HomeMy WebLinkAboutContract 32418 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract Nosm
WHEREAS, River Park, L.P., hereinafter called "Developer", desires to make
certain improvements to River Park Place, an addition to the City of Fort Worth, Texas;
and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
'F�11C,1ilkI kEC00u?D
River Park CFA (8-25-05).doc
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
dama,aes are caused, in whole or in part, by the allexed nezli-ence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
River Park Place-Newer CFA 4% and Utiliti2s 08 25 05 Ldoc
if pn
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C)Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $246,297.74.
River Park Place-Newer CFA 4% and Utilitibs 08 25 051.doc
SUMMARY OF
COST
River Park Place
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $182,190.75 182,190.75
2. Storm Drainage $54,634.00 54,634.00
3. Street Lights $0.00 $ -
4. Street Name Signs $0.00 $
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4%) 9,472.99 19,472.99
TOTALS 246,297.74 $ - 246,297.74
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
River Park Place-Newer CFA 4% and Utiliti4s 08 25 051.doc
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, aip, said Developer
Ws executed this instrument in triplicate, at Fort Worth, Texas this the� ay of
2005.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode,P. E.
Director
ty o F o
f
NO M&C REQUIRED Marc Ott
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approved as to Form:
As is n City Attorney
River Park, L.P. by ;f-5 CGene/a( f-*'4,Aer,
/( /'fQr4emtn'�,
ATTEST: EVE J nc�,
B .
Corporate Secretary R0
6erf Pres;deaf
RECEIVED
River Park CFA(8-25-05).doc 5
RIVER PARK SUBDIVISION
OPINION OF PROBABLE CONSTRUCTION COST FOR CFA
ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL
I WATER IMPROVEMENTS
1 8"Water Pipe incl. Fittings 1,844 LF $19.00 $35,036.00
2 Fire Hydrant 2 EA $1,350.00 $2,700.00
3 6"Gate Valve 2 EA $700.00 $1,400.00
4 8"Gate Valve 6 EA $800.00 $4,800.00
5 1"Single Water Service 52 EA $375.00 $19,500.00
6 Plug 8"Water Pie 1 EA $250.00 $250.00
7 8"x10"Tapping Sleeve&Valve 1 EA $2,100.00 $2,100.00
8 Remove& Replace Concrete Curb/Pavement 37 LF $20.00 $740.00
9 Testing T LS $500.00 $500.00
SUBTOTAL $67,026.00
II SANITARY SEWER IMPROVEMENTS
1 8"SDR 35 PVC Sewer Pie 2,256 LF $23.00 $51,888.00
2 8"SDR 26 PVC Sewer Pipe 40 LF $28.00 $1,120.00
3 4' Diameter Manhole, 6'Deep 16 EA $1,500.00 $24,000.00
4 Extra Manhole Depth >6' 24.5 VF $150.00 $3,675.00
5 4"Sanitary Sewer Service w/Double Cleanout 51 EA $375.00 $19,125.00
6 Connect to Exist. SS 1 EA $1,800.00 $1,800.00
7 Interior Protective Coating for Manhole 12.5 VF $185.00 $2,312.50
8 Cement Stabilized Backfill 40.0 LF $15.00 $600.00
9 Testing 1 LS $800.00 $800.00
10 Trench Safety 2,296 LF $1.00 $2,296.00
SUBTOTAL $107,616.50
III STORM DRAINAGE IMPROVEMENTS
1 30"Class III RCP 383 LF $62.00 $23,746.00
2 36"Class III RCP 230 LF $75.00 $17,250.00
3 10' Curb Inlet 1 EA $1,900.00 $1,900.00
4 4'x 4'Storm Drain Manhole 2 EA $2,200.00 $4,400.00
5 Connect to Existing 54" RCP 1 EA $3,600.00 $3,600.00
6 Concrete Collar 1 EA $500.00 $500.00
7 Trench Safety 613 LF $1.00 $613.00
8 Remove& Replace Concrete Curb/Pavement 35 LF $75.00 $2,625.00
SUBTOTALI I $54,634.00
uuYe
RIVER PARK SUBDIVISION
OPINION OF PROBABLE CONSTRUCTION COST FOR CFA
ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL
IV PAVING IMPROVEMENTS
1 Remove Concrete Curb 100 LF $3.00 $300.00
2 Remove Concrete Sidewalk 3,140 SF $2.00 $6,280.00
3 6" Lime Stabilized Sub rade 6,630 SY $1.95 $12,928.50
4 Lime for Stabilization 33#/SY) 109.5 TON $98.00 $10,731.00
5 6" Reinforced Concrete Pavement w/Curb 6,390 SY $21.75 $138,982.50
6 Adjust SSMH Rim/Valve Cover 13 EA $75.00 $975.00
7 4" Utility Sleeve 350 LF $7.00 $2,450.00
8 Concrete Wheel Chair Rams 2 EA $750.00 $1,500.00
9 Concrete Sidewalk 2,925 SF $2.75 $8,043.75
SUBTOTAL $182,190.75
TOTAL CONSTRUCTION COST $411,467.25
V CITY FEES
1 Street Signs 1 EA $100.00 $100.00
2 T&PW Construction Inspection (4%) 1 LS $9,472.99
3 Water Construction Inspection (2%) 1 LS $3,492.85
SUBTOTALI 1 1 $13,065.84
RECEIVED
PART B—PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: River Park, L.P.
2929 W. 5th Street, Suite A
Fort Worth,TX 76017
PROPOSAL FOR: PROJECT NAME RIVER PARK PLACE
WATER PROJECT NO. P-164-060164015379
SEWER PROJECT NO. P-174-070174013377
FILE NO. W-1715
X NO. X-17351
Includes the furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for the installation of paving, drainage, water and sanitary
sewer facilities and all necessary appurtenances and incidental work to provide a
complete and serviceable project designated as:
RIVER PARK PLACE
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, and the
General Contract Documents and General Specifications for Water Department Projects,
the General Contract Documents and General specifications for Transportation and Public
works Projects, the site of the project and understanding the amount of work to be done,
and the prevailing conditions, hereby proposes to do all the work, furnish all labor,
equipment and material except as specified to be furnished by the City, which is
necessary to fully complete the work as provided in the Plans and Contract Documents
and subject to the inspection and approval of the Director of the Department of
Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this
Proposal to execute a contract and furnish an approved Performance Bond, Payment
Bond, Maintenance Bond, and such other bonds, if any, as may be required by the
Contract Documents for the performing and completing of the said work. Contractor
proposes to do the work within the time stated and for the following sums:
B-1 ' r
Updated 0 /1
U q1�
UNIT Ell: STORM DRAIN
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place,the following
items)
1. 383 LF 30" CL III RCP Storm Drain
Sixty-Two
Dollars
Zero Cents $ 62.00 $ 23,746.00
2. 230 LF 36"CL III RCP Storm Drain
Seven -Five
Dollars
Zero Cents $ 75.00 $ 17,250.00
3. 1 EA 10' Standard Curb Inlet
Nineteen Hundred
Dollars
Zero Cents $ 1,900.00 $ 1,900.00
4. 2 EA 4' x 4' SDMH
_Twenty-Two Hundred
Dollars
Zero Cents $ 2,200.00 $ 4,400.00
5. 1 EA Connect to Exist. 54"RCP
_Thirty-Six Hundred
Dollars
Zero Cents $ 3,600.00 $ 3,600.00
6. 1 EA Concrete Collar
Five Hundred
Dollars
Zero Cents $ 500.00 $ 500.00
7. 613 LF Trench Safety
One
Dollars
Zero Cents $ 1.00 $ 613.00
1
Updated 05/1 /20M �
o cr�` ➢ G.n
8. 35 LF Remove &Replace Concrete
Curb/Pavement
Seventy-Five
Dollars
Zero Cents $ 75.00 $ 2,625.00
TOTAL AMOUNT BID STORM DRAIN $54,634.00
B-7
Updated 05/16/2005
UNIT IV: PAVING IMPROVEMENTS
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place,the following
items)
1. 100 LF Remove Concrete Curb
Three
Dollars
Zero Cents $ 3.00 $ 300.00
2. 3,140 SF Remove Concrete Sidewalk
Two
Dollars
Zero Cents $ 2.00 $ 6,280.00
3. 6,630 SY 6"Lime Stabilized Subgrade
One
Dollars
Ninety-Five Cents $ 1.95 $ 12,928.50
4. 109.5 TON Lime Stabilization(33 lbs/SY)
Ninety-Eight
Dollars
Zero Cents $ 98.00 $ 10,731.00
5. 6,390 SY 6"Reinforced Concrete Pavement
w/ Curb
Twenty-One
Dollars
-Seventy-Five Cents $ 21.75 $138,982.50
6. 13 EA Adjust SSMH Rim/Valve Cover
Seventy-Five
Dollars
Zero Cents $ 75.00 $ 975.00
B-8 v1Vl�� 'jE ;i F+,Ut,
Updated 05/16/ 00R7 , E1,1 H, Ne4Y'
7. 350 LF 4"Utility Sleeve
Seven
Dollars
Zero Cents $ 7.00 $ 2,450.00
8. 2 EA Concrete Wheel Chair Ramps
_Seven Hundred-Fifty
Dollars
Zero Cents $ 750.00 $ 1,500.00
9. 2,925 SF 4' Concrete Sidewalk
Two
Dollars
Seventy-Five Cents $ 2.75 $ 8,043.75
TOTAL AMOUNT BID PAVING $ 182,190.75
B-9
Updated 05/16/2005
TOTAL AMOUNT BID WATER $ 67 026.00
TOTAL AMOUNT BID SEWER $ 107 576.50
TOTAL AMOUNT BID STORM DRAIN $ 54 634.00
TOTAL AMOUNT BID PAVING $ 182 190.75
GRAND TOTAL AMOUNT BID $ 411,427.25
'`✓J ' 1. �S L7 L
Updated 0116/2005
PART B -PROPOSAL(Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and
will deliver an approved Surety Bond and such other bonds as required by the Contract
Documents, for the faithful performance of the Contract. The attached bid security, if
required is to become the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated
January 1, 1978, and that he has read and thoroughly understands all the requirements and
conditions of those General Documents and the specific Contract Documents and
appurtenant plans.
The successful bidder shall be required to perform the work in accord with the
following publications, both of which are incorporated herein and made a part
hereof for all purposes:
1. The General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased
from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public
Works.
The undersigned assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency in either furnishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.
7400.
The Bidder agrees to begin construction within ro calendar days after issue of the work
order, and to complete the contract within�working days after beginning construction
as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of ,our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
B-11
Updated 05/16/2005
11'
place of business, are not required to underbid resident bidders.
kB- The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
B-12
Updated 05/16/2005
I(we)acknowledge receipt of the following addenda to the plans and specifications,all of
the provisions and requirements of which have been taken into consideration on
preparation of the foregoing bid:
Addendum No. 1 (Initials) Addendum No.3(Initials)
Addendum No. 2 (Initials) Addendum No.4(Initials)
Respectfully submitted,
&V�6z- M.
B •
�—
Title f�
Y �
Addr s
��,
rOl v1— 01 If 7
Telephone:
B-13
Updated 05/16/2005
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000.00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000. 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00
Subtotal $00,000.00
City's Cost $00,000.00
Developer's Subtotal $00,000.00
10% Contingency $00,000.00
Project Total $00,000.00
Adjacent Developer's Cost $00,000.00
Developer's Cost $00,000.00
2% Inspection Fee $00,000.00
CFA CODE #2005113
DEVELOPER'S COST:
RIVER PARK PLACE
Fort Worth, Texas
August 25, 2005
PAGE I OF Exhibit C
If IY, lv'J,,.�
v�;�,`u
II. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER' S COST:
RIVER PARK PLACE
August 25, 2005
FORT WORTH, TEXAS
CFA CODE #2005113
Page II of Exhibit C
III
"NO City of Fort worth STREETLIGHTS INVOLVED"
RIVER PARK PLACE
Page III of Exhibit C
LAI'Gi v
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost
to the Developer of$0.00:
(Private Development)
River Park Place
CFA code: 2005113 August 20, 2005
PROJECT LOCATION
i9 TRINITY
tih y o 8
121
R
PN 0
7TH
GP�P 0 2
30 SEDAL
80 287
00
Lake
ngt
820 t �IRL MIN 81 Spy 9
46
20
287
0
5 9tiri
� � O
U 'S%
LOCA TION MAP
N. T.S. RECEIVED
RI VER PARK PLACE
DOE # 4990
FILE # W-1715
WATER PROD. # P164-060164015379
SEWER PROD. # P174-070174013377
PROJECT LOCATION
RIVER
A
D
Z-I
BELLAIRE
VICINITY MAP.• SCALE." 1" = 2000'
RI VER PARK PLACE
DOE # 4990
FILE # W-1715
WATER PROD. # P164-060164015379
SEWER PR0D. P174-070174013377
8"W 7H�1k v
`
f ESM' W .
UUIE \ \
70\ W N
\ � \ o
\\ \\ p
w
LO
Ct) i-S
Lw
\ \ _
C
LC) ��,\
___
_If
w
w o
z�
LO
21
w �¢
W
W
Q
Wftft�c � �
Co �
� � Z
\` �
lV
0 0 �
Z W
m
If
m ----------— ------—------- --_-------—------
Ii O
it LC) °o o
I
}I O
'} 15 8L _
}} ---- --10 - - - --- --
} 10'U/f _ _----------10 U/E--
` r ��-15'BL 15 B
r
_ _ w
9 --------=---------- U
O
\ ^� �QC 3 In
K
QS LLJ
U
Q
\
N
\ Q
15'BL
\\ Q
o'er V
� Z W
OLD INI \\\ �N>6\ 3fJ l J gga
\\ 1 J J.'1 P
JNI7,H-- JI Vn
/
- � N
Lr)
N \
/
CIN
J
/ -
10 . B� CIN \ W:�Mtn✓
/
/
E 'o4op
v
tx)
/
i
- o
Qo Qj Q �
o Qcov
LO Z W
` o
1}\ \\\ \\ \\\ N
RPM \ ESMj i J
w
LIQ LILJ
,\W
t
\ !\
r `
Lf 7 \
r
- - - - - - - - - -
- - - - - - - - - - - -S'-,M„ -- -- ----
-c 1�-
w \
1\ \ o
z
\ z�
�2
�Q
wLILJ
OLO
w�
LA
N
LLj
�WO � _ �l
J
W
Z
U
Q
Y WALL ESM7
�I
CK) Q�
II L-C)
�I
1 I 15'BL _
---- --10 - ---- --- ----
- - A41TX WY - -
J
r /
1U/t 10”U/E
/�-------- --
15 BL _
1 �- 15 BL
, �A"-TCHLINE
1W
GOICON ,?;l 1 i \ 3 n or
\ — r
V
\
/
i
-14
�.
— — — — — ------
I
\v
v
II�
cn _ — —
O
y -7/ Y / � Vfl
/
/
/j \ Q(35k,
\
�5
Cr)
03
CIN
Ix
/ N
\ \
i
N
31- CK3
/
- w
- w
- w
L
LAJ
o ' i FI IAliL 'E c 01D