Loading...
HomeMy WebLinkAboutContract 32378-A10 AMENDMENT NUMBER 10 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 3 IV COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 32378, (the CONTRACT) which was authorized by the City Council by M&C C-20954 on the 6th day of September, 2005; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $1,711,431 .00 authorized by the City Council on December 12, 2006 (M&C C-21883) , Amendment Number 2 in the amount of $126, 900 . 00 authorized by the City Council on August 19, 2008 (M&C C-22981) , Amendment Number 3 in the amount of $32, 600.00 authorized by the City Council on June 9, 2009 (M&C C-23573) , Amendment Number 4 in the amount of $51,000 .00 authorized by the City Council on March 23, 2010 (M&C C- 24140) , Amendment Number 5 in the amount of $47,000.00 administratively authorized on May 26, 2010, Amendment Number 6 in the amount of $47, 900.00 administratively authorized on February 3, 2011, Amendment Number 7 in the amount of $17 ,370 .00 authorized by the City Council on September 20, 2011 (M&C C-25170) , and Amendment Number 8 in the amount of $21,293 .00 administratively authorized on October 19, 2011; and Amendment Number 9 in the amount of $22,970 .00 administratively authorized on November 21, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Golden Triangle Boulevard from IH-35W to US 377; and WHEREAS, it has become necessary to execute Amendment No. 10 to said CONTRACT to include an increased scope of work and revised maximum fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal letter dated July 27, 2012 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $42,900 .00. OFFICIAL RECORD 2 CITY SECRETARY FT.WORTH,TX page -1- Article II of the CONTRACT is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be the amount of $2,476,639.00 . 3. All other provisions of the CONTRACT, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the day of J) ( �(-6,— , 2012 in Fort Worth, Tarrant County, Texas. 'ryp% 000000 � ATTEST: �; *- .000. � 0 APPROVED: 0 00 L, 4" %+ 0 C MaryJ. Ka � AooOOppO° a Fernando Costa City Secretary �aA� moo' Assistant City Manager APPROVAL RECOMMENDED: CA L) —\ / Dougl s W. Wiersig, E. Director, Transportation/Public Works Department TEAGUE NALL and PERKINS, INC. ENGINEER — 14b& Ty Hilto , .E. Principa APPROVED AS TO FORM AND LEGALITY: MSC: " L5o G Date: !0 Douglas W. Black Assistant City Attorney OFFICIAL RECORD CITY SECRETARY Page -2- FT.WORTH'TX X-7 TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning July 27, 2012 Mr. Michael Weiss, P.E. City of Fort Worth Transportation & Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Re: Golden Triangle Boulevard Widening From: IH 35W To: US 377 Fee Proposal for Contract Amendment No.10 Dear Mr. Weiss: Teague Nall and Perkins, Inc.is submitting this fee Amendment for the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services to be provided on this project: I. Revisions to Traffic Signal Design at Crawford Farms/Ranch Place: Subsequent to final plan approval,Traffic Operations requested that the traffic signal design be modified which required a new signal pole layout,adjustments to pedestrian facilities,and revisions to the striping plan. Effort for this task required a P.E. to redesign sidewalk ramps and crosswalks and a Sr, Traffic engineer to revise traffic signal layouts for 4 intersections. Fee: $2,500 If. Revisions to Temporary Signal Design at Old Denton Road: The Contractor proposed a new traffic control plan affecting the temporary signal at Old Denton Road. TxDOT has approved the requested traffic control change which requires the temporary signal design to be modified accordingly. Effort for this task required a Sr.Traffic engineer,P.E.,and Tech to coordinate design issues with TxDOT, review provided Traffic Control Plan revisions,evaluate compatible signal phasing against current construction conditions in order to design temporary signal layouts for each remaining phase of construction. Fee: $6,170 III. Subsurface Utility Engineering(SUE): The City requested that TNP perform nine(9)Level A Test Holes,including eight sanitary sewer services and one test hole on existing gas pipelines. Effort of this task included use of vacuum excavator truck and crew to locate and then complete Level"A°utility excavation for 9 crossing conflicts with existing unmarked utility lines. Each utility was surveyed and reported to the City and other Utility companies. Fee: $11,790 IV. Design of Sanitary Sewer Service Lines: Eight (8) existing sanitary sewer services were found to be in conflict with the proposed storm drain improvements TNP performed the design services necessary to relocate the sanitary sewer services, including development of a special double cleanout detail to fit the project constraints. Effort for this task required two P.E.'s and Technician to the review and analyze the reported utility surveys, evaluate alternate solutions, coordinate design options with City of Fort Worth Water Department, and design custom details for review with City of Fort Worth Water Department. Fee: $8,000 Teague Nall and Perkins,Inc.—FIRM 230 Mr.Michael Weiss,PE July 27,2012 Page 2 of 2 V. Storm Drain Revision at North Beach Street During the design phase, SUNOCO had approved the location of the proposed storm drain facilities' location within their pipeline easement. During construction,they requested that the storm drain facilities be moved to provide additional separation to their pipeline. TNP revised the plan which involved changing the paving grades at the intersection to make drainage work.The effort for this task required a P.E. and Tech to build a custom 3D model of the Roadway surface and retrofit an existing drainage design to new conditions. Fee: $4,500 VI. Traffic and Signal Modifications During construction,the City of Fort Worth's Traffic Department requested the following field changes: 1. Change ground-boxes to larger size at all locations except at the service location; 2. Provide Count- down pedestrian heads without audible pushbutton assemblies at all signalized pedestrian crossings;and 3. Provide pedestrian signal heads, pushbuttons, and ground boxes in in Golden Triangle medians greater than 20'wide(possibly at Old Denton Rd., Crawford Farms Dr./Rancho PI., North Beach St., and Alta Vista Rd.); and 4. Retrofit the proposed signal design at N. Beach to accommodate newly installed signal foundations. Effort for this task will require a Sr.Traffic Engineer,P.E.,and technician to coordinate design layouts and formats with TxDOT and the City of Fort Worth Traffic Department, identify existing roadway conditions, and designing proposed changes. Fee: $9,940 Summary of Contract AmendmentFee: I. Revisions to Traffic Signal Design at Crawford Farms/ Ranch Place: Fee: $2,500 ll. Revisions to Temporary Signal Design at Old Denton Road: Fee: $6,170 111. Subsurface Utility Engineering (SUE): Fee: $11,790 IV. Design of Sanitary Sewer Service Lines Fee: $8,000 V. Storm Drain Revision at North Beach Street Fee: $4,500 VI. Traffic and Signal Modifications Fee: $9,940 Total Contract Amendment Amount: $42,900 Schedule: TNP proposes to complete the work within two(2)weeks from a notice to proceed and approval of this amendment. Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. TMIn, CC File: FTW05210 M&C Review Pagel of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FobH COUNCIL ACTION: Approved on 10/9/2012 DATE: 10/9/2012 REFERENCE NO.: **C-25906 LOG NAME: 20GOLDEN TRI TNP AMEND 10 CODE: C TYPE: CONSENT PUBLIC NO HEARING. SUBJECT: Authorize Execution of Amendment No. 10 to City Secretary Contract No. 32378, an Engineering Services Agreement with Teague Nall and Perkins, Inc., in the Amount of $42,900.00 for Design Revisions on Golden Triangle Boulevard from Interstate 35W to US Highway 377, for a Revised Total Contract in the Amount of$2,476,639.00 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 10 to City Secretary Contract No. 32378, an Engineering Services Agreement with Teague Nall and Perkins, Inc., in the amount of$42,900.00 for design revisions on Golden Triangle Boulevard from Interstate 35W to US Highway 377, for a revised total design contract in the amount of$2,476,639.00. DISCUSSION: Golden Triangle Boulevard is currently under construction from Interstate Highway 35W to US Highway 377 under a contract awarded by the Texas Department of Transportation. The design contract for this project is between the City and Teague Nall and Perkins, Inc. This proposed amendment is for revisions to the design contract for permanent traffic signals at Old Denton Road, Rancho Place/Crawford Farms, North Beach Street, and Alta Vista Road to meet current City standards, revisions to the temporary traffic signal at Old Denton Road to match current construction phasing, additional subsurface utility engineering, the design of sanitary sewer lateral relocations, and revisions to the storm sewer design at North Beach Street. These revisions are needed in order to address unforeseen conditions encountered on the project during construction and to meet design, operation and maintenance standards that have been recently updated by the City. Teague Nall and Perkins, Inc., proposes to complete Amendment No. 10 for a lump sum fee not to exceed $42,900.00, for a total revised contract amount not to exceed $2,476,639.00. Staff considers this fee to be fair and reasonable for the scope of services to be performed. An Engineering Services Contract No. 32378 with Teague Nall and Perkins, Inc., was authorized by City Council on September 6, 2005. In addition, five previous Contract Amendments were authorized by Council: M&C C-21883, December 12, 2006, M&C C-22981, August 19, 2008, M&C C-23573, June 9, 2009, M&C C-24140, April 6, 2010, M&C C-25170, September 20, 2011. Four pervious Contract Amendments were administratively executed by Staff. This project is located in COUNCIL DISTRICT 2, Mapsco 21 L, 21 M, 21 R, 22L, 22M, 22N, 22P, 22Q and 23J. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvement Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C200 531200 202230014030 $42.900.00 nhtml:file://C:\Documents and Settings\weissm\My Documents\Golden Triangle\C-25906.mht 10/22/2012 M&C Review Page 2 of 2 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Michael Weiss (8485) ATTACHMENTS 20 GOLDEN TRI AMEND 10 Vicinity Map r201209.ppt ahtml:file://C:\Documents and Settings\weissm\My Documents\Golden Triangle\C-25906.mht 10/22/2012 . : . ■ � - . - , . « � . ■ . Q - - - 5 �. e d e \\ 2 « - AL CD G( - � LLI Q ` � � �cw NQ�aa Q1G 2 2 ) mEJ,§ e zLLI ) ; E ' 7 %. ff� - 0 �