City Of Fort Worth
,Change Order Request
Fae6dy
l'a0d DivYlan(larw DINa Pa6u tila6on) cky Sec No.14911117
Fw*A(Fq l4M20b740010•r0017240086*" Ciryp4 its Join
He
Carrtradar Ba11arc9eaAy LLC -1 Cams Oft OF 2-1 ONS! 612 112 0 1 8
Clly -w Mgr Qyirspaelor
phore Nmrrber(g17j 392.0274 Phone bkuaber-(611)Sea. i
Centrad Time
(CO)
orvnd Contract Amount S1,t 85,093.00 119
Extras t0 ock 21
Credits to Pala 50.00 0
pend ng Change Orders(in Mac Process) $1300 0
Cwurad Cost to $1,713,484.00 140
Amount of proposed Change Order $294,379.00 30
Revised Centrad Amount 52.02,863.00 170
Original Funds Ave%"far Change Orders $0.00
�g f yid"for us CO a.a00o OFFICIAL RECORD
CNANGEORGERS IoOATE(U4CLUOd1G TM ONE)AS%OFORNi M CON M4CT 20.34%
NAXAUOINAKE MIUCTAYOUNTMIMI NAI.CONMCYC0ST#IM S2,106,36s 2S I CITY SECRETARY
Afff!F ane+P&MON FOR OWME Ofinen: FT.WORTH,TX
The purpose Charge Order No.215 t0 pounder tarring around Oe parklrg areas and t0 provide sueen Ovals far tM butdhrg. This
r"ubed fendog Was fnck ded in the Initial project budget but was not Included In the const action contract The screen walls are designed ----
pRT W 10 provide a gM ter level Of privacy and prutac*n to the arroq*@s.as this renwdeled facility Inas a to peUnlage m erwo glass walls.
Q� Charge Order No 11140 391.00 It 2(1294,379.00.00)Increases the original contract amount 01.68S.D93.0(1)by$342,7/0.00 for a revised
0 amount of$2,027.963.00 A 20.11%true adg nal contract.AdOcnally.30 days vA be added 10 the wnbad for these
Uc.
J. ser i Secretary
t fs and agreed that the acceptabCe ofthis Chop Orderby the rnnttraanr consitutec an accord and sati*Oon and n presorts
payment In hl!{both time and money)for all costs arising out or,or hrindental to the above Change Order,
i cillr icor f4ute
Beatty Constnrction.LLC z; I
,2�•r
p1D Der /Bob
Drill i �?�s
G .AadtYrlt net,
M&CMsnber ' G28142 M&C Date ApprovedCon6jI6/2018
By lignin I adanona Manager:
OY signing I acknowledge that f am the person responsible 4A �
for the monitoring and admirimtlon 0f this contract,Including Orlan R.Glass,AIA
ensuring all performance and reporting requirements. Anhhectural Ser»ces Manager
881 f oup Rear t.214-468-4700
Construction
f.214-451-1163
Constructio I 3100 McKinnon St.,Third Floor
Dallas,TX 75201
May 23, 2018
Mr. Alan Bagamery
City of Fort Worth
401 West 13th Street
Fort Worth, TX 76102
Project: West Patrol Division - Joyce Drive Police Station
Re: Request for Change Order No. 040 / CE No.
Revision 9 Screen Wall
Dear Mr. Bagamery:
We are submitting, herewith, our Request for Change Order (Proposal) # 040 in the amount of One
hundred sixty-one thousand four hundred ninety-three dollars, $161,493.00.
The Scope of work includes:
The following price is to furnish and install screen walls around the West Patrol Joyce
Police Station per the Revision 9 Drawings.
Footings:
* Demolition - $4,923
o Saw, Demolish and haul from site asphalt and concrete paving adequate to install
screen wall foundation.
* Earthwork- $15,536
o Excavate existing soils and truck haul spoils from site.
o Excavate to a depth that allows top of footing to be placed 8" below finished
grade.
* Grade Beams - $49,521
o 1911f 2'-4" x 10" grade beam.
Grade beam to be placed in undisturbed soil using the earth excavation as forms.
o After placement of concrete backfill with granular fill material.
* Asphalt and Concrete Paving - $24,688
o Repair all asphalt and concrete paving removed to install footing.
Wheel Stops - $700
Total Price - $95,388
* Burnished CMU - $10,352.16
* CMU Mortar - $840
* CMU Grout - $1080
* Rebar - $675
* Equipment - $2,675
* Man Hours - $13512
* Labor Burden - $3783.36
* Overhead - $3289.01
* ADD CMU, Rebar at Control Joint - $1,344
elfoup Beatty t.214-468-4700
f.214-451-1163
Construction 3100 McKinnon St.,Third Floor
Dallas,TX 75201
* Add Control Joint Materials - $900
* Add Labor Hours for Control Joint Installation - $1,600
TOTAL- $40,023
Superintendent Salary - 4 WEEKS - $7840
PM Salary- 1 Week - $2008
PE Salary- 1 Week - $1553
Total Salary Price - $11,401
BBC MARKUP
Fee - 10%
This proposal covers only the changes to the specific work as set forth in the attached proposal
breakout. Changes in the work and associated price adjustments other than those noted in our
proposal are not included.
Please execute the attached approval form and return to us within 14 days. If you have any questions
pertaining to this proposal, please contact us at the job-site office.
Respectfully,
James Little
cc:
File:
CE #
RCO# 040
al f oup Rear t.214-468-4700
f.214-451-1163
Cons+ruc l+ic1Ci 3100 McKinnon St.,Third Floor
Dallas,TX 75201
West Patrol Division - Joyce Drive Police Station
RCO # 040 — Revision 9 Screen Wall
The additional work for the Revision 9 Screen Wall by Balfour Beatty Construction is hereby
approved:
Cost of Work:
# Budget Code Description Total
1 000.50300000.40 Footing for Screen Wall $95,388.00
2 000.50400000.40 Masonry for Screen $40,023.00
Wall
3 000.11910000.10 Salary $11,401.00
4 000.62000000.60 Fee $14,681.00
Total Cost of Work Items $161,493.00
Markups:
# Bud et Code Description Rate Total
Total Markups
Total $161,493.00
The total Cost to perform the work as described above is a CHANGE of One hundred sixty-one
thousand four hundred ninety-three dollars, $161,493.00. The contract Time will change by 0 days.
Please indicate your acceptance and approval of this additional work in the space provided below.
Reviewed by Architect: Date:
Authorization Granted by: Date:
Alan Bagamery,City of Fort Worth
Additional Signature: Date:
File:
CE #
RCO# 040
0 201 Laurence Drive, #206
Heath, Texas 75032
Phone:214-906-2292
fax:360-925-2668
� N
04-27-18 R2
Scott Journot
Project Engineer—Interiors/Special Projects
Balfour Beatty Construction
3100 McKinnon 7th Floor
Dallas, TX 7520
Subject: REVISION 8 Pricing WEST PATROL JOYCE
We are pleased to quote turnkey concrete work for the above referenced project. Our price includes supervision,labor,material,
equipment,and insurance;including concrete, reinforcing,and pier drilling.
We based this quote on:
Drawings: REV 08/01
Specs: NA
Addendum: NA
Included:
• Demolition
o Saw, Demolish and haul from site asphalt and concrete paving adequate to install screen wall foundation.
• Earthwork
o Excavate existing soils and truck haul spoils from site.
o Excavate to a depth that allows top of footing to be placed 8"below finished grade.
• Concrete
0 1911f 24"x 10"grade beam.
■ Grade beam to be placed in undisturbed soil using the earth excavation as forms.
o After placement of concrete backfill with granular fill material.
• Asphalt and Concrete Paving
o Repair all asphalt and concrete paving removed to install footing.
• Cost of Work
o Demolition $ 4,923.00
o Excavation $15,536.00
o Grade-beams $49,521.00
o Paving Repair $24,688.00 Wheel Stops$100.00 Each Installed-$700.00
o TOTAL COST $94,668.00 Total With Wheel Stops included- $95,388.00
Excluded as by others:
• Rock excavation
• Soil Treatments, including Lime or Cement stabilization,Termite control
• Soil erosion protection and Storm water pollution prevention plan(will follow the plan provided by others)
• General building permit(will provide permits for our trade,such as approach permits)
• Site retaining walls
• Concrete and soil testing fees
• Temperature control of concrete(ice,cold water, hot water batching,etc.)
• Building corners,offsets,and benchmarks
Page 1 of 2
Mann's Commercial Construction
• Landscape sleeves
• Pavers
• Fence footings
• Supply of miscellaneous steel and/or anchor bolts
• Insulating concrete or red concrete
• Utility concrete(catch basins, headwalls, manholes,pits)
• MEP pads unless shown and detailed on drawings
• Masonry reinforcing and fill
• Pre-cast
• Special finishes
• Any and all epoxy coated rebar
• Hardeners and/or sealers(sonosil,lapidolith,ashford...)
Not considered in price,but can be added for an additional charge:
• MEP/Housekeeping pads
Thank you for the opportunity to quote this project. If you have questions or require any additional information,please
do not hesitate to call.
Regards,
Alton W. Smith
President, Texas Division
Page 2 of 2
1224 Stinnett Place
De Soto TX 75115 Innovative Afasonry
Phone:972-223.4859
Fax:972-223-5189
April 23,2018
Re:west patrol masonry screen wall
1. Bumished cmu 2001 ea $5.16 ea. $10325.16
2. Cmu mortar 3qy $280.00 ea. $ 840.00
3. Cmu grout 6qy $180.00 ea. $1080.00
4. Rebar 450 If $1.50 ea. $ 675.00
5. Equipment/forklift,mortar mixers, saw,ect. $ 2675.00
6. Man hrs. 563 ea. $24.00 $13512.00
7. Labor Burden 28% $ 3783.36
8. OH &PRO 10% $3289.01
9. Total $36179.53
Innlvv�re Masaniy,InIG
1224Sffmn ettP/Wce
Dle Sato, Texas 75115
972m=34"Ofike
972 223 M89Fax
6/28/2017
Ref:west patrol screen wall
1. Add cmu,rebar at control joint 420 pcs ea $3.20ea $1344.00
2. Add control joints material 300 If ea $3.00ea $ 900.00
3. Add labor man hours 32 ea $50.00 ea $1600.00
4. Total $3844.00
Balfour Beatty t.214-468-4700
"� f.214-451-1163
Construction 3100 McKinnon St.,Third Floor
Dallas,TX 75201
May 29, 2018
Mr. Alan Bagamery
City of Fort Worth
401 West 13th Street
Fort Worth, TX 76102
Project: West Patrol Division - Joyce Drive Police Station
Re: Request for Change Order No. 042 / CE No.
Fence Quote
Dear Mr. Bagamery:
We are submitting, herewith, our Request for Change Order (Proposal) # 042 in the amount of One
hundred thirty-two thousand eight hundred eighty-six dollars, $132,886.00.
The Scope of work includes:
Price to Furnish and Install Black Vinyl Chain Link Fence.
1. 1700 LF Black Vinyl Chain Link/Barbwire Top - $45,900
2. 4 ea. Walk Gates with Panic Hardware - $10,000
3. 980 LF Concrete Mow Strip - $14,700
4. 90 ea. Core Drilling through Cement - $4,500
5. 2 ea 14" Cantilever Gates - $12,000
6 1 ea. 16" Cantilever Gates - $6,000
7. 2 ea. 17" Cantilever Gates - $12,000
8. 2 ea. 20' Double Drive Gates - $10,000
Total - $115,100
Labor Salary - Superintendent - 2 Weeks $3,920
PM Salary - 3 Days - $1008
PE Salary - 3 Days - $777
Total - $5705
BBC MARKUP.- Fee
This proposal covers only the changes to the specific work as set forth in the attached proposal
breakout. Changes in the work and associated price adjustments other than those noted in our
proposal are not included.
Please execute the attached approval form and return to us within 14 days. If you have any questions
pertaining to this proposal, please contact us at the.job-site office.
Respectfully,
Balfour Beat's t.214-468-4700
f.214-451-1163
C U n StrU Cti o n 3100 McKinnon St.,Third Floor
Dallas,TX 75201
James Little
cc:
File:
CE #
RCO# 042
OMP Beate t.214-468-4700
f f.214-451-1163
Cms`ruction 3100 McKinnon St.,Third Floor
Dallas,TX 75201
West Patrol Division - Joyce Drive Police Station
RCO # 042 — Fence Quote
The additional work for the Fence Quote by Balfour Beatty Construction is hereby approved:
Cost of Work:
# Budget Code Description Total
1 000.51120100.40 Fence Quote $115,100.00
2 000.11910000.10 Labor Sala $51705.00
3 000.62000000.60 Fee $12,081.00
Total Cost of Work Items $132,886.00
Markups:
# Budget Code Description Rate Total
Total Markups
Total $132,886.00
The total Cost to perform the work as described above is a CHANGE of One hundred thirty-two
thousand eight hundred eighty-six dollars, $132,886.00. The contract Time will change by 0 days.
Please indicate your acceptance and approval of this additional work in the space provided below.
Reviewed by Architect: Date:
Authorization Granted by: Date:
Alan Bagamery,City of Fort Worth
Additional Signature: Date:
File:
CE #
RCO# 042
CLEBURNE FENCE CO .
( 817 ) 480 - 9497
(254) 898 - 0490 FAX
FACSIMILE TRANSMITTAL SHEET
TO: VR0h1:
1)A�VVrS L'%i-fl ' �-- 9-/I
COMPANY: UATL`•:&jf
,tV
rAXNUMBER: TOTAL NO.OI'PAGfSINCLUDING COVLR:
1111ONH NUMBrit: SENDER'S REFERENCE NUMBS R:
Ll YOUR KrWriRGNCL•NUMDER:
❑ URGIiN'I' 13 1'lOR REVIEW 0 I'LLiASIi COMA UN'l' ❑PWAS13 RETLY ❑PLEASE RCCYCLL:
NOTES/Cdk1MLNT5:
17 ba' L 81" k � � G C �a�1,- L �l/c � 7- `�' — ��� �O d: s'
/QI 060 ' 1
Q cry
p /� �7v
�u
Y t�
tv 6- I LI( CQ h �' � 01
D Cl—U
611 0-0-6 '"J
$� ! Uub uv
U �Z
`'-O
Y. O, BOX 310, JOSHUA, ThXAS 760515