Loading...
HomeMy WebLinkAboutContract 32378-A9 AMENDMENT NUMBER 9 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 32378, (the CONTRACT) which was authorized by the City Council by M&C C-20954 on the 6th day of September, 2005 in the amount of $355,275 .00 . WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $1,711,431 . 00 authorized by the City Council on December 12 , 2006 (M&C C-21883) , Amendment Number 2 in the amount of $126,900 . 00 authorized by the City Council on August 19, 2008 (M&C C-22981) , Amendment Number 3 in the amount of $32, 600 .00 authorized by the City Council on June 9, 2009 (M&C C-23573) , Amendment Number 4 in the amount of $51,000 .00 authorized by the City Council on March 23, 2010 (M&C C- 24140) , Amendment Number 5 in the amount of $47,000 . 00 administratively authorized on May 26, 2010, Amendment Number 6 in the amount of $47, 900 .00 administratively authorized on February 3, 2011, Amendment Number 7 in the amount of $17 ,370 .00 authorized by the City Council on September 20, 2011 (M&C C-25170) , and Amendment Number 8 in the amount of $21,293.00 administratively authorized on October 19, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Golden Triangle Boulevard from IH-35W to US 377; and WHEREAS, it has become necessary to execute Amendment No. 9 to said CONTRACT to include an increased scope of work and revised maximum fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal letter dated October 31, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $22 , 970 .00. 2 . LOFF"'Ia RC Article II of the CONTRACT is amended to provide fa in ,TXPage -1- the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be the amount of $2 ,433,739.00 . 3 . All other provisions of the CONTRACT, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the ;D day of ���({YYL 1►� 2011 in Fort Worth, Tarrant County, Texas. ATTEST: APPROVED: r Hendrix p��°° °oQ�1�� Fernando Costa City Secretary x,1.0 b%0 Assistant City Manager o� APPROVAL RECOMMENDED: Q,� �000000o°° 'rn 1 Douglasy- Wiersig, P.E. Director, Transportation Public Works Department TEAGUE NALL and PERKINS, INC. ENGINEER TyYipal t n, P.E. Prin APPROVED AS TO FORM AND LEGALITY: M&C: V* 9 ) Date: Douglas W. Black Assistant City Attorney OFFICIAL RECORD CITY SECRETARY F7: WORTH, TX Page -2- Responsive Service. Retiable ResLilts. MID TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning October 31, 2011 Mr. Michael Weiss, P.E. City of Fort Worth Transportation & Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Re: Golden Triangle Boulevard Widening From: IH 35W To: US 377 Fee Proposal for Contract Amendment No.9 Dear Mr. Weiss: Teague Nall and Perkins, Inc.is submitting this fee Amendment for the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services to be provided on this project: 1. Off-Site/ Private Drainage Improvements for Alta Vista AnimaHospital: The City has requested that TNP design a storm drain system,outside the scope of the original project, to alleviate an existing drainage problem at the Alta Vista Animal Hospital. The drainage improvements being constructed with the Golden Triangle Blvd. roadway project provide an opportunity for the City to assist Alta Vista Animal Hospital with their drainage problem. An underground storm drainage system will be designed to extend from the animal hospital to Channel B that is to be constructed with the roadway project. The scope for this work will included surveying the site by Gorrondona and Associates, Inc. (MWBE) and the developing the design plans necessary for a change order. II. Traffic Signal Revisions at IH 35W: TxDOT along with City concurrence has directed TNP to revise the signal plans at IH 35W to reflect the use of RADAR detection system rather than the TxDOT standard VIVDS detection systems. This change is requested to in order to comply with a recent maintenance agreement between the City of Fort Worth and TxDOT, to transfer operational control of the signal to the City of Fort Worth. III. Temporary Signal for old Denton Road. TxDOT and the City have asked for a temporary signal at Golden Triangle to accommodate the anticipated need for construction traffic handling at Old Denton road. Fee Proposal for Contract Amendment No.9: $22,970 TNP proposes a fixed fee of$12,200 and an hourly fee not to exceed$10,770 to accomplish the scope of services described above. This fee shall be full compensation for work required of TNP and it sub consultants. 1100 Macon Street Fort Worth,Texas 76102 817.336.5773 phone 817.336.2813 fax Teague Nall and Perkins, Inc.-FIRM 230 www.tnp-online.com Mr.Michael Weiss,PE October 31,2011 Page 2 of 2 Summary of Contract Amendment Fee: I-A) Surveying(Gorrondona and Associates, Inc.) $5,700 I-B) Storm Drain Design /Project Management(hourly, not to exceed) $10,770 II) Signal Revisions @ IH 35W(DeShazo Tang and Assoc.) $1,000 III)Temporary Signal Design at Old Denton Road. $5,500 Total Contract Amendment Amount: $22,970 Schedule: TNP proposes to complete the work within four (4) weeks from a notice to proceed and approval of this amendment. Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. 1 Ty Hilton, P.E. CC: File: FTW5210