HomeMy WebLinkAboutContract 48339-FP1 City Secretary 48339 FV 1
Contract No. \\
FORT WORTH. Date Received Jun 28,2018
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: WELLINGTON, AREA 1 NORTH, PHASE 1
City Project No.: 100312
Improvement Type(s): Water ® Sewer
Original Contract Price: $1,767,958.85
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $1,767,958.85
AudC,,. &&9- Jun 26,2018
Contractor Date
Project Manager
Title
Kodiak Trenching&Boring,LLC
Company Name
b2ri�� Jun 26, 2018
Albert Samaniego(Jun 26,201.
Project Inspector Date
,4aron Lo
Aaron Long(Jun 2,2016) Jun 27,2018
Project Manager Date
Jun 27,2018
e Scarlett Morales Jun 27 2018
12 pM anager Date
Jun 28 211 ]AR tole �� ost. Ci anager Datea(�fFICIAL REC�;�'I' "R>IsTF '.WORTIH, 1 of 2
Notice of Project Completion
Project Name:WELLINGTON, AREA 1 NORTH, PHASE 1
City Project No.: 100312
City's Attachments
Final Pay Estimate
Change Order(s): ❑ Yes ® N/A
Pipe Report: ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid {i'
Consent of Surety
Statement of Contract Time
Contract Time: 100 WD Days Charged: 565
Work Start Date: 12/5/2016 Work Complete Date: 6/5/2018
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WELLINGTON AREA I NORTH,PHASE 1
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100312
DOE Number 0312
Estimate Number I Payment Number I For Period Ending 6/20/2018
CD
City Secretary Contract Number Contract Time 120:D
Contract Date Days Charged to Date 565
Project Manager NA Contract is 100.00 Complete
Contractor KODIAK TRENCHING 7 BORING,LLC
P 0 BOX 93929
SOUTHLAKE, TX 76092
Inspectors LAYER / SLATEN
r
Thursday,June 21,2018 Page I of 5
City Project Numbers 100312 DOE Number 0312
Contract Name WELLINGTON AREA I NORTH,PHASE 1 Estimate Number I
Contract Limits P3ynzent Number 1
Project Type WATER&SEWER For Period Ending 6/20/2018
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-------•----- ----- ----------------------
1 12"WATER PIPE 1859 LF $39.00 $72,501.00 1859 $72,501.00
2.. 8"WATER PIPE 16320 LF $23.00 $375,360.00 16320 $375,360.00
3 CONCRETE ENCASEMENT FOR UTILITY PIPES 7.8 CY $145.00 $1,131.00 7.8 $1,131.00
4 12"GATE VALVE 6 FA $2,400.00 $14,400.00 6 $14,400.00
5 8"GATE VALVE 50 FA $1,250.00 $62,500.00 50 $62,500.00
6 FIRE HYDRANT 8 FA $2,450.00 $19,600.00 8 $19,600.00
7 DUCTILE IRON WATER FITTINGS 9.61 TN $5,000.00 $48,050.00 9.61 $48,050.00
W/RESTRAINT
8 2"WATER SERVICE 2 EA $2,000.00 $4,000.00 2 $4,000.00
9 1"WATER SERVICE 328 EA $690.00 $226,320.00 328 5226,320.00
10 1"WATER SERVICE WITH 100'ROLL OF 4 FA $690.00 $2,760.00 4 $2,760.00
COPPER .
I1 CONNECTION TO EXISTING 4"-12"WATER 4 FA $1,580.00 $6,320.00 4 $6,320.00
MAIN
12 TRENCH SAFETY 18179 LF $0.25 $4,544.75 18179 $4,544.75
13 SWPPP>l ACRES I LS $300.00 $300.00 1 $300.00
Sub-Total of Previous Unit $837,786.75 $837,786.75
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
----- ----- ------ -------
1 12'SEWER PIPE 508 LF $40.00 $20,320.00 508 $20,320.00
2 12'SEWER PIPE 465 LF $40.00 $18,600.00 465 $18,600.00
3 12'DIP SEWER 922 LF $60.00 $55,320.00 922 $55,320.00
4 10"SEWER PIPE 943 LF $34.00 $32,062.00 943 $32,062.00
5 l0'SEWER PIPE 1148 LF $34.00 $39,032.00 1148 $39,032.00
6 8"SEWER PIPE 4467 LF $29.00 $129,543.00 4467 SJ29,543.00
7 8"SEWER PIPE 6923 LF $29.00 $200,767.00 6923 $200,767.00
8 4"SEWER SERVICE 327 FA $560.00 $183,120.00 327 $183,120.00
9 CONCRETE ENCASEMENT FOR UTILITY PIPES 91.9 CY $145.00 $13,325.50 91.9 $13,325.50
10 4'MANHOLE 64 EA $2,450.00 $156,800.00 64 $156,800.00
11 4'DROP MANHOLE l FA $4,200.00 $4,200.00 l $4,200.00
Thursday,June 21,2018 Page 2 of 5
City Project Numbers 100312 DOE Number 0312
Contract Name WELLINGTON AREA 1 NORTH,PHASE 1 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 6/20/2018
Project Funding
12 4'SHALLOW MANHOLE 3 EA $2,450.00 $7,350.00 3 $7,350.00
13 4'EXTRA DEPTH MANHOLE 164 VF $225.00 $36,900.00 164 $36,900.00
14 EPDXY MANHOLE LINER 9 VF $175.00 $1,575.00 9 $1,575.00
15 TRENCH SAFETY 15376 LF $0.25 $3,844.00 15376 $3,844.00
16 POST CCTV INSPECTION 15376 LF $1.10 $16,913.60 15376 $16,913.60
17 MANHOLE VACUUM TESTING 68 EA $150.00 510,200.00 68 $10,200.00
18 SWPPP>I ACRES I LS $300.00 $300.00 1 $300.00
——————————————————————————— -------
Sub-Total
------Sub-Total of Previous Unit $930,172.10 $930,172.10
----------------------------------------
Thursday,June 21,2018 Page 3 of 5
City Project Numbers 100312 DOE Number 0312
Contract Name WELLINGTON AREA 1 NORTH,PHASE 1 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 6/20/2018
Project Funding
Contract Information Summary
4
Original Contract Amount $1,767,958.85
Change Orders
l
Total Contract Price 51,767,958.85
Total Cost of Work Completed P $1,767,958.85
Less %Retained $0.00
Net Earned $1,767,958.85
Earned This Period $1,767,958.85
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,767,958.85 1
j
'I
i
a
a
f
a
F
Thursday,June 21,2018 Page 4 of 5
City Project Numbers 100312 DOE Number 0312
Contract Name WELLINGTON AREA 1 NORTH,PHASE I Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 6202018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / SLATEN Contract Date
Contractor KODIAK TRENCHING 7 BORING,LLC Contract Time 120 CD
P O BOX 93929 Days Charged to Date 565 CD
SOUTHLAKE, TX 76092 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,767,958.85
Less %Retained $0.00
Net Earned $1,767,958.85
Earned This Period $1,767,958.85
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% 50.00
Balance Due This Payment $1,767,958.85
Thursday,June 21,2018 Page 5 of 5
FORTWORTH
5
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Wellington Area 1 North Phase l
PROJECT NUMBER: 100312
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
12" PVC 1859
8" PVC 16320
2" Copper 80'
1" Copper 9,800
FIRE HYDRANTS: 8 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: AAI Passed
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
12" PVC 973
10" PVC 2000
8" PVC 11300
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: All Pamea
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
tnom The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Matthew Mahone,
Managing Director Of Kodiak Trenching and Boring,LLC, known to me
to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Wellington North
BY
Matthew Mahone
Subscribed and sworn before me on this date 6th of June, 2018.
�o";;',i���,, ALYSSA BOROWIAK
,,0�r�,.Vie =Notary Publla,State of Texan
Ot P is 3sy � �� Comm,Expires 0411-2022
Tarrant,Texas Notary ID 13162507
Bond BCD1045813
OWNER M
CONSENT OF SURETY ARCHITECT p
TO FINAL PAYMENT CONTRACTOR p
Conforms with the American Institute of SURETY p
Architects,AIA Document G707 OTHER p
TO OWNER: HPC Wellington North Development CoV ARCHITECT'S PROJECT NO.:
(Now mnimkir m) 3001 Knox Street
Dallas,Texas 75205
CONTRACT FOR:
Wellington Area 1 North, Phase 1
PROJECT: Wellington Area 1 North,Phase 1 CONTRACT DATED:
f.%wam/arklmad Ft.Worth,Texas October 13.2016
In accordance with the provisions ofthe Contract between the Owner and the Contractor as indicated above,the
(lnsem tmate mal addmm tf Nwvry)
The Hanover Insurance Company
440 Uncoln Street
Worcester,MA 01653
,SURETY.
on bond of
/!mx'tr mtaK malar/dnn nfC'mltnrtw)
Kodiak Trenching and Boring
214 East College Street
Grapevine.Texas 76051
,CONTRACTOR.
hereby approves ofthe final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any
of its obligations to
(Mart nuau arm/mMr"a/(Jmweq
HPC Wellington North Development Corp.
3001 Knox Street
Dallas,Texas 75205
OWNER.
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: May 03,2018
(lawn m,rrtnmg Ow nmw*fiJimed/n�da•atwerlr date and.mir.)
The Hanover insurance Company
(SUMO.)
Subscribed ano sworn to beiote me,a Notary —"� ��.
Anest: Public, in and for CounLy olt Fairfield and taraJamhanredn)treaenrnnve)
Cone.chi ....da .. ....
/ /, Robert D.Riggs-Dir.of Construction Operations-Surety
e0railotl Date.....'�..Q�3 1 f 200(�(Ptvaed nunir and title)
S-21341AS 10101
xop