HomeMy WebLinkAboutContract 48949-AR3 �IFOM-r WOl xyi City of Fort Worth CITYSECRETARY (fq����
Construction Allowance Request CONTRACT NO._L� 7.LL�I` 3..
s`M ame Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. x48949
oject No.(s 59601159607-060043010700430 001928 01780 M&C C-28156 City Prq.No. 1928
Project Description: Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Retta St.,Plumwood St.and
Purington Avenue
Contractorf Stabile&Winn,Inc. Allowance No: L-J Date: 5/2/2018
City Project Killgir.1 R.Sauceda City Inspector: I Ryan Miller
Phone Number 817-392-2387� Phone Number.1 817-392-8306
Dept. TPW Water Sewer Totals Contract Time
(Calender days
Original Contract Amount $957,108.25 $1,833,484.50 $1,421,299.25 $4,211,892.00 405
Allowances to Date $37,272.80 $26,550.00 $14,800.00 $78,622.80 160
Credits to Date $0.00 $0.00 $0.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $957,108.25 $1,833,484.50 $1,421,299.25 $4,211,892.00 565
Amount of Proposed Allocation $0.00 $0.00 $0.00 015
Revised Contract Amount $957,108.25 $1,833,484.50 $1,421,299.25 $4,211,892.00 580
Original Allowance Available for Allocation $50,000.00 $75,000.00 $50,000.00 $175,000.00
Allowance Funds Prevlously Allocated $37,272.80 $26,550.00 $14,800.00 $78,622.80
Remaining Funds Available for this Allocation $12,727.20 $48,450.00 $35,200.00 $96,377.20
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.87%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,264,865.00
This allowance will provide additional pay item for unclassified excavation to allow for the pulverization
and overlay of the 6-inch crown on Primrose Drive.
Staff re mends the approval of 15 additional calendar days for this allowance request.
by'
F FART
Wald P. Gonzales,A59t City SCMVtMY v
* ' * OFFICIAL RECORD
..........
XA� CITY SECRETARY
FT.WORTN,TX
I
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment In full for all costs arising out of,or incidental to,the above Construction Allowance Request.
btttroQ1tl aril _ w__. . onotl . _ ... ; . Gol!
SIAM-- ,:Date
Stabile&Winn,Inc. Jerry Henderson
tit rof A Date r6` Date
"ts( E tri C Wafeppept _ ate.._ Construction�SuperVisox' stet Qt3 t?
Ass: tant,Gi, to.tte =Date . AsslsfantCity Matteec 'Pate _
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Name Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 48949
Project No.(s) 59601159607-060043010700430-C01928-C1780 DOE No. C-28156 City Proj.No. 1928
Project Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St.,N.Reda St.,Plumwood St.and
Description Purington Avenue
Contractor Stabile&Winn,Inc. Allowance No: U Date: 5!2!2018
City Project Mgr. RSauceda City Inspector f Ryan Miller
CONSTRUCTION ALLOWANCE ITEMS TO BE ADDETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
22 Paving Construction Allowance TPW 0.19 LS $50,000.00 $9,275.00
TPW $9,275.00
Water
Sewer
Page 2 of 4 Additions Sub Total $9,275.00
City of Fort Worth
Construction Allowance Request
Project Name Water and Sewer Contract 2011 WSM-A Part 1 City Sec No. 48949
Project No.(s) 59601/59607-0600430/0700430-C01928-Cl780 DOE No. C-28156 City Proj.No. 1 1928
Project Description Water and Sewer replacement along Crooked Lane,Primrose Ave,Westbrook St,N.Retta SL,Plumwood St.and
Puringlon Avenue
Contractor Stame&Winn,Inc. Allowance No: F-3-1 Date Mal
City Project Mgr. R.Sauceds City Inspector I Ryan Mtger
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
22 Paving Construction Allowance TPW 0.19 LS $50,000.00 $9,275.00
TPW $9,275.00
Water
Sewer
Page 3 of 4 IDeleflons Sub Total 1$9,275.00
MMBE Breakdown for this Change Order
MWB Sutr Type of dery ce 3 =gmotan(00RIN6,0
Totals `$fhOQ
Previous Change Orders
t }
Total $OkOQv
Page 4 of 4
FORTWORTH
Contract Compliance Manager
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Signature
Roberto C. Sauceda,P.E
Name of Employee
Water Department-En ineering
Department
Senior Professional En ig'neer
Title
817-392-2387
Phone
/ 1
Date
WATER DEPARTMENT
THe CITY OF Farr WoKm * 1000 THxocnwRTON STikuT * Foxr WmTm,Toes 75102
817-392.8240 ; FAx 817-392-8195
o Printed on recycled paper