HomeMy WebLinkAboutContract 50811 9
Y
CITY SECRETARLSLI-i-
STANDARD
✓�F�F�fiCITY OF FORT WORTH, TEXAS CONTRACT NO.AGREEMENT FOR CONTRACTOR SERVICES
ypFF <04
p/ s���wp9 This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality
"),:and Badger Daylighting Corp., , authorized to do business in Texas ("Contractor"), for
JECT generally described as: Hydrovac Excavation for subsurface water line locates
les) in various locations within the City for Field Operations..
Article I
Scope of Services
(1) Contractor hereby agrees to perform as an independent contractor set forth in the
Scope of Services attached hereto as Attachment "A". These services shall be
performed in connection with Hydrovac Excavation for subsurface water line locates
(De-Holes) in various locations within the City for Field Operations..
(2) Additional services, if any, will be requested in writing by the City. City shall not pay
for any work performed by Contractor or its subcontractors, subcontractors and/or
suppliers that has not been ordered in writing. It is specifically agreed that
Contractor shall not be compensated for any alleged additional work resulting from
oral orders of any person.
Article II
Compensation
Contractor shall be compensated an amount up to $49,500.00 in accordance with the Fee
Schedule shown in Attachment "B". Payment shall be considered full compensation for all
labor, materials, supplies, and equipment necessary to complete the services described in
Attachment "A".
The Contractor shall provide monthly invoices to the City. Payment for services rendered
shall be due within thirty (30) days of the uncontested performance of the particular
services so ordered and receipt by City of Contractor's invoice for payment of same.
Acceptance by Contractor of said payment shall operate as and shall release the City from
all claims or liabilities under this Agreement for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
Article III
Term
Unless terminated pursuant to Article VIII herein, this Agreement shall be for a term
beginning on the effective date, as described below, and shall continue until the expiration of
the funds or completion of the subject matter contemplated herein, whichever occurs first.
Article IV FOFFICIALRECORD
City of Fort Worth,TexasETARY
Standard Agreement for Professional Services �Revision Date:11.07.17
Page 1 of 9
Independent Contractor
Contractor shall operate hereunder as an independent contractor, and not as an officer,
agent, servant, or employee of the City. Contractor shall have exclusive control of and the
exclusive right to control the details of the work to be performed hereunder and of all persons
performing same, and shall be solely responsible for the acts and omissions of its officers,
agents, employees, contractors and subcontractors. The doctrine of respondeat superior
shall not apply as between City and Contractor, its officers, agents, employees, contractors,
and subcontractors, and nothing herein shall be construed as creating a partnership or joint
venture between City and Contractor.
Article V
Professional Competence and Indemnification
(1) Work performed by Contractor shall comply in all aspects with all applicable local,
state and federal laws and with all applicable rules and regulations promulgated by
the local, state and national boards, bureaus and agencies. Approval by the City
shall not constitute or be deemed to be a release of the responsibility and liability of
Contractor or its officers, agents, employees, contractors and subcontractors for the
accuracy and competency of its services performed hereunder.
(2) THE CONTRACTOR, AT NO COST TO THE CITY, AGREES TO DEFEND,
INDEMNIFY AND HOLD THE CITY, ITS OFFICERS, AGENTS SERVANTS AND
EMPLOYEES, HARMLESS AGAINST ANY AND ALL CLAIMS, LAWSUITS,
ACTIONS, COSTS AND EXPENSES OF ANY KIND, INCLUDING, BUT NOT
LIMITED TO, THOSE FOR PROPERTY DAMAGE OR LOSS (INCLUDING
ALLEGED DAMAGE OR LOSS TO CONTRACTOR'S BUSINESS AND ANY
RESULTING LOST PROFITS) AND/OR PERSONAL INJURY, INCLUDING
DEATH, THAT MAY RELATE TO, ARISE OUT OF OR BE OCCASIONED BY
CONTRACTOR'S BREACH OF (i) ANY OF THE TERMS OR PROVISIONS OF
THIS AGREEMENT OR (ii) ANY NEGLIGENT ACT OR OMISSION OR
INTENTIONAL MISCONDUCT OF CONTRACTOR, ITS OFFICERS, AGENTS,
ASSOCIATES, EMPLOYEES, CONTRACTORS (OTHER THAN THE CITY) OR
SUBCONTRACTORS, RELATED TO THE PERFORMANCE OR NON-
PERFORMANCE OF THIS AGREEMENT; HOWEVER CONTRACTOR IS NOT
RESPONSIBLE FOR ANY PRE-EXISITING CONTAMINATION TO SOILS OR
SPOILS. THIS SECTION SHALL SURVIVE ANY TERMINATION OR
EXPIRATION OF THIS AGREEMENT.
Article VI
Insurance
(1) Contractor shall not commence work under this Agreement until it has obtained all
insurance required under this Article and the City has approved such insurance, nor
shall Contractor allow any subcontractor to commence work on its subcontract until
all similar insurance of the subcontractor has been so obtained and approval given
by the City; provided, however, Contractor may elect to add any subcontractor as
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 2of9
an additional insured under its liability policies.
Commercial General Liability
$1,000,000 each occurrence
$2,000,000 aggregate
Automobile Liability
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall be
on any vehicle used in the course of the Project.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
(2) Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Contractor's worker's
compensation insurance policy, the City, its officers, employees and servants shall
be endorsed as an additional insured on Contractor's insurance policies.
b. Certificates of insurance shall be attached to this Agreement prior to its execution.
c. Any failure on part of the City to attach the required insurance documentation
hereto shall not constitute a waiver of the insurance requirements specified
herein.
d. Each insurance policy shall be endorsed to provide the City a minimum thirty days
notice of cancellation, non-renewal, and/or material change in policy terms or
coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
f. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
g. Workers' compensation insurance policy(s) covering employees employed on the
Project shall be endorsed with a waiver of subrogation providing rights of recovery
in favor of the City.
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 3 of 9
h. City shall not be responsible for the direct payment of insurance premium costs
for Contractor's insurance.
i. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
j. In the course of the Agreement, Contractor shall report, in a timely manner, to
City's officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property loss.
k. Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
I. Upon the request of City, Contractor shall provide complete copies of all
insurance policies required by these Agreement documents.
Article VII
Transfer or Assignment
City and Contractor each bind themselves, and their lawful successors and assigns, to this
Agreement. Contractor, its lawful successors and assigns, shall not assign, sublet or transfer
any interest in this Agreement without prior written consent of the City.
Article VIII
Termination of Contract
(1) a. City may terminate this Agreement for its convenience on 30 days' written notice
to Contractor.
b. Either the City or the Contractor, for cause, may terminate this Agreement if
either Party fails substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such nonperformance within
5 days' written notice or thereafter fails to diligently complete the correction.
(2) If City chooses to terminate this Agreement, upon receipt of notice of termination,
Contractor shall discontinue services rendered up to the date of such termination
and City shall compensate Contractor based upon calculations in Article II of this
Agreement and Exhibit "B" attached hereto and incorporated herein.
(3) All reports, whether partial or complete, prepared under this Agreement, including
any original drawings or documents, whether furnished by the City, its officers,
agents, employees, consultants, or contractors, or prepared by Contractor, shall be
or become the property of the City, and shall be furnished to the City prior to or at
the time such services are completed, or upon termination or expiration of this
Agreement.
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 4 of 9
Article IX
Right to Audit
(1) Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Agreement, have access to and the right to examine any directly
pertinent books, documents, papers and records of Contractor involving transactions
relating to this Agreement. Contractor agrees that the City shall have access during
normal working hours to all necessary facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of
this section. City shall give Contractor reasonable advance notice of intended audits.
(2) Contractor further agrees to include in all its subcontracts hereunder, a provision to
the effect that the subcontractor agrees that the City shall, until the expiration of
three (3) years after final payment under the subcontract, have access to and the
right to examine any directly pertinent books, documents, papers and records of
such sub-contractor, involving transactions to the subcontract, and further, that City
shall have access during normal working hours to all sub-contractor facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this article. City shall give Contractor and any sub-
Contractor reasonable advance notice of intended audit.
(3) Contractor and sub-contractors agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse Contractor for the cost of copies
at the rate published in the Texas Administrative Code in effect as of the time copying
is performed.
Article X
Minority Business and Small Business Enterprise (MBE)(SBE) Participation
In accordance with the City's Business Diversity goals (Chapter 20, Article X of the City's
Code of Ordinances a/k/a Ordinance No. 20020-12-2011, as amended), the City has goals
for the participation of minority business enterprises and/or small business enterprises in City
contracts. Contractor acknowledges the MBE and SBE goals established for this Agreement
and its accepted written commitment to MBE and SBE participation. Any misrepresentation
of facts (other than a negligent misrepresentation) and/or the commission of fraud by the
Contractor may result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
Article XI
Observe and Comply
Contractor shall at all times observe and comply with all federal, state, and local laws and
regulations and with all City ordinances and regulations which in any way affect this
Agreement and the work hereunder, and shall observe and comply with all orders, laws
ordinances and regulations which may exist or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. Contractor agrees to defend, indemnify and hold harmless City
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 5 of 9
and all of its officers, agents and employees from and against all claims or liability arising out
of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its
employees.
Article XII
Immigration Nationality Act
Contractor shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (1-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Contractor shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any
Contractor employee who is not legally eligible to perform such services. CONTRACTOR
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Contractor, shall have the right to immediately
terminate this Agreement for violations of this provision by Contractor.
Article XIII
Venue and Jurisdiction
If any action, whether real or asserted, at law or in equity, arises on the basis of any
provision of this Agreement, venue for such action shall lie in state courts located in
Tarrant County, Texas or the United States District Court for the Northern District of Texas
— Fort Worth Division. This Agreement shall be construed in accordance with the laws of
the State of Texas.
Article XIV
Contract Construction
The parties acknowledge that each party and, if it so chooses, its counsel have reviewed
and revised this Agreement and that the normal rule of construction to the effect that any
ambiguities are to be resolved against the drafting party must not be employed in the
interpretation of this Agreement or any amendments or exhibits hereto.
Article XV
Severability
The provisions of this Agreement are severable, and if any word, phrase, clause,
sentence, paragraph, section or other part of this Agreement or the application thereof to
any person or circumstance shall ever be held by any court of competent jurisdiction to be
invalid or unconstitutional for any reason, the remainder of this Agreement and the
application of such word, phrase, clause, sentence, paragraph, section, or other part of this
Agreement to other persons or circumstances shall not be affected thereby and this
Agreement shall be construed as if such invalid or unconstitutional portion had never been
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 6 of 9
contained therein.
Article XVI
Notices
Notices to be provided hereunder shall be sufficient if forwarded to the other Party by
hand-delivery or via U.S. Postal Service certified mail return receipt requested, postage
prepaid, to the address of the other Party shown below:
City of Fort Worth
Attn: Roberto C. Sauceda, P.E.,
Water Department
Senior Professional Engineer
200 Texas Street
Fort Worth, Texas 76102
Contractor:
Badger Daylighting Corp.
Attn: April Daubenspeck
National Accounts / Contracts Manager
8930 Motorsport Way, Brownsburg, IN 46112
Article XVII
Prohibition On Contracts With Companies Boycotting Israel
Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1)
does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The
terms "boycott Israel' and "company" shall have the meanings ascribed to those terms in
Section 808.001 of the Texas Government Code. By signing this contract, Contractor
certifies that Contractor's signature provides written verification to the City that
Contractor: (1) does not boycott Israel; and(2) will not boycott Israel during the term
of the contract.
Article XVIII
Headings
The headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 7of9
This Agreement may be executed in one or more counterparts and each counterpart shall,
for all purposes, be deemed an original, but all such counterparts shall together constitute
but one and the same instrument.
The following attachments and schedules are hereby made a part of this Agreement:
Attachment A- Scope of Services
Attachment B–Compensation
Attachment C-Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E- Location Map
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY: BY:
CITY OF FORT WORTH CONTRACTOR
Badger Daylighting Corp
r 1
Jesus J Chapa ' Ashley Muter
Assistant City Manager Contract Specialist
Date: 'f' -30 —18— tie:
APPROVAL RECOMMENDED:
/ I
By: l k L
Chris Harder, P.E.
Interim Director, Water Department `
{
LOFFICIALRECORD
Citi of Fon woM,Texas RETARY
Standard Agreement for Professional Services
R"8of9ate:11.11717 THI TX
- .... "lx+tMsf� p4tt+3�!ho-s�rxs�asre"'�4�1� I>�!f;a:+aDa?�k�+��N�►�f' - . .. .. �"_rs � pR.�?thl
ii
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting Form 1295 No.
requirements.
Obert C. Sauceda, P.E. M&C Date:
Senior Professional Engineer
APPROVED AS TO FORM AND LEGALITY ATTEST:
By:
DouglasA W. Black Mary J. Ka
Senior Assistant City Attorney City Secreta FQRT�
'Ar.� 'k
..............
XAS
OFFICIAL RECORD
City of Fort worth.Texas CITY SECRETARY
Standard Agreement for Professional Services ,. ��'
ReAsbn Date:11.07.17 TX
Page 9 of 9
"� " 4R
ATTACHMENT A
f
Reference:
City Of Fort Worth: Test Hole Scope
Submitted by:
Badger Daylighting Corp.
Please Respond To:
John Green
{ Area Manager- Fort Worth
Badger Daylighting
(817) 609 3174 — Cell
Jgreen@badger-corp.com
SCOPE OF
BADGER
• To provide Hydrovac Excavation and Restoration Services for Subsurface Utility Locate
(Test Hole) Quality Level A.
• Pricing Table 1 —SEE ATTACHEMENT B
1) Pricing Includes: Test hole, backfill crew, concrete removal crew, concrete repair crew, haul trucks,
back fill material, concrete material.
a) All items listed will be as requested by clients direction.
2) 15 hole minimum to be laid out by client per mobilization/task order. Smaller quantities will be billed
hourly at$240/hr portal to portal.
3) Test Holes
a) If utility is not found under the utility mark, Badger will conduct a 12" sweep in attempt to
locate the utility. If the utility is not found, Badger will continue excavating at clients direction
a new test hole in order to visually verify the utility. Special note on duct banks. Some duct
banks due to width may require two potholes to locate the edges if the width of the duct bank is
required.
b) Ground conditions are considered to be average free of rock 6" in diameter or larger. Larger
obstructions greater than 6" in diameter will be considered out of scope.
c) Badger will make every effort to work with the facility owner to correctly mark the facility.
Any hole with no utility found is still considered a hole.
4) Delays outside of Badger's control are considered out of scope. Any unusual ground conditions
would also be considered out of scope which could include: brick, rail lines, manholes, large rocks
or any other unknown obstructions, roads under roads, high water tables, sloughing sand, etc. Any
cars parked on the side of the road that may interfere with potholing operations are out of Badgers
control and will be considered out of scope.
5) Inclement weather: For safety, weather is a factor and has to be favorable to work. Badger is not
responsible for weather delays or added expense.
6) All crews expect to work unimpeded without client delay.
7) Payment is expected no later than 30 days from receipt of invoice with zero percent (0%) retainage
withheld.
8) Pricing is valid for thirty (30) days.
Attachment 6
Rate Sheet
BAMR
DAYLIGHTING CORK'
Thank you for considering Badger Daylighting to provide the hydro excavation for your project. We will
be pleased to assist you on these projects at the rates noted below.
1. HOURLY EXCAVATION(Four Hour Minimum) PER TRUCK $240.00
2. OVERTIME RATE (Weekends&work exceeding 8 hours per day) PER TRUCK $245.00
3. PER DIEM(required if work requires overnight accommodations) PER OPERATOR $150.00
4. MOBILIZATION(exclude if project lies within 50 miles of Badger office) PER HOUR $150.00
5. CHASE TRUCK(if applicable and/or required) PER HOUR $30.00
6. BACKFILL MATERIAL(Includes standard fill dirt) PER l OCY $290.00
7. ORANGE FENCE(50FT roll) PER ROLL $23.00
8. T-POST PER EACH $7.00
9. CONCRETE REMOVAL CREW(labor,equipment,includes repair labor as PER HOUR $230.00
well)
10. BACKFILL CREW(labor,equipment) PER HOUR $150.00
11. HAUL TRUCKS(Four hour minimum) PER HOUR $120.00
12.DUMP CHARGES(if needed) PER LOAD $30.00
13.WATER CHARGES(If needed) PER LOAD $15.00
14.CONCRETE MATERIAL(Standard 5000 psi,Four yard minimum) PER CY $135.00
15. FUEL UPCHARGE(for every$0.50 above$4.00 per Gallon) PER HOUR $5.00
16. REMOTE HOSE(if required) PER FOOT $3.00
17. SEWER JETTING TRAILER PER DAY $325.00
18.3/4 TON PICKUP(used with jetting trailer only) PER DAY $100.00
Notes:
1. Rates include all hoses and necessary equipment for Hydrovac Excavation.
2. Customer is responsible for a water source and dump site for spoil.
3. Rates valid for 30 Days
Questions & Comments will be addressed by:
John Green
Area Manager - Fort Worth
817-609-3174 Phone
Jgreen@badger-corp.com Email