CHANGE ORDER
Chargl er'# 001 Date April 25,2018 Contract# CS-49988
i#le CONTRACT FOR UNDERGROUND STORAGE TANK REMOVALS AND INSTALLATION OF ABOVEGROUND STORAGE
TANKS LOCATED AT 4500 WILMA LANE
Project# ENV 17-04:VILLAGE CREEK PST
Funding(FID) 35005 0234100-100503 5330201-000884-999
Purchase Order#
Project Description Village Creek UST Removal and AST Replacement-4500 Wilma Lane,Fort Worth,Texas
Original Contract Amount $207,500.00
Extras To Date $0.00
Credits to Date $0.00
Contract Cost To Date $(57,690.00)
Balance Contract Remaining $150,810.00
Amount of this Change Order $57,147.51
Revised Contract Amount $264,647.51
IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL,
Change Order#f1 to City Secretary Contract No.49988 Contract with Cobb Environmental and Technical Services,Inc.for additional costs incurred during initial
phases of the UST removal and plan changes requested by the Water Department.The amounts are listed below for each individual change order item:
1. Over-excavation of UST tankhold;transportation and disposal of contaminated soils;delays in regards to potential changes from Water Department;
2. Repair of utility conduit damaged during UST removal;utility conduit was not marked on any documentation from Water Department and was not able
to be located during utility locate services;
3. Installation of subpanel to existing electrical panel in order to install neutral switch to operate new system;
4. Utilize flowable fill to abandon-in-place third UST due to inability to remove UST due to communication conduit running above UST location;
5. Placement of crushed stone over UST in location of utility conduits to serve as replacement of select fill and compaction;
6. Overexcavation of contaminated soils in and around tankhoid,transportation,and disposal of 249 cubic yards of petroleum impacted soils.
All work to be performed in accordance with the Proposal Specifications.
It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents in full(both time and
money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Name Cobb Environmental and Technical Services,Inc.
Original Contract Time Ongoing
Additional Approved Time to Date None
Additional Time for This Change Order None
Brain Cobb,President Date 0th/ 2 7 201 '
Project Manager _
Date �`
Roger Grantham ���� T 2 7/4
Environmental Manager Date /,2�/p��
Cody M.Whittenburg
Senior Assistant City Attorney '} ate I�
Christa Lopez-Reynolds / �� 5 Y?i
Assistant City ManagerV�u
Valerie Washington �' `• �� 1 r i
M&C# 1 C-28 itm Da 1 5.2017-205133
5
J. Kayser, City CITY SECRETARY
TEXP
FT.WORTH,TX
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Roger Grantham
Name of Employee/Signature
Environmental Supervisor
Title
t
AIL RECORD
ECRETARY
ORTH, TX