HomeMy WebLinkAboutContract 32229 AMENDMENT NO. 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. 3 DD,D1 (No M&C Needed) COUN'T'Y OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Wade & Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 28404, (the Contract) which was authorized by the City Council by M&C C-19437 on the 21st day of January 2003, and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Rehabilitation Contract LVI (56) . WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 18, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $22, 979 .40 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and servi all not exceed the sum of $335, 021. 90 . v� vly1 �:5 jRIGINAL 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ick day of INvyUs , 2005, in Fort Worth, Tarrant County, Texas. ATTTEnEST: Marty Hendrix City Sex-n- y NO M&C REQUIRED APPROVAL RECOMMENDED: AP O E A. Douglas Rademaker, P.E. arc A. Ott Director, Department of Assist t City Manager Engineering WADE & ASSOCIATES; INC. E GINEER ' By: �W4, Name: Mark G. Wade, P.E. President_ 6701 Brentwood Stair Road Fort Worth, TX 76112 APPROVED TO FORM AND LEGALITY: Assistan it Attorney ,f WHUE 18 July,2005 ATTN: Mr.Mike Domenech,P.E. Department of Engineering City of Fort Worth 900 Monroe Street, Suite 200 Fort Worth,Texas 76102 RE: Submission of REVISED Contract Amendment No.2, Contract LVI(56)Rehabilitation and Improvements Project No.PS58-070580175110,DOE No. 3765 WADE File No. 0211 Mr.Domenech: Please find attached, revised Contract Amendment No. 2 to the Contract 56 Rehabilitation and Improvements Project. This amendment has been revised to clarify the sanitary sewer designs associated with the Hams Hospital area improvements that have been constructed. Amendment No. 2 addresses the recovery of labor and expenses associated with the following items: 1. L-39/L-44: Additional Design Services: Additional topographic survey data was collected and processed for the Weatherford Street alignment revision at the direction of the City. Additional topographic survey data was also collected and processed for the portion of L-44 that was abandoned in Henderson St. Additional design changes to the proposed sanitary sewer improvements(L-39 &L-44)in the Henderson and W.Belknap Street area were also recently made to the plans. The design changes were made to facilitate the construction of these improvements at the request of the Department of Engineering and the Water Department. The changes included revising several sanitary sewer service re-route plans and converting a portion of L-39 into a private service to serve 929 W. Belknap Street using trenchless rehabilitation (CIDP). These changes required the re-submission of the plans and right of entry documents multiple times. We are seeking to recover the cost of processing the 845 LF of additional survey data associated with Henderson and Weatherford Streets. Additionally, we are seeking to recover the cost of two service re-route plans and 90 LF of trenchless sewer design,plus the revision and re-submission of 7 temporary right of entry documents and the entire set of design plans on mylar(7 sheets). Harris Hospital (M-35): Additional Design Services: The original project scope required the replacement of 85 LF of M-35 in 6N Street. However, significant scope of work changes was ultimately required for the sanitary sewer improvements located in 6'h Street around Harris Hospital that affected existing M-35 and M-442R. The City directed us to completely evaluate all of the sanitary sewer system in this area and to recommend system changes. The system evaluation process required manhole Consulting Engineers 1� nrrN^1o�1 6701 Brentwood Stair Road S u i t e 1 0 0 W Fort Worth, Texas 76112in U•:U1 8 1 7 . 4 5 1 . 2 8 2 0 111', LK. FAX 817-451 •2208 �• ,L",i J � Page 2 of 3 Mr.Mike Domenech,P.E. July 18,2005 inspections, additional dye testing and pipeline condition assessment analysis through CCTV tape reviews. Ultimately the sewer system changes amounted to 419 LF of sewer system and large service lateral designs. Additionally, the system improvements included abandoning approximately 126 LF of M-35 and diverting it to M-442R in 6ffi Street as well as replacing the last section of M-35. The revised project scope also included replacing the three primary 8-inch sewer service lines for Harris Hospital that cross through the hospital's maintenance tunnels and connected to M-442R and M-35. These sewer service crossings of the maintenance tunnels required the preparation of special design details. At the request of Harris Hospital, Wade provided limited inspection services during the construction of these sewer crossings. Additionally, we re-routed a sewer force main and several other sewer services that serve various Harris Hospital facilities as part of this project. The design of sewer improvements in this area required a number of subsurface utility investigations/inspections, additional surveying and included some construction inspection services in order to complete this project. We were also required to attend weekly coordination meetings discussing all of the ongoing water and wastewater projects in the area. We are seeking labor and expenses associated with the increase in design footage and extra services provided to see the successful construction of these improvements. The table below breaks down the extra design footage that was performed and itemizes the other supplemental services associated with this design location. Amendment Item Description Quantities Unit Prices Total Costs 1. L-392-44 Design: Additional Design Services $ 5,640.00 Supplemental Design Survey Processing 845 LF $4.00 $ 3,380.00 Supplemental Trenchless Design Footage 90 LF $13.00 $ 1,170.00 4-inch Service Re-route Design Revisions 2 Ea $300.00 $ 600.00 Submission of Revised R.O.E.Instruments 7 Ea $60.00 $ 420.00 Printing of Mylar Plans 7 E $10.00 $ 70.00 2. Harris Hospital: Additional Design Services $17,339.40 Additional Design Footage,Including Special 460 LF $16.00 $ 7,360.00 Details and abandoning a portion of M-35 Supplemental Design Survey&Data Processing 84 LF $4.10 $ 344.40 for Harris Hospital Sewer Service Crossings Additional Dye Testing 4 Ea $120.00 $ 480.00 Manhole Inspections 4 Ea $90.00 $ 360.00 CCTV Tape Reviews 8 Hrs $100.00 $ 800.00 Subsurface Utility Investigations 12 Hrs $100.00 $ 1,200.00 Construction Inspections 32 Hrs $100.00 $ 3,200.00 Hospital District Coordination Meetings 14 Ea $240.00 $ 3,360.00 Reproduction Costs I LS $235.00 $ 235.00 Total Amendment No. 2 Fee: $22,979.40 Wade & Associates, Inc. `v��U L �� ik f, Consulting Engineers Page 3 of 3 ` Mr.Mike Domenech,P.E. July 18,2005 Therefore, we are requesting Contract Amendment No. 2 to the Contract LVI (56) Rehabilitation and Improvements Agreement in the amount of$22,979.40. This amendment represents approximately a seven and one-half percent (7.36%) increase in the total contract value. For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 289,126.00 Amendment No. 1 $ 22,916.50 Amendment No. 2 $ 22,979.40 Revised Contract Value $ 335,021.90 Please do not hesitate to contact me should you have questions or need any background information concerning this matter. Thank you for your time and consideration. J SOC ES,INC. Bro s,P. ., t ana r CC: Peter Fu, P.E.,FWWD, City of Fort Worth Mark Wade,P.E.,President,Wade&Associates Wade & Associates, Inc. �p Consulting Engineers gdo ,�'"�I�uWo TES,