Loading...
HomeMy WebLinkAboutContract 32227 AMENDMENT NO. 3 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. do( (No MSC Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Pate Engineers, Inc. (Engineer) made and entered into City Secretary Contract No. 29041, (the Contract) which was authorized by the City Council by MSC C-19719 on the 19th day of August, 2003; and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2003 STM-E WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 14, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $6,545.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $180,921.74 . �. ._ HH, TEX. R I G I N A L 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. t - EXECUTED on this the day of —0 , 2005, in Fort Worth, Tarrant County, Texas. ATTEST: NO M&C REQUIRED M-AK–'t' Marty Hendrix City Secretary APPROVAL RECOMMENDED: APPROVED: T• A. Douglas Rademaker, P.E. Marc A. tt Director, Department of Assistant City Manager Engineering PATE ENGINEERS INC. ENGINEE f Name•Rick Horn Vice President 6000 Western Place II, Suite 730 Fort Worth, TX 76107 APPROVED TO FORM AND LEGALITY: Assistant "ttorney 2- AL HOD CITY SNIC�!!l �. PATE ENGINEERS June 14, 2005 Mr. Liam Conlon, Project Manager Department of Engineering City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, Texas 76102 Reference: Amendment to Water and Sanitary Sewer Replacement Contract 2003, STM-E D.O.E. File No. 4060 Water Project No. PW53-060530177760 PATE Job No. 121900100 Dear Mr. Conlon: We would like to request that an amendment be granted for the above referenced project in the amount of $ 6,250.00. This request is based on the decision to modify the construction plans to ensure an uninterrupted flow of water to a cola bottling plant during construction. Reaching this decision involved meetings with the plant manager and city officials. We have provided color sketches to assist in these meetings. The modifications include phasing a portion of the construction so that water continues to run in the existing line to be replaced until the new line is in service. Even with these design changes the contractor will have to work with the plant to schedule when service is switched because the plant tends to run nearly 24 hours a day for almost 7 days a week. Once we received a final directive, Pate made the necessary changes to the plan sheets. Pate will meet with the two city officials responsible for the project design and approval of the modifications and make any requested adjustments one time prior to signing, sealing and releasing to the contractor for construction. The M/WBE subcontractors should not be affected and the specified amount for their portion of our contract does not need to change. The amendment costs break out as follows: Pate Engineers, Inc.: Project Manager- $ 1,100.00 Project Engineer - 2,120.00 CADD Designer - 1,650.00 CADD Technician- 1,245.00 Administrative Asst. - . 430.00 Pate Total $ 6,545.00 FORT WORTH • 6000 Western Place II,Suite 730 • Fort Worth,Texas 76107 •T:817.698.0001 F:817.698.0320 Toll Free:866.533.PATE(7283) www.pateeng.com Total Amendment No. 3 Request $ 6,545.00 Original Contract Amount: $128,876.74 Amendment No. 1.Amount: 24,500.00 Amendment No. 2 Amount: 21,000.00 Revised Contract Amount: $ 174,376.74 Amendment No. 3 Amount: $ 6,545.00 New Revised Contract Amount: $180,921.74 We would like to receive approval of this amendment request as soon as possible since we have already completed the needed modifications to the plan sheets and the contractor could begin to schedule this work. We are planning to call you in the next few days to schedule a meeting to review the modifications that have been made to the plans. Please call me with any questions concerning this amendment. Thank you for your prompt consideration of this request. Sincerely, Agreed: PA ENGINEERS, INC. CITY OF FORT WORTH aul H. Krucke yer, P.E., R.P. . . Mr. Tony Sholola, P.E. Senior Project Manager Program Manager cc: Tony Sholola Ken Davis }FHCIilk � CITY MR[IMMY FORT WORTH • 6000 Western Place II,Suite 730 • Fort Worth,Texas 76107 • T:817.698.0001 F:817.698.0320 Toll Free:866.533.PATE(7283) www.pateeng.com