AMENDMENT NUMBER 4
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. - tr
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins ,
Inc. , (ENGINEER) made and entered into City Secretary Contract No. 32378 ,
(the CONTRACT) which was authorized by the City Council by M&C C-20954 on
the 6th day of September, 2005; and subsequently revised by Amendment
Number 1 which was authorized by the City Council on the 12th day of
December, 2006 (M&C C-21883) ;and subsequently revised by Amendment Number
2 which was authorized by the City Council on the 19th day of August,
2008 (M&C C-22981) ; and subsequently revised by Amendment Number 3 which
was authorized by the City Council on the 9th day of June, 2009 (M&C C-
23573) ;
WHEREAS, the Contract involves engineering services for the following
project:
Golden Triangle Boulevard from IH-35W to US 377 ;
WHEREAS, it has become necessary to execute Amendment No. 4 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the Contract:
1 .
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated December 30,
2009, copies of which are attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by
Engineer total $51,000 . 00.
2 .
Article II of the Contract is amended to provide for an increase in
the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$2,277 ,206.00 .
Page -1-
CITY SECRETARY
FT. WORTH, TX
7
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED on this the +L\ day of , 2010 in
Fort Worth, Tarrant County, Texas.
ATTEST: APPROVED:
Marty Hendrik �opuattFernando Costa
City Secretary oFoRr�Z4 Assistant City Manager
p 00000000
7�
P�•��° �a. �¢ C-24140
$+�� Contract Authorization
o 0 Zd March 23, 2010
0°0000000°00 a Date
APPROVAL RECOMMENDED:
AUQ
William X. Verke .E.
Director, Transportation/Public Works Department
TEAGUE NALL and PERKINS, INC.
ENGINEER
Ak
Ty H' on, P.E.
Prin ipal
APPROVED AS TO FORM AND LEGALITY:
Amy Ramsey
Assistant City Attorney
OFFICIAL RECM";;
C7TY SECRETAF
Page -2- FT OFTH,
Responsive
Tim TEAGUE NALL AND PERKINS
Civil Engineering Surveying Landscape Architecture Planning
Original Letter Issued: November 16, 2009
Revised Letter Issued: December 30, 2009
Mr. Michael Weiss, P.E.
City of Fort Worth
Transportation & Public Works Department
1000 Throckmorton
Fort Worth, Texas 76102
Re: Golden Triangle Boulevard Widening
From: IH 35W To: US 377
Fee Proposal for Contract Amendment No. 4
Dear Mr. Weiss:
Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract
based on additional services requested. The following is a brief description and cost for the
additional services to be provided on this project:
I. Realignment of Golden Triangle West of Old Denton Road
The City requests that TNP realign Golden Triangle Boulevard from STA 115+00 to STA
130+00 in order to reduce the right-of-way to be acquired from the property located at the
southwest corner of Golden Triangle Boulevard and Old Denton Road.
The scope of services necessary to accomplish the realignment of Golden Triangle Boulevard
are addressed below.
A. Construction Plans. The following plan sheets will be modified:
1. Alignment Data Sheets
2. Traffic Control Plans (phases 1-4)
3. Paving & Seeding Layout
4. Golden Triangle Paving Plan & Profile Sheets
5. Old Denton Road Plan & Profile Sheets
6. Intersection Layout Sheet
7. Drainage Area Maps & Computation Sheets
8. Culvert OD1 Plan & Profile
9. Culvert STA 127 Plan & Profile
10. Storm Drain Line "A-1"
11. Storm Drain Line "A-2"
12. Signal Plans at Old Denton Road
13. Signing & Pavement Marking Plans
14. Stormwater Pollution Prevention Plans
15. Plan Quantities & Estimate
B. Right-of-Way Documents
1. Revise documents for Parcels 2 and 29.
C. Environmental Document
1. Revise environmental document to account for changes per email from TxDOT's
environmental project manager.
1100 Macon Street Fort Worth,Texas 76102 817.336.5773 phone 817.336.2813 fax
www.tnp-online.com
Fort Worth # Dallas , Denton
Mr.Michael Weiss,PE
November 16,2009
Page 2 of 3
II. Eliminate Park Vista Intersection from Construction Plans
The City requests that TNP eliminate the Park Vista intersection from the project, including the
median opening and traffic signal. The scope of services necessary to accomplish this change
are addressed below.
A. Construction Plans. The following plan sheets will be modified:
1. Traffic Control Plans (phases 2 and 4)
2. Paving & Seeding Layout
3. Golden Triangle Paving Plan & Profile Sheets
4. Storm Drain lateral plan & profiles
5. Signing & Pavement Marking Plans
6. Stormwater Pollution Prevention Plans
7. Plan Quantities & Estimate
B. Right-of-Way Documents.
1. Revise documents for Parcels 42 and 54.
2. Prepare two (2) water line easements.
3. Prepare one (1) drainage easement.
Fee Proposal for Contract Amendment No. 4: $ 51,000.00
TNP proposes a fixed fee of$51,000 to accomplish the scope of services described above. This
fee shall be full compensation for work required of TNP and three subconsultants.
Summary of Fees:
I. Golden Triangle Realignment
A. Construction Plan Revisions $ 32,000
B. Right-of-Way Documents $ 2,000
C. Environmental Document Revisions $ 3,000
II. Eliminate Park Vista Intersection
A. Construction Plan Revisions $ 9,000
B. Right-of-Way Documents $ 5,000
Total $ 51,000
M/WBE Utilization:
TNP commits over 21% of the work covered under this amendment to certified M/WBE firms. The
breakdown of this participation is shown below:
Lina T. Ramey and Associates $ 4,000
Gorrondona & Associates $ 4,000
Ecological Communications Corp. $ 3,000
Total M/WBE Commitment $ 11,000
Mr.Michael Weiss,PE
November 16,2009
Page 3 of 3
Schedule:
TNP proposes to complete the work within four (4) weeks from a notice to proceed.
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Ty Hilton, P.E.
vAprojects\ftw05210\design contracOAmendment#3.doc
M&C Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FORTTII
COUNCIL ACTION: Approved on 3/23/2010
REFERENCE ** 20GOLDEN TRIANGLE
DATE: 3/23/2010 NO.: C-24140 LOG NAME: AMENDMENT 4
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize the Execution of Amendment No. 4 in the Amount of$51,000.00 to City
Secretary Contract No. 32378, an Engineering Services Agreement with Teague Nall and
Perkins, Inc., for the Design of Golden Triangle Boulevard from Interstate Highway 35W
to US Highway 377 (COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 4 in
the amount of$51,000.00 to City Secretary Contract No. 32378, an Engineering Services Agreement
with Teague Nall and Perkins, Inc., for the design of Golden Triangle Boulevard from Interstate
Highway 35W to US Highway 377, thereby establishing a total contract cost of$2,277,206.00.
DISCUSSION:
The 2004 Capital Improvement Program (CIP) approved $7,300,000.00 for the design and
construction of this project as a four-lane divided roadway.
This contract amendment is needed for the following design services:
Realign Golden Triangle Boulevard west of Old Denton Road to reduce the amount of right-of-way
to be acquired by 1.13 acres;
Eliminate right turn lanes and pavement at the future intersection for Park Vista Boulevard to
reduce the amount of right-of-way to be acquired by 1.04 acres and reduce the anticipated
construction cost. Park Vista Boulevard will be constructed in the future as new development
occurs in the area; and
Revise environmental, right-of-way, drainage and waterline easement documents to account for
these changes.
On September 6, 2005, (M&C C-20954)the City Council authorized the City Manager to execute City
Secretary Contract No. 32378 with Teague Nall and Perkins, Inc., in the amount of$355,275.00 for
the schematic design of Golden Triangle Boulevard from Interstate Highway 35W to US Highway 377
as a four lane divided arterial street.
On December 12, 2006, (M&C C-21883)the City Council authorized the City Manager to execute
Amendment No. 1 with Teague Nall and Perkins, Inc., in the amount of$1,711,431.00 for the final
design of Golden Triangle Boulevard from Interstate Highway 35W to US Highway 377 for a total
contract cost of$2,066,706.00.
On August 19, 2008, (M&C C-22981) the City Council authorized the City Manager to execute
Amendment No. 2 with Teague Nall and Perkins, Inc., in the amount of$126,900.00 for the design of
waterline improvements along Golden Triangle Boulevard from Interstate Highway 35W to US
Highway 377 for a total contract cost of$2,193,606.00.
On June 9, 2009, (M&C C-23573)the City Council authorized the City Manager to execute
Amendment No. 3 with Teague Nall and Perkins, Inc., in the amount of$32,600.00 for the additional
right-of-way exhibits, field staking for franchise utility relocations and the design of new traffic signals
at the Rancho Place/Crawford Farms and Park Vista intersections for a total contract cost of
file://C:\Documents and Settings\weissm\My Documents\Golden Triangle\C-24140.htm 3/30/2010
M&C Review Page 2 of 2
$2,206,206.00.
Teague Nall and Perkins, Inc., proposes to complete Amendment No. 4 for a lump sum fee of
$51,000.00. City staff considers this fee to be fair and reasonable for the scope of services to be
performed.
Teague Nall and Perkins, Inc., is in compliance with the City's M/WBE Ordinance by committing to an
additional 22 percent M/WBE participation on Amendment No. 4. The City's goal on this Amendment
is 20 percent.
This project is located in COUNCIL DISTRICT 2, Mapsco 21 L, 21 M, 21 R, 22N, 22P, 22Q, 22L, 22M
and 23J.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Street Improvements Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
C200 531200 202230014030 $51.000.00
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: William Verkest(7801)
Additional Information Contact: Jim Walker(8009)
ATTACHMENTS
Vicinity Map.pdf
file:H0\Documents and Settings\weissm\My Documents\Golden Triangle\C-241401tm 3/30/2010
ry
PL+ } ; '
IP
' r
i
I '
- 1f 1SiA'tl,�lV'
3111i�1i4 �
r. =
K;y
w +
1
4!
1 S�
y7 '
• ! 1
■ti