HomeMy WebLinkAboutContract 32378-A8 AMENDMENT NUMBER 8
STATE OF TEXAS 6 CITY SECRETARY CONTRACT NO. 3a�jr7$-Y��
COUNTY OF TARRANT 6
WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins,
Inc. , (ENGINEER) made and entered into City Secretary Contract No. 32378,
(the CONTRACT) which was authorized by the City Council by M&C C-20954 on
the 6th day of September, 2005 in the amount of $355,275 .00; and
subsequently revised by Amendment Number 1 which was authorized by the
City Council on the 12th day of December, 2006 (M&C C-21883) in the
amount of $1,711,431 . 00;and subsequently revised by Amendment Number 2
which was authorized by the City Council on the 19th day of August, 2008
(M&C C-22981) in the amount of $126,900.00; and subsequently revised by
Amendment Number 3 which was authorized by the City Council on the 9th
day of June, 2009 (M&C C-23573) in the amount of $32, 600.00; and
subsequently revised by Amendment Number 4 which was authorized by the
City Council on the 23rd day of March, 2010 (M&C C-24140) in the amount
of $51,000.00; and subsequently revised by Amendment Number 5 which was
administratively authorized by the City on the 26th day of May, 2010 in
the amount of $47,000.00; and subsequently revised by Amendment Number 6
which was administratively authorized by the City on the 3rd day of
February, 2011 in the amount of $47,900.00; and subsequently revised by
Amendment Number 7 which was authorized by the City Council on the 20th
day of September, 2011 (M&C C-25170) in the amount of $17,370 .00
WHEREAS, the Contract involves engineering services for the following
project:
Golden Triangle Boulevard from IH-35W to US 377;
WHEREAS, it has become necessary to execute Amendment No. 8 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated August 5,
2011, copies of which are attached hereto and incorporated herein. The
cost to City for the additional design services o be performed by
Engineer total $21,293.00.
2 . �FI1C1A`
Y
CITY See T�
�T ,W®Rt�°1s
0-'11 P03 : 31 IN
Page -1
Article II of the Contract is amended to provide for an increase in
the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$2,410,769.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED on this the ri6AA�- day of 2011 in
Fort Worth, Tarrant County, Texas.
ATTEST: APPROVED:
)2�L
Marty Hendrix ,444 Zl� Fernando Costa
City Secretary .® �® �'� Assistant City Manager
Jj o� o
0.00
APPROVAL RECObNENDED,v °
0 0
a o°*d
0000000000® �
� 'aCA�ao
Dou Wiersig, P.E.
Dir Transportation/Public Works Department
TEAGUE NALL and PERKINS, INC.
ENGI ER
Ty i ; n, P.E.
Princ pal
APPROVED AS TO FORM AND LEGALITY:
i
Doug Slack
Assistant City Attorney
Wim- Gid OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Page -2-
Responsive
X* TEAGUE NALL AND PERKINS
Civil Engineering Surveying Landscape Architecture Planning
August 5, 2011
Mr. Michael Weiss, P.E.
City of Fort Worth
Transportation &Public Works Department
1000 Throckmorton
Fort Worth, Texas 76102
Re: Golden Triangle Boulevard Widening
From: IH 35W To: US 377
Fee Proposal for Contract Amendment No.8
Dear Mr. Weiss:
Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on
additional services requested. The following is a brief description and cost for the additional services to be
provided on this project:
1. Temporary Signal for N. Beach St. at Golden Triangle Blvd.
TxDOT and the City has asked for a temporary signal at Golden Triangle to accommodate the
anticipated construction and opening of N. Beach St. at Golden Triangle Blvd. with the concurrent
construction and widening of Golden Triangle Blvd.
11. Temporary Signal for Crawford Farms/ Rancho PI. at Golden Triangle Blvd.
TxDOT and the City have asked for a temporary signal at Golden Triangle to accommodate the
signalization and realignment of Rancho PI.at Golden Triangle Blvd. during reconstruction of the
intersection for Crawford Farms/Rancho PI at Golden Triangle Blvd.
Fee Proposal for Contract Amendment No.8: $21,293.00
TNP proposes a fixed fee of$21,293.00 to accomplish the scope of services described above. This fee
shall be full compensation for work required of TNP.
Schedule:
TNP proposes to complete the work within two (2) weeks from a notice to proceed and approval of this
amendment.
Thank you for consideration of this contract amendment request. If you have any questions, please do not
hesitate to call me.
Sincerely,
TME,PILLND PERKINS, INC.
.
Ty Hilton, P.F.
CC: File: FTW5210
1100 Macon Street Fort Worth,Texas 76102 817.336.5773 phone 817.336.2813 fax
Teague Nall and Perkins,Inc.—FIRM 230 www.mp-online.com