Loading...
HomeMy WebLinkAboutContract 48723-A2 RECEIVED CITY SECRETARY JUL -6 2018 AMENDMENT No.2 CONTRACT NO._ f'3Z-- CTY OF FORT WORTH MYSECRERRY TO CITY SECRETARY CONTRACT No. 48723 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 48723, (the CONTRACT) which was administratively authorized on the 21St day of February, 2017 in the amount of $72, 643 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $4, 360 . 00 which was administratively authorized on February 20, 2018; and WHEREAS, the CONTRACT involves engineering services for the following project: Design Services for University Drive Fiber Conduit Design and Construction Phase Services; and; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 28, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $3,515. 00. (See Attached FID Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $80,518. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD CFW Official Release 9/19/2017 Page 1 of 3 CITY SECRETARY FT.WORTH,TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER —, Kimle_y-Horn and Associates, Inc. S san Alanis S ott R. Arnold, P.E. Assistant City Manager Assistant Secretary DATE: tic, DATE: h[l.11-JAS T APPR AA RECOMMENDED: Dougla Wti ig Direct T ansportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and eporting requirements . Clint Hoover, P.E. Senior Professional Engineer APPROVED AS TO FORM AND LEGALITY: M&C: Q6&—� Date: Douglas W. Black Assistant City Attorney of FoRr ATTEST: * '2 M r y J. aCr) j�.,, City Secr ary "SAS OFFICIAL RECORD CITY SECRETARY City of Fort Worth Professional Services Agreement Amendment Template FT.WORTH,TX CFW Official Release 9/19/2017 Page 2 of 3 FID BREAKDOWN SHEET City Secretary No. 48723 Amendment No. 2 Department FID Amount TPW 39001-0200431-5330500-C00005-C07130 $3, 515 . 00 Total : City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 3 of 3 Kimley>>> Horn June 28, 2018 Clint Hoover, P.E. City of Fort Worth—Transportation and Public Works Department 200 Texas Street Fort Worth, Texas 76102 Re: Amendment#2 CSN 48723—Design Services for University Drive Fiber Conduit Design and Construction Phase Services Dear Clint: Kimley-Horn and Associates, Inc. ("Kimley-Horn"or"Consultant")is pleased to submit this Amendment #2 to the City of Fort Worth (City) to provide additional services to revise the structural design associated with the Screening Wall 31 project. The following Scope of Services has been developed based on our discussions with the City. Scope of Services Kimley-Horn will provide the services specifically set forth below. Task 9—Structural Design Revisions Kimley-Horn will prepare revised structural design plans for the screening wall to accommodate the relocated TxDOT fiber conduit. Kimley-Horn will conduct one (1) site visit to verify the location of the relocated conduit. Kimley-Horn will also prepare an amendment to the existing construction task order package to add the additional work to the construction contract. Additional Services Any services not specifically provided for in the above scope will be billed as additional services and performed at our then current hourly rates Schedule We will provide our services in a mutually agreed upon schedule following Notice to Proceed from the City. Additional services, if desired, will be performed in a timely manner upon authorization by the City. Fee and Expenses Kimley-Horn will perform the services in Task 9 for a not-to-exceed fee of $3,515. All permitting, application, and similar project fees will be paid directly by the Client. Kimley-Horn will not exceed the total maximum labor fee shown without authorization from the Client. kimley-horn.com 801950, Fort Worth,Texas Ki m ep> H o r n Page 2 We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. By: Scott R. Arnold, F.E. Project Manager, Assistant Secretary 0 801�IilWltillillrfiililill! Cherry • Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Screening Wall 31 Structural Design City Project No.00005 Labor hours Expense Task Description Project Project Sr.Project Project Total LaTotal Expense Task No. Director Manager Engineer Engineer EIT CADD Administrative Cost Subconsultant Travel Fees Cost Task Suh Total Labor Rate $230 $205 $175 $155 $125 $100 $90 SBE Non-SBE 1.0 Structural Design Revisions 3 0 9 0 10 0 0 $3,51 $0 $0 $0 $0 $0 $3,615 1.1 Revise Structural Design 3 6 8 $2,74 $0 $2,740 1.2 .Site Visit 1 each 1 $175 $0 $175 1.3 Res and to Contractor Questions i $175 $0 $175 1,4 Construction Task Order Amendmenl 1 2 $425 $0 $425 Totals 3 0 9 0 10 0 0 $3,515 $0 $0 $0 so $0 $3,515 Project Summa Total Hours 22 Total Labor $3.515 Total Expense $0 MBE/SBE Subconsultan $0 Non-MBE/SBE Subconsultan $0 10% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cost $3,515 City of Fort Worth,Texas Attachment 8-Level of Effort Supplement PMO Official Release Date:8.09.2012 1 of