Loading...
HomeMy WebLinkAboutContract 32378-A8 AMENDMENT NUMBER 8 STATE OF TEXAS 6 CITY SECRETARY CONTRACT NO. 3a�jr7$-Y�� COUNTY OF TARRANT 6 WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 32378, (the CONTRACT) which was authorized by the City Council by M&C C-20954 on the 6th day of September, 2005 in the amount of $355,275 .00; and subsequently revised by Amendment Number 1 which was authorized by the City Council on the 12th day of December, 2006 (M&C C-21883) in the amount of $1,711,431 . 00;and subsequently revised by Amendment Number 2 which was authorized by the City Council on the 19th day of August, 2008 (M&C C-22981) in the amount of $126,900.00; and subsequently revised by Amendment Number 3 which was authorized by the City Council on the 9th day of June, 2009 (M&C C-23573) in the amount of $32, 600.00; and subsequently revised by Amendment Number 4 which was authorized by the City Council on the 23rd day of March, 2010 (M&C C-24140) in the amount of $51,000.00; and subsequently revised by Amendment Number 5 which was administratively authorized by the City on the 26th day of May, 2010 in the amount of $47,000.00; and subsequently revised by Amendment Number 6 which was administratively authorized by the City on the 3rd day of February, 2011 in the amount of $47,900.00; and subsequently revised by Amendment Number 7 which was authorized by the City Council on the 20th day of September, 2011 (M&C C-25170) in the amount of $17,370 .00 WHEREAS, the Contract involves engineering services for the following project: Golden Triangle Boulevard from IH-35W to US 377; WHEREAS, it has become necessary to execute Amendment No. 8 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated August 5, 2011, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services o be performed by Engineer total $21,293.00. 2 . �FI1C1A` Y CITY See T� �T ,W®Rt�°1s 0-'11 P03 : 31 IN Page -1 Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $2,410,769.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the ri6AA�- day of 2011 in Fort Worth, Tarrant County, Texas. ATTEST: APPROVED: )2�L Marty Hendrix ,444 Zl� Fernando Costa City Secretary .® �® �'� Assistant City Manager Jj o� o 0.00 APPROVAL RECObNENDED,v ° 0 0 a o°*d 0000000000® � � 'aCA�ao Dou Wiersig, P.E. Dir Transportation/Public Works Department TEAGUE NALL and PERKINS, INC. ENGI ER Ty i ; n, P.E. Princ pal APPROVED AS TO FORM AND LEGALITY: i Doug Slack Assistant City Attorney Wim- Gid OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page -2- Responsive X* TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning August 5, 2011 Mr. Michael Weiss, P.E. City of Fort Worth Transportation &Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Re: Golden Triangle Boulevard Widening From: IH 35W To: US 377 Fee Proposal for Contract Amendment No.8 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services to be provided on this project: 1. Temporary Signal for N. Beach St. at Golden Triangle Blvd. TxDOT and the City has asked for a temporary signal at Golden Triangle to accommodate the anticipated construction and opening of N. Beach St. at Golden Triangle Blvd. with the concurrent construction and widening of Golden Triangle Blvd. 11. Temporary Signal for Crawford Farms/ Rancho PI. at Golden Triangle Blvd. TxDOT and the City have asked for a temporary signal at Golden Triangle to accommodate the signalization and realignment of Rancho PI.at Golden Triangle Blvd. during reconstruction of the intersection for Crawford Farms/Rancho PI at Golden Triangle Blvd. Fee Proposal for Contract Amendment No.8: $21,293.00 TNP proposes a fixed fee of$21,293.00 to accomplish the scope of services described above. This fee shall be full compensation for work required of TNP. Schedule: TNP proposes to complete the work within two (2) weeks from a notice to proceed and approval of this amendment. Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TME,PILLND PERKINS, INC. . Ty Hilton, P.F. CC: File: FTW5210 1100 Macon Street Fort Worth,Texas 76102 817.336.5773 phone 817.336.2813 fax Teague Nall and Perkins,Inc.—FIRM 230 www.mp-online.com