HomeMy WebLinkAboutContract 50758-AD1 CITY SECRETARY
FIRST ADDENDUM TO CITY SECRETRR"CT N0 ----� ��
`o>/ d CONTRACT NO. 50758
f o
This First Addendum to City Secretary Contract Number 50758 ("First Addendum") is by and
between the City of Fort Worth ("City"), a home-rule municipality organized under the laws of
the State of Texas, acting by and through its duly authorized Assistant City Manager, and
Displays, LLC, acting through Pamela Suggs, its Director of Operations (the "Contractor") acting
by and through Pamela Suggs, its Director of Operations. The City has designated the Arts
Council of Fort Worth and Tarrant County, Inc. as its Contract Manager to manage this
agreement on its behalf.
WHEREAS, on May 20, 2017, the City and Contractor entered into City Secretary
Contract Number 50758 ("CSC No. 50758"), ("Agreement") whereby Contractor agreed to
provide specific services for the purpose of assisting with the care and maintenance of the Public
Art Collection;
WHEREAS, City is in need of services as specified in this First Addendum (collectively
"Services");
WHEREAS, City owns and maintains a public Artwork titled along the river
("Artwork") by Chris Powell ("Artist") which is sited in lower Heritage Park located at Franklin
Street and 445 N. Taylor Street, Fort Worth, TX 76109 (Council District 9);
WHEREAS, the Artwork is comprised of eight independent pieces: one (1) vertical
sculpture measuring 92" x 34" x 23" ("Sculpture") and seven (7) granite block elements
measuring 12" x 24" x 24" ("Elements"), a picture of Elements is attached hereto as Exhibit "A"
and incorporated herein for all purposes;
WHEREAS, in December 2006, the Artwork was partially deinstalled to accommodate
construction of the new Tarrant County College building, with the Elements moved to
storage/display on the grounds of the Fort Worth Community Arts Center located at 1300 Gendy
Street, Fort Worth, TX 76107 ("Arts Center");
WHEREAS, the Elements must be relocated to accommodate site work at the Arts
Center;
WHEREAS, Artist will enter into an agreement with City to design a final site design
including renovations to the attachment method for installation and Contractor is the Artist's
selected Contractor to make said renovations;
WHEREAS, City wishes to deinstall and move Elements to storage until Artist's final
site design is approved and Artist's agreement is executed with Contractor for renovations; and
WHEREAS, the City and Contractor wish to set out the additional Services to be
provided per the Agreement that will be specific to this addendum and this Artwork with the
intent that further Services may be requested by the City through future addenda;
NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter set
forth, the sufficiency of which is hereby acknowled agree as follows:
First Addendum to CSC 50758 OFFICIAL.RECORD Execution Copy 5/15/18
CITY SECRETARY Page 1 of 5
PTA WORTM,TX
I. Contractor agrees to move Elements from its temporary storage/display site at the Arts
Center located at 1300 Gendy Street, Fort Worth 76107 to Contractor's facility located at
626 106th Street, Arlington, TX 76011 for temporary storage until such time that the
Artist's agreement with the Contractor is executed for repairs to the Elements in advance
of installation.
2. The Services to be performed by the Contractor for this First Addendum are set forth in
the Contractor's Proposal for moving the Artwork elements ("Contractor's Proposal"),
which is attached hereto as Exhibit "B" and incorporated herein for all purposes, and
includes all labor, travel, and any other expenses required to complete the Services for
this Artwork. If any terms and conditions contained in Exhibit B are contrary to the
Agreement or this First Addendum, the terms and conditions of the Agreement shall
control first and then the terms and conditions of this First Addendum.
3. In consideration of the Services to be performed under this First Addendum, the City
agrees to pay the Contractor an amount not to exceed Four Thousand, Six Hundred and
Seventy Two Dollars and No Cents ($4,672.00), which includes a 20% contingency.
Payment from the City to the Contractor shall be made on an invoice basis following
receipt of a signed invoice with adequate deliverables provided at submission of invoice,
all in form acceptable to the City. Contractor shall not perform any additional services for
the City not specified by this Agreement unless the City requests and approves in writing
the additional costs for such services. The City shall not be liable for any additional
expenses of Contractor not specified by this Agreement unless the City first approves
such expenses in writing.
4. Contractor shall coordinate with the City to coordinate the required schedule and
availability to access the Artwork.
5. Contractor shall provide in its final report any information related to the services
provided under this First Addendum including before and after documentation noting
areas of concern and recommendations.
6. Contractor shall take such measures as are necessary to protect the Artwork from loss or
damage, including, without limitation, purchasing and maintaining the insurance required
in Article 6 of the Agreement.
7. All terms and conditions of the Agreement not specifically addressed herein remain in
full force and effect and are binding upon the parties.
8. Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1)
does not boycott Israel; and (2) will not boycott Israel during the term of the contract.
The terms "boycott Israel" and "company" shall have the meanings ascribed to those
First Addendum to CSC 50758 Execution Copy 5/15/18
Page 2 of 5
te,-rns in Section 808.001 of the Texas Government Code. By signing this .first
Addendum, Contractor certifies that C'ontractor's signature provides written
verification to the City that Contractor; (I) does not bovcott Israel, and (1) will not
boycott Israel during the term of the contract.
jN WITNESS WHEREOF the part ereto have executed five copies of this Fourth Addcndurn in
Fort Worth,Texas, on day of , 2018.
CITY OF FORT WORTH D LAYS. C
By: -Gv�/'�� By:
Jesus J. Chapa Pa ela ggs
Assistant City Manager Dir for of Operations
CONTRACT COMPLIANCE MANAGER
By signing, I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Jeri ifer Conn,Public Art Collection Manager
Ar' Council of Fort Worth
APPROVED AS TO FORM
AND�,EGALITY:
Jessica angsvang,Assistant City Attorney I1
Form 1295 NIA
fvl
ary J. K rty cretary
No M&C required
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
First Addendum to CSC 50758 Execution Copy 5/15/18
Page 3 of 5
EXHIBIT A
ARTWORK(ELEMENTS ONLY)
4 I '
Elements, part of along the river, by Chris Powell
First Addendum to CSC 50758 Execution Copy 5/15/18
Page 4 of 5
EXHIBIT B
Contractor's Proposal to deinstall, transport, and temporarily
store elements of along the river
Disph"lam ESTIMATE
dba:Displays Fine AA Seevkes
62s top St
hkvbl TX 761)11 DATE ES IMTE#
Metro:817-385.4433 Yry 15,2018 5103
FAX:817-38&3949 DISPLAYS LLQ
www,&olaysfac.aem
FINE ART SERVICES
O L TO SIP TO
RW VX RTH FURS ART FORT WORTH FUDIIC AAT
1300 C31MY Sr. I MRrATIMIM DISFLAYSIM I DBTH STREET
FORT WORTH,TX 76107 ARUNGTON,TX 78011
REP TERMS PROJECT f PO t
Lynda Gadd Net 30 (Iris Po�se1
ITEM DESCRIPTM PRICE EACH ESTIMATE
LABOR NIST ARL Harr of labor to de-i mW seven granite blocks 12 x 65.01) 2,080.00
24 x 24"each with dehery to DFAS
EQUIPMENT Reach fork equipment mW 1,263.52 1,263.52
RENTAL INST ARL
EQUIPMENT USE �49le9
INST ARL 9— 300.01) 30D.D0
MATERIALS iNST
ARL Matn*needed 2000 200.00
STORAGE NCC STOR ARL Nan dimale dorage per month tar(7)grarile blocks 50.0D 50.00
COLLECTION DATE RANGE: O5 AM118 - 05r13R018
DELIVERY DATE"": -
THIS ESTUATE 5 NOT A COlFWMATM OF BOORNG AM DOES NOT INCLUDE TRANSIT WSUGINCE UNLESS
OTHERWISE NOTED.
SUBTOTAL $ 3.893.52
Thank you for the estimate request. SALES TAX f 8.08
CREDITS $
TOTAL S 3,893.52
Please see additional Pmes.
Please sign Terms and Conditions page.
hh.atE
page 1
First Addendum to CSC 50758 Execution Copy 5/15/18
Page 5 of 5