Loading...
HomeMy WebLinkAboutContract 32444 5 AMENDMENT NO. 1 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO., (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Freese and Nichols, Inc. , (Engineer) made and entered into City Secretary Contract No. 29739, (the Contract) which was authorized by the City Council by M&C C-20003 on the 23rd day of March 2004; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Water and Sanitary Sewer Improvements to Serve the Thompson Road and Riverside North Area (Annexation A-00-20) WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 2, 2005, a. copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $24,786 .00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $174, 838.00. SRI 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this their l day of 2005, in Fort Worth, Tarrant County, Texas. ATTEST: f � NO M&C REQUIRED Marty Hendri Acting City Secretary APPROVAL RECOMMENDED: AP ROVED: /Ve, -- \1&-1--, A. Douglas Rademaker, P.E. ar A. btt Director, Department of Assistant City Manager Engineering Freese and Nichols, Inc. ENGINEER By: Name: Thomas Haster, P.E. Principal 4055 International Plaza Dallas, TX 76109 APPROV AS TO FORM LEGALITY: A sist t 7ity Attorney -2- Freese and Nicho[s, Inc. Engineers Environmental Scientists Architects 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817 735-7300 817 735-7491 fax www.freese.com September 2,2005 Mr. Miguel Domenech Project Manager Engineering Department City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: Request for Amendment No. 1 for the Water and Sanitary Sewer Improvements to serve the Thompson Road and Riverside North Area(Annexation A-00-20). City Secretary Contract Number 29739,DOE No. 4210 Dear Mr. Domenech: Attached is the revised engineering proposal for furnishing the City of Fort Worth the changes requested on the Water and Sanitary Sewer Improvements to serve the Thompson Road and Riverside North Area. These changes are listed below. • Design of approximately 2,300 sanitary sewer line from North Riverside Dr to sewer main M-454*. We propose to provide the design and survey services for a fee of$24,786. Exhibits 1, 2, 3, and 4 provide a breakdown of the fee. Original Contract Amount = $150,052.00 Amendment No. 1 = $ 24,786.00 Revised Contract Amount = $174,838.00 We propose to utilize Gorrondona&Associates,Inc, for survey services for$9,300 equating to 37.5%M/WBE participation. Your expeditious execution of this Amendment#1 to our original contract would be greatly appreciated. We appreciate the opportunity to be of continued service to you. [OFF05041]T:\FortWorth\Thompson Road\00 Letter.doc 5I7� r J ,tf Miguel Domenech City of Fort Worth Page 2 of 2 If you have any questions or comments,please contact Daniel Stoutenburg at(817)735-7395. Sincerely, ]FREESE AND NICHOLS,INC. t4w, 7;Z� Thomas Haster,P.E. Principal Att lI� REC0 D [0FF05041]TAFort Worth\Thompson Road\00_Lettendoc J]�(;� •`[ (D� ��R� 'C iJ j]I, V�5 P IU,�r,. CITY OF FORT WORTH AMENDMENTS, CHANGE ORDERS or EXTRA WORK CONTRACT COMPLIANCE MEMORANDUM FTHIYSORM MUST BE ATTACHED TO THE ROUTING "M & C" BEFORE LEGAL AND ANAGER APPROVAL. To: Miguel Domenech (underline appropriate one Project Manager Buyer Department Director i From: Rachel Ortega 'c 6104 M/WBE Office Staff Extension Date: September 7, 2005 In the Amount of$ 24,786.00 4210 DOE Number Project/Bid: Amendment No. 1-Water and Sanitary Sewer Improvements to serve the Thompson Road and Riverside North Area. 1. Compliance with the City's M/WBE Ordinance as it relates to amendments,change orders or extra work has been achieved by one of the following methods: a) Freese & Nichols, Inc., is in compliance with the City's M/WBE Ordinance by committing to an a goal of 38% M/WBE participation on this project. The M/WBE goal set on this project is 12%. b) is in compliance with the City's M/WBE Ordinance by committing to an additional% M/WBE participation on this amendment. The City's goal on this Change Order No. 1, is %. C) is in compliance with the City's M/WBE Ordinance by documenting good faith effort. The City's goal on this amendment, change order or extra work is %. d) is in compliance with the City's M/WBE Ordinance by approval of a waiver request of the M/WBE requirement. The City's goal on this amendment, change order or extra work is %. 05/11/99