HomeMy WebLinkAboutContract 49988-CO1 - - 4 y, 4 FORTWORTH . ' CITY SECRETARY CONTRACT NO. 4 7W Q L CHANGE ORDER Chargl er'# 001 Date April 25,2018 Contract# CS-49988 i#le CONTRACT FOR UNDERGROUND STORAGE TANK REMOVALS AND INSTALLATION OF ABOVEGROUND STORAGE TANKS LOCATED AT 4500 WILMA LANE Project# ENV 17-04:VILLAGE CREEK PST Funding(FID) 35005 0234100-100503 5330201-000884-999 Purchase Order# Project Description Village Creek UST Removal and AST Replacement-4500 Wilma Lane,Fort Worth,Texas Original Contract Amount $207,500.00 Extras To Date $0.00 Credits to Date $0.00 Contract Cost To Date $(57,690.00) Balance Contract Remaining $150,810.00 Amount of this Change Order $57,147.51 Revised Contract Amount $264,647.51 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL, Change Order#f1 to City Secretary Contract No.49988 Contract with Cobb Environmental and Technical Services,Inc.for additional costs incurred during initial phases of the UST removal and plan changes requested by the Water Department.The amounts are listed below for each individual change order item: 1. Over-excavation of UST tankhold;transportation and disposal of contaminated soils;delays in regards to potential changes from Water Department; 2. Repair of utility conduit damaged during UST removal;utility conduit was not marked on any documentation from Water Department and was not able to be located during utility locate services; 3. Installation of subpanel to existing electrical panel in order to install neutral switch to operate new system; 4. Utilize flowable fill to abandon-in-place third UST due to inability to remove UST due to communication conduit running above UST location; 5. Placement of crushed stone over UST in location of utility conduits to serve as replacement of select fill and compaction; 6. Overexcavation of contaminated soils in and around tankhoid,transportation,and disposal of 249 cubic yards of petroleum impacted soils. All work to be performed in accordance with the Proposal Specifications. It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Name Cobb Environmental and Technical Services,Inc. Original Contract Time Ongoing Additional Approved Time to Date None Additional Time for This Change Order None Brain Cobb,President Date 0th/ 2 7 201 ' Project Manager _ Date �` Roger Grantham ���� T 2 7/4 Environmental Manager Date /,2�/p�� Cody M.Whittenburg Senior Assistant City Attorney '} ate I� Christa Lopez-Reynolds / �� 5 Y?i Assistant City ManagerV�u Valerie Washington �' `• �� 1 r i M&C# 1 C-28 itm Da 1 5.2017-205133 5 J. Kayser, City CITY SECRETARY TEXP FT.WORTH,TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Roger Grantham Name of Employee/Signature Environmental Supervisor Title t AIL RECORD ECRETARY ORTH, TX