HomeMy WebLinkAboutContract 50873 Received Date:6/20/18
Received Time:8:30 a.m.
Developer and Project Information Cover Sheet:
Developer Company Name: FG Aledo Development,LLC
Address, State,Zip Code: F3045 Lackland Rd,Fort Worth,TX,76116
Phone&Email: i k illasableholdin s
Authorized Signatory,Title: Kim Gill,President of KTFW Investments,Inc. Manager of Developer
Project Name: Morningstar Section 6 Phase 4
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: FM 3325 Parker County
Plat Case Number: FP 17-064 Plat Name: Morningstar Development
Mapsco: 71OZ Council District: ETJ
CFA Number: 2018-057 City Project Number: 101091
OFFICIAL KRCORQ
cmy SlCRF-TARY
WORTH,TX
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 50873
WHEREAS, FG Aledo Development, LLC , ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Morningstar Section 6 Phase 4 ("Project") within the
City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires t: e eve oper 5s con tr Aor(s)
City of Fort worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4 CITY SECRETARY
CFA Official Release Date: 02.20.2017 1 FT,WORTH,TX
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) N. Sewer(A-1) ®_ Paving (B) Z_ Storm Drain(B-1) N. Street Lights & Signs
(C) Z.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured,licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 3 of 11
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 4of11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further, Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth, Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 7of11
Cost Summary Sheet
Project Name: Morningstar Section 6 Phase 4
CFA No.: 2018-057 City Project No.: 101091
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 145,309.25
2.Sewer Construction $ 125,572.80
Water and Sewer Construction Total $ 270,882.05
B. TPW Construction
1.Street $ 363,307.00
2.Storm Drain $ 53,431.00
3.Street Lights Installed by Developer $ 31,019.25
4. Signals $ -
TPW Construction Cost Total $ 447,757.25
Total Construction Cost(excluding the fees): $ 718,639.30
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 5,417.65
D. Water/Sewer Material Testing Fee(2%) $ 5,417.65
Sub-Total for Water Construction Fees $ 10,835.30
E. TPW Inspection Fee(4%) $ 16,669.52
F. TPW Material Testing(2%) $ 8,334.76
G. Street Light Inspsection Cost $ 1,240.77
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 26,245.05
Total Construction Fees: $ 37,080.35
Choice
Financial Guarantee Options,choose one Amount Mark omr 2
Bond=100% $ 718,639.30
Completion Agreement=100%/Holds Plat $ 718,639.30 x
Cash Escrow Water/Sanitary Sewer-125% $ 338,602.56
Cash Escrow Paving/Storm Drain=125% $ 559,696.56
Letter of Credit=125%w/2yr expiration period $ 898,299.13
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
FG Aledo Development,LLC
Jesus J.Chapa(Jun 19,2018)
Jesus J. Chaps
Assistant City Manager
Date: Jun 19,2018 KIM GILL(-run
Name: Kim Gill
Recommended by: Title: President of KTFW INVESTMENTS,
INC. MANAGER OF DEVELOPER
r ►1 / fr
Evelyn Robes(Jinn 11 F2018) Date: Jun 14,2018
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Contract Compliance Manager:
By signing, I acknowledge that I am the
Approved as to Form &Legality: person responsible for the monitoring and
administration of this contract, including
/GLI�� /�GC�GIG`f6`1 ensuring all performance and reporting
Richard A.McCracken(Jun 19,2018) requirements.
Richard A. McCracken
Assistant City Attorney �'c�L `yfi2a/�
M&C No. N/A J;�fe Scarlett Morales(Jun 19,2018)
Ll
Date: Name: Janie Morales
Form 1295: N/A Title: Development Manager
ATTEST:
Mary T. Kgyser
MaryJ.Kayser(Jun 20,2018)
Mary J. Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date: 02.20.2017
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
i Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
Exhibit A-1: Sewer Improvements
Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACBMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101091
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Morningstar Section 6 Phase 4
CFA Official Release Date:02.20.2017
Page 11 of 11
00 42 43
DAP-BID PROPOSAL
PW l or7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT BIDS 3/11/2018
MORNINGSTAR-SECTION 6-PHASE 4 CPN: 101091
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist
Item Specification Unit of Bid
Description Section No. Measure Quantity Unit Price Bid Value
No.
UNIT I:WATER IMPROVEMENTS
1-1 311 0161 6"Water Pipe 133 11 12 LF 10 S28.w S2gu.w
1-2 3311.0261 8"Water Pipe 33 11 12 LF 2,293 $21.25 $48,726.25
1-3 3312.3002 6"Gate Valve 331220 EA 2 $950.00 $1,900.00
1-4 3312.3003 8*Gate Valve 331220 EA 4 $1,050.00 $4,200.00
1-5 3312.0117 Connect.to Existing 4"-12"Water Main 33 1225 EA 3 $800.00 $2,400.00
1-6 3312.0001 Fire Hydrant 331240 EA 2 $3,750.00 $7,500.00
1-7 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 2 $7,500.00 $15,000.00
1-8 3305.0109 Trench Safety 3305 10 LF 2,303 $1.00 $2,303.00
19 3312.2003 1"Water Service 33 12 10 EA 72 $875.00 $63,000.00
TOTAL UNIT I:WATER IMPBQYEMENTIJ $145,309.25
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form V4rrioa April 2.2014 00 42 43-EXECUTED CONTRACT BID ITEMS-MORNINGSTAR-SECTION 6 PHASE 4-03-11-16.xis
00 42 43
DAP-BID PROPOSAL
Paga 2 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT BIDS 3/11/2018
MORNINGSTAR-SECTION 6-PHASE 4 CPN: 101091
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist
Item Description Specification Unit ofBid Unit Price Bid Value
No. I
Section No. Measure Quantity
UNIT II: SANITARY SEWER IMPROVEMENTS
Z-1 3331.4115 8"Sewer Pipe 33 31 2U Lr 1,328 $36.UU �47,8U8.UU
2-2 3339.1001 4'Manhole 33 39 20 EA 8 $5,100.00 $40,800.00
2-3 3331.3101 4'Sewer Service,Two-way cleanout 33 31 50 EA 48 $525.00 $25,200.00
2-4 3301.0002 Post-CCTV Inspection 330131 LF 1,328 $3.10 $4,116.80
2-5 13301.0101 Manhole Vacuum Testing 33 01 30 EA 8 $165.00 $1,320.00
2.6 3305.0109 Trench Safety 3305 10 LF 1,328 $1.00 $1,328.00
2-7 9999.0001 Connect to Existing Sanitary Sewer Main 33 11 10 EA 3 $500.00 $1,500.00
2-8 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 7 5500.00 $3,500.00
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $125,572.80
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-EXECUTED CONTRACT BID ITEMS-MORNINGSTAR-SECTION 6 PHASE 4-03.11.1 Y.As
00 42 43
DAP-BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT BIDS 3/11/2018
MORNINGSTAR-SECTION 6-PHASE 4 CPN: 101091
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
13u11ist
Specification Unit of Bid
Item Description Section No. Measure Quantity Unit Price Bid Value
No.
UNIT III: DRAINAGE IMPROVEMENTS
3-1 3305.0109 Trench Safety 33 U5 IU LF 101 b i.W S I61.0U
3-2 3341.0309 36"RCP,Class III 3341 10 LF 160 $112.00 $17,920.00
3-3 9999.0002 TXDOT 2:136"CH-PW-O-HDWL(MODIFIED) 33 49 40 EA 1 $6,800.00 $6,800.00
3-4 3349.5003 29 Curb Inlet 33 49 20 EA 2 $11,300.00 $22,600.00
3-5 3137.0104 Medium Stone,Riprap,Dry 313700 SY 70 $85.00 $5,950.00
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $53,431.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Forth Version April 2,2014 00 42 43-EXECUTED CONTRACT BID ITEMS-MORNINGSTAR-SECTION 6 PHASE 4-03-11.1 S.xls
00 42 43
DAP-BID PROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT BIDS 3/112018
MORNINGSTAR-SECTION 6-PHASE 4 CPN: 101091
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist
Specification Unit of Bid
Item Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT IV:PAVING IMPROVEMENTS
4-1 3213.0101 0"Con,;11ti1nt 32 13 13 SY 7,585 1.41.79 1310,977.13
4-2 3211.0501 6"Lime Treatment 32 1129 SY 8,111 $2.05 $16,627.55
4-3 3211.0400 Hydrate Lime 3211 29 TN 122 $169.00 $20,618.00
4-4 3213.0501 Barrier Fra Ramp-Type R-1 32 13 20 EA 4 $1,249.00 54,996.00
4-5 3213.0504 Barrier Fra Ramp-Type M-2 32 13 20 EA 2 $1,195.00 $2,390.00
4-6 3441.4003 Furnish&Install Ground Mount post W/Stop& 34 41 30 EA 3 $1,161.90
Directive R1-1 $387.30
4-7 9999.0003 Street Name Plates for Street Intersection(4-blades) 3441 30 EA 12 544.70 $536.40
TOTAL UNIT IV:PAVING IMPROVEMENTS $363,307.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Forth Version April 2,2014 00 42 43-EXECUTED CONTRACT BID ITEMS-MORNINGSTAR-SECTION 6 PHASE 4-03.11.18.x15
00 42 43
DAP-BID PROPOSAL
Page 5 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT BIDS 3/11/2018
MORNINGSTAR-SECTION 6-PHASE 4 CPN: 101091
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist
Item Description Specification Unit Unit Price Bid Value
No Section No. Measure
Bid
e Quantity
UNIT V: STREET LIGHTING IMPROVEMENTS
5-1 9999.000V Install llulizphane-Culunbia Alwwnun Pole, 34 41 20 EA 16 $525.00 $8,400.00
Washington-14.5'Luminaire WFCL2-070HO-30K-AS-BK-L5-
5-2 3441.3001 Furnish/Install Rdwy Illum Foundation TY 7 34 41 20 EA 16 $850.00 $13,600.00
5-3 2605.3015 Furnish/Install 2 Inch Conduit PVC SCH 80(T) 26 05 33 LF 839 $8.50 $7,131.50
5-4 3441.3401 Furnish/Instal11i10 Copper Electric Conductor 3441 10 LF 839 $2.25 51,987.75
Note: Tri-County Electric is providing certain items
above
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $31,019.25
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-EXECUTED CONTRACT Bm ITEMS-MORNINGSTAR-SECTION 6 PHASE 4-03-11-1 g.xla
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM CONTRACT BIDS 3/11/2018
MORNINGSTAR-SECTION 6-PHASE 4 CPN: 101091
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description Unit Price Bid Value
No. Section No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $1_45,309.25
UNIT II:SANITARY SEWER IMPROVEMENTS $125,572.80
UNIT III: DRAINAGE IMPROVEMENTS $53,431.00
UNIT IV:PAVING IMPROVEMENTS _ $363,307.00
UNIT V:STREET LIGHTING IMPROVEMENTS $31,019.25
Total Construction Bid $718,639.30
Contractor agrees to complete WORK for FINAL ACCEPTANCE within #days calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-EXECUTED CONTRACT BID ITEMS-MORNINGSTAR-SECTION 6 PHASE 4.03-11-18.xls
COMPLETION AGREEMENT—LENDER FUNDED
This Completion Agreement("Agreement)is made and entered into by and among the City
of Fort Worth("City"), and 1+TT, LLC, a Texas LM.TED•Ll14BILITY
CO PORA'HC NC'Developer"), and as State Bank;as succe§sor=
in-intcrest by merger to Southwest Bank, a Texas State Ba k("Leader"), effective as of the date
subscribed by the City's City Manager or Assistant City Manager. The City, the Developer and
the Lender are hereinafter collectively called the "Parties".
WITNESSETH:
WHEREAS, the Developer owns that certain tract of real property that contains
approximately 22.640 ACRES?[acres that is located in the City,the legal description of which tract
of real property is marked Exhibit "A" — Legal Description, attached hereto and incorporated
herein for all purposes ("Property"); and
WHEREAS, the Developer intends to develop the Property as an addition to the City
through plat FP 17-064 or FS<NUmb6r ; and
WHEREAS, the Developer and the City have entered into a Community Facilities
Agreement relating to the development of MORINGS SECTIQT 6a_PRASE 4 ("CFA");
and
WHEREAS, the City has required certain assurances of the availability of funds to
complete the water and sewer utilities, streets/paving, storm drain, street lights and street signs for
the development of the Property ("Improvements"), and
WHEREAS, in order to provide such assurances as have been required by the City, the
Lender has agreed to advance certain funds to the City for Hard Costs (which term is hereinafter
defined)subject to,and in accordance with,the terms,provisions and conditions of this Agreement;
and
WHEREAS, the Developer has granted to the Lender as additional security for the Loan
(which term is hereinafter.defined) a security interest in all plans and specifications for the
development of the Property (collectively, the "Plans"); and
WHEREAS, the Parties desire to set forth the terms and conditions of such
accommodations as are described above.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 1 of 15
NOW THEREFORE,for and in consideration of the benefits to be derived from the mutual
observance by the Parties of the terms and conditions hereof, and for and in consideration of Ten
Dollars($10.00)and other good and valuable consideration,the receipt, adequacy and sufficiency
of which are hereby acknowledged, the Parties agree as follows:
1. Recitals. The foregoing recitals are true, correct and complete and constitute the
basis for this Agreement and they are incorporated into this Agreement for all purposes.
2. The Completion Amount. The City and the Developer agree that the Hard Costs
required to complete the Improvements in the aggregate should not exceed the sum of SEVEN
H 11, AAP > .1GKTEEN JTHOid,A,� _S?K kiUNDRED~TFJU-VNINE a#d THIRTY CENTS
Dollars ($718,639.30). hereinafter called the "Completion Amount". Notwithstanding the
foregoing, it is acknowledged that the actual costs of completion of the Improvements may vary
as a result of change orders agreed to by the Parties, but such variances for the purposes of this
Agreement shall not affect the Completion Amount as used herein.
3. Adjustments to the Completion Amount. The Lender may from time to time make
advances to the Developer for the development of the Property under the development loan that
has been made by the Lender to the Developer for the purpose of financing the costs of constructing
the Improvements for the Property (the "Loan") subject to, and in accordance with, the terms,
conditions and provisions of the Loan Documents (which term is hereinafter defined) evidencing
and securing the Loan. Some of those advances shall be for Hard Costs as specified in the
"Approved Budget" relating to the Loan, a copy of which Approved Budget is marked Exhibit
"B", attached hereto and incorporated herein for all purposes, with the Hard Costs line items
highlighted. The term"Hard Costs" shall mean the actual costs of construction and installation of
the Improvements. To the extent that advances under the Loan are for the payment of Hard Costs,
the Completion Amount shall be deemed reduced, dollar for dollar. The Lender may withhold
statutory retainage from any advances under the Loan or pursuant to this Agreement. All such
retainage withheld, to the extent it is attributable to Hard Costs, shall also reduce the Completion
Amount dollar for dollar. All retainage withheld by the Lender for Hard Costs that are advanced
to the City pursuant to this Agreement shall be released to the City as provided in the Texas
Property Code upon expiration of the statutory retainage period.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date: 07.01.2015
Page 2 of 15
4. Completion by the Developer. The Developer agrees to complete the
Improvements on or before the date for completion that is established in the Loan Documents plus
thirty(30) days (the "Completion Date"), in accordance with the CFA,the Plans approved by the
Lender and the City and all documents evidencing or securing the Loan (collectively, the "Loan
Documents"). For the purposes of this Agreement, the development of the Property shall be
deemed complete upon acceptance by the City of the Improvements. The City shall promptly
notify the Lender and the Developer upon such acceptance.
5. Completion by the City. In the event that either: (A) the development of the
Property is not completed by the Completion Date for any reason whatsoever,or(B)the Developer
is in default under the Loan, then the Lender, at its sole option, may request the City to complete
development.The City may, at its sole option and at the cost and expense of the Developer,within
10 days from receipt of Lender's request, notify Lender that it will undertake to complete the
Improvements and the City shall then commence, pursue, and complete the Improvements in a
reasonably timely, diligent and workmanlike manner in accordance with the Plans, subject to the
terms of this Agreement. The Lender and the.Developer agree that the City may use the Plans as
necessary to complete the Improvements.
If the City does not timely elect to complete the construction of the Improvements or if the
Lender does not request the City to complete construction of the Improvements, then the Lender
may at its election terminate this Agreement, or at its option, proceed to complete the
Improvements, or foreclose on any of its collateral, or take any and all such action as may be
provided under the Loan Documents.
6. Advance of Completion Costs to the City and Delivery of Hard Costs Collateral to
the Ci In the event the Lender has requested the City and the City has elected to complete the
Improvements, Lender shall transfer to the City all remaining undisbursed Hard Costs specified in
the Approved Budget within 10 days of the date that the City elected to complete and provided
Lender with written notice of such election.
The Developer hereby authorizes and instructs the Lender to make the transfer of any
remaining undisbursed Hard Costs specified in the Approved Budget to the City within 10 days of
notification that the City elects to complete the Improvements.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date: 07.01.2015
Page 3 of 15
In the event the cost to complete the Improvements exceeds the moneys transferred to the
City, City shall notify Lender and Developer in writing of the need of additional funds. The
additional funds required to complete the Improvements shall be delivered to the City within 10
business days following notification to Lender and Developer. Failure to deliver the additional
funds shall relieve the City of the obligation to complete the Improvements, in which event City
shall use the Hard Costs funds in its possession to pay the contractor(s)all funds due it/them. Any
remaining undisbursed Hard Costs shall be returned to Lender within a reasonable time.
7. Completion by the Lender. The Lender may, at its discretion, but shall not be
obligated to, undertake to complete the Improvements if there is any default under any Loan
Documents in lieu of requesting the City to complete the Improvements. If the Lender elects to
complete the Improvements, any Hard Costs it expends shall, dollar for dollar, reduce the
Completion Amount.
8. Easements. In the event the City or the Lender undertakes the completion of the
Improvements, the Developer (and to the extent necessary the Lender) grants to the City and the
Lender open access to the Property and shall execute and deliver such temporary easements over
and across the entirety of the Property for the purpose of access and use for the completion of the
construction of the Improvements in accordance with this Agreement. To the extent requested by
the City and the Lender, written temporary construction easements in form acceptable to the City
and the Lender shall be executed by the Developer and filed of record. Nothing in this paragraph
shall reduce any rights of the Lender or obligations of the Developer under the Loan Documents.
9. Lender's Rights. Nothing in this Agreement shall affect any portion of the Lender's
collateral for the Loan or limit or impair the Lender's right to foreclose the same or deal with the
collateral as it elects in accordance with the Loan Documents.
10. Satisfaction of the City Requirements. The City agrees that the assurances and
covenants contained in this Agreement satisfy all requirements of the City with respect to
Developer's performance bond or other financial security in connection with the development of
the Property and the completion of the Improvements that are contained in the CFA or in any other
agreement relating thereto, and the City hereby accepts the assurances and covenants contained
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 4 of 15
herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the
provisions of this Agreement shall control.
11. Termination. This Agreement shall terminate upon the earlier to occur of the
following: (a) acceptance by the City of the Improvements; (b) mutual written agreement of
all of the Parties; or(c)the reduction of the Completion Amount to zero. However, release of the
plat shall be governed by paragraph 12 hereof and termination pursuant to (b) or (c) of this
paragraph 11 shall not require the City to release the plat.
12. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat
of the Property.until the Improvements are completed and accepted by the City and all Hard Costs
contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence
from the Developer showing that all Hard Costs contractors have been paid, including but not
necessarily limited to lien waivers and bills paid affidavits,the City shall within a reasonable time
file the final plat for the Property in the Plat Records of the county where the Property is located.
The purpose of the City retaining the final plat of the Property as provided herein is to guarantee
the Developer's obligations under the CFA are completed.
13. Construction Contracts. Developer agrees to include in each Construction contract
that it enters into for the completion of the Improvements the following:
a.A statement that the City is not holding any security to guarantee any payment for work
performed on the Improvements;
b. A statement that the Property is private property and that same may be subject to
mechanic's and materialman's liens;
c.A requirement that each contractor contracting with the Developer release the City from
any claim that is related to the Property of the Improvements; and
d. A requirement that each contractor contracting with the Developer include in each
subcontract the statements contained in a., b., and c. above.
14. Miscellaneous.
A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the
Parties without the prior written consent of all the other Parties.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 5 of 15
B. Notice. Any notice required or permitted to be delivered under this Agreement shall be
deemed received on actual receipt by the appropriate party at the following addresses:
(i) Notice to the City shall be addressed and delivered as follows:
City of Fort Worth
Planning and Development Department
200 Texas Street
Fort Worth,Texas 76102
Attention: CFA Division
Janie Morales,Development Manager
Email: Janie.Morales@fortworthtexas.gov
Confirmation Number: 817-392-7810
and/or
Attention: CFA Division
Email: cfa@fortworthtexas.gov
Confirmation Number: 817-392-2025
With a copy thereof addressed and delivered as follows:
Richard A. McCracken
Office of the City Attorney
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Confirmation Number: 817-392-7611
(ii) Notice to the Developer shall be addressed and delivered as follows:
PG ALEDO DEVELOPMENT,LLC, KIM GILL
3045 LACKLAND ROAD
FORT WORTH,TEXAS 76116
Email: kgill@sableholdings.com
(iii) Notice to the Lender shall be addressed and delivered as follows:
SIMMONS BANK,ALEC BARRY
2200 WEST 7TH STREET
FORT WORTH,TEXAS 76102
Email: Alea.Bar,i�y@simm,onsbanik.com
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 6 of 15
A party may change its address for notice upon prior written notice to the other parties pursuant to
the terms hereof.
C. Texas Law to Annly. This Agreement shall be construed under and in accordance with the
laws of the State of Texas.
D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties
and their respective legal representatives, successors and assigns.
E. Legal Construction. In case any one or more of the provisions contained in this Agreement
shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such
invalidity, illegality, or unenforceability shall not affect any other provision of this
Agreement, and this Agreement shall be construed as if such invalid, illegal, or
unenforceable provision had never been contained in this Agreement.
F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of
the Parties with respect to the subject matter hereof and supersedes any prior
understandings or written or oral agreements among the Parties concerning the subject
matter hereof, provided, however, that this Agreement shall not supersede, amend or
modify any of the Loan Documents or any portion thereof.
G. Amendment. This Agreement may only be amended by a written instrument executed by
all of the Parties to his Agreement.
H. Headings. The headings that are used in this Agreement are used for reference and
convenience purposes only and do not constitute substantive matters to be considered in
construing the terms and provisions of this Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 7 of 15
ACCORDINGLY,the City of Fort Worth, Developer and Lender have each caused this
instrument to be executed in quadruplicate in each entity's respective name by its duly
authorized signatories'effective as of the date executed by the City's City Manager or his/her
designee.:
CITY OF FORT WORTH: DEVELOPER:
FG ALEDO DEVELOPMENT, LLC.
Jesus J.Chapa(Jun 19,2018)
Jesus J. Chapa KIM GILL( un 14,12018)
Assistant City Manager Name: KIMBERLY GILL
Title: PRESIDENT of KTFW
INVESTMENTS,INC.
Date:
Jun 19,2018 MANAGER of DEVELOPER
Approved as to Form and Legality:
Date: Jun 14,2018
AVIMakWX LENDER:
Richard A.McCracken(Jun 19,2018) SIMMONS BANK
Richard A. McCracken
Assistant City Attorney
Alec Bann
ATTEST: F FOIZr
Alec Barry(Jun 15,2018)
!Z Name: TMC BARRY
Title: REGIONALPRI"S[M.'NT
Mary�Yser �_
Mary J.Kayser(Jun 20,2018)
Mary J. Kayser . ........ < Contract Compliance Manager
City Secretary �j(q$ By Signing I acknowledge that I am the
(( 11 person responsible for the monitoring and
M&C: N administration of this contract, including
Date: ensuring all performance and reporting
r quirements.
JJanie S.Morales
Development Manage
FOF�FICIALRlCORD
71TY SECRETARY
a'm WORTH,TX
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 8 of 15
KIlVII ERLY A, the Guarantor of the Development Loan, is executing this Completion
Agreement for the sole purpose of acknowledging that advances that are made by the Lender
pursuant to this Completion Agreement shall be deemed to be advances that are made under the
Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement
that was executed by KIMBERLY GILL.
GUARANTOR
ByK[M GILL(.run 14,201,9)
Name:kIMBERLY GILL
Title: PRESIDENT of KTFW 1NETIMENT ,
INC., MANAGER OEDE'VELOPER
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 9 of 15
List of Exhibits to the Completion Agreement
Attachment 1 —Changes to the Standard Completion Agreement
Exhibit A- Legal Description
Exhibit B - Approved Budget
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 10 of 15
ATTACHMENT"1"
Changes to Standard Completion Agreement
None
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 11 of 15
EXHIBIT A
STATE OF TEXAS
COUNTY OF PARKER
Being a tract of land out of the P. J. McClary Survey,Abstract No. 907 and the J. Morris Survey,
Abstract No. 927, and situated in Parker County,Texas, and surveyed by Miller Surveying, Inc. of
Hurst, Texas in May of 2017, said tract being a portion of the same tract of land described in the
deed to FG Aledo Development,LLC,recorded as Document No.2014-10308 in the Deed Records
of Parker County, Texas, and being a portion of the same tract of land described in the deed to
FWFW Holdings, Inc., recorded as Document No. 2014-10303 in said Records and being more
particularly described by metes and bounds as follows:
Beginning at a 1/2 inch "MILLER 5665" capped steel rod found for the most easterly corner of
Lot 16, Block 52, Morningstar, an addition to Parker County, Texas according to the plat thereof
recorded in Cabinet D, Slide 560 of the Plat Records of Parker County, Texas;
Thence North 25 degrees 20 minutes 46 seconds West a distance of 273.94 feet to a 1/2 inch
"MILLER 5665" capped steel rod found for the beginning of a curve to the right with a radius of
910.00 feet and whose chord bears North 01 degrees 24 minutes 25 seconds East at 819.27 feet;
Thence with said curve along an arc length of 849.81 feet to a 1/2 inch "MILLER 5665" capped
steel rod found for the end of said curve;
Thence South 61 degrees 50 minutes 23 seconds East a distance of 40.00 feet to a 1/2 inch
"MILLER 5665" capped steel rod set for the beginning of a curve to the right with a radius of
870.00 feet and whose chord bears North 34 degrees 24 minutes 27 seconds East at 189.35 feet;
Thence with said curve along an arc length of 189.72 feet to a 1/2 inch "MILLER 5665" capped
steel rod set for the end of said curve;
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 12 of 15
Thence North 40 degrees 39 minutes 17 seconds East a distance of 191.88 feet to a 1/2 inch
"MILLER 5665" capped steel rod set;
Thence North 89 degrees 49 minutes 35 seconds East a distance of 423.81 feet to a 1/2 inch
"MILLER 5665" capped steel rod set;
Thence South 80 degrees 23 minutes 44 seconds East a distance of 356.43 feet to a 1/2 inch
"MILLER 5665" capped steel rod set;
Thence South 09 degrees 36 minutes 16 seconds West a distance of 468.51 feet to a 1/2 inch
"MILLER 5665" capped steel rod found for the most northerly corner of Lot 20, Block 53,
Morningstar, an addition to Parker County,Texas according to the plat thereof recorded in Cabinet
, Slide of the Plat Records of Parker County, Texas;
Thence South 43 degrees 53 minutes 16 seconds West a distance of 125.43 feet to a 1/2 inch
"MILLER 5665" capped steel rod found in the easterly right-of-way line of Gladstone Drive, said
rod being the beginning of a curve to the left with a radius of 300.00 feet and whose chord bears
North 47 degrees 22 minutes 04 seconds West at 13.15 feet;
Thence with said right-of-way line and with curve along an arc length of 13.15 feet to a 1/2 inch
"MILLER 5665" capped steel rod found;
Thence South 41 degrees 22 minutes 35 seconds West a distance of 170.00 feet to a 1/2 inch
"MILLER 5665" capped steel rod found for the northwest corner of Lot 98, Block 57 of said
Morningstar Addition
Thence North 65 degrees 58 minutes 48 seconds West with the northerly boundary line of said
Block 57 a distance of 80.16 feet to a 1/2 inch "MILLER 5665" capped steel rod found;
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 13 of 15
Thence South 89 degrees 14 minutes 16 seconds West continuing with said northerly boundary
line a distance of 205.01 feet to a 1/2 inch "MILLER 5665" capped steel rod found;
Thence South 00 degrees 45 minutes 44 seconds East with the westerly boundary line of said Block
57 a distance of 58.39 feet to a 1/2 inch "MILLER 5665" capped steel rod found;
Thence South 15 degrees 56 minutes 16 seconds East continuing with said westerly boundary line
a distance of 106.84 feet to a 1/2 inch "MILLER 5665" capped steel rod found;
Thence South 25 degrees 20 minutes 46 seconds East continuing with said westerly boundary line
a distance of 264.00.feet to a 1/2 inch "MILLER 5665" capped steel rod found for the northest
corner of Lot 30 of said Block 57;
Thence South 64 degrees 39 minutes 14 seconds West a distance of 170.00 feet to a 1/2 inch
"MILLER 5665" capped steel rod found in the westerly right-of-way line of Mineral Point Drive;
Thence South 25 degrees 20 minutes 46 seconds East with said westerly right-of-way line a
distance of 9.32 feet to a 1/2 inch "MILLER 5665" capped steel rod found;
Thence South 64 degrees 39 minutes 14 seconds West a distance of 240.00 feet to a 1/2 inch
"MILLER 5665" capped steel rod found in the easterly right-of-way line of Gill Point Lane;
Thence North 25 degrees 20 minutes 46 seconds West with said easterly right-of-way line a
distance of 6.84 feet to a 1/2 inch "MILLER 5665" capped steel rod found;
Thence South 64 degrees 39 minutes 14 seconds West a distance of 170.00 to the point of
beginning and containing 22.640 acres of land, more or less.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 14 of 15
EXHIBIT B
APPROVED BUDGET
Section I
Water $145,369.25
Sewer $1,25,573.80
Subtotal $270,882.05
Section II
Interior Streets $363,307.00
Storm Drains $535431.00
Subtotal $416,738.00
Section III
Street Lights $1 i,Q19.25
Sub-total $31,019.25
TOTAL $718,639.30
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 15 of 15