HomeMy WebLinkAboutContract 49967-CO2 o��CCTNO `7��C� FORT WORTH. City Of Fort Worth ,Change Order Request Fae6dy l'a0d DivYlan(larw DINa Pa6u tila6on) cky Sec No.14911117 Fw*A(Fq l4M20b740010•r0017240086*" Ciryp4 its Join He Carrtradar Ba11arc9eaAy LLC -1 Cams Oft OF 2-1 ONS! 612 112 0 1 8 Clly -w Mgr Qyirspaelor phore Nmrrber(g17j 392.0274 Phone bkuaber-(611)Sea. i Centrad Time (CO) orvnd Contract Amount S1,t 85,093.00 119 Extras t0 ock 21 Credits to Pala 50.00 0 pend ng Change Orders(in Mac Process) $1300 0 Cwurad Cost to $1,713,484.00 140 Amount of proposed Change Order $294,379.00 30 Revised Centrad Amount 52.02,863.00 170 Original Funds Ave%"far Change Orders $0.00 �g f yid"for us CO a.a00o OFFICIAL RECORD CNANGEORGERS IoOATE(U4CLUOd1G TM ONE)AS%OFORNi M CON M4CT 20.34% NAXAUOINAKE MIUCTAYOUNTMIMI NAI.CONMCYC0ST#IM S2,106,36s 2S I CITY SECRETARY Afff!F ane+P&MON FOR OWME Ofinen: FT.WORTH,TX The purpose Charge Order No.215 t0 pounder tarring around Oe parklrg areas and t0 provide sueen Ovals far tM butdhrg. This r"ubed fendog Was fnck ded in the Initial project budget but was not Included In the const action contract The screen walls are designed ---- pRT W 10 provide a gM ter level Of privacy and prutac*n to the arroq*@s.as this renwdeled facility Inas a to peUnlage m erwo glass walls. Q� Charge Order No 11140 391.00 It 2(1294,379.00.00)Increases the original contract amount 01.68S.D93.0(1)by$342,7/0.00 for a revised 0 amount of$2,027.963.00 A 20.11%true adg nal contract.AdOcnally.30 days vA be added 10 the wnbad for these Uc. J. ser i Secretary t fs and agreed that the acceptabCe ofthis Chop Orderby the rnnttraanr consitutec an accord and sati*Oon and n presorts payment In hl!{both time and money)for all costs arising out or,or hrindental to the above Change Order, i cillr icor f4ute Beatty Constnrction.LLC z; I ,2�•r p1D Der /Bob Drill i �?�s G .AadtYrlt net, M&CMsnber ' G28142 M&C Date ApprovedCon6jI6/2018 By lignin I adanona Manager: OY signing I acknowledge that f am the person responsible 4A � for the monitoring and admirimtlon 0f this contract,Including Orlan R.Glass,AIA ensuring all performance and reporting requirements. Anhhectural Ser»ces Manager 881 f oup Rear t.214-468-4700 Construction f.214-451-1163 Constructio I 3100 McKinnon St.,Third Floor Dallas,TX 75201 May 23, 2018 Mr. Alan Bagamery City of Fort Worth 401 West 13th Street Fort Worth, TX 76102 Project: West Patrol Division - Joyce Drive Police Station Re: Request for Change Order No. 040 / CE No. Revision 9 Screen Wall Dear Mr. Bagamery: We are submitting, herewith, our Request for Change Order (Proposal) # 040 in the amount of One hundred sixty-one thousand four hundred ninety-three dollars, $161,493.00. The Scope of work includes: The following price is to furnish and install screen walls around the West Patrol Joyce Police Station per the Revision 9 Drawings. Footings: * Demolition - $4,923 o Saw, Demolish and haul from site asphalt and concrete paving adequate to install screen wall foundation. * Earthwork- $15,536 o Excavate existing soils and truck haul spoils from site. o Excavate to a depth that allows top of footing to be placed 8" below finished grade. * Grade Beams - $49,521 o 1911f 2'-4" x 10" grade beam. Grade beam to be placed in undisturbed soil using the earth excavation as forms. o After placement of concrete backfill with granular fill material. * Asphalt and Concrete Paving - $24,688 o Repair all asphalt and concrete paving removed to install footing. Wheel Stops - $700 Total Price - $95,388 * Burnished CMU - $10,352.16 * CMU Mortar - $840 * CMU Grout - $1080 * Rebar - $675 * Equipment - $2,675 * Man Hours - $13512 * Labor Burden - $3783.36 * Overhead - $3289.01 * ADD CMU, Rebar at Control Joint - $1,344 elfoup Beatty t.214-468-4700 f.214-451-1163 Construction 3100 McKinnon St.,Third Floor Dallas,TX 75201 * Add Control Joint Materials - $900 * Add Labor Hours for Control Joint Installation - $1,600 TOTAL- $40,023 Superintendent Salary - 4 WEEKS - $7840 PM Salary- 1 Week - $2008 PE Salary- 1 Week - $1553 Total Salary Price - $11,401 BBC MARKUP Fee - 10% This proposal covers only the changes to the specific work as set forth in the attached proposal breakout. Changes in the work and associated price adjustments other than those noted in our proposal are not included. Please execute the attached approval form and return to us within 14 days. If you have any questions pertaining to this proposal, please contact us at the job-site office. Respectfully, James Little cc: File: CE # RCO# 040 al f oup Rear t.214-468-4700 f.214-451-1163 Cons+ruc l+ic1Ci 3100 McKinnon St.,Third Floor Dallas,TX 75201 West Patrol Division - Joyce Drive Police Station RCO # 040 — Revision 9 Screen Wall The additional work for the Revision 9 Screen Wall by Balfour Beatty Construction is hereby approved: Cost of Work: # Budget Code Description Total 1 000.50300000.40 Footing for Screen Wall $95,388.00 2 000.50400000.40 Masonry for Screen $40,023.00 Wall 3 000.11910000.10 Salary $11,401.00 4 000.62000000.60 Fee $14,681.00 Total Cost of Work Items $161,493.00 Markups: # Bud et Code Description Rate Total Total Markups Total $161,493.00 The total Cost to perform the work as described above is a CHANGE of One hundred sixty-one thousand four hundred ninety-three dollars, $161,493.00. The contract Time will change by 0 days. Please indicate your acceptance and approval of this additional work in the space provided below. Reviewed by Architect: Date: Authorization Granted by: Date: Alan Bagamery,City of Fort Worth Additional Signature: Date: File: CE # RCO# 040 0 201 Laurence Drive, #206 Heath, Texas 75032 Phone:214-906-2292 fax:360-925-2668 � N 04-27-18 R2 Scott Journot Project Engineer—Interiors/Special Projects Balfour Beatty Construction 3100 McKinnon 7th Floor Dallas, TX 7520 Subject: REVISION 8 Pricing WEST PATROL JOYCE We are pleased to quote turnkey concrete work for the above referenced project. Our price includes supervision,labor,material, equipment,and insurance;including concrete, reinforcing,and pier drilling. We based this quote on: Drawings: REV 08/01 Specs: NA Addendum: NA Included: • Demolition o Saw, Demolish and haul from site asphalt and concrete paving adequate to install screen wall foundation. • Earthwork o Excavate existing soils and truck haul spoils from site. o Excavate to a depth that allows top of footing to be placed 8"below finished grade. • Concrete 0 1911f 24"x 10"grade beam. ■ Grade beam to be placed in undisturbed soil using the earth excavation as forms. o After placement of concrete backfill with granular fill material. • Asphalt and Concrete Paving o Repair all asphalt and concrete paving removed to install footing. • Cost of Work o Demolition $ 4,923.00 o Excavation $15,536.00 o Grade-beams $49,521.00 o Paving Repair $24,688.00 Wheel Stops$100.00 Each Installed-$700.00 o TOTAL COST $94,668.00 Total With Wheel Stops included- $95,388.00 Excluded as by others: • Rock excavation • Soil Treatments, including Lime or Cement stabilization,Termite control • Soil erosion protection and Storm water pollution prevention plan(will follow the plan provided by others) • General building permit(will provide permits for our trade,such as approach permits) • Site retaining walls • Concrete and soil testing fees • Temperature control of concrete(ice,cold water, hot water batching,etc.) • Building corners,offsets,and benchmarks Page 1 of 2 Mann's Commercial Construction • Landscape sleeves • Pavers • Fence footings • Supply of miscellaneous steel and/or anchor bolts • Insulating concrete or red concrete • Utility concrete(catch basins, headwalls, manholes,pits) • MEP pads unless shown and detailed on drawings • Masonry reinforcing and fill • Pre-cast • Special finishes • Any and all epoxy coated rebar • Hardeners and/or sealers(sonosil,lapidolith,ashford...) Not considered in price,but can be added for an additional charge: • MEP/Housekeeping pads Thank you for the opportunity to quote this project. If you have questions or require any additional information,please do not hesitate to call. Regards, Alton W. Smith President, Texas Division Page 2 of 2 1224 Stinnett Place De Soto TX 75115 Innovative Afasonry Phone:972-223.4859 Fax:972-223-5189 April 23,2018 Re:west patrol masonry screen wall 1. Bumished cmu 2001 ea $5.16 ea. $10325.16 2. Cmu mortar 3qy $280.00 ea. $ 840.00 3. Cmu grout 6qy $180.00 ea. $1080.00 4. Rebar 450 If $1.50 ea. $ 675.00 5. Equipment/forklift,mortar mixers, saw,ect. $ 2675.00 6. Man hrs. 563 ea. $24.00 $13512.00 7. Labor Burden 28% $ 3783.36 8. OH &PRO 10% $3289.01 9. Total $36179.53 Innlvv�re Masaniy,InIG 1224Sffmn ettP/Wce Dle Sato, Texas 75115 972m=34"Ofike 972 223 M89Fax 6/28/2017 Ref:west patrol screen wall 1. Add cmu,rebar at control joint 420 pcs ea $3.20ea $1344.00 2. Add control joints material 300 If ea $3.00ea $ 900.00 3. Add labor man hours 32 ea $50.00 ea $1600.00 4. Total $3844.00 Balfour Beatty t.214-468-4700 "� f.214-451-1163 Construction 3100 McKinnon St.,Third Floor Dallas,TX 75201 May 29, 2018 Mr. Alan Bagamery City of Fort Worth 401 West 13th Street Fort Worth, TX 76102 Project: West Patrol Division - Joyce Drive Police Station Re: Request for Change Order No. 042 / CE No. Fence Quote Dear Mr. Bagamery: We are submitting, herewith, our Request for Change Order (Proposal) # 042 in the amount of One hundred thirty-two thousand eight hundred eighty-six dollars, $132,886.00. The Scope of work includes: Price to Furnish and Install Black Vinyl Chain Link Fence. 1. 1700 LF Black Vinyl Chain Link/Barbwire Top - $45,900 2. 4 ea. Walk Gates with Panic Hardware - $10,000 3. 980 LF Concrete Mow Strip - $14,700 4. 90 ea. Core Drilling through Cement - $4,500 5. 2 ea 14" Cantilever Gates - $12,000 6 1 ea. 16" Cantilever Gates - $6,000 7. 2 ea. 17" Cantilever Gates - $12,000 8. 2 ea. 20' Double Drive Gates - $10,000 Total - $115,100 Labor Salary - Superintendent - 2 Weeks $3,920 PM Salary - 3 Days - $1008 PE Salary - 3 Days - $777 Total - $5705 BBC MARKUP.- Fee This proposal covers only the changes to the specific work as set forth in the attached proposal breakout. Changes in the work and associated price adjustments other than those noted in our proposal are not included. Please execute the attached approval form and return to us within 14 days. If you have any questions pertaining to this proposal, please contact us at the.job-site office. Respectfully, Balfour Beat's t.214-468-4700 f.214-451-1163 C U n StrU Cti o n 3100 McKinnon St.,Third Floor Dallas,TX 75201 James Little cc: File: CE # RCO# 042 OMP Beate t.214-468-4700 f f.214-451-1163 Cms`ruction 3100 McKinnon St.,Third Floor Dallas,TX 75201 West Patrol Division - Joyce Drive Police Station RCO # 042 — Fence Quote The additional work for the Fence Quote by Balfour Beatty Construction is hereby approved: Cost of Work: # Budget Code Description Total 1 000.51120100.40 Fence Quote $115,100.00 2 000.11910000.10 Labor Sala $51705.00 3 000.62000000.60 Fee $12,081.00 Total Cost of Work Items $132,886.00 Markups: # Budget Code Description Rate Total Total Markups Total $132,886.00 The total Cost to perform the work as described above is a CHANGE of One hundred thirty-two thousand eight hundred eighty-six dollars, $132,886.00. The contract Time will change by 0 days. Please indicate your acceptance and approval of this additional work in the space provided below. Reviewed by Architect: Date: Authorization Granted by: Date: Alan Bagamery,City of Fort Worth Additional Signature: Date: File: CE # RCO# 042 CLEBURNE FENCE CO . ( 817 ) 480 - 9497 (254) 898 - 0490 FAX FACSIMILE TRANSMITTAL SHEET TO: VR0h1: 1)A�VVrS L'%i-fl ' �-- 9-/I COMPANY: UATL`•:&jf ,tV rAXNUMBER: TOTAL NO.OI'PAGfSINCLUDING COVLR: 1111ONH NUMBrit: SENDER'S REFERENCE NUMBS R: Ll YOUR KrWriRGNCL•NUMDER: ❑ URGIiN'I' 13 1'lOR REVIEW 0 I'LLiASIi COMA UN'l' ❑PWAS13 RETLY ❑PLEASE RCCYCLL: NOTES/Cdk1MLNT5: 17 ba' L 81" k � � G C �a�1,- L �l/c � 7- `�' — ��� �O d: s' /QI 060 ' 1 Q cry p /� �7v �u Y t� tv 6- I LI( CQ h �' � 01 D Cl—U 611 0-0-6 '"J $� ! Uub uv U �Z `'-O Y. O, BOX 310, JOSHUA, ThXAS 760515