the Contractors Insurance certificates and forward the certificates to City acceptance by Citys legal counsel. Engineer's review of the insurance certificates is only for the purpose of determining if the Contractor maintains the general types and amounts of insurance required by the contract documents and is not a legal review to determine if the Contractor's insurance coverage complies with all applicable requirements. ii. Pre-construction Conference-At a date and time selected by City at a facility provided by City, attend the pre-construction conference and assist City during the conference.With assistance from Engineer, City shall prepare an agenda for the conference,and prepare and distribute minutes.The pre-construction conference shall include a discussion of the Contractor's tentative schedules, procedures for transmittal and review of the Contractor's submittals, processing payment applications,critical work sequencing, change orders,record documents,and the Contractor's responsibilities for safety and first aid. iii. Construction Schedule Review-Review and comment on the Contractor's initial and updated construction schedule and advise City as to acceptability. iv. Construction Sequence Review-Analyze the Contractor's construction schedule, schedule of values, activity sequence,and construction procedures as applicable to City's ability to keep existing facilities in operation. b. Progress meetings—Attend periodic progress meetings(up to four)with the City to review progress of the work and consult with the City and the Contractor concerning issues with the work. c. Construction site visits- Make periodic visits (up to four)to the construction site over the construction period to observe progress of the work and consult with the City and the Contractor concerning problems and progress of the work. d. Submittal Review-Review drawings and other data submitted by the Contractor as required by the construction contract documents. Engineer's review shall be for general conformity to the construction contract documents and shall not relieve the Contractor of any of his contractual responsibilities.Such reviews shall not extend to means, methods, techniques,sequences, or procedures of construction, or to safety precautions and programs incident thereto. Engineer shall maintain a log of all submittals.The log shall include the submittal number,title, date received, review comments, date returned, date resubmitted, etc. e. Warrantee and Test Review- Receive and review guarantees, bonds and certificates of inspection, and tests and approvals which are to be assembled by the Contractor in accordance with the construction contract documents and transmit them to City. f. Request for Information—Interpret construction contract documents when requested by City or the Contractor.The Engineer shall maintain a log of the requests for information (RFI log).The log will include the date of the request, a brief description, reviewer,and date of response. g. Change Management—Provide documentation and administer the processing of contract modifications. Evaluate the cost and scheduling aspects of all change orders. h. Review Contractor's Monthly Payment Requests—Review monthly estimates for the 3 purpose of estimating progress payments to the Contractor. City is responsible for verifying the quantities of work which are the basis of the payment requests and that the work complies with the Contract Documents. i. Performance Test Review—Analyze data from performance testing of equipment by the Contractor or supplier when the construction contract documents require the equipment to be tested after installation.Submit conclusions to City. j. Startup Assistance—Attend on-site equipment and system start-up and commissioning activities for the new HSP-H-20 pump and hydropneumatic tank.These services include: L HSP-H-20: 1. Civil/Process Engineer(x2) 4 Site Visits 4 days 2. Electrical/Controls Engineer 4 Site Visits 4 days 3. HVAC/Mechanical Engineer 1 Site Visit 1 days ii. Hydropneumatic tank: 1. Civil/Process Engineer(x2) 3 Site Visits 3 days 2. Electrical/Controls Engineer 1 Site Visits 1 days k. Substantial Completion Inspection—Upon substantial completion,work with City to inspect the construction work and prepare a punch-list of those items to be completed or corrected before final completion of the project. Submit results of the inspection to City and the Contractor. I. Final Inspection—Upon completion or correction of the items of work on the punch-list, conduct a final inspection with City and Contractor to determine if the work is completed. Provide written recommendations concerning final payment to City, including a list of items, if any,to be completed prior to making such payment. m. Construction Records- Upon completion of the project, revise the construction contract drawings to conform to the construction records. Submit two copies of the prints and one set of 3 mil wash-off black-lined Mylar reproducible. An electronic version of both Drawings and Specifications shall be provided to City in electronic format on flash drive. SURVEYING 2. Additional Survey at High Service Pump Station a. Horizontal and vertical data will be based on the previous topographic survey and control previously provided. Items included are: L Spot elevations at the HSP-H-20 site ii. Spot elevations at the hydropneumatic tank site a. ADDITIONAL SERVICES This scope excludes: • Corrosion engineering, • Surge protection engineering, • Geotechnical engineering, • Sue, • Extension of the metal building at the high service pump station. 4 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Amendment No 4 for Design Services for Northside N 24-Inch Water Transmission Main,Project 6N4 City Project No.100277 L.ber houret Easvme Teak No. T.sk 13—Hplion rcect ra.N roect Profact CM EIac GA EIae PM °a EIac CAU ProleNM ConsVucta eck PMS MaN 1W Tolal tabor 8ubmnsuluM Tab`furpen a Teak Sub Total Cirecbr M.n En Inver En Inaar En Inver n UA En Inner Cart T-1 Reprod.— ga 1.0 Pro ect Management 1 13 T 11 11 1 0 2 0 2 0 1 0 0 58802 i0 i0 BO 07. BST! S]380 C0 k,k-a 1 0 1,614 0 513 of lanan nb-0 4 2 1,59 onto an moot nn¢e 4 $2,016srfi sTa z. o fiz9 Ci ent kic a me.Iln9 1 0 1 1.8< Coommale slu pump,motor en ventlan1 s763 s0 S70 mo fpr euacon - 11 RG R 2'o 0 2 32 40 12 50 40 4 3 enfical o�rc 2 B 26 til89 pere0 4 mal CI malim4 77 4 4 2 2 16,579 so %Mil min Iry Submit5ca e2 2 fi iesJ ----T 1 2 ifi 1 2. 1B —1,70 ov) c e Cci ire4 1 1 4 ; mita e 4 2 1,52 3.0 0Su ai an 0 veR.cemont an ac 8 1,168 No antl Atlaentle rs 4 44 4 m nna ana tae z 8 pnlmclar¢u pier review Tfi ropam an on armed lens end EP..10 eatesve Z B 3 3 E4,019 E0 14,049 0 0 65, m eC.Atlm nistrzi on ry - 16 anairuc6pn mento Conc WNan cha u 2Ma .1 5738 et NonS 14 4 B 0 iota a 6 o .T ge 4 40 50 I��nte�vre 2 4 so an9emena emam est o 4T6 4 B m Startup 12 32 ZASit 11 so3 mall,a N 2 12 2,52 35 2 wrtl m 8 1 6A. 1 ,1] - w 0 3,301 urvtllllonn8 al serve al 6 3,300 TOMIa 3 185 11T 195 89 is 281 et fi 8 12 17 4 1fi1221 3300 0 38)8 165098 Pro eN 5um Tptel Hours 1,0.13 Nal a 83,6)8 M Subwnsu�lan 3,300 5 Su w evllenl so ay. sun So ' Total Pro„aN C sl 5165 429 City of Forl Worth,Tees ABechment 3-Lwel.1 Eflart Supplement - PMO OM[Iel RNeaee NW:fi.09.2012 1 ot1 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 5/15/2018 DATE: Tuesday, May 15, 2018 REFERENCE NO.: **C-28684 LOG NAME: 60NSIV24INWMA4 - FNI SUBJECT: Authorize Execution of Amendment No. 4 in the Amount of$165,429.00 to City Secretary Contract No. 48498, an Engineering Agreement with Freese and Nichols, Inc., for a Revised Contract Amount of $636,477.00 for Northside IV 24-Inch Water Transmission Main Along Bowman Roberts Road from Santa Gertrudis Street to Haltom Bailey Boswell Road (COUNCIL DISTRICTS 2 & 7) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 4 to City Secretary Contract No. 48498, an Engineering Agreement with Freese and Nichols, Inc., in the amount of $165,429.00 for a revised contract in the amount of$636,477.00 for Northside IV 24-Inch Water Transmission Main along Bowman Roberts Road from Santa Gertrudis Street to Haltom Bailey Boswell Road Project. (City Project No. 100277) DISCUSSION: On December 13, 2016 Mayor and Council Communication (M&C C-28046) the City Council authorized the execution of an Engineering Agreement with Freese and Nichols, Inc., in the amount of$386,311.00 for the preparation of plans and specifications for the Northside IV 24-Inch Water Transmission Main along Bowman Roberts Road from Santa Gertrudis Street to Haltom Bailey Boswell Road Project. The agreement was subsequently revised by three amendments as follows: Amendment No. 1 in the amount of$6,963.00 administratively authorized February 28, 2017; Amendment No. 2 in the amount of $34,592.00 authorized by M&C C-28316 on August 1, 2017 and Amendment No. 3 in the amount of $43,182.00 administratively authorized October 25, 2017. Amendment No. 4 will provide for the necessary design for a new 3 Million Gallon Pump at the Eagle Mountain Water Treatment Plant and a new 15,000-gallon hydro pneumatic tank with all of the mechanical piping, valves and electrical components in the existing electrical building. The proposed pump and tank will provide for increased capacity and delivery reliability to existing and future customers in the vicinity of the Eagle Mountain Water Treatment Plant. In addition to the amendment amount, $60,000.00 is required for increased project management and inspection costs. M/WBE OFFICE: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the M/WBE or BIDE Ordinance, because the purchase of goods or services from source(s) where subcontracting or supplier opportunities are negligible. The project is located in COUNCIL DISTRICTS 2 and 7. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budgets, as appropriated, of the Water/Sewer Bond 2017A Fund. The Major Mains Programmable Project P00002 includes an appropriation of$9,874,000.00 for the Water main capital projects. After the funding of this M&C, the amount of$9,648,571.00 of the appropriation will be available to fund future individual projects http://apps.cfwnet.org/ecouncil/printme.asp?id=25811&print=true&DocType=Print 5/17/2018 Funding for Northside IV 24-inch Water Transmission Main along Bowman Roberts Road from Santa Gertrudis Street to Haltom Bailey Boswell Road project is depicted in the table below: FUND Existing Additional Project Appropriations Appropriations Total* W&S Community Facilities $849,045.00 $0.00 $849,045.00 Agreement Fund 56008 2017A Water& Sewer $5,348,779.00 $0.00 $5,348,779.00 Bond Fund 56011 Project Total $6,197,824.00 $0.00 $6,197,824.00 * Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDS): TO Fund Departmentccoun Project Program ctivity Budget Reference# moun ID ID Year Chartfield 2 FROM Fund Department ccoun Project Program ctivity Budget Reference# moun ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Chris Harder (5020) Additional Information Contact: Robert Sauceda (2387) ATTACHMENTS 1. 60NSIV24INWMA4-FNI Compliance Memo.pdf (CFW Internal) 2. 60NSIV24[NWMA4-FNI FID Table (Dan).docx (CFW Internal) 3. 60NSIV24INWMA4-FNI Form 1295.pdf (Public) 4. 60NSIV24INWMA4-FNI Map.pdf (Public) 5. 60NSIV24INWMA4-FNI SAM.pdf (CFW Internal) http://apps.cfwnet.org/ecouncii/printme.asp?id=25811&print=true&DocType=Print 5/17/2018 60NSIV24INWMA4-FNI - FID Table FIDs (KK JOURNAL ENTRIES) 56.01 OW600"430 53305 100277 00173 91,99 OC Rec � Fund Dept# Accou Project Activi Budget Y C Progra Amount I # nt ID ty ear F m � Purpo Xfe FIDs (GL JOURNAL ENTRIES) Rec Fund j Dept# Accou Project Activi Budget Y C Progra Amount # j nt ID i ty ear F m Purpo Xfe Amorti FID (Expen No Entries Needed) s se Only KK or GL _ _ h�� Fund Dept# j Accou � Project Active � Budget Y ! C Progra Amount ; I R�c nt ID i ty i ear i F i m I i Purpo Xfe i CERTIFICATE OF INTERESTED PARTIES FORM 1295 loft Complete Nos.1-4 and 6 N there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 Ifthere are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 12018-326381 Freese and Nichols,Inc. Fort Worth,TX United States Date Filed: Name of governments]entity or state agency that is a party to the contract for which the-Torm is 03115/2018 being filed. City of Fort Worth Date Acknowl 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract City Project#.100277 Engineering Services 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Pence,Bob Fort Worth,TX United States X Coltharp,Brian Fort Worth,TX United States X Milrany,Cindy Fort Worth,TX United States X Taylor,Jeff Houston,TX United States X John,New San Antonio,TX United States X Nichols,Mike Fort Worth,TX United States X Cole,Scott Fort Worth,TX United States X Gooch,Tom Fort Worth,TX United States X Hatley,Tricia Oklahoma City,OK United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Susanne M.Johnson and my date of birth is 03/03/1955 My address is 4055 International Plaza, Suite 200 Fort Worth TX 76109 US (street) (City) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is We and correct Executed In Tarrant County, State of Texas ,on the i_day of March 20__10. (month) (year) /auu,A� /Y) QdA�� Signature of authorized agent of c4ftracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.5523