HomeMy WebLinkAboutContract 49551-FP1 Departo T W Const.Services
CPN# - D t
Project Manager
Risk Management Canad �'t YWORTH, CITYSECRETARY
D.O.E. Brotherton —?�—i�J 1
CFA Morales/Scanned �o CONTRACT N0. 1
Gutzler/Scanned 53 f1—IG-� _
The Proceeding people have been Contacted 1710N AND PUBLIC WORKS
concerning the request for final payment&have PROJECT COMPLETION 's-6 b b 0p
— U Oge?3
released this project for such payment.
:veloper Projects)
City Project Ns: 100923
Clearance Conducted By � ta�
Regarding contract 100923 for AMERICAN AIRLINES SANITARY SEWER RELOCATION as required by the
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the � q ,�cgli ;j
f 5 LS t'l
MAY 2 9 2018
Original Contract Price: $116,678.00
Amount of Approved Change Ns
Revised Contract Amount:
Total Cost Work Completed: $116,678.00
-�7' aa417
Recommen cceptance Date
Asst. Directo T W - Development Services
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
2345'
s,
CP
Co a. nts�: �D O
OFFICIAL RECORD
CITY SECRETARY
F7•WORTN,TX
Rev.9/22/16
L4
MAY 29018
City Project Numbers 100923 DOE Number 0923
Contract Name AMERICAN AIRLINES SANITARY SEWER RELOCATION Estimate Number 1
Contract Limits Payment Number 1
Project Type SEWER For Period Ending 5/8/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON / OVERSTREET Contract Date
Contractor HM&MF,LTD Contract Time 80 CD
2501 PARKVIEW RD.,#330 Days Charged to Date 233 CD
FORT WORTH, TX 76102 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $116,678.00
Less %Retained $0.00
Net Earned $116,678.00
Earned This Period $116,678.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1 16,678.00
Monday,May 21,2018 Page 4 of 4
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name AMERICAN AIRLINES SANITARY SEWER RELOCATION
Contract Limits
Project Type SEWER
City Project Numbers 100923
DOE Number 0923
Estimate Number 1 Payment Number 1 For Period Ending 5/8/2018
CD
City Secretary Contract Number Contract Time 8(FD
Contract Date Days Charged to Date 233
Project Manager NA Contract is 100.00 Complete
Contractor HM&MF,LTD
2501 PARKVIEW RD.,#330
FORT WORTH, TX 76102
Inspectors DICKINSON / OVERSTREET
Monday,May 21,2018 Page I of 4
City Project Numbers 100923 DOE Number 0923
Contract Name AMERICAN AIRLINES SANITARY SEWER RELOCATION Estimate Number 1
Contract Limits Payment Number I
Project Type SEWER For Period Ending 5/8/2018
Project Funding
SANITARY SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
------ -------------- ———— —
1 REMOVE 10"SEWER LINE 318 LF $31.00 $9,858.00 318 $9,858.00
2 REMOVE 4'SEWER MANHOLE 2 EA $1,365.00 $2,730.00 2 $2,730.00
3 POST CCTV INSPECTION 424 LF $2.00 $848.00 424 $848.00
4 MANHOLE VACUUM TESTING 5 EA $150.00 $750.00 5 $750.00
5 BYPASS PUMPING 1 LS $10,600.00 $10,600.00 1 $10,600.00
6 TRENCH SAFETY 424 LF $1.00 $424.00 424 $424.00
7 CONCRETE COLLAR 1 EA $550.00 $550.00 1 $550.00
8 4"SEWER SERVICE 2 EA $2,500.00 $5,000.00 2 $5,000.00
9 6"SEWER SERVICE 1 EA $1,100.00 $1,100.00 1 $1,100.00
10 18"SEWER PIPE 384 LF $97.00 $37,248.00 384 $37,248.00
11 EPDXY MANHOLE LINER 56.8 VF $165.00 $9,372.00 56.8 $9,372.00
12 4'MANHOLE 4 EA $5,853.00 $23,412.00 4 $23,412.00
13 4'DROP MANHOLE 1 EA $6,500.00 $6,500.00 1 $6,500.00
14 T EXTRA DEPTH MANHOLE 27.62 VF $300.00 $8,286.00 27.62 $8,286.00
Sub-Total of Previous Unit $116,678.00 $116,678.00
---------------------------------------
Monday,May 21,2018 Page 2 of 4
City Project Numbers 100923 DOE Number 0923
Contract Name AMERICAN AIRLINES SANITARY SEWER RELOCATION Estimate Number 1
Contract Limits Payment Number 1
Project Type SEWER For Period Ending 5/8/2018
Project Funding
Contract Information Summary
Original Contract Amount $116,678.00
Change Orders
Total Contract Price $116,678.00
Date 5 ��) I I� Total Cost of Work Completed $116,678.00
Contrac r Less %Retained $0.00
Date ^�� Net Earned $116,678.00
Inspection Supe isor Earned This Period $116,678.00
!� Retainage This Period $0.00
Date
Less Liquidated Damages
Proje t Vanager
Days @ /Day $0.00
Date 17 LessPavement Deficiency $0.00
Asst.D o T/ Less Penalty $0.00
M` L Date S/FwLess Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $116,678.00
Monday,May 21,2018 Page 3 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: American Airlines Sanitary Sewer Relocation
PROJECT NO.: 100923 CONTRACTOR: Muckleroy&Falls
DOE NO.: N/A
PERIOD FROM:09/13/17 TO: 05/03/18 FINAL INSPECTION DATE: 2-May-18
WORK ORDER EFFECTIVE:9/13/2017 CONTRACT TIME: 80 0 WE CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTHCHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28
14. 29.
15. 30.
31.
----------------------
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
THIS
& HOLIDAYS & TOO COLD RELOCATIONS OTHERS * CHARGED DAYS
PERIOD 233
PREVIOUS
PERIOD 0
TOTALS
TO DATE 233
*REMARKS:
CC.-'kACTOR DATE INSPECTOR DATE
ENGINEERING DEPARTMENT
51 The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TY 76012-6311
(817) 392-7941 •Fax: (817) 392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Muckleroy&Falls American Airlines Sanitary Sewer Relocation
Inspector City Project Number
Travis Overstreet 100923
Construction Components Project Manager
❑Water ❑� Waste Water ❑Storm Drainage ❑Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$116,678.00 0 Simple 0 Routine 0 Complex
Final Contract Amount Date
,$116,678.00 5/9/2018
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 N
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 N
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 N
1 I Property Restoration 5 N
12 After Hours Response 5 N
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 231
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 231
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 308
Rating( ITS/MSI x 100%) 231 / 308 = 75%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature �) Contractor Signature � G--`�7'
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 8851 Camp Bowie West Blvd. •Fort Worth,TX'76116• (817) 392-8306
FORT' WORTH REV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 5/9/2018
Name of Contractor Project Name
Muckelroy&Falls American Airlines Sanitaa Sewer Relocation
DOE Inspector Project Manager
Travis Overstreet Fred Ehia
DOE Number Project Difficulty Type of Contract
N/A 0 Simple 0 Routine 0 Complex ❑water ❑✓ waste water ❑Storm Drainage ❑Pavement
Initial Contract Amount Final Contract Amount
$116,678.00 $116,678.00
11)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector I Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector Ll 2 Clari &Su icienc of Details y
3 Accuracy of Measured Quantities q 13 Applicability of Specifications �l
4 Display Of Professionalism 1- 4 Accuracy of Plan Quantities
5 Citizen Com laint Resolution W PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs t/ 1 Knowled e And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments f 4 Resolution of Utility Conflicts
3 Bid Oep ning to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
p
COMMENTS VW(
Signature Contractor — l--`--}'
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
, s The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817) 392-7845
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Taylor Hale, V.P. of
Operations Of Muckleroy & Falls, known to me to be a credible person,
who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
American Airlines Trinity Campus
BY
, 0„� �10•�/ Name or Title
Subscribed and sworn before me on this date 21 st of May, 2018.
HM&MF,Ltd.,d/b/a MUCKLEROY&FALLS,a Texas
Limited Partnership by Muckleroy&Falls Construction
Co.,a Texas Corporation and General Partner
Z"
Notary Public
C _
BETH AIKIN
_2j' Lam-Notary Public,State of Texas
?�9 +P Comm.Expires 05-28-2022
'��;;0„ Notary ID 3494766
CONSENT OF OWNER
SURETY COMPANY ARCHITECT
TO FINAL PAYMENT CONTRACTOR
SURETY
AIA DOCUMENT G707 OTHER
Bond No 2258302
PROJECT: American Airlines- Sanitary Sewer Relocation(job#100923),Ft.Worth TX
(name,address)
TO(Owner) [ City of Fort Worth ] ARCHITECT'S PROJECT NO:
1000 Throckmorton Street
Fort Worth,TX 76102-6312 CONTRACT FOR: Construction
] CONTRACT DATE: 5/16/2017
CONTRACTOR: Muckleroy&Falls
5801 Edwards Ranch Rd,Suite 100
Fort Worth,TX 76109
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
North American Specialty Insurance Company
5200 Metcalf OPN111
Overland Park,KS 66202 , SURETY COMPANY,
on bond of(here insert name and address of Contractor)
Muckleroy& Falls
5801 Edwards Ranch Rd, Suite 100
Fort Worth,TX 76109 , CONTRACTOR,
hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to(here insert name and address of Owner)
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102-6312 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 4th day of May , 2018
North American Specialty Insurance Company
Surety Company
Signature of Authorized Representative
Attest: �
(Seal): ? Attornev-In-Fact
Tit Linda Michelle Stalder
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
AIA DOCUMENT G707 CONSENT OF SURETY COMPANY TO FINAL PAYMENT APRIL 1970 EDITION AIA ONE PAGE
1970 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 New York Ave.,NW,WASHINGTON,D.C. 20006
SWISS RE CORPORATE SOLUTIONS
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
WESTPORT INSURANCE CORPORATION
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS,THAT North American Specialty Insurance Company,a corporation duly organized and existing under
laws of the State of New Hampshire,and having its principal office in the City of Overland Park,Kansas and Washington International Insurance
Company a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Overland
Park,Kansas,and Westport Insurance Corporation,organized under the laws of the State of Missouri,and having its principal office in the City of
Overland Park,Kansas each does hereby make,constitute and appoint:
SAMMY JOE MULLIS,JR.,JOHN WILLIAM NEWBY,CHERI LYNN IRBY,WILBERT RAYMOND WATSON,MICHAEL L.TULLIS,SANDRA LEE RONEY.DEBRA LEE MOON,
ANDREA ROSE CRAWFORD,MARY JO ZAKRZEWSKI,JAMES B.ROGERS,JR.,TROY RUSSELL KEY AND LINDA MICHELLE STALDER JOINTLY OR SEVERALLY
Its true and lawful Attomey(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by
law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of: ONE HUNDRED TWENTY FIVE MILLION($125,000,000.00)DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on March 24,2000 and Westport Insurance Corporation by written consent of its Executive Committee dated July 18,2011.
"RESOLVED,that any two of the President,any Senior Vice President,any Vice President,any Assistant Vice President,
the Secretary or any Assistant Secretary be,and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named
in the given Power of Attorney to execute on behalf of the Company bonds,undertakings and all contracts of surety,and that each or any of them
hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached."
\\lU\Itiii4!!/!// mtwunanw��y� /f -`
lee .AllTY/ ���� ZtONq�/Y
A'- �lP;...... q
_2�-G�PPOTGgj% 2~-G
SEAL
FSG''s StB en Anderson,Senior VicePresident o as tngton nurnanoaa asurancc Company '
CCiAt g S Z t
C ' St=ril -.0 p Oc •cj g &Senior Vice President of North American Specialty Insurance Company X:
=m °�: om s
1873 &Senior Vice President of Westport Insurance Corporation
�ni`•z ar:g1 go
y•.yahIrl t
'........�0
BY-
%4 •'�
/////111111 IttUt\\\\Q\ Mike A.Ito,Senior Vice President of Washington International Insurance Company �
&Senior Vice President of North American Specialty Insurance Company
&Senior Vice President of Westport insurance Corporation
IN WITNESS WHEREOF,North American Specialty Insurance Company,Washington International Insurance Company and Westport
Insurance Corporation have caused their official seals to be hereunto affixed,and these presents to be signed by their authorized officers this
this 12 day of January ,20 18
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois Westport Insurance Corporation
County of Cook Ss:
On this 12 day of January 20 18,before me,a Notary Public personally appeared Steven P.Anderson ,Senior Vice President of
Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Senior Vice President of
Westport Insurance Corporation and Michael A.Ito Senior Vice President of Washington International Insurance Company and Senior Vice President
of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation,personally known to me,who
being by me duly swom,acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the
voluntary act and deed of their respective companies.
OFFICIAL SEAL '1
A.L.KENNY
Notary Public-State of Illinois
My Commission Esp;us
1=412021 M.Kenny,Notary Public '
I, Jeffrey Goldberg , the duly elected Vice President and Assistant Secretary of North American Specialty Insurance Company,Washington
International Insurance Company and Westport Insurance Corporation do hereby certify that the above and foregoing is a true and correct copy of a
Power of Attorney given by said North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance
Corporation which is still in full force and effect.
IN WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this 4th day of May 20 18
//
Jeffrey Goldberg,Vice President&Assistant Secretary of Washington International Insunmce Company&
North American Specialty Insurance Company&Vice President&Assistant Secretary of Westport Insurance Corporation
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: American Airlines Sanitary Sewer Relocation
PROJECT NUMBER: 100923
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
N/A N/A N/A N/A
FIRE HYDRANTS: N/A VALVES(16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A N/A N/A N/A
DENSITIES:
NEW SERVICES: N/A N/A N/A
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SS-A 0+00 to 4+83.02 18" PVC 384
PIPE ABANDONED SIZE TYPE OF PIPE LF
Yes 10" PVC 318
DENSITIES: Yes
NEW SERVICES: N/A N/A N/A
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
0
(817)392-7941 •Fax: (817) 392-7845