HomeMy WebLinkAboutContract 49941-FP1 City Secretary 49941
Contract No.
FORTWORTH, Date Received Jun 28,2018
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Moriah At Timberland Additon PH 1
City Project No.: 100618
Improvement Type(s): Water N Sewer N
Original Contract Price: $259,165.50
Amount of Approved Change Order(s): $27,739.00
Revised Contract Amount: $286,904.50
Total Cost of Work Complete: $286,904.50
6&9,;-,f4Pyh Jun 21,2018
Se Haboumb(Jun U.2018)
Contractor Date
Operations Manager
Title
Jackson Construction, Ltd
Company Name
RON'ta eord t-%' Jun 22,2018
Ronald Cordova(Jun 22.2018)
Project Inspector Date
KhaJaafari P.E. n25, _ _ Jun 25 2018
Projec Manager Date
Janie Sculen Morales(Jun 25.2018) - Jun 25,2018
CFA Manager Date
S" AI A(A Jun 25 201
Susan Moo(Jun 2S 20181
Asst. City Manager Date OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX �ge 1 of 2
Notice of Project Completion
Project Name: Moriah At Timberland Additon PH 1
City Project No.: 100618
City's Attachments
Final Pay Estimate CR
Change Order(s): ® Yes O N/A
Pipe Report: ® Yes O N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 180 CD Days Charged: 177
Work Start Date: 12/18/2017 Work Complete Date: 6/12/2018
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name MORIAH AT TIMBERLAND ADDITION PH 1
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100618
DOE Number 0618
Estimate Number 1 Payment Number 1 For Period Ending 6/13/2018
CD
City Secretary Contract Number Contract Time 60;D
Contract Date Days Charged to Date 177
Project Manager NA Contract is 100.00 Cnmpietc
Contractor JACKSON CONSTRUCTION LTD
5112 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors DICKINSON / CAZORLA
Tuesday,June 19,2018 Page I of 5
City Project Numbers 100618 DOE Number 0618
Contract Name MORIAH AT TIMBERLAND ADDITION PH 1 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 6/13/2018
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
------------- -------------------- ---
1 REMOVE 16"WATER LINE 659 LF $41.00 $27,019.00 659 $27,019.00
2 TRENCH SAFETY 1085 LF $0.10 $108.50 1085 $108.50
3 ABANDON 16"WATER VALVE 1 EA $450.00 $450.00 1 $450.00
4 DUCTILE IRON WATER FfITINGS 3.9 TN $7,200.00 $28,080.00 3.9 $28,080.00
W/RESTRAINT
5 8"WATER PIPE(CO#1) 280 LF $38.50 $10,780.00 280 $10,780.00
6 12"WATER PIPE 75 LF $59.50 $4,462.50 75 $4,462.50
7 16"WATER PIPE 1010 LF $65.50 $66,155.00 1010 $66,155.00
8 FIRE HYDRANT(CO#1) 4 EA $4,372.00 $17,488.00 4 $17,488.00
9 CONNECTION TO EXISTING 16"WATER MAIN 2 EA $4,000.00 $8,000.00 2 $8,000.00
10 8'GATE VALVE(CO#1) 4 EA $1,300.00 $5,200.00 4 $5,200.00
11 12"GATE VALVE I EA $2,400.00 $2,400.00 1 $2,400.00
12 16"GATE VALVE W/VAULT 3 EA $17,000.00 $51,000.00 3 $51,000.00
13 6"WATER PIPE(CO#1) 11 LF $36.00 $396.00 11 $396.00
14 16X 16 TAPPING SLEEVE(CO#1) 1 EA $8,480.00 $8,480.00 1 $8,480.00
15 16X8"TAPPING SLEEVE(CO#1) 1 EA $8,725.00 $8,725.00 1 $8,725.00
Sub-Total of Previous Unit $238,744.00 $238,744.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-------------- -------- --------
1 8'SEWER PLUG 2 EA $50.00 $100.00 2 $100.00
2 CONCRETE ENCASE SEWER PIPE 1.4 CY $475.00 $665.00 1.4 $665.00
3 POST CCTV INSPECTION 761 LF $3.00 $2,283.00 761 $2,283.00
4 MANHOLE VACUUM TESTING 3 EA $200.00 $600.00 3 $600.00
5 TRENCH SAFETY 425 LF $0.10 $42.50 425 $42.50
6 CONCRETE COLLAR 3 EA $680.00 $2,040.00 3 $2,040.00
7 8"SEWER PIPE 425 LF $41.00 $17,425.00 425 $17,425.00
8 4'MANHOLE 2 EA $3,600.00 $7,200.00 2 $7,200.00
9 4'DROP MANHOLE I EA $5,000.00 $5,000.00 1 $5,000.00
10 4'EXTRA DEPTH MANHOLE 8 VF $160.00 $1,280.00 8 $1,280.00
Tuesday,June 19,2018 Page 2 of 5
City Project Numbers 100618 DOE Number 0618
Contract Name MORIAH AT TIMBERLAND ADDITION PH 1 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 6/13/2018
Project Funding
11 CONNECT TO EXISTING SANITARY SEWER 1 EA SI,400.00 51,400.00 I $1,400.00
LINE
12 8"SEWER SERVICE 2 EA 51,700.00 $3,400.00 2 53,400.00
13 8"DIP SEWER PIPE 60 LF $87.00 55,220.00 60 55,220.00
14 EPDXY MANHOLE LINER 7 VF 5215.00 $1,505.00 7 $1,505.00
----------------- ----------------
Sub-Total of Previous Unit $48,160.50 548,160.50
——————————————————————————————————————
Tuesday,June 19,2018 Page 3 of 5
City Project Numbers 100618 DOE Number 0618
Contract Name MORIAH AT TIMBERLAND ADDITION PH 1 Estimate Number I
Contract Limits Payment Number I
Project Type WATER do SEWER For Period Ending 6/13/2018
Project Funding
Contract Information Summary
Original Contract Amount $259,165.50
Chance Orders
Change Order Number 1 $27,739.00
Total Contract Price $286,904.50
Total Cost of Work Completed $286,904.50
Less %Retained $0.00
Net Earned $286,904.50
Earned This Period $286,904.50
Retainage This Period $0.00
Less Liquidated Damages
Days Q /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $286,904.50
Tuesday,June 19,2018 Page 4 of 5
City Project Numbers 100618 DOE Number 0618
Contract Name MORIAH AT TIMBERLAND ADDITION PH 1 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 6/13/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON / CAZORLA Contract Date
Contractor JACKSON CONSTRUCTION LTD Contract Time 60 CD
5112 SUN VALLEY DRIVE Days Charged to Date 177 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $286,904.50
Less %Retained $0.00
Net Earned $286,904.50
Earned This Period $286,904.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days Q $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $286,904.50
Tuesday,June I9,2018 Page 5 of 5
c p f00618
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: ModshatTlmbedand-PhaseIInhastruelure CHANGE
CONTRACT: Paying.Drainage,Water Sewer Im rovements ORDER No:
CFA# and 100618 CITY PARTICIPATION: NO
CITY PROJECT B 100618
DOE 8
WATER PROJECT 59601-0000430.100616.001460
SEWER PROJECT#t 59607-0700430-100618-001380
FIL 8
INSPECTOR: Phone No:
PROJECT MANAGER: Phone No:
CONTRACT UNIT
WATER SEWER PAVING ORAOtAOE 6TREET LIGHTS CONTRACT
O.v.lop.r 0. 1op.r D.v.Iop.r D...lop.r O.wlop.r DAYS
Cori Coal ; Cost Cast '`Co.t
ORIGINAL CONTRACT Sill 0105.00 616160.60 _
OCTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE 3211,00S.00 s SIa,160.60 $0.00 $0.00 50.00 0
AMOUNT OF PROP.CHANGE ORDER 621739.00
REVISED CONTRACT AMOUNT S238,744.00 48 160.60 30.00 $0.00 $0.00 0
TOTAL REVISED CONTRACT AMOUNT
PER UNIT $236744.00 146160.60 30.00 $0.00 0.00
REVISED COST SHIRE Day.Cost: 52116,!0160
TOTAL REVISED CONTRACT 3266,!114.60
YOU are d edad to make the bIWrA dlanoes In Aha contract documents:
CITY BID rram
PAY ITEM S 0 QUANTITY UNIT ITEM DESCRIPTION UNITPRICE TOTAL
5 3312.0241 116 LF e'Waler PIpe S38.50 $4,406.
6 3312.0001 1 E0. Am Hydrant $4,372. 37.
10 33123003 1 EA WGate Valve S1,300. $1,300,00
13 3311.0141 11 LF W Water Pipe $36.00 5395.00
14 3312,4111 1 FFA I6W Tapulno Sibeer"6 Valve S6,4110.
15 3312.4112 1 FA 16'16"Tapolno Sleeve 8 Valva S8,72S. $8,725.00
$27,739.00
REASONS FOR CHANGE ORDER Water,extension me iad to nave Lor tOR-Z Sock 1.Changes correspond to RMWsirn No.T as shown on shoats 3 and aA of Eta consa,=foa phos
NO CITY FUNDS INVOLVED IN THIS CONTRACT.DEVELOPER IS RESPONSIBLE FOR 10D%OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVE
(Cons rep En "ee (Cge, ,armpn
/
Wes GO W
Name: ! rwme: N Este
Tina:
A4 bolr EA2 iA for TAM: \Ace President Tro« Qfflce M=er
RevlseC 10.12-2011 Pope 1
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Moriah at Timberland Addition Phase 1
PROJECT NUMBER: 100618
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
I
16" PVC 1010
12" PVC 75
8" PVC 279
FIRE HYDRANTS: 3 VALVES(16"OR LARGER) 3
PIPE ABANDONED SIZE TYPE OF PIPE LF
Removed 16" PVC 659
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8" PVC 425
8" DIP 60
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
� ! The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845